24
Includes Add-ons A1/A4/A5/A6 *General Guide | See Master Plan BLADE POWER & DATA BL-8

BLADE POWER & DATA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BLADE POWER & DATA

Includes Add-ons A1/A4/A5/A6

*General Guide | See Master Plan

BLADE POWER & DATA

BL-8

Page 2: BLADE POWER & DATA
Page 3: BLADE POWER & DATA

BL8 – BLADE Power & Data Introduction ......................................................................4

Title

Cable Tray Power ...................................................................................................................6

Power....................................................................................................................................... 10

Vertebrae................................................................................................................................ 12

Additional Surface Power Modules ................................................................................. 14

J-Channels ............................................................................................................................. 14

EDITION CODE

PO

WE

R &

DA

TA

BL

AD

E

1

Page 4: BLADE POWER & DATA

Connections to the building wiring must be done by a qualified electrician according

to national, state, and local codes.

Never connect components while system is under load.

All unused outlets must be capped.

WARNINGRisk of fire or electric shock. Do not electrically connect a distribution harness to more

than one supply source. Disconnect power before servicing. Failure to do so may cause shock and/or

personal injury.

IMPORTANT NOTES

1

Page 5: BLADE POWER & DATA

ELECTRICAL SPECIFICATIONS

PO

WE

R &

DA

TA

BL

AD

E

2

Page 6: BLADE POWER & DATA

STANDARD SEQUENCE

TITLE 24 SEQUENCE

4 | DUPLEX SEQUENCE

The duplexes must be attached to the harness in a particular order. Arrange the duplexes in the correct order by following the sequence.

START at the far left position. Continue in a straight line, following the sequence. Start in the same position on the next harness in line, and continue with the sequence.

START

ATTACH ALL DUPLEXES LEFT TO RIGHT

START

1st Harness Jumper 2nd Harness

PO

WE

R &

DA

TA

C1 C2 C3 C4 REPEAT

C1 C2 C3 C4C4C4 REPEAT

BL

AD

E

3

Page 7: BLADE POWER & DATA

BPDR_C1BPDR_C2

BPDR_C3BPDR_T24_C4

SENSOR ACTIVATED

CONTROL CIRCUIT

Title 24 Electrical Requirement: HALF of the Duplexes on Each Harness Must be C4 Control Circuits.

1 | DUPLEX RECEPTACLE

2 | TITLE 24 COMPLIANCE

3 | NORTH

The duplex receptacle are designated as circuit 1, 2, 3, or 4.

The number is printed on each duplex.

Circuit 4 is the sensor activated control circuit.

If you are installing this power system within the state of California,

you must comply with the California Title 24 regulations.

Every duplex, harness, jumper, and infeed displays a North arrow.

The North arrows MUST point the same direction on all parts.

PO

WE

R &

DA

TA

BL

AD

E

4

Page 8: BLADE POWER & DATA

C1 C2

C3C4

C1 C2

C3C41st Harness Jumper 2nd Harness

TITLE 24 SEQUENCE

STANDARD SEQUENCE

C1

C2

C3C4

C1C41st Harness Jumper 2nd Harness

C4

C4

POWER HARNESS BPDH18-4 SEQUENCE

START

START

START

START

36 Inch Power Harness, Receives 4 Duplexes.

PO

WE

R &

DA

TA

C1 C2 C3 C4 REPEAT

C1 C2 C3 C4C4C4 REPEAT

ATTACH ALL DUPLEXES IN THE CORRECT ORDER BY FOLLOWING

THE APPROPRIATE SEQUENCE

BL

AD

E

5

Page 9: BLADE POWER & DATA

C1 C2

C3C4

C1 C2

C3C41st Harness Jumper 2nd Harness

C1

C2

C3C4

C1C41st Harness Jumper 2nd Harness

C4

C4

START

START

START

START

POWER HARNESS BPDH60 SEQUENCE

36 Inch Power Harness, Receives 4 Duplexes.

PO

WE

R &

DA

TA

TITLE 24 SEQUENCE

STANDARD SEQUENCE C1 C2 C3 C4 REPEAT

C1 C2 C3 C4C4C4 REPEAT

ATTACH ALL DUPLEXES IN THE CORRECT ORDER BY FOLLOWING

THE APPROPRIATE SEQUENCE

BL

AD

E

6

Page 10: BLADE POWER & DATA

POWER HARNESS BPDH60-8 SEQUENCE

36 Inch Power Harness, Receives 8 Duplexes.

START

START

START

START

C1 C2 C3 C4

C1C2C3C4

1st Harness

Jumper

2nd Harness

C1 C2 C3 C4

C1C2C3C4

C1 C2

C3

C4

C1

C4

1st Harness

Jumper

2nd Harness

C4 C4

C2 C4 C3 C4

C1C4C2C4

PO

WE

R &

DA

TA

TITLE 24 SEQUENCE

STANDARD SEQUENCE C1 C2 C3 C4 REPEAT

C1 C2 C3 C4C4C4 REPEAT

ATTACH ALL DUPLEXES IN THE CORRECT ORDER BY FOLLOWING

THE APPROPRIATE SEQUENCE

BL

AD

E

7

Page 11: BLADE POWER & DATA

QTY PRODUCT CODE

1 BCTSM/BCTLM (set of 2)

1 BNCT/BCTX

2-3 BCTX-RK/ BNCT-RK

1 BTEC (set of 2) *if applicable

BLADE CABLE TRAY

BL1–A1PARTS LIST

8

Page 12: BLADE POWER & DATA

NOTE: 8x Duplex per harness requires 3 risers, 4x Duplex per harness requires 2 risers.

1 | ATTACH DUPLEXES TO POWER HARNESS

2 | INSERT DUPLEXES AND FACEPLATES

Mount power harness to risers and align power harness c-bracket holes with riser holes. Tighten nut onto bolt through the hole sets.

Slide and snap the duplexes onto the harness.

Data faceplates snap into the riser cutout. Position the risers so that the faceplates are turned opposite directions.

CA

BL

E T

RA

Y

ATTACH ALL DUPLEXES IN THE CORRECT ORDER BY FOLLOWING

THE APPROPRIATE SEQUENCE

BL

AD

E

9

Page 13: BLADE POWER & DATA

3 | PLACE POWER ASSEMBLY IN CABLE TRAY

4 | SECURE TO WORKSTATION

Slide risers into cable tray from the end. The shape of the risers interlocks with the shape of the trays.

Installation of cable tray will depend on the workstation that is being assembled. Please reference the workstation installation guide to complete these steps.

CA

BL

E T

RA

Y

RETURN THE WORKSTATION INSTALL GUIDE TO COMPLETE INSTALLATION

BL

AD

E

10

Page 14: BLADE POWER & DATA

Power Infeed Power Jumper

Goes To Base

Power Source

5 | LINK POWER COMPONENTS

Attach the infeed and the jumper. Connect the infeed to the end harness. Connect the jumper to join the two harnesses.

If you do not need a jumper, connect harness to infeed.

CA

BL

E T

RA

YB

LA

DE

11

Page 15: BLADE POWER & DATA

Connections to the building wiring must be done by a qualified electrician according to national, state, and local codes.

Never connect components while system is under load.

All unused outlets must be capped.

IMPORTANT NOTES

WARNINGRisk of fire or electric shock. Do not electrically connect a distribution harness to more

than one supply source. Disconnect power before servicing. Failure to do so may cause shock and/or

personal injury.

12

Page 16: BLADE POWER & DATA

Ceiling Infeed - Power Pole

Floor Infeed - Vertebrae

Wall Infeed - From Bridge to Wall

BLADE INFEEDS

13

Page 17: BLADE POWER & DATA

QTY PRODUCT CODE

1 BBP2

2 Connecting Plates

2 BPPBRK

1 BPPCTP

BLADE POWER POLE

BL1–A1PARTS LIST

14

Page 18: BLADE POWER & DATA

2 | SECURE POWER POLE BRACKET TO WORKSTATIONS

Insert 4 screws to secure the bracket box to the workstations end leg (if possible).

Slide bracket collar around the power pole and push the bracket halves together then attach with 4 bolts.

Bracket Collar

Bracket Box

1 | JOIN POWER POLE HALVES

Lower the connecting plate into the bottom half of the power pole, tighten 4 bolts to secure the plates.

Slide top half of the power pole onto the exposed plates and insert 4 bolts.

Bottom Half

Top Half

PO

WE

R P

OL

EB

LA

DE

15

Page 19: BLADE POWER & DATA

PO

WE

R P

OL

EB

LA

DECut a hole in the appropriate ceiling tile and insert trim plate, tabs first into the hole.

Press on each tab to bend them down. The tabs will grip the ceiling tile. Once secure, slide power pole into the opening.

Trim Plate

3 | INSERT TRIM PLATE AND POWER POLE

8 1 7"16 3 7"x

16

Page 20: BLADE POWER & DATA

IMAGE PRODUCT CODE DESCRIPTION

VB## Power Vertebrae

BPMA 2 Power Outlet Desktop Unit

BPDMA 2 Data Port Desktop Unit

BMFDA Combo, 2 Power Outlet & 2 Data Port Desktop Unit

BWMJC## Wire Management J-Channel

JC1 Wire Management J-Clip

*Check your project specifications for the full product code.

PARTS REFERENCE LIST

BLADE WIRE MANAGEMENT & DESKTOP POWER

17

Page 21: BLADE POWER & DATA

POWER VERTEBRAE

Assemble vertebrae links by inserting the pegs of one link in the holes of the next. Secure vertebrae to base with two screws.

Attach vertebrae to surface with 2 wood screws through the top brackets and into the underside of the surface.

WIR

E M

AN

AG

EM

EN

TB

LA

DE

18

Page 22: BLADE POWER & DATA

DESKTOP POWER UNITS

Remove grommet cover and lower power unit into grommet hole. Tighten the bolt on the underside of the surface and replace grommet cover. W

IRE

MA

NA

GE

ME

NT

BL

AD

E

19

Page 23: BLADE POWER & DATA

J-CHANNEL & J-CLIP

Remove the backing from the adhesive strips then stick the J-channel or J-clip to a clean dry surface.

Insert wood screw(s) to secure the J-channel or J-clip to the underside of a worksurface.

WIR

E M

AN

AG

EM

EN

TB

LA

DE

20

Page 24: BLADE POWER & DATA

Workspace made easy.

210.648.2095 | mycleardesign.com

© 2021 Clear Design. All rights reserved.