    TECHNICAL REPORT

    AIR TRAFFIC CONTROL TOWER

    PRELIMINARY BENEFIT/COST ANALYSIS (2008)

    Hernando County Airport

    Brooksville, Florida

    prepared for:

    Hernando County, Florida

    January 2008

    prepared by:

    uadrex Associates, Inc. irport Development Services

  • 8/14/2019 BKV BC Report (Final).pdf

    2/30

    i

    TABLE OF CONTENTS

    I INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    II. AIRCRAFT ACTIVITY SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    III. AIRCRAFT ACTIVITY FORECASTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    IV. ATCT BENEFIT/COST RATIO ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    B. Critical Values and Other FAA Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

    C. Base Case Scenario Benefit/Cost Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    D. Alternate Case Scenario Benefit/Cost Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    E. Break-Even Scenario Benefit/Cost Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    V. CONCLUSIONS AND RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    APPENDIX A Supporting Documentation

    APPENDIX B Detailed B/C Calculations - Base Case Scenario

    APPENDIX C Detailed B/C Calculations - Alternate Case Scenario

    APPENDIX D Detailed B/C Calculations - Break-Even Scenario

  • 8/14/2019 BKV BC Report (Final).pdf

    3/30

    ATCT Benefit/Cost Analysis

    1 An operation is counted as either an aircraft take-off or landing.

    Page 1Hernando County Airport 1/21/08

    I. Introduction

    Quadrex Associates, Inc., was retained by the Hernando County (FL), to provide professionalplanning services for the development of the Benefit/Cost (B/C) documentation necessary for

    establishing the feasibility of a proposed new Air Traffic Control Tower (ATCT) at the HernandoCounty Airport (BKV). This information is intended for determining the potential range for federalparticipation in costs associated with the annual operation of the Control Tower by the FederalAviation Administration (FAA) under the Contract Tower Program (CTP).

    The following tasks were incorporated into the study:

    1. Review FAAs current (2007) Terminal Area Forecast (TAF)2. Develop pro-forma Benefit/Cost Analysis using FAA data3. Review other site specific data relevant to the B/C analysis (master plan forecasts, based

    aircraft, etc.)

    4. Develop pro-forma alternative B/C reflecting site-specific data and other sources

    The following report narrative presents the findings and recommendations of the study. Thecomments and opinions expressed in this report are those exclusively of Quadrex Associates and donot reflect the position of the Federal Aviation Administration or that of any other federal, state, orlocal agency.

    II. Aircraft Activity Summary

    Hernando County Airport (BKV) is a general aviation airport located six miles southwest ofBrooksville, Florida. The Airport has two runways, Runway 9/27 which is 7,001 feet long and is

    enhanced by a precision instrument landing system (ILS) for approaches to Runway 9 and Runway03/21 which is 5,015 feet long . Figure A illustrates the layout of the Airport. According to arecent aircraft census conducted by airport management, there are currently 168 aircraft based at theAirport. Table 1 provides a breakdown of based aircraft by category. It is noted that the totalaircraft count is somewhat higher than the information on record with the FAA. The census wasconducted to provide the FAA with more current data to update the national airport database. Thisnew information will be used to develop an alternate scenario for the B/C calculations.

    As an airport currently without an operational air traffic control tower, aircraft activitycharacteristics (i.e., number of operations1, aircraft mix, etc.) at the airport are not officially countedon a regular basis. Since this information is a fundamental component used for determining the need

    and justification (benefit) for air traffic control services, a review of other data sources wasconducted. Normally, without an ATC Tower to keep contemporaneous records of aircraft activity,the airport activity at BKV would be estimated through the preparation of a master plan or airportlayout plan update or from the FAA data developed from periodic inspections of the airport.

  • 8/14/2019 BKV BC Report (Final).pdf

    4/30

    ATCT Benefit/Cost Analysis

    Page 2

    Hernando County Airport 1/21/08

    Figure

    A

    EXISTINGF

    A

    CILITIES

    HernandoCou

    ntyAirport

    QUADREX

    ASSOCIATES,INC.

    AirportDevelopmentServices

  • 8/14/2019 BKV BC Report (Final).pdf

    5/30

    ATCT Benefit/Cost Analysis

    2 Reference: FAA Terminal Area Forecast, FY 2007-2025

    Page 3

    Hernando County Airport 1/22/08

    Table 1Based Aircraft Census

    Hernando County Airport

    AircraftType

    Actual A/CNumber

    Percent of TotalAircraft

    FAA TAFA/C Data

    Single Engine Piston 139 77.6% 130

    Multi-engine Piston 12 9.5% 12

    Multi-engine Turbine 17 11.5% 3

    Helicopter 14 1.3% 7

    Other 3 0.0% 4

    Total 185 100.0% 156

    Source: FAA 2007 Terminal Area Forecast and BKV Airport Management Records

    This information is also generally used as input data in the preparation of the FAAs Terminal Area Forecast

    (TAF). Tthe FAAs TAF for BVK used a 2006 baseline figure of 77,483 total operations 2. Table

    2 presents the breakdown of operations by type of activity as estimated by the FAA.

    Table 2Estimated Aircraft Operations (CY 2006)

    Hernando County Airport

    OperationsType

    AnnualOperations

    Percent of TotalOperations

    Itinerant

    Air Carrier 0 0.0%

    Air Taxi/Charter 468 0.6%

    General Aviation 34,264 44.2%

    Military 779 1.0%

    Subtotal Itinerant 35,511 45.8%

    Local

    General Aviation 40,804 52.7%

    Military 1,168 1.5%

    Subtotal Local 41,972 54.2%

    Total 77,483 100.0%

    Source: FAA 2007 Terminal Area Forecast (CY 2006 for BKV)

  • 8/14/2019 BKV BC Report (Final).pdf

    6/30

    ATCT Benefit/Cost Analysis

    Page 4Hernando County Airport 1/21/08

    III. Aircraft Activity Forecasts

    Table B-1 in Appendix B presents the FAAs 2007-2025 TAF projections for future activity at BKV.As this table indicates, the FAAs forecast projects only marginal annual growth of approximately1.3 percent for general aviation air traffic activity (including both itinerant and local operations) overthe next 15-year period.

    As an alternative to the current TAF, the FAA will consider a master plan forecast that has beenrecently approved (i.e., within the past 2 years). Since the Airport has recently completed a forecastupdate as part of the ongoing Master Plan update, a separate Alternate Case scenario wasdeveloped using the activity forecasts. In addition, the based aircraft data from the Airport MasterPlan Inventory will be used to estimate average aircraft values for the Alternate Case scenario.Table C-1 presents the Master Plan forecast broken down by individual years. It should be notedthat the FAA Airports District Office has reviewed and approved these forecasts as being consistentwith the Terminal Area Forecast (see Appendix A, Supporting Documentation).

    Also, military aircraft operations from both the Terminal Area Forecast and the Master Plan Update

    appear to be significantly underestimated. The Airport currently is the home of a Florida ArmyNational Guard helicopter unit and supports the training activities of other military units, mostnotably the Coast Guard operating C-130's out of the St. Petersburg Clearwater InternationalAirport. The Airports long runway with an ILS, a DOD fueling contractor on-site, and relativelyuncongested and unpopulated airspace, make BKV an attractive alternative for military flighttraining. It is conservatively estimated that 25 itinerant and 100 local military operations per weekcurrently occur at BKV and no doubt this activity would increase if positive controlled airspace wereestablished at the Airport (See Appendix A, Supporting Documentation). This adjustment in militaryactivity was included in the Alternate Forecast (Table C-1) in place of the Master Plan militaryfigures to represent a reasonable estimate of military training activity is occurring at the Airport.

    IV. ATCT Benefit Cost Ratio Analysis

    A. GeneralThe FAAs Air Traffic Division administers the funding for the operation of Level 1 VFR air trafficcontrol towers through contract agreements with qualified ATC contractors on a regional basis. ThisContract Tower program has proven to be very effective in significantly reducing the cost ofproviding air traffic control services so that many locations, which would have otherwise seen theirATC services eliminated due to FAA budget constraints, can continue to benefit from the servicesof an Air Traffic Control Tower facility.

    The decision process for the funding of the operation of contract tower locations is primarilydetermined by a Benefit/Cost analysis. FAA Report APO 90-7, Establishment and DiscontinuanceCriteria for Air Traffic Control Towers outlines the procedures for calculating Benefit/Cost (B/C)ratios.

    Costs are those direct costs associated with the operation of the Control Tower including labor andother expenses. Benefits are measured in terms of lives and property saved by the prevention of

  • 8/14/2019 BKV BC Report (Final).pdf

    7/30

    ATCT Benefit/Cost Analysis

    3It is the FAAs current policy to consider candidate new entrants into the Contract Tower Progam only if their

    establishment B/C ratio equals or exceeds 1.0.

    Page 5Hernando County Airport 1/21/08

    midair collisions and other accidents and the savings in flight time by providing controlled airspacearound the Airport. The benefit of the Control Tower must be greater than the cost (benefit/costratio of greater than 1.0) order to qualify for full funding under the FAAs Contract Tower program.

    The FAA also manages a separately funded Cost-Sharing program which allows airports currentlyin the Contract Tower Program with B/C ratios under 1.0 to continue to participate in air traffic

    control services. This cost-sharing program uses the B/C ratio to determine the pro-rated share ofFAA costs with the balance contributed by the airport sponsor.

    B. Critical Values and Other FAA Assumptions

    The FAA in the B/C analysis process uses various critical values that represent the generic cost

    of specific items and are set by the General Accounting Office (GAO). The critical values for itemsused in the B/C Analysis include:

    Table 3

    FAA Critical Values & Assumptions

    Statistical Life................................................. $ 3,000,000Serious Injury.................................................. 580,700Minor Medical Injury...................................... 42,900GA Travelers Time (per hour)....................... 32.50Other Travelers Time (per hour).................... 28.00Discount Rate (for net present value).............. 7%

    Source: FAA Office of Policy and Plans (Base Year 2002)

    Generally, FAA policy considers new entrants into the Contract Tower Program initially using theestablishment criteria of APO 90-7 which applies the statistical means for accident risk as aprimary factor in the B/C calculations. Also, for new entrants, projected operations are discountedby 7.5 percent to account for the number of operations that would not be handled by an ATCTfacility open for at least 12 hours daily. The establishment period for new ATC Tower facilitiesentering the Contract Tower Program generally applies to the first one to two years of operation,depending on the point the control tower enters the program since the FAA calculates the B/Cbiennially. All subsequent calculations of the B/C ratio by the FAA after the initial establishmentperiod are conducted using the discontinuance criteria.3

    For existing Contract ATC Towers in subsequent years (Years 3-15), the B/C calculation is

    conducted using the discontinuance criteria which considers the upper bounds of the statistical riskof accidents. Projected operations are not discounted in the discontinuance scenario since it isassumed that all operations handled by ATC are counted.

  • 8/14/2019 BKV BC Report (Final).pdf

    8/30

  • 8/14/2019 BKV BC Report (Final).pdf

    9/30

    ATCT Benefit/Cost Analysis

    Page 7Hernando County Airport 1/22/08

    the FAA covering the entire operational costs of the new ATC Tower location. For the AlternateCase (Years 3-15 Discontinuance), Table C-3 shows the value of the ATC Tower benefits

    increasing to $8,287,258with a resultant B/C ratio of 1.89and thus, the costs for operating theControl Tower would be eligible for continued full funding by a comfortable margin. Appendix Ccontains the detailed calculations of the benefits from the Alternate Case scenario.

    E. Break-Even Scenario Benefit/Cost Analysis

    While outside the scope of this analysis, another forecast of aviation activity was developed toillustrate the approximate levels of aircraft activity that would result in a Benefit/Cost ratio equaling1.0 under the establishment criteria and thus allow the Airport to enter into the Contract TowerProgram. Generally, a total of 90,500 annual operations extended over the 15-year period with nogrowth would result in a break-even 1.0 B/C ratio. Table D-1 presents the Break-Even forecast datashowing the level operations that would have to occur in order to reach the 1.0 B/C threshold. TableD-2 presents the detailed B/C calculations.

    V. Conclusions and Recommendations

    Based on the analysis using the current based aircraft and the forecast of aviation activity from theAirport Master Plan Update, it appears that full funding of ATC services at Hernando CountyAirport under the FAAs Contract Tower Program would be likely once the facility is constructed.If the decision is made to go forward with the development of a new ATC Tower facility, it is

    recommended that formal application for entry into the FAAs Contract Tower Program office besubmitted immediately so that the operational cost of the tower facility can be programmed into theFAAs FY 2010 budget.

  • 8/14/2019 BKV BC Report (Final).pdf

    10/30

    APPENDIX

    SUPPORTING DOCUMENTATIO

  • 8/14/2019 BKV BC Report (Final).pdf

    11/30

    30 RUNWAY IDENT:31 LENGTH:

    32 WIDTH:

    33 SURF TYPE-COND:

    34 SURF TREATMENT:

    35 GROSS WT:

    36 (IN THSDS)

    37

    38

    40 EDGE INTENSITY:

    42 RWY MARK TYPE-COND:

    43 VGSI:

    44 THR CROSSING HGT:

    45 VISUAL GLIDE ANGLE:

    46 CNTRLN-TDZ:

    47 RVR-RVV:48 REIL:

    49 APCH LIGHTS:

    50 FAR 77 CATEGORY:

    51 DISPLACED THR:

    52 CTLG OBSTN:

    53 OBSTN MARKED/LGTD:

    54 HGT ABOVE RWY END:

    55 DIST FROM RWY END:

    56 CNTRLN OFFSET:

    57 OBSTN CLNC SLOPE:

    58 CLOSE-IN OBSTN:

    60 TAKE OFF RUN AVBL (TORA):

    61 TAKE OFF DIST AVBL (TODA):

    62 ACLT STOP DIST AVBL (ASDA):

    63 LNDG DIST AVBL (LDA):

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    SW

    DW

    DTW

    DDTW

    39 PCN:

    (>) ARPT MGR PLEASE ADVISE FSS IN ITEM 86 WHEN CHANGES OCCUR TO ITEMS PRECEDED BY >

    >

    >

    >

    >

    >

    >

    >

    PU10 OWNERSHIP:

    11 OWNER:

    12 ADDRESS:

    13 PHONE NR:

    14 MANAGER:

    15 ADDRESS:

    16 PHONE NR:

    17 ATTENDANCE SCHEDULE:

    18 AIRPORT USE:

    19 ARPT LAT:

    20 ARPT LONG:

    21 ARPT ELEV:

    22 ACREAGE:

    23 RIGHT TRAFFIC:

    24 NON-COMM LANDING:

    25 NPIAS/FED AGREEMENTS:

    26 FAR 139 INDEX:

    GENERAL

    HERNANDO COUNTY

    16110 AVIATION LOOP DR

    352-754-4061

    DON SILVERNELL

    16110 AVIATION LOOP DR

    BROOKSVILLE, FL 34609

    352-754-4061

    BROOKSVILLE, FL 34609

    28-28-24.9000N ESTIMATED

    082-27-19.5000W

    76 SURVEYED

    2498

    NO

    NO

    NGPRY

    PUBLIC

    70 FUEL:

    SERVICES

    71 AIRFRAME RPRS: MAJOR

    72 PWR PLANT RPRS: MAJOR

    73 BOTTLE OXYGEN: HIGH

    74 BULK OXYGEN: HIGH

    75 TSNT STORAGE: HGR, TIE

    76 OTHER SERVICES:

    AVNCS, CHTR, INSTR, RNTL, SALES

    80 ARPT BCN:

    81 ARPT LGT SKED:

    CG

    DUSK-DAWN

    82 UNICOM: 123.000

    83 WIND INDICATOR:

    YES84 SEGMENTED CIRCLE:

    85 CONTROL TWR: NONE

    86 FSS: SAINT PETERSBURG

    NO87 FSS ON ARPT:

    88 FSS PHONE NR:

    89 TOLL FREE NR: 1-800-WX-BRIEF

    90 SINGLE ENG:

    91 MULTI ENG:

    92 JET:

    90

    8

    2

    TOTAL:

    93 HELICOPTERS:

    94 GLIDERS:

    95 MILITARY:

    96 ULTRA-LIGHT:

    5

    0

    0

    3

    100 AIR CARRIER:

    102 AIR TAXI:

    103 G A LOCAL:

    104 G A ITNRNT:

    105 MILITARY:

    TOTAL:

    500

    300

    26,200

    22,000YES-L

    100

    49,000

    0

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    >

    OPERATIONS FOR 12

    MONTHS ENDING

    >

    100LL A

    11/07/2001

    FACILITIES

    BASED AIRCRAFT

    OPERATIONS

    RUNWAY DATA

    LIGHTING/APCH AIDS

    OBSTRUCTION DATA

    DECLARED DISTANCES

    >

    >

    >

    >

    >

    >

    >

    111 INSPECTOR: S( ) 11/07/2001112 LAST INSP: 113 LAST INFO REQ:

    ALL ALL 0700-1800

    03/215,015

    150

    CONC-G

    50.0

    75.0

    135.0

    MED

    NPI - G NPI - G/

    /

    /

    /

    - / -

    -/- /

    /

    A(V) A(NP)/

    /

    TREES TREES/

    /

    44 50/

    2,150 1,900/

    0B 0B/

    44:1 34:1/

    N N/

    /

    /

    /

    /

    09/277,002

    150

    CONC-G

    90.0

    130.0

    230.0

    MED

    PIR - G NPI - G/

    P4L P4L/

    /

    /

    - / -

    -/-/

    MALSR /

    PIR C/

    /

    TREES/

    /

    55/

    2,400/

    0B/

    50:1 40:1/

    N N/

    /

    /

    /

    /

    - -/

    /

    /

    /

    - / -

    -/-

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    - -/

    /

    /

    /

    - / -

    -/-

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    110 REMARKS:>

    A 014 ARPT ADMINISTRATOR.

    A 081 MIRL RYS 03/21 & 09/27 PRESET LOW INTST DUSK-2200, TO INCR INTST AND ACTVT AFTER 2200 - CTAF. ACTVT PAPI RYS 09 & 27 - CTAF.

    AIRPORT MASTER RECORDForm Approved OMB 2120-0015

    U.S. DEPARTMENT OF TRANSPORTATION

    FEDERAL AVIATION ADMINISTRATION

    PRINT DATE:

    12/20/2007AFD EFF

    03083.*A

    HERNANDO COUNTY

    BROOKSVILLE FL

    HERNANDO FL

    1 ASSOC CITY:

    2 AIRPORT NAME:

    3 CBD TO AIRPORT (NM):

    4 STATE:

    7 SECT AERO CHT:

    FAA SITE NR:

    5 COUNTY:

    JACKSONVILLE

    LOC ID:>

    >

    6 REGION/ADO: ASO/ORL

    BKV

    06 SW

    01/21/2008

    FAA Form 5010-1 (5-91) SUPERSEDES PREVIOUS EDITION

  • 8/14/2019 BKV BC Report (Final).pdf

    12/30

    FAA Terminal Area Forecast: National Forecast 2007 (1) Airport Operations

    LOCID: BKV HERNANDO COUNTY

    Year F Itn Air Carrier Itn Air Taxi Itn GA Itn Mil Local GA Local Mil Total Airport Ops

    2002 0 300 22,000 500 26,200 0 49,000

    2003 0 300 21,500 500 25,500 0 47,800

    2004 0 450 32,770 740 38,269 740 72,969

    2005 0 461 33,843 769 40,304 1,154 76,531

    2006 0 468 34,264 779 40,804 1,168 77,483

    2007 * 0 474 34,689 500 41,310 750 77,723

    2008 * 0 480 35,119 500 41,822 750 78,671

    2009 * 0 486 35,554 500 42,341 750 79,631

    2010 * 0 492 35,995 500 42,866 750 80,603

    2011 * 0 498 36,442 500 43,397 750 81,587

    2012 * 0 504 36,894 500 43,935 750 82,583

    2013 * 0 510 37,351 500 44,480 750 83,591

    2014 * 0 516 37,814 500 45,032 750 84,612

    2015 * 0 523 38,283 500 45,590 750 85,646

    2016 * 0 529 38,758 500 46,156 750 86,693

    2017 * 0 536 39,238 500 46,728 750 87,752

    2018 * 0 543 39,725 500 47,307 750 88,825

    2019 * 0 549 40,218 500 47,894 750 89,911

    2020 * 0 556 40,716 500 48,488 750 91,010

    2021 * 0 563 41,221 500 49,089 750 92,123

    2022 * 0 570 41,732 500 49,698 750 93,250

    2023 * 0 577 42,250 500 50,314 750 94,391

    2024 * 0 584 42,774 500 50,938 750 95,546

    2025 * 0 591 43,304 500 51,570 750 96,715

    Report created 1/21/2008 14:59

  • 8/14/2019 BKV BC Report (Final).pdf

    13/30

    FAA Terminal Area Forecast: National Forecast 2007 (1) Based Ai rcraft

    LOCID: BKV HERNANDO COUNTY

    Year F Single Jet Multi Helicopter Other Total

    2002 90 2 8 5 3 108

    2003 90 2 8 5 3 108

    2004 134 3 12 7 0 156

    2005 90 2 8 5 3 108

    2006 130 3 12 7 4 156

    2007 * 130 3 12 7 4 156

    2008 * 131 3 12 7 4 157

    2009 * 131 4 12 8 4 159

    2010 * 132 4 12 8 4 160

    2011 * 132 4 12 8 5 161

    2012 * 132 4 12 8 5 161

    2013 * 133 4 12 9 5 163

    2014 * 133 5 12 9 5 164

    2015 * 134 5 12 9 5 165

    2016 * 134 5 12 10 5 166

    2017 * 134 5 12 10 5 166

    2018 * 135 6 12 10 6 169

    2019 * 135 6 12 10 6 169

    2020 * 136 6 12 11 6 171

    2021 * 136 7 12 11 6 172

    2022 * 136 7 12 11 6 172

    2023 * 137 7 12 12 6 174

    2024 * 137 8 12 12 7 176

    2025 * 138 8 12 13 7 178

    Report created 1/21/2008 15:00

  • 8/14/2019 BKV BC Report (Final).pdf

    14/30

    What are the methods?

  • 8/14/2019 BKV BC Report (Final).pdf

    15/30

  • 8/14/2019 BKV BC Report (Final).pdf

    16/30

  • 8/14/2019 BKV BC Report (Final).pdf

    17/30

  • 8/14/2019 BKV BC Report (Final).pdf

    18/30

  • 8/14/2019 BKV BC Report (Final).pdf

    19/30

  • 8/14/2019 BKV BC Report (Final).pdf

    20/30

    APPENDIX

    BASE CASE SCENARI

  • 8/14/2019 BKV BC Report (Final).pdf

    21/30

  • 8/14/2019 BKV BC Report (Final).pdf

    22/30

  • 8/14/2019 BKV BC Report (Final).pdf

    23/30

  • 8/14/2019 BKV BC Report (Final).pdf

    24/30

    APPENDIX

    ALTERNATE CASE SCENARI

  • 8/14/2019 BKV BC Report (Final).pdf

    25/30

    TABLEC-1

    MASTER

    PLAN

    FORECASTUPDATE

    AirTrafficControlTowerBenefit/CostAn

    alysis

    HernandoCountyAirport

    Forecast

    Air

    AirTaxi&

    GA

    Military

    Total

    GA

    Military

    Total

    Total

    Year

    Carrier

    Charter

    Itinerant

    Itinerant[1]

    Itinerant

    Local

    Local[1]

    Local

    Operations

    2006

    -

    478

    34,937

    1,625

    37,040

    40,496

    4,875

    45

    ,371

    82,410

    2007

    -

    485

    35,679

    1,625

    37,789

    41,353

    4,875

    46

    ,228

    84,018

    2008

    -

    493

    36,422

    1,625

    38,539

    42,211

    4,875

    47

    ,086

    85,625

    2009

    -

    500

    37,164

    1,625

    39,289

    43,068

    4,875

    47

    ,943

    87,232

    2010

    -

    507

    37,647

    1,625

    39,780

    43,629

    4,875

    48

    ,504

    88,284

    2011

    -

    515

    38,130

    1,625

    40,270

    44,190

    4,875

    49

    ,065

    89,335

    2012

    -

    522

    38,614

    1,625

    40,761

    44,751

    4,875

    49

    ,626

    90,387

    2013

    -

    530

    39,097

    1,625

    41,251

    45,312

    4,875

    50

    ,187

    91,438

    2014

    -

    537

    39,580

    1,625

    41,742

    45,873

    4,875

    50

    ,748

    92,490

    2015

    -

    544

    40,095

    1,625

    42,265

    46,471

    4,875

    51

    ,346

    93,610

    2016

    -

    552

    40,610

    1,625

    42,787

    47,068

    4,875

    51

    ,943

    94,730

    2017

    -

    559

    41,126

    1,625

    43,310

    47,666

    4,875

    52

    ,541

    95,851

    2018

    -

    567

    41,641

    1,625

    43,832

    48,263

    4,875

    53

    ,138

    96,971

    2019

    -

    574

    42,156

    1,625

    44,355

    48,861

    4,875

    53

    ,736

    98,091

    2020

    -

    582

    42,705

    1,625

    44,912

    49,498

    4,875

    54

    ,373

    99,285

    2021

    -

    589

    43,254

    1,625

    45,469

    50,135

    4,875

    55

    ,010

    100,478

    2022

    -

    597

    43,804

    1,625

    46,025

    50,771

    4,875

    55

    ,646

    101,672

    Notes:

    [1]Assumes6,500annualmiltaryoperations(split25

    %itinerant/75%local)

    Source:

    BKVAirportMaste

    rPlanUpdate,2006

    01/21/08

  • 8/14/2019 BKV BC Report (Final).pdf

    26/30

  • 8/14/2019 BKV BC Report (Final).pdf

    27/30

  • 8/14/2019 BKV BC Report (Final).pdf

    28/30

    APPENDIX

    BREAK EVEN SCENARI

  • 8/14/2019 BKV BC Report (Final).pdf

    29/30

  • 8/14/2019 BKV BC Report (Final).pdf

    30/30