7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
1/39
foresore masterplaconsultation report may 2013
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
2/39
Ackowledemetscosultatio reportTh cor projct tam icdd Ds Jigs ad ChrisHghs from th Brak ODa District Coci, WarwickKats ad Matthw Baida from WAX Dsig ad GaBckb from Ifrapa.
A spcia thaks is xtdd to a th mmbrs of thBiaog Ba commit who took part i th Biaog BaForshor Mastrpa Commit Srvs, workshops addrop i sssios that hav gidd th dirctio of th Projctad th visio for Biaog Bas Forshor ftr.
This rport is prpard as a prd to th Biaog BaForshor Mastrpa Rport. It smmariss th fidigsad aass iformatio gathrd drig a Paig forRa costatio that was drtak o th 6th Fbrarto 9th Fbrar 2013. Throgh rviw of th commitsrsposs ad kowdg a dtaid assssmt procss
has ad to a sris of paig pricips ad pottiaprojcts which ar offrd as a cocsio to this rport.
From this procss th projct tam wi sr th havdorsmt from th commit ad Coci to dvopth ftr visio for th forshor mastrpa.
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
3/39
1.0 InTRODuCTIOn 1
1.1 Projct Apprciatio
1.2 Projct Objctivs
1.3 Projct Dscriptio
2.0 COMMunITy KnOWleDGe2.1 Paig For Ra Costatio
2.2 Cofirmig th Dsig Rspos
2.3 Who Was Ivovd
2.4 Commit egagmt
2.5 Charactr & Ctr
2.6 Commit Big Idas
3.0 SuMMARy OF PlAnnInG FORReAl COnSulTATIOn 3
3.1 Cocsio
4.0 SITe AnAlySIS 19
4.1 Itrodctio
4.2 lad us & Dstiatio
4.3 Coctios
4.4 Viwscaps
4.5 eviromt
4.6 ladscap Charactr
4.7 Faciitis
4.8 Traffic Movmt
5.0 PlAnnInG DIReCTIOnS 29
5.1 K Pricips
6.0 POTenTIAl DIReCTIOnS 31
6.1 Itrodctio
7.0 MOVInG FORWARD 35
7.1 Progrssig th Mastrpa
cotets
fo
res
hore te
r
pl
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
4/39
Th Brak ODa Coci gagd WAX Dsig adIfrapa to dvop a stratgic ad og trm paigdirctio for th Biaog Ba Forshor xporig thxistig ifcs cratd b commit ds, torismdmads ad th rstig prssrs o iq adscaps
ad viromts aog th forshor.
Th dvopmt of th Biaog Ba Forshor Mastrparqird a op diaog with vro who cars abotth forshor ad its ftr. Th mastrpa ad associatdcostatio procss hpd to stabish a covrsatiowhr isss ad opportitis wr hard qa ad thato o voic domiatd th discssio.
Th projct tam is awar how diffict sch a covrsatioca somtims b ad th strgg that is oft rqirdi achivig th bst og trm otcoms. This is wh thmthodoog for th mastrpa focss o gagig withth commit ad stakhodrs, to ar ad itrprt
iformatio ad avoid qick fixs that do ot rfct th ogtrm visio for th forshor.
B workig with th commit, Coci, visitors, tradrsad othr stakhodrs i Biaog Ba, th projct tam wiaim to dvop a iovativ forshor mastrpa to hpCoci ad commit adopt a proactiv approach to tackth compx isss ad scr a sstaiab ad rsiitftr for th forshor of Biaog Ba.
Th mastrpa wi focs o providig w dirctios forth forshor that cosidrs th isss ad opportitisassociatd with th forshor ad widr ara. Th rporttaks a hoistic approach to achivig a baac btw
vas sch as bat ad coog as w as fctio thatcoti to attract pop whi maitai th atra adctra adscaps of th ara.
Th projct tams approach baacs th mros advarid itrsts ad activitis aog th coasta dg ofBiaog Ba Forshor aimig to provid a framwork bwhich xistig ad ftr rqirmts ca b cosidrdad vaatd.
To drstad th xistig ad ftr isss adopportitis for th forshor ad tow.
To dvop a mastrpa that wi addrss isss adampif opportitis throgh a hoistic ad baacdapproach withot affctig th forshors fctio,
amit, atra assts or iq charactr.
To dvop a mastrpa that rfcts th commitaspiratios ad addrsss th xpctatios addmads of th forshor.
To dvop dsig ad paig proposas that wiistrat, gid ad rvitais th ftr Biaog BaForshor ad its widr cotxt.
To idtif priorit works for Coci ad th Committhat faciitats th progrssiv impmtatio of thprojct withot affctig ftr work or opportitis(basd o a 10 ar paig programm).
To provid opportitis for capacit.
To provid a bdgtar framwork for th ForshorMastrpa.
To provid a commit ad Coci dorsd visio forBiaog Ba ad its forshor.
Th rcogitio of Biaog Ba ad th Ba of Firs aso of words hottst torist dstiatio i 2009 broghtopportitis as w as isss for th rgio. Viwd asa sigificat cop b ma, th ackowdgmt of thBas grat scic ad ctr bat is cratig w kids
of prssrs ad impacts o th adscap qaitis adassts that mak th Ba sch a spcia pac.
Biaog Ba is a sma coasta tow o th east coastof Tasmaia a 2.5 hors driv from lacsto. With apopatio of approximat 210 prmat rsidtsBiaog Ba is hom to thos who hav ithr rtird thror hav sttd ito a raxig ifst. Th arb tow of StHs is th srvic tow for Biaog Ba, which is hom too th o caf ad o othr shops.
With approximat 200 shacks ad big a popar pacto visit ad a hoida dstiatio for ma Tasmaias,maiadrs ad itratioa visitors aik th tows
popatio sws drig th pak moths pacig icrasigprssrs o xistig ifrastrctr.
Withot a robst ad w cosidrd mastrpa, thcotstd atr of th coasta adscap wi icras asth isss raisd b oca commit, cosrvatio grops,torism, aborigia hritag, ad othr stakhodrs wicoti to cash ovr how to bst capitais o th rgiosw fod pbicit ad at th sam tim propr maagth ara.
01 Itroductio1 .3 project1 . 2 project objecties1 . 1 project appreciatio
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
5/39
01 02
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
6/39
A Paig for Ra xrcis was drtak i BiaogBa ovr a 4 da priod from th 7th of Fbrar to th 9thof Fbrar 2013. Th aim of th Paig for Ra xrciswas for th projct tam to bcom immrsd i th towad forshor with a focs o gagig th commit ar
i th mastr paig procss.
Drig th 4 das i Biaog Ba, th projct tam asodrtook xtsiv sit aasis ad mappig aog thforshor. B drivig ad wakig aog th forshor, thtam was ab to gai itimat kowdg of th forshorad th isss ad opportitis that wi d to bcosidrd.
A oi srv was drtak i cojctio with thpaig for ra costatio to bid po th commitiformatio cssar to divr a itgratd forshormastrpa.
As with th costatio procss th srv providd avaab isight ito th forshors fctioait ad thchags ad opportitis. It aso aidd i rachig awidr adic ad thos shack owrs that wr ab toattd th costatio sssio.
Drig th projct tams visit th car park adjact thBiaog Ba Caf was trasformd ito a dsig stdiowhr a costatio carava was ocatd ivitig thcommit to:
commicat thir isss ad idas viw th trasatio of thir idas ito opportitis ad
ftr dirctios
provid fdback o th mrgig stratgic dirctios
provid fdback o pas istratig thir idas
Th costatio procss focsd o bidig commitowrship i th projct, ad srig that th stratgicdirctios of th framwork wr dirct driv ad ikd toth iq ds of Biaog Bas commit.
Idas ad opportitis wr idtifid from th commit
drop-i sssios ad dvopd ito sktchs ad pasthat istratd was that th proposd dirctios cod bachivd. Ths sktchs ad pas th formd th basisfor ogoig covrsatio btw th commit ad thprojct tam.
02 commuity cosultatio2 . 1 plai for real cosultatio 2 . 2 Cofirmi te Desi Respose
As th Paig for Ra progrssd commit mmbrswr ab to s how thir idas cod b trasatd itoraitis ad cod provid immdiat fdback o pas adproposd dirctios.
A aasis of commit fdback ad sit assssmt ofth forshor was drtak drig th 4 das cocdigwith a prstatio of th fidigs to mmbrs of thcommit. B combiig th ars of iformatio adprovid opportit for fdback drig th visit, th projcttam was ab to dvop a st of gidig pricips, as thbasis for th Forshor Mastrpa Rport.
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
7/39
2 . 3 Wo was ioled
52
C o m m u i t y M e m b e r s
10
12
32
C o u c i l S t a f f
O l i e S u r e y s .
F a c e b o o k l i k e s .
03 04
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
8/39
2 . 4 Commuity eaemet
As part of th commit costatio, varios mappigxrciss wr drtak that abd mmbrs of thcommit to idtif ad map attribts, isss, spcificocatios ad importat charactristics aog th forshor.
Ths icdd:
Fctioait ad Faciitis
Assssig adscap vas (atra, scic, rcratio,commit ad socia ad historica ad ctra)
Most frqt jors b foot or bik Isss ad opportitis aog th forshor
Charactr ad Ctr
Commit big idas for th forshor
This activit providd th projct tam with a gratrdrstadig of how th forshor is sd b thcommit, how pop trav aog th forshor ad whichpacs ar vad b th commit ad for what raso.
Aasis of ths maps is providd ovr th foowig pags.
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
9/3905 06
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
10/39
Th commit wr askd to ot what activitis thjod participatig i aog th forshor ad whatactivitis wod th ik to jo or xpric i th ftr.
Activitis icdig wakig, kaakig, fishig, watrskiig,
swimmig, paig crickt, bik ridig, joig atr,divig ad sorkig wr a jod aog th forshorcrrt.
2 . 4 . 1 fuctioality ad facilities
Th activitis that th commit wod ik to jo orxpric did ot ra chag from thos mtiodabov. Howvr a itrprtiv paspac ad sigag wasotd svra tims as a activit that th commit wodik to s.
Cocsios draw from th xrcis dmostratd thatth commit arad jo a wid varit of activitis. Thftr paig of th forshor shod ot focs o fiigaras with additioa activitis, bt shod aim to maksma chags ad adjstmts that hac ad icras
participatio i th crrt avaiab ad jod activitis.
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
11/39
How do you usually travel along the foreshore?
Wak
Rid a Bik
Driv a Car
0 to a hor
1 hor to 3 hors
Mor tha 3 hors
On average, how long do you stay along the foreshore when
you visit?
What facilities along the foreshore would encourage you to
stay longer?
75% 9%
16%
33%42%
25%Viwig Patform
Itrprtativ Sigag
upgradd Paths
Improvd Toit Faciitis & Showrs
Barbcs
Picic Satig with Shtr
6% 26%12%
12%
26%18%
42% of th commit wh visitig th forshor sta oavrag for 1 to 3 hors, 33% sta for mor tha 3 horsad 25% ss tha a hor. As th majorit of visitors to thforshor sta for a xpdd priod of tim th mastrpads to cosidr faciitis ad fctios that spports visitorad commit visitatio.
Th forshor is fortat to hav a rag of diffrtfctios ad faciitis that provid opportitis for thcommit ad visitors to sta ad jo. To catr morspcifica for th commitis ds ad icras thgth visitors sta, th commit idtifid th opportitfor a viwig patform ad improvd accss paths asfaciitis that wod corag ogr stas. Aso sggstdwr barbc faciitis, itrprtativ sigag, improvdtoit ad showr faciitis ad picic satig with shtr.Ths fidigs spport cocis dvopmt of a viwigpatform, howvr a varit of opiios wr xprssd iratio to its ocatio.
Wh askd how th commit travs aog th forshor,wakig was th prdomiat mas of trav. This wasfoowd b drivig (16%) ad ridig a bik (9%). Thishighights th importac of coctd pdstria accssaog th forshor as w as providig opportitis fromwhich to wak. At th sam tim, vhicar ad ccigopportitis d to b dvopd ad itgratd ito thmastrpa.
2 . 4 . 2 isitatio ad actiatio
07 08
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
12/39
usig mbrd dots th commit wr askd to mapad xprss whr th cosidrd diffrt vas of thadscap aog th forshor. Th vas th commitwhr askd to map wr atra va, scic va,rcratio va, commit ad socia va ad historica
ad ctra va.
Th commit idtifid rcogisd aras aog thforshor that ar s as providig diffrt adscapvas ad withi this ar pacs of particar importac.Sch ocatios wi rqir cosidratio i th forshormastrpa. Th shacks wr rcogisd for thir historicaad ctra va. Irrspctiv of thir crtai ftrrcogisig th ar vad is a importat cosidratio forth mastrpa.
not srprisig, dots that highightd aras of atraad scic va wr fod aog th tir forshorriforcig its bat ad distrbd atr. Whi dotsfor atra va wr scattrd aog th forshor argrgropigs wr pacd arod Grats lagoo, th bach
ad th rock otcrops soth of th gchs. A argrgropig of dots rprstig scic va wr fod at thgchs.
Simiar to aras of scic ad atra va th commitrcogisd aras of rcratio, commit ad socia vaaog th tir forshor. A hot spot for ths vas wasocatd at th viag gr.
2 . 4 . 3 Ladscape alues
Landscape Values
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
13/39
This map providd participats with th opportit to potthir primar jors, b foot or bicc, aog th forshor.
From aasis of th mappig, high frqtd paths wridtifid, stabishig th cor framwork for th frthr
dvopmt of a cc ad footpath twork aog thforshor.
2 . 4 . 4 Most frequet joureys by foot or bike
Th mappig riforcd that th tir forshor was wsd b wakrs ad ccist. Wakig trais arod Gratslagoo ad th coctio btw th Gchs adSkto Ba ar commo sd b th commit. Thmappig riforcd th tir forshor. As was vidt
i th mappig ad covrsatios had with commitmmbrs i ratio to wakig ad ccig th xistigcoctios aog th forshor ar sgmtd ad otcar dfid as coctios.
Typical Journeys
09 10
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
14/39
2 . 4 . 5 Issues ad Opportuities
usig mbrd dots mappig th commit wr askdto xprss thir opiio o whr th cosidrd th isssad opportitis aog th forshor to b.
Throgh this mappig xrcis th projct tam wr abto witss dbat btw th commit o th prcivdisss ad opportitis aog th forshor ad stabishwhr thr ma b coficts i ftr mastr paig adwhr k opportitis xist
Coficts that aros from th mappig ar isss arod thrcratio withi Grats lagoo i.. watrskiig, caoig,parkig faciitis vrs th atra spcis habitat that thisprovids for mch fora ad faa. Th shacks, for adagaist, sor or ico ad th proposd viwig patformaros as a cottios iss agai as a pottia ico or asor.
Th foowig braks dow th isss ad opportitis asidtifid b th commit, icdig that from th oisrv:
Beach Access
Poor accss to bach
Stps ad/or ramp accss rqird oto bach
Accss for a poits rqird
Maitai car accss to bach (coctio ad firvacatio accss)
Gra icras accssibiit to th forshor ivarios ocatios
Footpaths (concrete)
Icompt footpath coctios aog mai road
Crossig poits ad vhicar coficts
Width of footpaths
Compt footpath coctios
Icras width of footpath
Cycling
no cc paths
no bik parks or racks
Dvop bik path to St Hs
Issues and Opportunities
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
15/39
Car Parking
nd for additioa car parkig ad ratioais iformaparkig aras
nd for mor trair parkig
Frthr ivstigatio rqird ito w car park arstat (diffrig opiios)
Coastr bs parkig ar caf
Frthr pgrad of trac car park to icrasfctio
Walking Trails
existig paths oft ovrgrow
nd to maitai paths
Opportit for wakig trais (Skto Ba)
Dvop wakig track to dg of forshor
Interpretation
Gra ack of sigag ad itrprtatio abot thara
Cofsig sigag (iformatio sig sti o mai road)
Opportit for itrprtiv sigag (trac car park,stat or top of hi)
Icras visitors drstadig of th tow, forshorad Ba of Firs rgio (sigificac of
Biaog as th Gatwa to Ba of Firs)
Environment Management
Wd maagmt throghot th forshor
Maitai ad maag xistig trs (assts/habitats/shtr)
Rviw of aima maagmt (pop both for adagaist)
Protct wid fowrs (orchids)
Protct ssitiv faa aras (povrs ad pgis)
Shacks
Coditio of shacks
udrstadig hritag sigificac
nd to provid crtait i ratio to ftr of shacks
Pottia to rs som shacks
Boat Ramp
Isss ratig to accss ad cambr of th road
lack of trair parkig
Sitig of th harbor ara
Impact of dmpd cocrt
Pottia for brak wa (ot bastr rock) Cos wstr accss road to provid parkig or op
spac
Entrance Car Park
Dsig of car park ad fctio
Cogstio at trac
nd for mor parkig
Impact of b posts
Pottia viwig patform
Provid aw ad picic ara
Viewing Platform
Isss srrodig th ocatio
nd to kp th dsig simp
Impact of mta fiish o th visa charactr of th ara
Sigificat cofict pop both for ad agaist
Pottia opportit for itrprtatio of both Ba ofFirs ad Skto Ba
Recreation Park (Village Green)
Addrss foodig ad watroggig
Sm from toits
Icras sab aras for pop
Rtai tis corts ad commit focs
Grants Lagoon
nd to cosidr viromta maagmt of agoo(rosio, fshig, wds)
nd to maitai tracks
Icras rcratio va (waks, shtr, sats)
Provid parkig to tr-a-rod ara
Opiios both for ad agaist powr boats i th agoo
(d to provid dirctio)
General Comments
lack of shad ad shtr i som aras
Mor ittr bis
nd to maitai atra charactr
Kp ifrastrctr off th bach
limit dvopmt impact o th forshor
udrgrod powris
11 12
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
16/39
Th phsica charactr ad ctr of th Biaog Baforshor was xpord throgh svra qstios (askddrig th costatio ad b th oi srv) that askdth commit to cosidr th forshor i hmaistic trmsto hp pait a pictr of how th forshor is prcivd ow
ad what pop cosidr a ftr otcom for th forshorto b. This providd a rich dscriptio of th towsprsoait ad possib dirctios for th mastrpa.
Wh askd abot th prsoait of th Biaog Baforshor toda it was vr mch abot how spcia thatprso is, thir bat ad thir atra qaitis. Thisdpictio of Biaog Ba ad its forshor aowd thprojct tam to drstad how th commits viw of thpac toda ad how importat it is to th commit as it is.
I th ftr, th commit xprssd th wod ik tos th forshors prsoait sta th sam with omior modificatios. With pop ra apprciatig ad
vaig th atra ad scic sttigs, it is car a abrptchag to th prsoait of th Biaog Ba forshor,ot big pictr chag, is ot dsird, bt rathr smaritrvtios that add to rathr tha tak awa from thxistig charactr of Biaog.
Ths qstios wi hp to provid dirctios for actiosad stratgis withi th mastrpa.
2 . 5 caracter ad culture
Fantastic I would marry them ifthey werent so popular, but I
am happy to share them
Unloved, dull and lacking character
Natural and rugged at times, wild and inviting
An artist with no money for paint
Magnificent, but a little untidy
a bit boring, no real identity
Relaxed, easy going and informal - anything goes
I am Binalong Bay with due modesty, I am veryspecial.....dont spoil me
Open, free-spirited and natural
Most beautiful person in Australia
decrepit, long haired, overgrown mess
wat you said: Persoality ow:
02 commuity cosultatio
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
17/39
not conforming to the idealimage of a foreshore area just
being itself
fun loving, relaxed, beautiful/unique, mysterious, down to earth, inviting
potential to be beautiful with careful use of native vegetation
natural, untouched, no buildings - keep it picture perfect
Needs a good haircut and shave
As they were with a few touch ups
I hope they will be still natural andstaggeringly beautiful in the future
Just the same
wat you said: Persoality i te future:
An artist with money for paint
relaxed and welcoming with a generous sense of hospitality
13 14
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
18/39
Drig th drop-i sssios ad oi srv commitmmbrs wr askd to shar thir big idas for thBiaog Ba forshor. lavig it ao ad doig othigwas th o big ida that was strog xprssd b macommit mmbrs.
Othr commo big idas wr itrprtatio sigag aogth forshor, stabishig a coctd footpath twork,kpig th shacks, improvig th boat ramp ad th rockwa brakwatr, th pottia for sstaiab commrcia adcoomic dvopmt.
Th big idas postr was a f wa to start commitmmbrs thikig abot what wod ra bfit thforshor. B rcordig thir commts it aows th projcttam th opportit to cosidr crtai big idas throghth dvopmt of th mastrpa.
This howvr has giv th projct tam th chag ofdivrig th big ida of doig othig whi dvopig amastrpa that ooks to addrss th coficts idtifid ith isss ad opportitis mappig as w as divrigothr big idas pt forward b th commit.
2 . 6 commuity bi ideaswat you said: Commuity bi ideas iclude:
Leave it as it is, maintain the natural character andqualities of the foreshore
Improve signage and interpretation
development of style guide to direct appropriate development
Improve the boat ramp and rock wall
keep the shacks
Expand the potential for walking
Creating sustainable development
commercial and economicdevelopment
planting of trees for shade and construction of well
located shelters for wind and rain protection
Interpretation centre and viewing platform
visitor centre
clean up undergrowth
02 commuity cosultatio
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
19/3915 16
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
20/39
3.1 coclusio3 summary of te plai for real cosultatio
Th aasis of th qaitativ ad qatitativ commitkowdg throgh th paig for ra procss hasrstd i th foowig smmar of k isss adopportitis, as idtifid b th commit of BiaogBa:
Th d for improvd cotios pdstria adccig accss
locatio ad dsig of proposd viwig patform
Cocr abot chag ad i cosidrd dsigrsposs
Pottia for Biaog Ba to b th cstodia of th Baof Firs
Cosidratio for traffic camig masrs aog thforshor
Itrprtativ sigag promotig Biaog Bas iqcharactr ad ctr
Improvd disabiit accss
Saf pdstria crossigs rqird
Ratioaisatio of car parkig icdig tor bss adtrair movmts
upgrad to boat ramp ad improvd saft arod thbrak wa
Rtai commit tis corts
Icras coctios to th bach
evok a ss of owrship ad prid amog ocarsidts
Improv faciitis aog th forshor Provid a saf ad scr viromt
Maitai atra charactr aog forshor
Promot viromta awarss
limitd dvopmt aog th forshor
esrig dvopmt icds ow carbo procsssad abs og-trm chag i coomic, socia adviromta bhavior
Cratig distictiv viromts across th pbicram
Coctio to ss of pac with cosidratio forcommit xpctatios
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
21/3917 18
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
22/39
4 Site aalysis
A dtaid sit aasis of th tow was drtak bth projct tam, to gai a drstadig of th phsicaaspcts, th charactr ad fctio ad op spacsfaciitis aog th forshor.
4 . 1 Itroductio
lookig at th forshor hoistica, this sit aasis covrsth foowig topics:
Land Use & Destinations
Connections
Viewscapes Environment
Landscape Character
Facilities
Traffic Movement
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
23/39
19 20
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
24/39
Grants
Lagoon
Entra
nceCarp
ark
CafeCarPark
Recre
ation
Harbo
ur+shacks
Park
+Vie
wing
Area
12
3
4
5
6
Community Land Use
Natural Habitat
Road Corridor
Residential Edge
Fragmtd ad isoatd adss
Dfid sparatio of coastaad rsidtia dg
Importac of road corridor asitrfac btw tow adforshor
extsiv adscap sttigthroghot tir forshor
nd to ik activitis adaras
nd to maitai sparatiobtw tow ad forshor toriforc adscap cotxt
Coti to rstrictdvopmt o coasta dg
4 . 2 lad use ad destiatio
fidis
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
25/39
4 . 3 coectios
GrantsLa
goon
trails
Skeleton
BayTrail
Trails and connections
Informal Connections
Restricted Access(Climbing)
Formal Footpath
No Footpath Connections
Bach accss coctratd
wstr d of forshor
Improvmt to xistigcoctios rqird
Opportitis to provid waccss poits aog forshorad bach
no footpath ik aogforshor gth
Opportit to coct othrfootpath trais i th widrara
Improv ikags to ad from
th forshor (particardisabd/a accss paths)
fidis
Binalon
gCafe
Villag
eGree
n
Gulch
es
21 22
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
26/39
Viewpoints + lookouts
Glimpsed Views FromFootpath
Panoramic views (partof the landscape)
Filtered or Framed Views
Cotios viws throghotth forshor
Diffrt framd viw ofsigificat scic va(cratio of a adscapgar)
Gimpsd viws fromrsidtia dg
fidis
4 . 4 iewscapes
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
27/39
Wave Directions
Prevailing Winds
Silting of Harbour
Localised Flooding
Natural Drainage Lines
eviromt ssitivit ofagoo
Coditio of crks addraiag aras
Impact of tids ad storms oifrastrctr
Foodig of op spac
Impact cimat chag adpottia v ris
fidis
4.5 Eiromet
Maint
ainwate
rquality
+habit
atvalue
Need
tomaintai
n&prote
ct:
natur
aldraina
gelines
Silt+
nutrie
ntloa
ds
(review
upstreamim
pacts)
Suns
et
Sunrise
23 24
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
28/39
fidis
4 . 6 ladscape caracter
Rocky Coast
Coastal Woodland
Recreation/Open Space
Beach
Coastal Scrub
Foreshore DunesCo
astal
Woodla
nd
Open
Space
RockyC
oast
Recre
ation
Space
Coastal
ScrubB
each
Foresho
reDu
nes
Dfid adscap charactrsaog forshor
Opportitis to coct aras& provid opportitis forxporatio
nd to drstad capacitimits of aras (pottia fordamag)
Amazig adscap divrsitwithi sma ocait(1.5 - 2km)
narrow profi (sigificatrisk of oss, rmova ordiscoctios of aras)
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
29/39
fidis
4.7 facilities
Picnic Tables
Boat Ramp & CleaningStation
Toilet Block
Tennis Court
Barbecue & Shelter
Good provisio of faciitisaog forshor
Good accss to toits (450msparatio)
W distribtd faciitis(approximat 100-150mapart)
limitd satig + shtr
Poor sigag
Fw faciitis that providdstiatios
Toilet&
Show
ers
PicnicT
ables
Cafe
Tennis
Court
Playgrou
nd
ToiletBloc
k
BoatRa
mp&Cle
aning
Station
Picnic
Table
s
25 26
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
30/39
fidis
4 . 8 Traffic moemet
Vehicular Access
Informal Trailer Parking
Pedestrian Access
Potential PedestrianCrossing
No Footpath
Observed Unsafe TurnAround Location
Potential Turn AroundArea
Potential Bus Park
Fore
shore
Dunes
Poor ccig amit d toarrow road ad footpath
Poor a abiitis accss
Dagros pdstriaviromt d to poor sightdistacs for motorist
usaf spds obsrvd bmotorist
Poor coditio of roads
no dsigatd disabiit parks
no forma pdstria roadcrossigs
Rviw of tor bs movmtrqird
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
31/39
27 28
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
32/39
5.0 plai directios
I rspos to th aasis, costatio ad isssvaatio, a st of paig pricips hav b dvopdi ordr to gid th ftr dsig, dvopmt adivstmt aog th forshor. Togthr, ths pricips sta framwork for chag ad rwa aog th forshor.
Ths pricips aim to ampif th charactr ad vasassociatd with th forshor as w as gid th approachto ftr paig dcisios. Th pricips focs o thfoowig:
Preserving the Best
Achieving Balance
Fostering Progress
Create a Sense of Belonging
Preseri te best
To preserve the best is to recognise the significance ofthe foreshore
Rcogisig th atra qaitis ad drstadig whatis rqird to maitai thos qaitis. Rmmbrig thatdoig othig is ot ogh. Thr wi awas b chagad jst saig, W dot d to do athig, wi otkp th charactr of th Biaog Ba forshor th sam.Prsrvig th bst rcommds impmtig dsigthat aow for chag, that ampif ad rfct th xistigcharactr ad ctr of Biaog Ba. B promotig thdivrsit of pop, th viromt ad what maks a paciq voks a ss of owrship ad prid amog ocarsidts.
aciei balace
To achieve a balance between give and take.
With baac thr is awas compromis. Compromisis abot rcogisig that b givig a itt, somthig morca b gaid. Cofict btw commit grops hasa disadvatagos affct o progrssio. Achivig abaacd approach rqirs rsotio ad drstadigthrogh ot th paig ad dsig procss that mtth ds of ocas ad visitors ad viromt vrsifrastrctr aog th forshor. Coaborativ dcisiomakig ds to b promotd gagig rsidts tostabish a strog distictiv idtit.
Fosteri proress
To foster progress reuires careful consideration tocreate new solutions for change along the foreshore.
Progrss is oft s as a dirt word bt vrthigprogrsss. Chag is ivitab ad ds to b accptdto bgi a w discors o th pottia of chagad gid ftr socia, coomic ad viromtaotcoms aog th forshor. It is drstadig howchags ar divrd ad makig sr cttrd, pokdad i cosidrd rspos do ot appar a throgh thforshor. B drstadig what faciitis, dstiatiosad dvopmt is rqird to spport commit dsappropriat rsposs, ifrastrctr ad faciitis ca bdivrd that provid masrd ad appropriat progrss.
create a sese of beloi
To create a sense of belonging is to ensure planningand design outcomes retain a sense of place.
If it dost ook right it shodt b hr. Crat a ssof bogig that xpors th ida of dmic ifrastrctr.Dsigig ifrastrctr ad faciitis ad impmtigdvopmt that appars to bog withi th forshoradscap ad fs that it is of th pac. This is bttrdscribd as w bt it ooks ik it has b hr forvr.Crat distictiv ivig viromts across th pbicram that grat oca mpomt, icd ow carboprocsss ad ab og-trm chag i coomic, sociaad viromta bhavior.
5 . 1 key priciples
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
33/39
PRESERvIng ThE BEST
AChIEvIng BALAnCE
FOSTERIng PROgRESS
CREATE A SEnSE OF BELOngIng29 30
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
34/39
6.0 potetial directios
Th isss ad opportitis idtifid from th Paig forRa costatio procss ad sit aasis of th BiaogBa forshor hav car idtifid opportitis withi thadscap. I ordr to istrat th pottia of th forshora mbr of k projcts hav b proposd that sk
to addrss th isss ad maximis ths opportitis.utimat th objctiv of th dsigs ar to cratsccssf pbic spacs that:
Promot pops hath, happiss, ad wbig
ecorag sstaiab dvopmt to grow adforish
Cbrat th aras iq idtit, ctr ad histor
Improv accssibiit for both pdstrias ad vhicswhi icrasig amit
Provid w vs of fctio ad w faciitis thathac th socia ad viromta capacit of thtow ctr
Protct ad promot th atra viromt
6.1 troductiokey potetial projects
Th foowig pottia projcts brig togthr th ittof th paig pricips, istratig a ftr visio for thBiaog Ba forshor. Th projcts focs o divrigbst practic otcoms focsig o th ds of th
commit ad visitors.
Itrprtatio ad visitor ook ot
Coctd pdstria twork
Viag gr pgrad
Th foowig visaisatios aim to dmostrat th pottiaof th Biaog Ba forshor ad prst idas of whatchag ma ook ik.
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
35/39
31 32
COnnECT
BELOng
EnhAnCE
PROTECT
Imaie If
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
36/39
02
you could take
the kids to
explore the
new adventure
playspace
you could walk or ride along
the entire foreshore and
surrounding areas
You could take in the
spectacular views from a
lookout that feels it is
of the place
YOU COULD DISCOVER THEFORESHORES NATURAL
BEAUTY LEARNING ABOUT ITSUNIqUE ENVIRONMENT
Imaie If..............
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
37/39
Binalong BaYs unique storY
and historY was interpreted
along the foreshore
YOU COULD SPEND A DAYALONG THE FORESHOREWITH FRIENDS ENJOYING THE
BEST IT HAS TO OFFER
All of tese imaiis are possible trou te
implemetatio of te Bialo Bay foresore
masterpla.
33 34
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
38/39
7.0 Moi forward
Coci Sig off
Dvop Stratgic thikig
Bid paig pricips ito strctr pas
Prodc forshor mastrpa
7 . 1 proressi te masterpla
7/30/2019 Binalong Bay Foreshore Masterplan Consultation Report
39/39