Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 1
PRELIMINARIES
1/1/1 GENERAL CONDITIONS OF CONTRACT (GCC)
The MCA-Namibia Standard General Conditions of
Contract contained in the Invitation for Bids shall be the
applicable contract for the execution of the Works
1/1/2 MODEL PREAMBLES
The Model Preambles for Trades (2008 edition) as
published by the Association of South African Quantity
Surveyors shall be deemed to be incorporated in these bills
of quantities and no claims arising from brevity of
description of items fully described in the said Model
Preambles will be entertained
The Model Preliminary Document can be purchased from the
Institute of Namibian Quantity Surveyor's offices situated at
22 Stein Street, Klein Windhoek, Windhoek during week
days from 8H00 to 12H00
All references in this document made to "the Architect" or "the
Engineer" will mean the "Project Manager" as defined in the
GCC, except where the profession is meant.
Supplementary preambles are incorporated in these bills of
quantities to satisfy the requirements of this project. Such
supplementary preambles shall take precedence over the
provisions of the said Model Preambles
The contractor's prices for all items throughout these Bills of
Quantities must take account of and include for all of the
obligations, requirements and specifications given in the
said Model Preambles and in any supplementary preambles
These Bills of Quantities are consecutively numbered and
the Tenderer is required to check the number of pages and
should any be found missing or in duplicate or the figuresor
typing indistinct or there be any doubt, obscurity or ambiguity
as to the meaning or intent of the descriptions, particulars,
etc. He must inform the Quantity Surveyor at once in writing
and have the same rectified or explained as the case may
be. No claim whatsoever will be afterwards admitted due to
the Contractor having failed to comply with any of the above
conditions.
No alterations, erasure, omission or addition is to be made
in the text and conditions of these Bills of Quantities and
should any such alteration, amendment, note or addition be
made, the same will not be recognised, but the reading of
these Bills of Quantities, as prepared by the Quantity
Surveyor will be adhered to.
Section No. 1
Preliminaries
Preambles
1
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
1/1/3 SUPPLEMENTARY PREAMBLES TO THE MODEL PRELIMINARIES
B2.1: Site and Bounderies
The sites will be as indicated on the site plans in the Bidding
Documents.
B2.2: Area of the Works
The Area of the Works to be occupied by the Contractor,
any restriction on the area and the limit of access or exit will
be pointed out to the Contractor by the Engineer on handing
over of the Site.
B2.3: Boundary Beacons, setting-out pegs and master
datum
The Contractor shall notify the Engineer if any
encroachments of adjoining foundations, buildings,
structures, pavements, etc., exist so that the necessary
arrangements can be made for the rectification of any such
encroachments
B2.4: Site soil investigation
No site soil investigation report is available and the Tenderer
is advised to inspect the site to as certain the exact nature of
the ground and report to the Engineer.
B2.5: Viewing of the Site
No claims for extras arising from the Contractor having
failed to comply with this Clause will be entertained.
B2.9: Existing known services
Existing services and points of connection are shown on the
Site plan or will be pointed out on the Site by the Engineer.
B5.6: Special Scaffolding
No special scaffolding is measured as these Bills of
Quantities are based on the Sixth edition of the Standard
System for Measuring Building Work.
B5.7: Contractor's Offices and Sheds
Under NO circumstances may any of the buildings at any
stage be used for temporary accommodation for workers
contractor's offices or storage of materials.
B6.1: Water
The contractor shall provide water for the Works in
accordance withAlternative A
B6.2: Electricity and Lighting
The contractor shall provide electricity and lighting for the
Works in accordance withAlternative A
B6.3: Telephones
The contractor shall provide telephones for the Works in
accordance with Alternative A
Section No. 1
Preliminaries
Preambles
2
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
B6.4: Toilets
The contractor shall provide toilets for the Works in
accordance with Alternative A
B7.1: Cash Discount
All Prime Cost and Provisional Sums are net and do not
include a cash discount, nor will the Contractor be allowed
or entitled to a cash discount.
B8.1: Sales Taxes
Delete the whole of this clause and replace with the following:
"Provision is made in the separate Bid Invitation
Documents for all inclusion of Value Added Tax
(VAT) at 15%. The Contractor shall price these Bills of
Quantities excluding Value added Tax (VAT)."
B8.3: Payment of Preliminaries
Payment of Preliminaries will be calculated from the priced
in accordance with Alternative B In addition to the exclusions
items within the Preliminaries mentioned in the third paragraph
of this clause it shall bedeemed that "day works" be added
as a fourth exclusion
B8.4: Adjustment of Preliminaries
The Adjustment ofPreliminaries will be on the basis of fixed
price, value relatedand time related items in accordance with
Method 3. In addition to the exclusions mentioned in this
paragraph of this clause it shall be deemed that day works be
added as a fourth exclusion.
1/1/4 SPECIFIC PRELIMINARIES
Site instructions
Instructions issued on site are to be recorded in triplicate in
a site instruction book which is to be maintained on site by
the contractor.
Warranties for material and workmanship
Where warranties for materials and/or workmanship are called
for, the contractor shall obtain a written warranty, addressed to
the employer, from the firm supplying the materials and/or
doing the work and shall deliver same to the engineer on the
certified completion ofthe contract. The warranty shall state
that workmansip, materials and installation are warranted for
a specified period from the date of final completion and that
any defects that may arise during the specified period shall
be made good at the expense of the firm supplying the
materials and/or doing the work, upon written notice to do
so. The warranty will not be enforced if the work is damaged
by defects in the construction of the building in which case
the responsibility for replacement shall rest entirely with the
contractor.
Section No. 1
Preliminaries
Preambles
3
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
Co-operation of contractor for cost management
It is specifically agreed that the contractor accepts the obligation
of assisting the engineer in implementing proper cost
management. The contractor will be advised by the engineer
of all cost management procedures which will be
implemented tot ensure that the final building cost does not
exceed the budget. The engineer undertakes to make
available to the contractor all budgetary allowances and cost
assessments/reports to enable the proper procedure to be
implemented and the contractor shall attend all cost plan
review and cost management meetings. The contractor
undertakes to extend these procedures, as necessary, to all
subcontractors
Testing of windows for watertightness
Each window shall betested for watertightness with water
sprayed on using adequate pressure. If in the opinion of the
engineer, the pressure proves to be inadequate, then the
pressure shall be boosted by means of compressed air or other
approved means.
Revenue Stamps
The Contractor must allow for and provideall necessary .
revenue stamps require
Proprietary Branded Products
The Contractor shall take delivery of, handle, store, use, apply
and/or fix all proprietarybranded products in strict accordance
with the manufacturers' instructions after consultation with the
manufacturer's authorised representative.
Non-Cession of Monies
The Contractor shall not cede norassign his rights or claims to
any monies due or to become due under the contract.
As Built Drawings
The position of construction breaks and the extent of individual
concrete pours are to be recorded bythe Contractor on the
Structural Engineer's drawings andare to be submitted to the
Architect and the Structural Engineer for their records.
The Contractor shall furnish theArchitect with a set of marked
up drawings indicating the positions of all plumbing and
drainage pipework as actually built.
Section No. 1
Preliminaries
Preambles
4
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
BILL NO. 1
PRELIMINARIES
FIXED CHARGE ITEMS
1/2/1 Adherence to Contactual Requirements Item 1 0.00
1/2/2 Establishment of Contractor's Camp and other facilities as Item 1 0.00
specified.
1/2/3 Removal of Contractor's Camp and other facilities on
completion of Contract
TIME RELATED ITEMS
Contractual Requirements
1/2/4 Contractor to comply with the Namibia Environmental Item 1 0.00
Management Act No.7 of year 2007 as well as the
Environmental Assessment Policy of year 1995 by
implementing the Environmental Management Plans (EMP)
documented separately as part of this contract.
1/2/5 Contractor to comply with Namibia Public Health and Item 1 0.00
Safety Management Policy under Act no.11 of year 2007 by
implementing the Public Health and Safety Awareness Plan
(PHSAP) documented separately as part of this contract.
1/2/6 Adherence to al other Contactual Requirements Item 1 0.00
1/2/7 Maintain Contractor's Camp and other facilities Item 1 0.00
1/2/8 Other Time Related Charges (Specify below) Item 1 0.00
Carried to Final Summary N$ 0.00
Section No. 1
PreliminariesBill No1
Preliminaries
5
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTSECTION 2
BUILDING WORKS
BILL NO. 1
ALTERATIONS
For preambles see Model Preambles for Trades
REMOVAL OF EXISTING WORK
Breaking up and removing mass concrete, brick work, etc
2/1/1 Concrete apron m2 19 0.00
Breaking up and removing mass concrete, brick work,
pipe work, contaminated soil and river boulders,
including disposing of contaminated soil
2/1/2 Septic tanks m3 40 0.00
Dismantle and remove existing solar geysers, including
sealing of all holes and making safe of electrical
connections
2/1/3 Solar geysers No 8 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No1Alterations
6
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTSECTION 2
BUILDING WORKS
BILL NO. 2
EARTHWORKS (PROVISIONAL)
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
SUPPLEMENTARY PREAMBLES
The quantities of excavation, filling, carting away, etc
measured are the nett volumes and the Contractor is to
make allowances in his prices for the bulking of material.
Descriptions of carting away of excavated material shall be
deemed to include loading excavated material onto trucks
directly from the excavations or, alternatively, from stock
piles situated on the building site.
The nature of the ground is assumed to be loose sandy
material, therefore "earth".
SITE CLEARANCE, ETC
Site clearance
2/2/1 Digging up and removing rubbish, debris, vegetation, Ha 4 0.00
hedges, shrubs and trees not exceeding 200mm girth, bush,
etc.
EXCAVATION, FILLING, ETC
Excavation in earth not exceeding 2m deep
2/2/2 Surface beds & thickenings m3 35 0.00
Extra over trench and hole excavations in earth for
excavation in
2/2/3 Soft rock m3 50 0.00
2/2/4 Hard rock m3 150 0.00
Risk of collapse of excavations
2/2/5 Sides of trench and hole excavations not exceeding 1,5m m2 5 0.00
deep
Extra over all excavations for carting away
2/2/6 Surplus material from excavations and/or stock piles on site m3 35 0.00
to a dumping site to be located by the contractor
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No. 2
Earthworks (Provisional)
7
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Keeping excavations free of water
2/2/7 Allow for keeping all excavations clear of water or mud Item 1 0.00
In-situ material ripped and re-compacted to 95% Mod
AASHTO density
2/2/8 Under surface beds m3 122 0.00
Prescribed density tests on filling
2/2/9 Modified AASHTO Density test No 5 0.00
SOIL POISONING
"Shell-Drite" or other approved anti-termite soil poison
guaranteed against termite infestation for a period of
ten years
2/2/10 Under floors etc, including forming and poisoning shallow m2 20 0.00
furrows against foundation walls etc, filling in furrows and
ramming
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No. 2
Earthworks (Provisional)
8
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 3
CONCRETE, FORMWORK AND REINFORCEMENT
For preambles see "Model Preambles for Trades"
SUPPLEMENTARY PREAMBLES
Cost of tests
The costs of making, storing and testing of concrete test
cubes as required under clause 7 "Tests" of SABS 1200 G
shall include the cost of providing cube moulds necessary
for the purpose, for testing costs and for submitting reports
on the tests to the architect. The testing shall be
undertaken by an independent firm or institution nominated
by the contractor to the approval of the architect. (Test
cubes are measured separately)
Formwork
Description of formwork shall be deemed to include use and
waste only (except where described as "left in" or
"permanent"), for fitting together in the required forms,
wedging, plumbing and fixing to true angles and surfaces as
necessary to ensure easy release during stripping and for
reconditioning as necessary before re-use
The vertical strutting shall be carried down to such
construction as is sufficiently strong to afford the required
support without damage and shall remain in position until
the newly constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be
slabs not exceeding 250mm thick unless otherwise
described
Formwork to sides of bases, pile caps, ground beams, etc
will only be measured where it is prescribed by the engineer
for design reasons. Formwork necessitated by irregularity
or collapse of excavated faces will not be measured and the
cost thereof shall be deemed to be included in the allowance
for taking the risk of collapse of the sides of the excavations,
provision for which is made in "Earthworks"
REINFORCED CONCRETE CAST AGAINST
EXCAVATED SURFACES
25MPa/19mm concrete
2/3/1 Surface beds m3 1 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No. 3Concrete, Formwork and Reinforcement
9
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
REINFORCED CONCRETE
25MPa/19mm concrete
2/3/2 Concrete slabs m3 6 0.00
TEST BLOCKS
2/3/3 Making and testing 150 x 150 x 150mm concrete strength No 22 0.00
test cube (Provisional)
SMOOTH FORMWORK
Smooth formwork to sides
2/3/4 Edges and risers not exceeding 300mm high m 138 0.00
Smooth formwork to soffits
2/3/5 Slabs propped up not exceeding 1500mm high above m2 26 0.00
bearing level cast in panels exceeding 1m2 and not
exceeding 2m2
Boxing in smooth formwork to form
2/3/6 25mm Chamfers at corners m 59 0.00
REINFORCEMENT
Fabric reinforcement
2/3/7 Type 245 fabric reinforcement in concrete surface beds, m2 39 0.00
slabs, etc
2/3/8 Type 311 fabric reinforcement in concrete surface beds, m2 30 0.00
slabs, etc
2/3/9 Type 395 fabric reinforcement in concrete surface beds, m2 23 0.00
slabs, etc
CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with a steel
float
2/3/10 Top of slabs m2 26 0.00
2/3/11 Surface beds m2 19 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No. 3Concrete, Formwork and Reinforcement
10
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 4
MASONRY
SUPPLEMENTARY PREAMBLES
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
BRICKWORK
Prices for brickwork shall include for setting up and building
windows and door frames into position in brick walls,
wedging, pinning, building solid against frames, etc.,
bedding of roof coverings, wall plates, base plates, etc.,
forming ventilation flues through walls for air bricks, etc.,
building ends of rafters, purlins, joists, bars, pipes, bolts, etc.
into or through brickwork including wrapping in polyethylene
sheeting as necessary.
Sizes in descriptions
Where sizes in descriptions are given in brick units, "one
brick" shall represent the length and "half brick" the width of
a brick.
Hollow walls, etc
Descriptions of hollow walls shall be deemed to include
leaving every fifth perpend of the bottom course of the
external skin open as a weep hole.
Walls in two skins described as "bagged and sealed" shall
be deemed to include having the outer face of the inner skin
bagged with 1:6 cement and sand mixture and sealed with
two coats "Brixeal" bitumen emulsion waterproofing coating.
Pointing
Descriptions of recessed pointing to fair face brickwork and
face brickwork shall be deemed to include square recessed,
hollow recessed, weathered pointing, etc.
Decorative blocks
Blocks shall be of approved manufacture, sound, well burnt
or cured and uniform and true in size, shape and colour.
Samples
Samples of all masonry building units, except those for walls
described as "load bearing", shall consist of a minimum of 6
units. Samples of building units to be used in walls
described as "load bearing" shall consist of 30 units from
every 30 000 units delivered to site.
Section No. 2
Building WorksBill No.4
Masonary
11
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SUPERSTRUCTURE
Brickwork of concrete bricks in class II mortar
2/4/1 Half brick walls m2 92 0.00
Brick reinforcement
2/4/2 75mm Wide reinforcement built in horizontally m 947 0.00
BRICKWORK SUNDRIES
Expansion joints
2/4/3 6mm "Jointex" or similar approved bitumen impregnated m 62 0.00
fibreboard in expansion joint not exceeding 300mm wide
built vertically between brick walls
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.4Masonary
12
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 5
WATERPROOFING
DAMP-PROOFING OF WALLS AND FLOORS
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
One layer of 375 micron "Consol Plastics Brikgrip DPC"
or similar approved embossed damp proof course
2/5/1 In walls m2 5 0.00
One layer of 250 micron "Consol Plastics Brikgrip DPC"
or similar approved embossed damp proof course
2/5/2 Under surface beds m2 4 0.00
JOINT SEALANTS, ETC
Approved silicone sealant, including preparation of
surfaces, application of primers and protection of
adjacent surfaces
2/5/3 Rake out 6mm thick "Jointex" fibreboard in vertical m 62 0.00
expansion joint in brickwork for a depth of 10mm and point
with approved silicone sealant
2/5/4 8 x 8mm At junction of sanitary fitting, mirror, etc, with tiled m 12 0.00
wall
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.5Waterproofing
13
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 6
CARPENTRY AND JOINERY
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
SUPPLEMENTARY PREAMBLES
Particle board:
Particle board shall comply with the following specifications:
2/6/1 a) SABS 1300 Particle board: exterior and flooring type
2/6/2 b) SABS 1301 Particle board: interior type
Joinery
Descriptions of frames shall be deemed to include frames,
transomes, mullions, rails, etc.
Descriptions of hardwood joinery shall be deemed to include
pelleting of bolt holes.
Fixing
Items described as "nailed" shall be deemed to be fixed with
hardened steel nails or shot pins to brickwork or concrete.
Decorative laminate finish
Laminate finish shall be glued under pressure. Edge strips
shall be butt jointed at junctions with adjacent similar finish.
FLOORS AND SKIRTINGS
Wrot Meranti
2/6/3 19 x 75 mm Rounded skirting plugged to walls including 19 m 244 0.00
mm quadrant bead planted on including mitres, etc.
DOORS, ETC
Semi-solid flush panel Class 4 medium duty door with
hardboard finish both sides and concealed hardwood
edges to sides, hung to steel frames
2/6/4 44mm Double door 1511 x 2 032mm high No 20 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.6Carpentry and Joinery
14
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
JOINERY
All hardwoods required for joinery is to be in selected Wrot
Meranti all housed, framed, grooved, tongued, blocked,
dovetailed, notched, glued and screwed together with all
screw heads countersunk and pellated with matching timber
plugs including all cutting and waste.
Joinery fittings are measured in number and prices for all
fittings are to include for manufacturing and fixing the units
in position complete with all doors, drawers, etc, with
Formica or Melawood finishes and edging or painted
finishes, including all ironmongery, glazing, etc, as shown on
the joinery fitting drawings attached to the back of these Bills
of Quantities
Metal support framing and sanitary fittings to joinery fittings,
where applicable, have been separately measured in the
relevant bills - Metalwork and Plumbing & Drainage
respectively
Plywood
2/6/5 18mm Thick shelving treated with furniture oil, screwed to m2 15 0.00
shelf brackets (elsewhere measured)
2/6/6 18mm Thick decking treated with furniture oil, screwed to m2 19 0.00
mild steel stand (elsewhere measured)
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.6Carpentry and Joinery
15
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 7
IRONMONGERY
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
SUPPLEMENTARY PREAMBLES
Finishes to ironmongery
Where applicable finishes to ironmongery are indicated by
suffixes in accordance with the following list:
BS Satin bronze lacquered CH Chromium plated
SC Satin chromium plated
SE Silver enamelled
GE Grey enamelled
AS Anodized silver
AB Anodized bronze
AG Anodized gold
ABL Anodized black
PB Polished brass
PL Polished and lacquered
PT Epoxy coated
SD Sanded
LOCKS
The following locks are in one set with a master key:
2/7/1 Solid Art 390/311 chromium plated two lever mortice No 30 0.00
lockset.
The following locks are to be replaced
2/7/2 Solid Art 390/311 chromium plated two lever mortice No 40 0.00
lockset.
BATHROOM FITTINGS
Vaal Potteries or similar approved
2/7/3 '654010V70/94' 150 x 150mm Toilet roll holder plugged No 10 0.00
'Craneware'
2/7/4 150 x 150mm White single soap dish fixed to wall No 20 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.7Ironmongery
16
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Approved
2/7/5 25mm Diameter CP towel rail 450mm long including CP end No 10 0.00
brackets, plugged
SUNDRIES
Union or similar approved
2/7/6 AL8730SC Floor mounted door stop, plugged No 60 0.00
2/7/7 '8025SS' Hat and coat hook with rubber buffers screwed to No 10 0.00
steel door frame
Approved
2/7/8 20mm Diameter pipe hanger for wardrobe, including all m 17 0.00
fittings
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.7Ironmongery
17
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 8
METALWORK
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
SUPPLEMENTARY PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts and
washers.
Descriptions of expansion anchors and bolts and chemical
anchors and bolts shall be deemed to include nuts, washers
and mortices in brickwork or concrete.
Metalwork described as"holed for bolt(s)" shall be deemed
to exclude the bolts unless otherwise described.
Unless otherwise described mild steelwork is to include for a
factory applied coat of red lead oxide primer after
manufacture and before leaving the works.
Prices for metalwork are to include for all cutting, fitting,
welding, brazing, soldering, drilling, bolting, riveting and
forming mitred and welded intersections of metal
components as well as for setting up and fixing in position or
building into brickwork, or casting into concrete complete.
SUNDRY STEELWORK
Welded mild steel pupose made kitchen sink & counter
stand
2/8/1 50 x 50 x 5mm Angle section support frame welded together m 279 0.00
and built into wall as per Architect's specifications
Mild steel shelve supports
2/8/2 50 x 50 x 5mm Angle section shelving support confected to m 72 0.00
shelves using 4 x self cutting screws recessed into shelves
and bolted to wall using 8mm bolts and including fisher
plugs
PRESSED STEEL DOOR FRAMES
1,2mm Double rebated frames suitable for half brick
walls with 2 x 100mm standard steel butt hinges per
door leaf with and including rubber buffers and striker
plate, complete
2/8/3 Frame for double door 1359 x 2 032mm high No 20 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.8Metalwork
18
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 9
PLASTERING
For preambles see Model Preambles for Trades
INTERNAL PLASTER
Cement plaster on brickwork
2/9/1 On walls m2 107 0.00
2/9/2 On narrow widths m2 12 0.00
EXTERNAL PLASTER
Cement plaster on brickwork
2/9/3 On walls m2 80 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.9
Plastering
19
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 10
TILING
For preambles see Model Preambles for Trades
WALL TILING
200 x 200 x 7mm 'San Lorenzo' or equal approved
ceramic tiles fixed with adhesive to plaster (plaster
elsewhere) with 'TAL Goldstar' adhesive and flush
pointed with 4mm wide tinted waterproof jointing
compound
2/10/1 On walls in isolated panels, splashbacks, etc. (Provisional) m2 23 0.00
2/10/2 On walls m2 36 0.00
2/10/3 On narrow widths m2 1 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building WorksBill No.10Tiling
20
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 11
PLUMBING AND DRAINAGE
SUPPLEMENTARY PREAMBLES
PLUMBING AND DRAINAGE (PROVISIONAL)
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
SUPPLEMENTARY PREAMBLES
Polycop polypropylene pipes
Polypropylene pipes 54mm diameter and under shall be
seamless copper coloured class 16 pipes jointed with
"Fast-fuse" heat welded thermoplastic or brass compression
fittings as designed for use with copper pipes as stated.
Pipes shall be firmly fixed to walls etc, with coloured nylon
snap-in pipe clips with provision for accommodating thermal
movement and jointed and fixed strictly in accordance with
the manufacturer's instructions.
All pipe diameters are nominal external.
Polylink polypropylene pipes
Polypropylene pipes 63mm diameter and over shall be class
12 pipes jointed with cast iron "Supraclamp" running joints.
Fusion welded bends, once or twice mitred as necessary,
and tees shall be factory manufactured.
Fusion welded bends and tees shall include jointing to pipes
with PVC rubber ring double Z joint couplers.
Branch tees shall include flanged and bolted joints to
"Polycop" branch pipes in addition and for brass
compression male iron to copper straight couplers.
Reducers shall include jointing to pipes with PVC rubber ring
double Z joint couplers and reducers shall be of sufficient
overall length to accommodate same.
All pipes shall be jointed and fixed strictly in accordance with
the manufacturer's instructions.
All pipe diameters are nominal external.
Section No. 2
Building WorksBill No.11Plumbing and Drainage
21
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
uPVC pressure pipes and fittings
Pipes for water supply shall be of the class stated.
Pipes of 40mm diameter and smaller shall be plain ended
with solvent welded uPVC loose sockets and fittings.
Pipes of 50mm diameter and greater shall have sockets and
spigots with push in type integral rubber ring joints. Bends
shall be uPVC and all other fittings shall be cast iron, all with
similar push-in type joints.
Copper pipes
Pipes shall be hard drawn and half-hard pipes of the class
stated. Class 0 (thin walled hard drawn) pipes shall not be
bent. Class 1 (thin walled half-hard), class 2 (half-hard) and
class 3 (heavy walled half-hard) pipes shall only be bent with
benders with inner and outer formers. Fittings to copper
waste, vent and anti-syphon pipes, capillary solder fittings
and compression fittings shall be "Cobra Watertech" type.
Capillary solder fittings shall comply with ISO 2016. Only
compression fittings shall be used in walls or in ground.
Fixing of pipes
Unless specifically otherwise stated, descriptions of pipes
shall be deemed to include fixing to walls etc, casting in,
building in or suspending not exceeding 1m below
suspension level.
Reducing fittings H3
Where fittings have reducing ends or branches they are
described as "reducing". In the case of pipes with diameters
not exceeding 60mm only the largest end or branch size is
given. Should the contractor wish to use other fittings and
bushes or reducers he may do so on the understanding that
no claim in this regard will be entertained. In the case of
pipes with diameters exceeding 60mm all sizes are given
and no claim for extra bushes, reducers, etc, will be
entertained.
Exposed concrete surfaces
Exposed surfaces of concrete stormwater channels, cover
slabs, inspection eye marker slabs, gulley tops, cleaning eye
tops, catchpits, inspection chambers, etc shall be finished
smooth with plaster.
Excavations
No claim for rock excavation will be entertained unless the
contractor has timeously notified the Engineer thereof prior
to backfilling.
Soft rock and "hard rock" shall be as defined in
"Earthworks".
Section No. 2
Building WorksBill No.11Plumbing and Drainage
22
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
Laying, backfilling, bedding, etc. of pipes
Pipes shall be laid and bedded and trenches shall be
carefully backfilled in accordance with manufacturers'
instructions.
Where no manufacturers' instructions exist pipes shall be
laid in accordance with clauses 5.1 and 5.2 of each of the
following:
SABS 1200 L : Medium-pressure pipelines
SABS LD : Sewers
SABS LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with
clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB :
Earthworks (Pipe trenches).
Pipes shall be bedded in accordance with clauses 3.1 to
3.4.1, 5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be
class B bedding.
Flush pans
Flush pans shall have straight or side outlets and "P" or "S"
traps as necessary.
Stainless steelbasins, sinks, wash troughs, urinals, etc.
Units shall have standard aprons on all exposed edges and
tiling keys against walls where applicable.
Waste unions
Descriptions of waste unions shall be deemed to include
rubber or vulcanite plugs and chains fixed to fittings.
Densyl petrolatum anti-corrosion tape as
manufactured by Denso SA (Pty) Ltd.
Pipes to be taped shall be coated with the appropriate
primer and the tape shall be applied with minimum 15mm
lap per spiral unless otherwise described.
Couplings and fittings to pipes shall be taped in strict
accordance with the manufacturer's instructions including all
mastic, tape, "Layflat" sheeting, securing of same, etc.
Section No. 2
Building WorksBill No.11
Plumbing and Drainage
23
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
RAINWATER DISPOSAL
0,8 mm Galvanized sheet iron rainwater goods:
2/11/1 100 x 150 x 100 mm VHV galvanized sheet iron concealed m 220 0.00
eaves gutter fixed to falls on splay rebated roof trusses.
2/11/2 75 mm Diameter galvanized sheet iron seamless rainwater m 100 0.00
downpipe fixed to walls on alloy brackets at not exceeding
1500 mm centres.
Extra over eaves gutter for:
2/11/3 Outlet with 75 mm diameter nozzle and domical galvanized No 40 0.00
iron grating.
2/11/4 Closed end No 40 0.00
Extra over downpipe for:
2/11/5 Shoe No 40 0.00
2/11/6 600 mm Projecting eaves offset. No 40 0.00
Fulbore or other approved outlets
2/11/7 100 mm Diameter vertical outlet type including joint to 75 No 40 0.00
mm diameter mild steel rainwater downpipe (elsewhere
measured) including casting in position into slab.
SANITARY FITTINGS
'Citi Metal Products/Franke' grade 304 (18/10) or equal
approved stainless steel sanitary fittings including
sealing all sanitary fittings against tiled walls with
approved silicone
2/11/8 1500 x 535mm Double centre bowl stainless inset sink, No 10 0.00
fitted onto mild steel stand (measured elsewhere)
'Cobra" or equal approved sanitary fittings including
sealing all sanitary fittings against tiled walls with
approved silicone
2/11/9 White wash hand basin with tap holes with overflow or No 10 0.00
chainstay hole bolted to wall with concealed wall brackets
2/11/10 White colour P-trap WC pan with 6 litre cistern and No 12 0.00
complete with flushing mechanism
2/11/11 900 x 900 x 150mm "Granada" shower tray complete No 12 0.00
shower door and waste outlet, bedded in position
Carried Forward N$ 0.00
Section No. 2
Building Works
Bill No.11Plumbing and Drainage
24
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Chromium plated
2/11/12 32mm '301' CP Basin waste with backnut and '309' anti-theft No 10 0.00
plug
2/11/13 40mm '317-40' Sink waste with back nut, CP chain and No 20 0.00
vulcanite plug
TRAPS, ETC
PVC
2/11/14 Bottle trap No 20 0.00
2/11/15 P-trap Shower trap with 'Cobra 323' grating No 12 0.00
'Cobra Watertech' or equal approved
2/11/16 32mm '335' CP bottle trap with CP tail pipe including wall No 10 0.00
flange
TAPS, VALVES, ETC
'Cobra Watertech' or equal approved
2/11/17 15mm '232/350CP' angle regulating valve with 350mm long No 22 0.00
supply pipe
2/11/18 15mm 'Star 211' pillar tap No 20 0.00
2/11/19 15mm '206 Star' wall mounted CP toilet bibtap No 12 0.00
2/11/20 15mm 'ECCP 431' built-in type shower set comprising one No 12 0.00
pair '128' Star stop taps, 'KP2.6' vandal resistant shower
head with self cleaning nozzle
2/11/21 15mm '500-21' CP wall type elbow action single tap No 20 0.00
2/11/22 15mm Diameter 171/041 Star CP wall type sink mixer with No 10 0.00
overarm swivel outlet
WATER SUPPLIES
Class 10 HDPe type pipes
2/11/23 25mm Pipes laid in and including trenches not exceeding m 55 0.00
1m deep
Extra over Class 10 HDPe type IV pipes for "Plasson"
fittings
2/11/24 25mm Fittings No 40 0.00
2/11/25 25mm Bend No 40 0.00
2/11/26 HDPe/Cu adaptor No 10 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.11Plumbing and Drainage
25
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
2/11/27 HDPe/GMS adaptor No 10 0.00
GMS pipes
2/11/28 20mm Pipes m 10 0.00
2/11/29 Extra over GMS pipes for fittings
20mm Fittings No 20 0.00
Sundries
2/11/30 600 x 600mm Brick valve box 600mm deep internally No 10 0.00
including 100mm thick concrete slab with 300mm high half
brick walls all round and including Saint-Gobain stop-cock
box product 2670 type I/d, duty class I/D and including ball
type valve with M.S support 10mm thick anchored to floor
slab
SANITARY PLUMBING
uPVC pipes
2/11/31 110mm Pipes m 60 0.00
Extra over uPVC pipes for fittings
2/11/32 110mm Bend No 24 0.00
2/11/33 110mm Access bend No 12 0.00
2/11/34 110mm Access junction No 24 0.00
2/11/35 110mm Access horn No 12 0.00
2/11/36 110mm Pan connector No 12 0.00
2/11/37 110mm P-trap No 12 0.00
2/11/38 110mm 'GI Two-way' vent valve No 12 0.00
Sundries
2/11/39 Testing waste pipe system Item 10 0.00
INTERNAL WATER RETICULATION
Class 0 copper pipes
2/11/40 15mm Pipes m 180 0.00
2/11/41 22mm Pipes m 147 0.00
2/11/42 22mm Pipes chased into brickwork m 15 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.11
Plumbing and Drainage
26
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Extra over class 0 copper pipes for soldered type
fittings
2/11/43 15mm Fittings No 206 0.00
2/11/44 22mm Fittings No 130 0.00
Extra over class 0 copper pipes for compression type
fittings
2/11/45 22mm Fittings No 40 0.00
Brass
2/11/46 25mm Gate valve No 20 0.00
2/11/47 35mm Gate valve No 10 0.00
2/11/48 50mm Gate valve No 10 0.00
Sundries
2/11/49 Leave or form 300 x 150 x 110mm deep plastered valve No 100 0.00
recess in half brick wall
2/11/50 Testing water pipe system Item 10 0.00
WATER HEATERS
Wood fired heater as per Henco Engineering or similar
approved (piping measured elsewhere)
2/11/51 150 Litre wood fired water heater No 10 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building Works
Bill No.11Plumbing and Drainage
27
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 12
GLAZING
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
TOPS, SHELVES, DOORS, MIRRORS, ETC
5mm Silvered float glass copper backed mirrors with
bevelled edges holed for and fixed with chromium
plated dome capped mirror screws with rubber buffers
to plugs in brickwork or concrete
2/12/1 Mirror 300 x 500mm high No 10 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building Works
Bill No.12Glazing
28
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 2
BUILDING WORKS
BILL NO. 13
PAINTWORK
NOTES:
Attention is directed to the relevant sections of the Model
Preambles to All Trades which forms a part of this Bill and
must be read in conjunction herewith.
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces
Surfaces shall be thoroughly washed down and allowed to
dry completely before any paint is applied. Blistered or
peeling paint shall be completely removed and cracks shall
be opened, filled with a suitable filler and finished smooth
Previously painted metal surfaces
Surfaces shall be thoroughly rubbed and cleaned down.
Blistered or peeling paint shall be completely removed and
sanded down to bare metal
Previously painted wood surfaces
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and sanded down
and cracks and crevices shall be primed, filled with suitable
filler and finished smooth
SUPPLEMENTARY PREAMBLES
Paint are to manufactured and supplied by PLASCON
PAINTS (PTY) LTD or equal approved and applied in strict
accordance with the manufacturer/supplier's specification.
All work to be executed in strict accordance with the
specifications of Plascon Paints (Pty) Ltd. The coating
systems are as per Plascon's 'List of Decorative Paint
Products' unless otherwise specified. Full specifications are
available at Tel. + 27 (0)11 301-4600 or from the various
branch offices.
Primers and first coats may be thinned in accordance with
the paint specifications of Plascon Paints (Pty) Ltd to aid the
absorption of the paint.
All surfaces must be sound, clean and have a moisture
content of less than 8% for walls generally and 3% for
slabs/screeds etc.
Where surfaces of plaster etc are sandy / friable, the first
coat must be replaced with 'Plascon Merit' plaster primer
thinned 10% with turpentine.
Section No. 2
Building WorksBill No.13
Paintwork
29
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
PAINTWORK ETC, TO PREVIOUSLY PAINTED
WORK
ON CONCRETE SURFACES
Prepare and clean using sugar soap powder cleaner
and apply two coats CAT 60, Bitumen Emulsion
(Supplier: Colas, Okahandja)
2/13/1 On apron ground slabs m2 505 0.00
ON FLOATED PLASTER
Prepare and stop with 'Polycell Medall 90' and apply
one coat 'Plascon Alkaline Plaster Primer (UC56) and
apply two coats 'Plascon Wall & All', colour Oatmeal
(WAA 8) paint
2/13/2 On external walls m2 1724 0.00
Prepare and stop with 'Polycell Medall 90' and apply
one coat 'Plascon Alkaline Plaster Primer (UC56) and
apply two coats 'Plascon Super Acrylic', colour Broken
White (EPL 314) paint
2/13/3 On internal walls m2 1542 0.00
Prepare and cleaning and apply two coats 'Plascon
Sure Coat PVA', colour White paint
2/13/4 Internal ceilings m2 666 0.00
ON METAL
Spot priming defects in pre-primed surfaces with
'Namelcote Zinc Chromate Metal Primer' (UC53) and
apply one coat 'Plascon Merit Universal Undercoat'
(UC1) and two coats 'Plascon Super Universal Enamel',
colour Light Brown (G370) paint
2/13/5 On door frames m2 159 0.00
Spot priming defects in pre-primed surfaces with
'Namelcote Zinc Chromate Metal Primer' (UC53) and
apply one coat 'Plascon Merit Universal Undercoat'
(UC1) and two coats 'Plascon Super Universal Enamel',
colour Windsor Green (G33) paint
2/13/6 On external window frames (measured on flat) m2 86 0.00
Spot priming defects in pre-primed surfaces with
'Namelcote Zinc Chromate Metal Primer' (UC53) and
apply one coat 'Plascon Merit Universal Undercoat'
(UC1) and two coats 'Plascon Super Universal Enamel',
colour Broken Ivory paint
2/13/7 On internal window frames (measured on flat) m2 86 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.13Paintwork
30
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
ON WOOD
Spot priming defects in pre-primed surfaces with
approved 'Wood Primer' and two coats 'Plascon Super
Universal Enamel', colour Light Brown (G370) paint
2/13/8 On doors m2 209 0.00
Prepare and apply one coat 'Plascon Woodcare Sanding
Sealer' smoothed of using steel wool after drying and
two coats 'Plascon Woodcare Polywax Exterior Sealer'
2/13/9 On doors m2 66 0.00
2/13/10 On plywood shelving and decking (both side measured) m2 68 0.00
2/13/11 On skirtings not exceeding 300mm girth m 610 0.00
ON FIBRE CEMENT
Spot priming defects in pre-primed surfaces with
approved 'Wood Primer' and two coats 'Plascon Super
Universal Enamel', colour Windsor Green (G33) paint
2/13/12 On fascias m2 106 0.00
PAINTWORK ETC, TO NEW WORK
ON FLOATED PLASTER
Prepare surfaces and remove all loose material, apply
one coat 'Plascon Alkaline Plaster Primer (UC56) and
apply two coats 'Plascon Wall & All', colour Oatmeal
(WAA 8) paint
2/13/13 On external walls m2 80 0.00
Prepare surfaces and remove all loose material, apply
one coat 'Plascon Alkaline Plaster Primer (UC56) and
apply two coats 'Plascon Super Acrylic', colour Broken
White (EPL 314) paint
2/13/14 On internal walls m2 120 0.00
ON METAL
Apply 'Namelcote Zinc Chromate Metal Primer' (UC53)
and apply one coat 'Plascon Merit Universal Undercoat'
(UC1) and two coats 'Plascon Super Universal Enamel',
colour Battleship Grey (G13) paint
2/13/15 On mild steel frame m2 56 0.00
Carried Forward N$ 0.00
Section No. 2
Building WorksBill No.13Paintwork
31
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
ON WOOD
Spot priming defects in pre-primed surfaces with
approved 'Wood Primer' and two coats 'Plascon Super
Universal Enamel', colour Light Brown (G370) paint
2/13/16 On doors m2 40 0.00
SUNDRIES
ON FLOORS
Prepare and clean floors using sugar soap powder
cleaner
2/13/17 On internal floors m2 640 0.00
Carried Forward to Summary of Section 2 N$ 0.00
Section No. 2
Building Works
Bill No.13
Paintwork
32
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
Section No. 2
Building Works
SECTION SUMMARY - Building Works
Bill 1 Alterations Page -6- N$ 0.00
Bill 2 Earthworks (Provisional) Page -8- N$ 0.00
Bill 3 Concrete, Formwork & Reinforcement Page -10- N$ 0.00
Bill 4 Masonry Page -12- N$ 0.00
Bill 5 Waterproofing Page -13- N$ 0.00
Bill 6 Carpentry & Joinery Page -15- N$ 0.00
Bill 7 Ironmongery Page -17- N$ 0.00
Bill 8 Metalwork Page -18- N$ 0.00
Bill 9 Plastering Page -19- N$ 0.00
Bill 10 Tiling Page -20- N$ 0.00
Bill 11 Plumbing & Drainage (Provisional) Page -27- N$ 0.00
Bill 12 Glazing Page -28- N$ 0.00
Bill 13 Paintwork Page -32- N$ 0.00
Carried to Final Summary N$ 0.00
Section No. 2
Building Works
33
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 3
EXTERNAL WORKS
BILL NO. 1
SEPTIC TANK - TYPE 1
Excavation in earth for septic tank
3/1/1 Not exceeding 2m deep m3 82 0.00
3/1/2 Exceeding 2m and not exceeding 4m deep m3 24 0.00
Extra over excavation in earth for excavation in
3/1/3 Soft rock m3 10 0.00
3/1/4 Hard rock m3 6 0.00
Extra over all excavations for carting away
3/1/5 Surplus material from excavations and/or stock piles on site m3 70 0.00
to a dumping site to be located by the Contractor
Risk of collapse of excavations
3/1/6 Sides of trench and hole excavations exceeding 1,5m and m2 112 0.00
not exceeding 3m deep
Selected earth filling obtained from the excavations
and/or prescribed stock piles on site compacted to 98%
Mod AASHTO density
3/1/7 Backfilling to trenches, holes, etc m3 36 0.00
Compaction of surfaces
3/1/8 Compaction of ground surface under floors etc including m2 38 0.00
scarifying for a depth of 150mm, breaking down oversize
material, adding suitable material where necessary and
compacting to 98% Mod AASHTO density
10MPa/19mm Unreinforced concrete
3/1/9 Surface blinding under surface beds m3 2 0.00
10MPa/19mm Reinforced concrete
3/1/10 In filling in hollow walls m3 12 0.00
30MPa/19mm Reinforced concrete
3/1/11 Surface beds cast in panels on waterproofing m3 8 0.00
3/1/12 Slabs m3 6 0.00
Carried Forward N$ 0.00
Section No. 3
External Works
Bill No.1
34
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Finishing top surfaces of concrete smooth with a wood
float
3/1/13 Surface beds m2 38 0.00
3/1/14 Slabs m2 26 0.00
Smooth formwork to sides
3/1/15 Edges and risers not exceeding 300mm high m 28 0.00
Rough formwork to soffits
3/1/16 Slabs including removing shuttering through 600 x 600mm m2 16 0.00
wide opening
High tensile steel reinforcement to structural concrete
work
3/1/17 10mm Diameter bars t 0.18 0.00
3/1/18 12mmDiameter bars t 0.16 0.00
Fabric reinforcement
3/1/19 Type 195 fabric reinforcement in concrete surface beds, m2 76 0.00
slabs, etc
3/1/20 Type 395 vertically between brick skins in hollow walls m2 116 0.00
Brickwork of 7MPa concrete bricks in class II mortar
3/1/21 One brick walls m2 12 0.00
3/1/22 440mm Hollow wall in two half brick skin including wire ties m2 60 0.00
Bricks reinforcement
3/1/23 75mm Wide reinforcement built in horizontally m 298 0.00
3/1/24 150mm Wide reinforcement built in horizontally m 30 0.00
Waterproofing
3/1/25 Waterproofing (DPC) between concrete slab and brickwork m2 12 0.00
Screeds to falls on concrete
3/1/26 40mm Thick on surface bed m2 14 0.00
Bagging and including two coats of Flintcoat
3/1/27 On external walls m2 68 0.00
Steel troweled waterproof cement plaster
3/1/28 On walls m2 72 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
35
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
3/1/29 On walls in narrow widths m2 2 0.00
uPVC pipes
3/1/30 110mm Pipes laid in and including trenches not exceeding m 16 0.00
1m deep
Extra over uPVC pipes for fittings
3/1/31 110mm Bend No 8 0.00
3/1/32 110mm Junction No 8 0.00
3/1/33 110mm Vent valve No 8 0.00
Gratings, covers, etc
3/1/34 600 x 600mm Type 8B double seal cast iron manhole cover No 4 0.00
and frame bedded in concrete
FRENCH DRAIN
Excavation in earth for septic tank
3/1/35 Not exceeding 2m deep m3 30 0.00
Extra over excavation in earth for excavation in
3/1/36 Soft rock m3 4 0.00
3/1/37 Hard rock m3 2 0.00
Extra over all excavations for carting away
3/1/38 Surplus material from excavations and/or stock piles on site m3 30 0.00
to a dumping site to be located by the Contractor
Risk of collapse of excavations
3/1/39 Sides of trench and hole excavations exceeding 1,5m and m2 82 0.00
not exceeding 3m deep
Clean granular filling material of 20 to 100mm supplied
by the Contractor
3/1/40 Filling to trench m3 16 0.00
Coarse river sand filling supplied by the Contractor
3/1/41 Filling to trench m3 14 0.00
'Bidim' or similar approved material
3/1/42 U14 Filter fabric to sides,top and bottom of trench m2 76 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
36
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Mass concrete
3/1/44 Around inspection pipe m3 0.2 0.00
Perforated uPVC pipes laid in open trench
3/1/45 110mm uPVC pipes m 28 0.00
3/1/46 110mm x 45 Degree access junction No 8 0.00
3/1/47 110mm End cap No 2 0.00
MULTI PURPOSE HOLDING PENS AND CRUSH
PENS
Excavation in compacted fill not exceeding 2m deep
3/1/48 Bases m3 24 0.00
Risk of collapse of excavations
3/1/49 Sides of trench and hole excavations not exceeding 1,5m m2 322 0.00
deep
Extra over all excavations for carting away
3/1/50 Surplus material from excavations and/or stock piles on site m3 24 0.00
to a dumping site to be located by the contractor
Keeping excavations free of water
3/1/51 Keeping excavations free of all water other than Item 2 0.00
subterranean water
UNREINFORCED CONCRETE CAST AGAINST
EXCAVATED SURFACES
25MPa/19mm concrete
3/1/52 Foundations m3 24 0.00
Cast in items
3/1/53 Steel uprights No 336 0.00
STRUCTURAL STEEL, ETC
Welded and bolted multi-purpose holding pens and
crush pens structure of round, steel tube, posts, angles,
channel and round bar, including braces, cleats, gusset,
base plates and connection plates bolted to steel or
concrete all as per attached drawings
3/1/54 Structure of hollow steel tubes 48mm diameter with 3mm t 7 0.00
wall thickness
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
37
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
3/1/55 Structure of hollow steel tubes 102mm diameter with 3mm t 5.92 0.00
wall thickness
3/1/56 Structure of 10 and 12mm round bars t 0.32 0.00
GATES
Gates of 48mm diameter hot rolled round steel tube as
per dwg no. HR11/15/2
3/1/57 Gate 2500mm x 1340mm high (A) No 8 0.00
3/1/58 Gate 2000mm x 1340mm high (B) No 40 0.00
3/1/59 Gate 900mm x 1340mm high (C) No 2 0.00
SUNDRIES H3
3/1/60 Neck clamps complete as per specification No 4 0.00
3/1/61 12mm Chains m 30 0.00
3/1/62 Steel caps welded on top of 102mm steel posts No 304 0.00
PAINTWORK ETC, TO NEW WORK
ON METAL
Prepare remove all rust and mill scale and welding
spots and spot prime defects with one coat 'Namelcoat
Zinc Chromate Metal Primer (UC53)', one coat 'Merit
Universal Undercoat (UC1)' and two coats 'Plascon
Super Universal Enamel (NY1/G)' paint
3/1/63 On rails, bars, cornices, etc. m 3364 0.00
3/1/64 Gates measured on flat m2 272 0.00
ADJUSTABLE LOADING RAMP
Excavation in compacted fill not exceeding 2m deep
3/1/65 Bases m3 2 0.00
Risk of collapse of excavations
3/1/66 Sides of trench and hole excavations not exceeding 1,5m m2 4 0.00
deep
Extra over all excavations for carting away
3/1/67 Surplus material from excavations and/or stock piles on site m3 2 0.00
to a dumping site to be located by the contractor
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
38
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Keeping excavations free of water
3/1/68 Keeping excavations free of all water other than Item 2 0.00
subterranean water
UNREINFORCED CONCRETE CAST AGAINST
EXCAVATED SURFACES
25MPa/19mm concrete
3/1/69 Foundations m3 2 0.00
STRUCTURAL STEEL, ETC
Welded and bolted adjustable loading ramp of round,
steel tube, posts, angles, channel and round bar,
including braces, cleats, gusset, base plates and
connection plates bolted to steel or concrete
3/1/70 Structure of hollow steel tubes 48mm diameter 3mm wall t 0.72 0.00
thickness
3/1/71 Structure of hollow steel tubes 60mm diameter 3mm wall t 0.06 0.00
thickness
3/1/72 Structure of hollow steel tubes 102mm diameter 3mm wall t 0.74 0.00
thickness
3/1/73 Structure taper flanged channels 100 x 50mm 10.6kg/m t 0.46 0.00
3/1/74 Structure of angles 40 x 40 x 5mm t 0.14 0.00
3/1/75 Structure of round bars 10 and 12mm diameter t 0.24 0.00
GATES
Gates of 48mm diameter hot rolled round steel tube as
per dwg no. HR11/15/3
3/1/76 Gates 450mm x 1600mm high No 8 0.00
SUNDRIES
3/1/77 3mm mild steel plates m2 18 0.00
3/1/78 12mm Chains m 6 0.00
3/1/79 Steel caps welded on top of 102mm steel posts No 32 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
39
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
PAINTWORK ETC, TO NEW WORK
ON METAL
Prepare remove all rust and mill scale and welding
spots and spot prime defects with one coat 'Namelcoat
Zinc Chromate Metal Primer (UC53)', one coat 'Merit
Universal Undercoat (UC1)' and two coats 'Plascon
Super Universal Enamel (NY1/G)' paint
3/1/80 On rails, bars, cornices, etc. m 606 0.00
3/1/81 Gates measured on flat m2 2 0.00
3/1/82 Steel plates m2 36 0.00
PLUMBING AND DRAINAGE
For preambles see Model Preambles for Trades
SUPPLEMENTARY PREAMBLES
'Polycop' polypropylene pipes:
Polypropylene pipes 54mm diameter and under shall be
seamless copper coloured class 16 pipes jointed with
"Fast-fuse" heat welded thermoplastic or brass compression
fittings as designed for use with copper pipes as stated
Pipes shall be firmly fixed to walls etc with coloured nylon
snap-in pipe clips with provision for accommodating thermal
movement and jointed and fixed strictly in accordance with
the manufacturer's instructions
All pipe diameters are nominal external
'Polylink' polypropylene pipes:
Polypropylene pipes 63mm diameter and over shall be class
12 pipes jointed with cast iron "Supraclamp" running joints
Fusion welded bends, once or twice mitred as necessary,
and tees shall be factory manufactured
Fusion welded bends and tees shall include jointing to pipes
with PVC rubber ring double Z joint couplers
Branch tees shall include flanged and bolted joints to
"Polycop" branch pipes in addition and for brass
compression male iron to copper straight couplers
Reducers shall include jointing to pipes with PVC rubber ring
double Z joint couplers and reducers shall be of sufficient
overall length to accommodate same
All pipes shall be jointed and fixed strictly in accordance with
the manufacturer's instructions
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
40
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
All pipe diameters are nominal external
uPVC pipes and fittings:
Soil, waste and vent pipes and fittings shall be solvent weld
jointed
uPVC pressure pipes and fittings:
Pipes for water supply shall be of the class stated
Pipes of 40mm diameter and smaller shall be plain ended
with solvent welded uPVC loose sockets and fittings
Pipes of 50mm diameter and greater shall have sockets and
spigots with push in type integral rubber ring joints. Bends
shall be uPVC and all other fittings shall be cast iron, all with
similar push-in type joints
Copper pipes:
Pipes shall be hard drawn and half-hard pipes of the class
stated. Class 0 (thin walled hard drawn) pipes shall not be
bent. Class 1 (thin walled half-hard), class 2 (half-hard) and
class 3 (heavy walled half-hard) pipes shall only be bent with
benders with inner and outer formers. Fittings to copper
waste, vent and anti-syphon pipes, capillary solder fittings
and compression fittings shall be "Cobra Watertech" type.
Capillary solder fittings shall comply with ISO 2016. Only
compression fittings shall be used in walls or in ground
Fixing of pipes:
Unless specifically otherwise stated, descriptions of pipes
shall be deemed to include fixing to walls etc, casting in,
building in or suspending not exceeding 1m below
suspension level
Reducing fittings:
Where fittings have reducing ends or branches they are
described as "reducing". In the case of pipes with diameters
not exceeding 60mm only the largest end or branch size is
given. Should the contractor wish to use other fittings and
bushes or reducers he may do so on the understanding that
no claim in this regard will be entertained. In the case of
pipes with diameters exceeding 60mm all sizes are given
and no claim for extra bushes, reducers, etc will be
entertained
Exposed concrete surfaces:
Exposed surfaces of concrete stormwater channels, cover
slabs, inspection eye marker slabs, gulley tops, cleaning eye
tops, catchpits, inspection chambers, etc shall be finished
smooth with plaster
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
41
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Soft rock and "hard rock" shall be as defined in
"Earthworks"
Laying, backfilling, bedding, etc. of pipes:
Pipes shall be laid and bedded and trenches shall be
carefully backfilled in accordance with manufacturers'
instructions
Where no manufacturers' instructions exist pipes shall be
laid in accordance with clauses 5.1 and 5.2 of each of the
following:
SABS 1200 L : Medium-pressure pipelines
LD : Sewers
LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with
clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB :
Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to
3.4.1, 5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be
class B bedding
'Densyl' petrolatum anti corrosion tape as
manufactured by Denso SA (Pty) Ltd:
Pipes to be taped shall be coated with the appropriate
primer and the tape shall be applied with minimum 15mm
lap per spiral unless otherwise described
Couplings and fittings to pipes shall be taped in strict
accordance with the manufacturer's instructions including all
mastic, tape, "Layflat" sheeting, securing of same, etc
WATER SUPPLY
High density polyethylene Class 6 piping complying
with SABS 533
3/1/83 25mm Pipes laid in ground not exceeding 1m deep m 6 0.00
3/1/84 50mm Pipes laid in ground not exceeding 1m deep m 337 0.00
Extra on HDPE class 6 pipes for uPVC compression
fittings
3/1/85 25mm HDPE to galvanised mild steel reducer No 6 0.00
3/1/86 50mm Reducer No 34 0.00
3/1/87 50mm Bend No 16 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
42
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
3/1/88 50mm Tee No 6 0.00
3/1/89 50mm Threaded 'BSP' adaptor No 9 0.00
3/1/90 50mm Elbow HDPE/GMS male/female adaptor No 8 0.00
3/1/91 50mm HDPE/GMS flanged male/female adaptor No 12 0.00
3/1/92 63mm Reducer No 15 0.00
Galvanised threaded mild steel pipes
3/1/93 40mm Pipes m 75 0.00
3/1/94 40mm Pipes fixed to steel structure m 15 0.00
3/1/95 50mm Pipes m 29 0.00
3/1/96 50mm Pipes fixed to steel structure m 121 0.00
Extra over galvanised mild steel pipes for steel fittings
3/1/97 50mm Elbow No 42 0.00
3/1/98 50mm Reducer No 22 0.00
3/1/99 10mm Diameter U-bolt clamp for 50mm galvanised mild No 16 0.00
steel pipe
Galvanised flanged mild steel pipes
3/1/100 50mm Pipes m 96 0.00
Extra over galvanised flanged mild steel pipes for steel
fittings
3/1/101 40mm Screwed end cap No 4 0.00
3/1/102 50mm Bend No 12 0.00
Valves, etc
3/1/103 40mm Ball valve as supplied by Cobra Brass No 4 0.00
3/1/104 25mm Pressure gauge with 50 x 25mm galvanised mild No 1 0.00
steel Tee intersection
3/1/105 50mm Stop valve No 10 0.00
3/1/106 50mm Gate valve No 6 0.00
3/1/107 50mm 'Cobra Type 700-50' high pressure float valve No 5 0.00
3/1/108 50mm 'Southern Cross All Brass' high pressure float valve No 1 0.00
installed in zinc reservoir
3/1/109 50mm Air valve type Vent-o-mat RBXb No 1 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
43
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
3/1/110 50mm Ball type check valve No 4 0.00
3/1/111 50mm Low pressure 'Southern Cross All Brass' float valve No 1 0.00
Valve chamber on 100mm thick 20 MPa/19mm concrete
base, half brick wall sides and bagged finish internally
to receive cast iron stop cock box (measured
elsewhere) finished smooth on all exposed surfaces
including all necessary excavation, backfilling, carting
away, formwork, etc
3/1/112 Valve chamber 800 x 800mm and not exceeding 500mm No 2 0.00
deep internally
Valve chamber covers, etc
3/1/113 'Saint Gobain' stop cock box product 2670 type l/d dutyclass No 4 0.00
l/D
Sundries
3/1/114 20mm Galvanised mild steel garden stand pipe 1,5m long No 3 0.00
with 500mm burried under ground with 'Cobra - 108LK' tap
with hose connector, the pipe fitted into a 110mm UPVC
sleeve filled withe 15Mpa mass concrete the sleeve painted
with enamel paint to specification
3/1/115 110mm x 100mm Long UPVC sleeve cast into concrete No 4 0.00
surface bed
3/1/116 20Mpa/19mm concrete borehole slab, size 1 450 x 400 x No 4 0.00
100mm thick cast after pipe installation is completed,
including all formwork, excavations, etc
3/1/117 Mild steel cage for borehole size 1 250 x 400 x 600mm high No 4 0.00
of 50 x 50 x 5mm angle iron frame filled in with 25 x 25 x
3mm angle iron intermediate support for axpanded metal,
the sides covered with 25mm expanded metal and the top
covered with slightly sloping galvanised corrugated iron, the
cage provided with 4 x 150 x 150 x 10mm mild steel base
plates, each bolted to concrete base with 4 x M10 chemical
bolts, including all finishing, painting etc
3/1/118 50 x 50 x 5mm Mild steel angle valve support kg 140 0.00
3/1/119 'Densyl' petrlatum anti-corrosion tape to 50mm galvanised m 6 0.00
mild steel pipes
Testing
3/1/120 Testing water pipe system as per SANS 1200 and all leaks Item 2 0.00
to be repaired
3/1/121 Testing of existing water pipelines H3
3/1/122 Testing water pipe system as per SANS 1200 No 4 0.00
Carried Forward N$ 0.00
Section No. 3
External WorksBill No.1
44
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
Budgetary allowance
3/1/123 Allow an amount of N$20,000-00 for repairs to existing Item 1 20,000.00 20,000.00
water pipelines
WATER TROUGH
1,6mm Thick mild steel water through as manufactured
by Hemco Enginnering
3/1/124 Water trough 5m long x 600mm wide x 200mm deep fixed No 7 0.00
to mild steel channel section bearers
3/1/125 Feeding trough as per specification No 3 0.00
3/1/126 Refurbish existing water trough 5m long x 600mm wide x No 1 0.00
200mm deep fixed to mild steel channel section bearers
3/1/127 Float valve cover plate, size 400mm long x 600mm wide x No 1 0.00
200mm high
WATER TROUGH SUPPORT
Excavation in compacted fill not exceeding 2m deep
3/1/128 Trenches m3 12 0.00
Risk of collapse of excavations
3/1/129 Sides of trench and hole excavations not exceeding 1,5m m2 48 0.00
deep
Extra over all excavations for carting away
3/1/130 Surplus material from excavations and/or stock piles on site m3 15 0.00
to a dumping site to be located by the contractor
Keeping excavations free of water
3/1/131 Keeping excavations free of all water other than Item 2 0.00
subterranean water
25MPa/19mm concrete
3/1/132 Surface beds including ground beams m3 27 0.00
Testing
3/1/133 Making and testing a set of four 150 x 150 x 150mm No 4 0.00
concrete strength test cubes per concrete pour, one crushed
at 7 days and 3 at 28 days (Provisional)
Finishing top surfaces of concrete smooth with a wood
float
3/1/134 Surface beds m2 120 0.00
Carried Forward N$ 20,000.00
Section No. 3
External WorksBill No.1
45
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 20,000.00
Rough formwork to sides
3/1/135 Edges of slabs not exceeding 300mm high m 92 0.00
Mesh reinforcement
3/1/136 Mesh ref. 395 fabric reinforcement in slabs m2 84 0.00
Channel section trough support fixed to concrete base
with L-shaped anchor bolt cast into concrete
3/1/137 100 x 50mm x 11kg/m Channel section beams kg 46.2 0.00
Bolts to beams, etc
3/1/138 M16 Grade 8.8 HD anchor bolt 200mm long embedded in No 24 0.00
top of concrete
SOIL DRAINAGE
uPVC pipes
3/1/139 110mm Pipes laid in and including trenches not exceeding m 357 0.00
2m deep including bedding and backfilling all in accordance
to SABS standards
Extra over uPVC pipes for fittings
3/1/140 110mm Bend No 23 0.00
3/1/141 110mm IE Junction No 16 0.00
3/1/142 110mm T Junction No 9 0.00
Sundries
3/1/143 Testing drainage pipe system Item 2 0.00
Carried to Final Summary N$ 20,000.00
Section No. 3
External WorksBill No.1
46
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 4
PROVISIONAL SUMS
BILL NO 1
NOTE:
The following sums and amounts are NET.
Under no circumstances may any Provisional Sum be
extended at an amount lower than the amount given in the
Bill.
Unless a specific percentage mark-up for Attendance is
indicated in the Rate column, the amount priced by the
Contractor for Attendance against each Provisional Sum
shall be deemed to to be the Lump Sum ad shall not be
adjusted unless the scope of th sub-contract varies
significantly.
Provisional sums contained herein may be omitted and
reduced to claim for any loss by way of reductions ore
omissions or any discount, or percentage relating to
Provisional Sums or PC amounts or any loss of profit related
thereto.
General
Unless otherwise described, all prime cost amounts and
provisional sums exclude the cash discount of 5% and
include for delivery to site of all articles concerned
All prime cost amounts and provisional sums are net and
include for delivery to site of all articles concerned
Profit
Where stated, the contractor may allow for profit if required
General attendance upon nominated sub-contractors and
direct contractors
The item "Allow for general attendance" which follows each
provisional sum for selected sub-contractors and direct
contractors work, shall be deemed to cover all the
contractor's costs incurred in providing free of charge to the
selected sub-contractors and direct contractors, the
following:
1. The services as in clause B7.3 of the Preliminaries
2. Hoisting of the selected sub-contractor's and direct
contractor's material in batches that can be handled by the
contractor's hoist or crane during normal working hours
3. Making good in all trades and cleaning down and
removal of rubbish on completion
Section No. 4
Provisional SumsBill No.1
47
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
Taking delivery
Taking delivery of goods or articles by the contractor on site
shall mean getting in, unpacking, checking that the quantity
is correct and that the goods are complete and undamaged,
submitting a report thereof to the interested parties and
issuing vouchers for the receipt of such goods. The
contractor shall store the goods and will be held responsible
for the safety thereof and indemnify the employer against
any damage or loss which may occur
PROVISIONAL SUMS, ETC
Note: The following sums are for work to be executed by the
contractor and will, where applicable, be measured and
valued at bill or agreed rates on completion.
ELECTRICAL INSTALLATION
Provide the sum of N$ 80,000.00 (Eighty Thousand Item 1 80,000.00 80,000.00
Namibian Dollars) for the electrical installation
Profit Item 1 0.00
Allow for general attendance Item 1 0.00
BORE HOLE PUMP REPAIRS
Provide the sum of N$ 50,000.00 (Fifty Thousand Namibian Item 1 50,000.00 50,000.00
Dollars) for bore hole pump repairs complete
Allow for profit Item 1 0.00
Allow for general attendance on sub-contractor Item 1 0.00
Carried Forward to Final Summary N$ 130,000.00
Section No. 4
Provisional Sums
Bill No.1
48
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
SECTION 5
BULK POWER FOR KOPANO
BILL 1
PLEASE NOTE : All rates called for
below shall be individually and
realistically priced. Omissions,
nominal or minimal rates, or
'INCLUDED' in place of any rate
called for, will NOT be accepted. ALL
QUANTITIES TO FINALLY
CONFIRMED AT SETTING-OUT
STAGE
GENERAL
5/1/1 Provision of all calculations, working Sum 1 0.00
drawings, manuals and as-built
drawings as called for
5/1/2 Submission of calculations of all line Sum 1 0.00
parameters, conductor sag profiles,
tensions, pole structure foundations
for approval, prior to
commencement of constructio
5/1/3 Drawings and manuals, as specified, Sum 1 0.00
prints and magnetic media, including
line profile drawing, sag charts and
templates, condition of First
Delivery, all locations
5/1/4 Compilation of meter serial number Sum 1 0.00
and consumer installation list,
handed over to client in XLS
spreadsheet data file. NB : THIS ITEM
IS A SPECIFIC REQUIREMENT FOR
THIS CONTRACT
5/1/5 Provision of GPS waypoint Sum 1 0.00
coordinate list of all consumer
positions and LV reticulation line
angle structures in text data file,
based on WGS84 datum. NB : THIS
ITEM IS A SPECIFIC REQUIREMENT
FOR THIS CONTRAC
SETTING OUT
5/1/6 Setting out of site in conjunction Sum 1 0.00
with Engineer, ALL sites
Carried Forward N$ 0.00
Section No. 5
Bulk Power for Kopano
Bill No.1
49
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
COMMISSION & TEST
5/1/7 Provision of all testing equipment to Sum 1 0.00
carry out specified tests including
payment of fees to any outside
Authority in respect of inspections
and/or testing of the Works
5/1/8 Preliminary testing and inspection of Sum 1 0.00
installation with Engineer, to ensure
correct and safe installation, prior to
Practical Completion inspection with
Client and Supply Authority,
including insulation tests on all
cables, earth resistance
measurements on earth mats and
electrodes
5/1/9 Testing and commissioning of entire Sum 1 0.00
installation, including compilation of
detailed inspection and test records
as per NRS 1034
5/1/10 Provision of THREE-PHASE generator Sum 1 0.00
on site for testing and
commissioning in absence of NORED
supply (provisional item, to be
confirmed on site prior to
commencement of commissioning
process). NB : THIS ITEM IS A
SPECIFIC REQUIREMENT FOR THIS
CONTRACT
MV RETICULATION MV
RETICULATION POLES, CREOSOTED
PINE TO SABS 753
5/2/1 Pole, 13 m x 180 mm top dia, for MV No 1 Rate Only
overhead line at road crossings
5/2/2 Pole, 12 m x 180 mm top dia, for MV No 1 Rate Only
overhead line for special clearance
requirements
5/2/3 Pole, 11 m x 180 mm top dia, for MV No 44 0.00
overhead line MV OVERHEAD LINE
INSULATORS, CONDUCTOR AND
ACCESSORIES
5/2/4 33 kV strain insulator assembly, No 24 0.00
Cullinan EP 1044, 40 kN, longrod,
porcelain, twisted tongue/clevis (incl
eye-bolts and nuts, formed deadend,
thimble clevis, D-shackle and
M20 eyebolt)
Carried Forward N$ 0.00
Section No. 5
Bulk Power for KopanoBill No.1
50
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
5/2/5 33 kV line post insulator assembly, No 123 0.00
Cullinan EP 480, 4 kN post type,
porcelain (incl conductor wrap lock
ties, spindle, nut and washers)
5/2/6 33 kV stand-off insulator No 5 0.00
assembly, Cullinan EP 480 4 kN post
type, porcelain (incl conductor wrap
lock ties, spindle, nut and washers)
MV CONDUCTOR
5/2/7 Conductor, ACSR, code RABBIT m 15300 0.00
5/2/8 Crimped ACSR joints on angle set/3 15 0.00
structure jumpers
5/2/9 Mechanical in-line ACSR joints MV set/3 16 0.00
POLE-TOP EQUIPMENT
5/2/10 Galvanised 33 kV A-frame cross-arm, No 1 0.00
intermediate type, complete with
threaded rod, nuts, flat, spring and
curved washers
5/2/11 Galvanised 33 kV A-frame cross-arm, No 4 0.00
strain type, complete with threaded
rod, nuts, flat, spring and curved
washers
5/2/12 Galvanised 33 kV horizontal No 2 0.00
cross-arm, strain type, complete
with pole clamps, threaded rod, stay
arm, coach screw nuts, flat, spring
and curved washers
MV LINE TERMINATION
5/2/13 33 kV line supply load-break cutout set/3 1 0.00
fuse assembly, incl galvanised special
horizontal mounting cross-arm,
spacers and stay strap and mounting
brackets, solid fuse, conductor
jumpers and clamps, threaded rod,
coach screws, nuts, curved washers etc.
5/2/14 Line MV stay assembly, complete No 7 0.00
with 380 x 380 x 6 mm galvanised
baseplate, stay rod, 7x4 mm² stay
wire, thimble, dead-end/guy grips,
insulator, tumbuckle and painted
steel pipe stay guard
5/2/15 Butt earth for intermediate poles, No 44 0.00
complete with galvanised steel down
conductor, shorted BCEW coils, top
strap and staples, as specified
Carried Forward N$ 0.00
Section No. 5
Bulk Power for KopanoBill No.1
51
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 0.00
5/2/16 Line number plate, embossed No 1 0.00
aluminium, on first pole of OHL and
spur-lines
5/2/17 Pole number plate, alphanumerical, No 1 Rate Only
punched on aluminium plate 50 x 30
mm, nailed to pole 2000 mm agl
CONVERSION OF EXISTING MV STRUCTURES
5/2/18 Convert existing 33 kV HLPCD pole No 1 0.00
structure to intermediate A-frame
configuration : remove 3 x HLP
insulators, replace by intermediate
A-frame (labour only -material
included elsewhere) MV POLE &
STAY FOUNDATIONS TO SABS 1200
5/2/19 Excavate / drill pole OHL foundations No 44 0.00
as per site setting out to required
depth in ALL types of material,
erection, backfill & compaction of
foundation backfill. NOTE : No
additional or extra-over rates for
different types of materials will be
accepted
5/2/20 Excavate / drill stay foundations as No 10 0.00
per site setting out to required depth
in ALL types of material, erection,
backfill & compaction of foundation
backfill. NOTE : No additional or
extra-over rates for different types
of materials will be accepted
MV OVERHEAD LINE ROUTE
5/2/21 Survey of line route and peg all pole km 5.1 0.00
positions
5/2/22 Manual route clearing for overhead km 5.1 0.00
line, 10 m wide, incl removal of all
roots and stumps mechanical
clearing not permissible
5/2/23 Compensation for removal of fruitbearing Prov 1 25,000.00 25,000.00
trees, only on instruction by
engineer
TRANSFORMERS & ACCESSORIES
Including complete erection of
structure with meter and crows-foot
earthing
5/3/1 Transformer pole support, 11 m x No 1 0.00
180 mm top diameter
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
52
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/3/2 Transformer pole support, 9 m x 140 No 1 0.00
mm top diameter
5/3/3 Transformer MV stay assembly, No 2 0.00
complete with 380 x 380 x 6 mm
galvanised baseplate, stay rod, 7x4
mm² stay wire, thimble, deadend/
guy grips, insulator, tumbuckle
and painted steel pipe stay guard
5/3/4 Pole-mounted transformer, 100 kVA, No 1 0.00
33 000/415 V, Dyn 11
5/3/5 Pole-mounted transformer, 50 kVA, No 1 0.00
33 000/415 V, Dyn 11
5/3/6 Pole-mounted transformer, 25 kVA, No 1 0.00
33 000/415 V, Dyn 11
5/3/7 Transformer platform, consisting of No 1 0.00
two galvanised steel cradles, two
galvanised steel channel iron
supports complete with all mounting
hardware
5/3/8 33 kV transformer cut-out fuse set/3 1 0.00
assembly, incl galvanised special
horizontal mounting cross-arm,
spacers and stay strap and mounting
brackets, 10 A fuse, conductor
jumpers and clamps, threaded rod,
coach screws, nuts, curved washers etc
5/3/9 Transformer surge arrester, 33 kV, set/3 1 0.00
Areva Varisil HE33-SD (with
disconnector), 10 kA, incl galvanised
mounting bracket, stay strap, coach
screw, threaded rod, nuts, curved
washers, conductor jumpers and earth
wire connectors, lugs and clamps etc
5/3/10 Surge arrester, 6 kV, Areva Varisil No 1 0.00
HE06 (without disconnector), 10 kA,
LV neutral to MV earth, incl
mounting bracket, conductor
jumpers and earth wire connectors,
lugs and clamps
5/3/11 Surge arrester, 250 V, 1,5 kA, LV set/4 1 0.00
phases to neutral, incl mounting
bracket, conductor lugs, jumpers and
clamps, installed on transformer
below LV terminal bushings on
flexible earth connections
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
53
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
TRANSFORMER METERBOARD
Pole-mounted three-phase Type B
meterboard, COMPLETE WITH
5/3/12 Pole-mounted board No 1 0.00
5/3/13 80 A ABB / JSO, 25 kA, three phase No 1 0.00
main circuit breaker
5/3/14 80 A ACTARIS / GEC kWH meters No 3 0.00
5/3/15 3-phase+neutral surge arrester, 40 kA set/3 1 0.00
5/3/16 Isolator, three phase, 40 A, 10 kA, in No 1 0.00
series with surge arresters
Pole-mounted three-phase Type C
meterboard, COMPLETE WITH :
5/3/17 Pole-mounted board No 1 Rate Only
5/3/18 150 A, 25 kA, three phase ABB / JSO No 1 Rate Only
main circuit breaker
5/3/19 Landis & Gyr ZMG405 kVA/kWh No 1 Rate Only
meter (as supplied by NORED), to
NORED/NamPower specification,
commissioned and configured
5/3/20 3 x 150/5 A CT's set/3 1 Rate Only
5/3/21 Meter voltage circuit protection set/3 1 Rate Only
fuses or 1 A resettable overload unit
5/3/22 Removable neutral-earth link No 1 Rate Only
5/3/23 3-phase+neutral surge arrester, 40 kA set/4 1 Rate Only
5/3/24 Isolator, three phase, 100 A, 10 kA, No 1 Rate Only
in series with surge arresters
5/3/25 Transformer label, engraved No 1 Rate Only
anodised aluminium, 300 x 200 mm,
as per drawing
TRANSFORMER EARTHING
5/3/26 Transformer MV earth electrode, No 1 0.00
consisting of 4 off 1 500 mm long
earth rods driven vertically into the
ground 5 m from transformer
position, interconnected with 2 off 5
m x 50 x 3 mm copper bar and
connected to transformer tank with
70 mm² PVC insulated earth wire,
including trenching, backfill and compaction.
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
54
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/3/27 Transformer LV earth electrode, No 1 0.00
consisting of 4 off 1 500 mm long
earth rods driven vertically into the
ground 2 m from transformer
position, interconnected with 2 off 5
m x 50 x 3 mm copper bar and
connected to transformer neutral
with 70 mm² insulated earth wire,
including trenching, backfill and
compaction
5/3/28 Earth conductor protective pipe, 20 No 2 0.00
mm thin-wall galvanised pipe, 3 m
long, strapped to pole with stainless
steel band-it strapping LV CABLES
CABLE, LV, PVCSWA, STRANDED
COPPER CONDUCTOR
5/3/29 Cable, PVCSWA, 4 x 50 mm², m 10 0.00
transformer to Type C meter board,
fastened to pole with stainless steel
straps at 500 mm intervals
5/3/30 Cable, PVCSWA, 4 x 35 mm², m 10 Rate Only
transformer to Type B meter board,
fastened to pole with stainless steel
straps at 500 mm intervals
5/3/31 Cable, PVCSWA, 4 x 50 mm², Type B m 50 0.00
meter board to changeover board in
generator room
5/3/32 Cable, PVCSWA, 4 x 35 mm², Type B m 10 Rate Only
meter board to ABC LV reticulation
distribution board, fastened to pole
with stainless steel straps at 500 mm
intervals
5/3/33 Cable, PVCSWA, 4 x 6 mm² from m 10 Rate Only
current change over board to new
staff houses
5/3/34 Cable termination, indoor, 4 x 50 No 1 0.00
mm², including cable gland and
shroud
5/3/35 Cable termination, outdoor, 4 x 50 No 1 0.00
mm², including cable hood and
terminal lugs
5/3/36 Cable termination, indoor, 4 x 35 No 1 0.00
mm², including cable gland and
shroud
5/3/37 Cable termination, outdoor, 4 x 35 No 1 Rate Only
mm², including cable hood and
terminal lugs
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
55
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/3/38 Cable termination, outdoor, 4 x 6 No 2 Rate Only
mm², including cable hood and
terminal lugs
5/3/39 BCEW, 25 mm², installed with 50 m 50 0.00
mm² LV cables, connected to earth
electrode and distribution board
earth stud
5/3/40 BCEW, 6 mm², installed with 6 mm² m 50 Rate Only
LV cables, connected to earth
electrode and distribution board
earth stud
5/3/41 Kick pipe for main cable and earth No 1 0.00
conductor, 50 mm galvanised BOSAL
thin-wall steel tube, 3 m long,
strapped to pole with stainless steel
5/3/42 Stainless steel strapping of OHL Sub 1 0.00
supply cables to poles, at 500 mm
intervals TRANSFORMER POLE &
STAY FOUNDATIONS TO SABS 1200
5/3/43 Excavate / drill pole OHL foundations No 2 0.00
as per site setting out to required
depth in ALL types of material,
erection, backfill & compaction of
foundation backfill. NOTE : No
additional or extra-over rates for
different types of materials will be
accepted
5/3/44 Excavate / drill stay foundations as No 2 0.00
per site setting out to required depth
in ALL types of material, erection,
backfill & compaction of foundation
backfill. NOTE : No additional or
extra-over rates for different types
of materials will be accepted
CHANGEOVER BOARD
5/3/45 Manual changeover board, complete No 1 0.00
with changeover switch and
indicator lights, mounted in a wall box
5/3/46 Main incoming circuit breaker, 40 A No 1 0.00
SH3-G3, 10 kA, Curve 1, for 25 kVA transformer
5/3/47 Feeder circuit breaker, 15 A, Single phase No 2 0.00
5/3/48 House control circuit breaker, 5 AS ingle phase No 2 0.00
5/3/49 LV surge diverters, connected to set/4 1 0.00
phase/neutral and earth bars
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
56
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/3/50 Main DB crows foot earth electrode, No 1 0.00
consisting of three vertical earth rods
interconnected by 3 x 2 m, 35 mm² BCEW
and by insulated 35 mm² earth
conductor to DB earth stud,
including compression gland
5/3/51 Distribution board wiring diagram, No 1 0.00
printed on A3 paper, laminated in
plastic sheeting and fixed to DB door
ADDITIONAL ITEMS Items omitted
above, required for a safe and
functional installation. Please specify
5/3/52 0.00
5/3/53 0.00
5/3/54 0.00
5/3/55 0.00
5/3/56 0.00
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
57
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
PROVISIONAL ITEMS
The rates for Provisional Items DO
NOT necessarily form part of the
contract, and are to be applied only
on specific written instruction by
the Engineer, at the discretion and
approval of the Client. Rates and
amounts listed in this Section WILL
betaken into consideration during
Tender Adjudication
5/4/1 PROFIT ON MATERIAL State profit % 1 Rate Only
percentage for supply, delivery to
site, storage and insurance for items
not mentioned in other Sections of
this Schedule of Quantities
5/4/2 Per cent mark-up on Suppliers' % 1 Rate Only
invoice DAYWORKS Rates for work
over and above rates quoted for
elsewhere in this document
LABOUR
5/4/3 Electrician hr 20 0.00
5/4/4 Wireman hr 20 0.00
5/4/5 Linesman hr 10 0.00
5/4/6 Jointer hr 15 0.00
5/4/7 Labourer (Employee) hr 30 0.00
5/4/8 Labourer (Casual) hr 30 0.00
PLANT
5/4/9 Compressor hr 50 0.00
5/4/10 Hammers Other hr 50 0.00
TRANSPORT
5/4/11 1 ton LDV km 100 0.00
5/4/12 5 ton truck km 50 0.00
5/4/13 8 ton truck km 25 0.00
GENERAL MATERIAL
5/4/14 Circuit breaker, JSO, 25 kA or No 1 0.00
equivalent, rated 125 A
5/4/15 Circuit breaker, JSO, 25 kA or No 1 0.00
equivalent, rated 100 A
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
58
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/4/16 Consumer distribution board. 24 No 3 0.00
way, single phase, surface mount,
installed in building back to back
with external meterboard, complete
with wall penetration,
interconnecting wiring and wall
fastener screws and plugs
5/4/17 MCB, main supply, 30 A TP, 5 kA, SF3 No 3 0.00
-G3, installed in meterboard
5/4/18 MCB, 80 A, 1 ph, 10 kA, for supply to No 3 0.00
special consumers
5/4/19 Feeder circuit breaker, SH3-G3, 10 kA, No 3 0.00
or equivalent, Curve 1, rated 40 A
5/4/20 Feeder circuit breaker, SH1-G3, 10 kA, No 3 0.00
or equivalent, Curve 1, rated 40 A
5/4/21 Termination, indoor, PVCSWA cable, m 5 0.00
4x16 mm², underground consumer
supply connection
5/4/22 Insulated copper earth wire, 35 mm² m 50 0.00
OVERHEAD LINE MATERIAL
5/4/23 33 kV line post insulator assembly, No 3 0.00
Cullinan EP 306, 12,5 kN post type at
road crossings and two adjacent
structures, porcelain (incl conductor
twin ties, spindle, nut and washers)
5/4/24 Conductor, ACSR, code GOPHER m 100 0.00
5/4/25 Conductor, ACSR, code FOX m 100 0.00
5/4/26 Conductor, ACSR, code MINK m 100 0.00
5/4/27 Conductor, ACSR, code HARE m 100 0.00
CIVIL WORK : TO SABS 1200
EXCAVATION AND TRENCHING
5/4/28 Excavate / drill 2 200 mm deep, No 1 0.00
backfill and compact in ALL types of
material for 13 m poles
5/4/29 Excavate / drill 2 000 mm deep, No 1 0.00
backfill and compact in ALL types of
material for 12 m LV poles
5/4/30 Excavate / drill 1 800 mm deep, No 10 0.00
backfill and compact in ALL types of
material for 11 m poles
Carried Forward N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
59
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNTBrought Forward N$ 25,000.00
5/4/31 Excavate / drill 1 500 mm deep, No 10 0.00
backfill and compact in ALL types of
material for 8 m LV poles
5/4/32 Excavate / drill 1 200 mm deep, No 10 0.00
backfill and compact in ALL types of
material for Airdac support /
termination poles
5/4/33 Excavate / drill 1 600 mm deep, No 10 0.00
backfill and compact in ALL types of
material for MV & LV stays
5/4/34 Trenching in ALL types of material m 100 0.00
for LV OHL and consumer supply
cables, 800 mm deep, 500 mm wide
Quantity is provisional -to be
finalised on site
5/4/35 Route clearing for overhead line, 8 m km 5 0.00
wide
ADDITIONAL ITEMS
Items omitted above, required for
a safe and functional installation.
Please specify
5/4/35 0.00
5/4/37 0.00
5/4/38 0.00
5/4/39 0.00
5/4/40 0.00
Carried Forward to Final Summary N$ 25,000.00
Section No. 5
Bulk Power for KopanoBill No.1
60
Bill of Quantities
Katima and Kopano Quarantine Camps
DESCRIPTION UNIT QUANTITY RATE AMOUNT
FINAL SUMMARY
Section 1 Preliminaries Page -5- N$ 0.00
Section 2 Building Works Page -33- N$ 0.00
Section 3 External Works Page -46- N$ 20,000.00
Section 4 Provisional Sums Page -48- N$ 130,000.00
Section 5 Bulk Power for Kopano Page -60- N$ 25,000.00
Contingencies
Allow the 5% of total contract amount for Contingencies to be 5% N$ 8,750.00
used as directed by the Engineer and deducted in whole or in
part if not required
TOTAL Excluding VAT - Carried to Form of Tender 183,750.00
VAT 15% 15% N$ 27,562.50
TOTAL Including VAT N$ 211,312.50
61