Upload
naomi-terry
View
214
Download
0
Embed Size (px)
Citation preview
BIDDERS’ CONFERENCE IT-3980Replacement and Supply of Electrical Overhead Travelling Cranes up to
10 Tons Capacity
March 20th 2014 Handling Engineering Group
Technical Annexes 1 and 2
Handling Engineering Group 3
Technical Annexes 1 and 2
• Annex 1: General Requirements for Electrical Overhead and Gantry Cranes
• Annex 2: PLC Programming and Documentation Requirements
March 20th 2014
Handling Engineering Group 4
Annex 1• General requirements applicable both to
new cranes and to new components for refurbishment works on existing cranes
• Some of the requirements are mandatory while others are applicable only when stated in the technical questionnaire
• Machine Directive 2006/42/EC and technical questionnaire have priority with respect to this document
March 20th 2014
Handling Engineering Group 5
Annex 1
March 20th 2014
Handling Engineering Group 6
Annex 1
March 20th 2014
Handling Engineering Group 7
Annex 1
March 20th 2014
Handling Engineering Group 8
Annex 1
March 20th 2014
Handling Engineering Group 9
Annex 1
March 20th 2014
Handling Engineering Group 10
Annex 1
March 20th 2014
Handling Engineering Group 11
Annex 1
March 20th 2014
Handling Engineering Group 12
Annex 1
March 20th 2014
Handling Engineering Group 13
Annex 1
March 20th 2014
Handling Engineering Group 14
Annex 1
March 20th 2014
Handling Engineering Group 15
Annex 2
Covers the following aspects of PLC programming:• Design requirements• Interface with users• Software protection• Documentation
March 20th 2014
Handling Engineering Group 16
Annex 2
March 20th 2014
Handling Engineering Group 17
Annex 2
March 20th 2014
Handling Engineering Group 18
Annex 2
March 20th 2014
Handling Engineering Group 19
Annex 2
March 20th 2014
Handling Engineering Group 20
Annex 2
March 20th 2014