Upload
dangdung
View
216
Download
1
Embed Size (px)
Citation preview
BHP Billiton Base Metals
CRU Wire and Cable Conference, Paris, June 2007Arnoud BalhuizenVice President Marketing & Trading - Copper Cathodes
Page 2
DisclaimerThe views expressed here contain information derived from publicly available sources that have not been independently verified. Norepresentation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by BHP Billiton.
Nothing in this release should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
Page 4
BHP Billiton - Committed for the Long TermAntamina 33.75%
Cerro Colorado Escondida 57.5% Olympic Dam
Cannington
• Being an employer of choice • Working to the highest HSEC standards • Understanding and managing risks• Significant capital investment with long lead times• Commitment to exploration through the business cycle
Spence
Slide 5
Strategic Focus - Base Metals
Olympic Dam, Resolution, Exploration
People
‘Licence to Operate’
World Class Assets
The BHP Billiton Way(Value Added Processes)
Financial Strength and Discipline
Project Pipeline
GrowthOptions
People
‘Licence to Operate’
World Class Assets
The BHP Billiton Way(Value Added Processes)
Financial Strength and Discipline
Project Pipeline
GrowthOptions
Leading BHP Billiton CSGin terms of BusinessExcellence savings
Numerousawardsand recognitionfor community,safety andenvironment
27,000 employees, operations andproject contractors(incl. Antamina)
Largest copper mineand largest silver minein the world
First half operatingmargins of 62% andEBIT of over US$2.9B
Sulphide Leach,Spence
Page 6
0
1000
2000
3000
4000
5000
6000
7000
8000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 20170
1000
2000
3000
4000
5000
6000
7000
8000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Copper project growth: Expectation vs Reality000t Copper
Data: Brook Hunt, BHP Billiton
Top 50 probable and possible mine projects in 2001 total 7.2mt
Evolution of the forecasts
Page 7
Examples of Success - Escondida• The decision to invest in the second concentrator at Escondida was made in 2000 –
when copper reached historic lows in real terms.• Over US$3B has been invested at Escondida since July 2000 to lift production to
around 1.4 Mtpa of copper. • We will continue to invest to ensure the optimum development in this world class ore
body.
Escondida (100%)
0.0
200.0
400.0
600.0
800.0
1000.0
1200.0
1400.0
2001 2002 2003 2004 2005 2006 2007
Financial Year
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
Copper Production (000t payable) Capital Expenditure ($US millions) Average LME Copper Price ($US/lb)
Production (000tpa) LHS
Capital US Millions LHS
Copper Price US$/lb RHS
Page 8
Examples of Success - Spence• Investment of US$996m committed in October 2004• Less than 2 year payback at current prices.• 19 year mine operations life• 3 to 1 waste/ore ratio for life of mine• Mine pre-strip of 78 million tonnes completed on
schedule
Page 9
Spence: history – discovery to production
100014001800220026003000340038004200460050005400580062006600700074007800
Q1-96
Q1-97
Q1-98
Q1-99
Q1-00
Q1-01
Q3 Q1-02
Q1-03
Q1-04
Q3 Q1-05
Q1-06
Q1-07
LME 3 Mth copper price – US$/tonne
Data: LME, BHP Billiton
Deposit discovered by Rio Algom
Exploration and development
Billit
on pu
rchas
e Rio
Algo
m
BHP
and B
illiton
mer
ge to
BH
P Bi
lliton
Completion of concept, pre-feasibility, feasibility studies
Definitive feasibility study completed, project approved for execution (Oct04)
Project construction and mine development
2005/20061st copper production
Page 10
Increased metal book provides deeper market insight
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
2003 2004 2005 2006 2007 2008
Third partySpenceOlympic DamTintayaCerro ColoradoEscondida
Data: BHP Billiton
Numbers are total cathode marketed and include 100% of Escondida
Calendar Years
Cathode sales - tonnes
Page 12
Global Base Metal Exploration – Focused Main Initiatives
Mexico
Andes Brownfield And Regional
Kazakhstan
Mongolia
Copper Belt DRC
Cannington
Brownfield And Regional
Olympic Dam
Brownfield And Regional