21
BCP-Mumbai Mega BCP-Mumbai Mega Flood Flood Presented by NSDL Presented by NSDL

BCP-Mumbai Mega Flood

  • Upload
    vangie

  • View
    42

  • Download
    1

Embed Size (px)

DESCRIPTION

BCP-Mumbai Mega Flood. Presented by NSDL. MUMBAI. Mumbai’s Destiny on July 26, 2005. Geographical Nature Of Mumbai Date with Destiny. Shocking Memories of July 26, 2005. Cause for Rainfall on July 26, 2005. Highest Ever Rainfall Cloudburst Maximum during last century. - PowerPoint PPT Presentation

Citation preview

Page 1: BCP-Mumbai Mega Flood

BCP-Mumbai Mega BCP-Mumbai Mega FloodFlood  

Presented by NSDLPresented by NSDL

Page 2: BCP-Mumbai Mega Flood

MUMBAIMUMBAI

Page 4: BCP-Mumbai Mega Flood

Mumbai’s Destiny on Mumbai’s Destiny on July 26, 2005July 26, 2005

Geographical Nature Of MumbaiGeographical Nature Of Mumbai

Date with DestinyDate with Destiny

Page 5: BCP-Mumbai Mega Flood

Shocking Memories of July 26, Shocking Memories of July 26, 20052005

Page 6: BCP-Mumbai Mega Flood

Cause for Rainfall on July 26, Cause for Rainfall on July 26, 20052005

Highest Ever RainfallHighest Ever Rainfall

CloudburstCloudburst

Maximum during last centuryMaximum during last century

Page 7: BCP-Mumbai Mega Flood

Lifeline of MumbaiLifeline of Mumbai

Page 8: BCP-Mumbai Mega Flood

Business Impact of July 26, Business Impact of July 26, 20052005

Banking Transactions Banking Transactions

ATM Network of several banks stopped ATM Network of several banks stopped functionningfunctionning

Failure of the connectivity with their Failure of the connectivity with their central systems located in Mumbaicentral systems located in Mumbai

Page 10: BCP-Mumbai Mega Flood

Stock ExchangesStock Exchanges

Bombay Stock ExchangeBombay Stock Exchange

National Stock ExchangeNational Stock Exchange

Sensex touched all time high on July 27, Sensex touched all time high on July 27, 20052005

Page 11: BCP-Mumbai Mega Flood

NSDL & RAINSNSDL & RAINS

NSDL & DisasterNSDL & Disaster

No stoppage because of floodsNo stoppage because of floods

Continuous connectivity with the Continuous connectivity with the business partners all over India business partners all over India

Page 12: BCP-Mumbai Mega Flood

NSDL Mission Statement - NSDL Mission Statement - BCPBCP

Capability to restore operations on Capability to restore operations on failure of any system/sub-system at failure of any system/sub-system at NSDL/Participants/NetworkNSDL/Participants/Network

Without loss of critical investor data Without loss of critical investor data within a reasonable time to ensure within a reasonable time to ensure securities settlement securities settlement

Page 13: BCP-Mumbai Mega Flood

BCP & Disaster RecoveryBCP & Disaster Recovery

Near Site (Dual Logging)Near Site (Dual Logging)

Fully operational Disaster Recovery SiteFully operational Disaster Recovery Site

Online Data volumes replicated to DRSOnline Data volumes replicated to DRS

Page 14: BCP-Mumbai Mega Flood

BCP & Disaster RecoveryBCP & Disaster Recovery Fireproof Back-up storage facility in all Fireproof Back-up storage facility in all

data centersdata centers

BCP (Copy of Documents / Source codes BCP (Copy of Documents / Source codes etc.)etc.)

Dual UPS with Battery Back-up, DG Set Dual UPS with Battery Back-up, DG Set for Power failurefor Power failure

Page 15: BCP-Mumbai Mega Flood

BCP & Disaster RecoveryBCP & Disaster Recovery

Fire / Smoke Detection and automatic Fire / Smoke Detection and automatic protectionprotection

Redundancy for Air Conditioners Redundancy for Air Conditioners

Readiness drills (Intra-day Shifting Readiness drills (Intra-day Shifting successful)successful)

Page 16: BCP-Mumbai Mega Flood

Recovery on pathRecovery on path

Page 17: BCP-Mumbai Mega Flood

Recovery/BCPRecovery/BCP Common man on the roads to help Common man on the roads to help

Government providing all the necessary Government providing all the necessary supportsupport

Mumbai Municipal Corporation officials Mumbai Municipal Corporation officials on their toes through out the disasteron their toes through out the disaster

Page 18: BCP-Mumbai Mega Flood

Recovery/BCPRecovery/BCP Power supply, Rail transport, Airports Power supply, Rail transport, Airports

started normal operations on the very started normal operations on the very next daynext day

Life back to normal within 24 hrsLife back to normal within 24 hrs

Business as usual in the financial Business as usual in the financial capital of Indiacapital of India

Page 19: BCP-Mumbai Mega Flood

Recovery/BCPRecovery/BCP Inspite of huge individual losses Inspite of huge individual losses

Mumbai started buzzing within 48 hours Mumbai started buzzing within 48 hours of the disasterof the disaster

Financial Markets back on the trackFinancial Markets back on the track

NSDL providing continuous support to NSDL providing continuous support to all the business partners across Mumbai all the business partners across Mumbai

Page 20: BCP-Mumbai Mega Flood

Life Back to NormalLife Back to Normal

Page 21: BCP-Mumbai Mega Flood

Thank YouThank You

Disasters will come and go as we don’t have Disasters will come and go as we don’t have the ability to stop them but with our never say the ability to stop them but with our never say

die attitude we shall overcome all the die attitude we shall overcome all the obstaclesobstacles