Victor Ford and Associates Inc Landscape Architects Public Meeting January 11, 2016 BLOOR STREET EAST STREETSCAPE Welcome Welcome BLOOR EAST STREETSCAPE BLOOR EAST STREETSCAPE Public Open House Monday, January 11, 2016 5:30pm - 7:30pm brief presentation at 6:00pm toronto.ca/bloorstreeteast

BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE

WelcomeWelcome

BLOOR EAST STREETSCAPE BLOOR EAST STREETSCAPE

Public Open HouseMonday, January 11, 2016

5:30pm - 7:30pm brief presentation at 6:00pm

toronto.ca/bloorstreeteast

Page 2: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE

In 2013 the Bloor East Neighbourhood Association contacted the Public Realm Section in Transportation Services to have the raised tree planters from Huntley Street to Sherbourne Street replaced.

City Staff identifi ed an opportunity to bundle streetscaping enhancements with the scheduled roadway asphalt resurfacing in 2017 as part of the Transportation Services Capital Plan. This would allow more comprehensive and coordinated improvements to the street as a whole.

The City of Toronto is now planning improvements to the Bloor Street East streetscape from St. Paul’s Square to Parliament Street as part of the 2017 asphalt resurfacing.

City staff began work in 2015 to assess existing conditions and identify opportunities.

Two large development sites are located between Sherbourne Street and Parliament Street on the south side of Bloor Street. Due to pending redevelopment, proposed improvements along this stretch are limited in 2017. A coordinated streetscape will be reconstructed when the sites are redeveloped.

Project BackgroundProject Background

Page 3: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE

The primary goal of the streetscape scope is to improve the pedestrian experience by providing adequate in-ground tree planting infrastructure, improving paving conditions, providing seating and incorporating additional bicycle parking. At this time there are no plans to relocate the existing curbs on Bloor East. Potential Streetscape improvements will be focused between the existing curb locations and the street property line.

One of the opportunities presented by roadway asphalt resurfacing is the possibility of improving on-street cycling routes by changing the width and number of vehicle lanes. In 2016, the City is undertaking a Major Corridor Study about bike lanes on Bloor Street from Sherbourne Street to Keele Street. This study includes a pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will guide the City with what type of cycling infrastructure could be implemented on this section of Bloor St. East. You can fi nd more about the Bloor Bike Lane Study please visit: toronto.ca/bloorbikelanes

Goals & OpportunitiesGoals & Opportunities

Preliminary Proposed Roadway Cross Section with Bike Lanes

Page 4: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE Nor

th

The City of Toronto is planning improvements to the Bloor Street East streetscape from St. Paul’s Square to Parliament Street.

Study AreaStudy Area

Scheduled roadway asphalt resurfacing in 2017 as part of the Transportation Services Capital Plan.

Opportunity to include streetscape improvements.

Began work in 2015 to assess conditions and identify opportunities.

nih

Page 5: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE

TimelineTimelineProject TimelineProject Timeline

Winter 2015Winter 2015: Inventory and analysis of the study area, identify existing conditions and opportunities.

Spring/Summer 2015: Spring/Summer 2015: Meetings with neighbourhood groups and the local Councillors to gather insight into what improvements the community would like to see along Bloor Street E.

Summer/Fall 2015:Summer/Fall 2015: Preliminary design concept for street improvements.

January 11, 2016:January 11, 2016: Public meeting to gather feedback on the preliminary design concept.

Spring 2016: Spring 2016: Present fi nal design to the public.

Spring/Summer 2017:Spring/Summer 2017: Construction begins.

Page 6: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

HOWARD STREET

TED

ROG

ERS

WAY

JARV

IS S

TREE

T

CHUR

CH S

TREE

T

ST. P

AULS

SQU

ARE

SHER

BOUR

NE S

TREE

T

PARL

IAM

ENT

STRE

ET

HUNT

LEY

STRE

ET

MOUNT

PLE

ASAN

T RO

AD

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

EXISTING SITE FURNISHINGS:

31 City standard bicycle racks (post and ring)

4 City standard benches (Astral)

8 City standard waste and recycling bins (Astral)

3 City standard TTC shelters (Astral)

5 Numerous assorted newspaper boxes (including 4 standard corrals and 1 Multi-publication structure) located at 5 separate locations

0 1 2m

EXISTING SIDEWALK CONDITIONS: map

Nor

th

1

3 4

5

6 7

8

9 10 11 12

13

14

15

2

LEGENDSidewalk pavement condition

Poor

Fair

Good

On street parking with hourly restrictions

Photo Key - see Site Photo Panel

Limit of project

15

Page 7: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

North side of Bloor Street East looking west North side of Bloor Street East looking east South side of Bloor Street East looking east South side of Bloor Street East looking east North side of Bloor Street East looking west

South side of Bloor Street East South side of Bloor Street East looking east South side of Bloor Street East looking east North side of Bloor Street East looking west North side of Bloor Street East looking west

South side of Bloor Street East looking east South side of Bloor Street East looking east North side of Bloor Street East looking west South side of Bloor Street East looking east South side of Bloor Street East looking east

EXISTING CONDITIONS: site photos

Site Photos

1 5

9

13

2

6 10

3

7

11 14

4

8

12 15

Page 8: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

TED

ROG

ERS

WAY

ST. P

AULS

SQU

ARE

MOU

NT P

LEAS

ANT

ROAD

MANULIFE

ROGERS GREENWIN SQUARE MALL

ROGERS 360-370 BLOOR ST E

401-419 BLOOR ST E

388 BLOOR ST E TD BANK

175 BLOOR ST E235 BLOOR ST E

ST. PAUL’S CHURCH ST. PAUL’S CHURCH

160 BLOOR ST E

250 BLOOR ST E 278 BLOOR ST E

BELLAGIO

SHER

BOUR

NE S

TREE

T

HUNT

LEY

STRE

ET

*

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

Common Hackberry(Celtis occidentalis)

Native

Suitable street tree species are tolerant of urban conditions, hardy and both drought and salt tolerant.

Zelkova(Zelkova serrata)

Non-native

Valley Forge Elm(Ulmus americana ‘Valley Forge’)

Native-non-native hybridDutch elm disease resistant

Kentucky Coffee Tree(Gymnocladus dioicus)

Native

Bur Oak(Quercus macrocarpa)

Native

Black Locust(Robinia pseudoacacia)

Regionally native

0 50m2010

PROPOSED TREE PLANTING

Suitable Street Tree Species

Nor

th

LEGEND

Existing Trees

TO BE PRESERVED IN-PLACE (1)

MAY BE SUITABLE FOR TRANSPLANT (8)

POSSIBLE NEW TREE LOCATIONS

For Streetscape Strategy from Sherbourne St. Parliament St. refer to planted bump out section and perspective

(17 trees total, 8 trees to be removed due to poor health)

*

Page 9: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

• Uniform paving pattern with City standard precast concrete unit pavers to provide a cohesive look throughout the streetscape

• Increased tree canopy and better infrastructure to support tree growth including larger continuous soil trenches, tree grates and tree guards

• Additional bicycle racks

• Additional seating

ENHANCED SIDEWALK AND STREET TREES

New seating (City standard shown)Tree grate

Extent of continuous soil trench below grade

Bicycle racks

Trench drainNew Curb

City standard unit pavingNew tree

Property lineProperty line

EXISTING SURFACE TO REMAIN

BUILDING EDGE

PLAN VIEWnot to scale

STREETSCAPE OPPORTUNITIES

Prop

erty

line

Bui

ldin

g Ed

ge

City standard unit paving

Trench drain

New curb

Planting soil

Existing surface to remain

Tree grate

Tree guard

SECTION - S1not to scale

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

HOWARD STREET

TED

ROG

ERS

WAY

RVIS

STR

EET

CHUR

CH S

TREE

T

ST. P

AULS

SQU

A

SHER

BOUR

NE S

TREE

T

STR

EET

HUNT

LEY

STRE

ET

MOUNT

PLE

ASAN

T RO

AD

key map

Enhancements Include

S1

Page 10: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

EXISTING CONDITIONS: Bloor Street East, south side looking east

STREETSCAPE OPPORTUNITIES

Enhanced Sidewalk and Street Trees

key map

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

HOWARD STREET

TED

ROG

ERS

WAY

RVIS

STR

EET

CHUR

CH S

TREE

T

ST. P

AULS

SQU

A

SHER

BOUR

NE S

TREE

T

STR

EET

HUNT

LEY

STRE

ET

MOUNT

PLE

ASAN

T RO

AD

Page 11: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

TED

ROG

ERS

WAY

RVIS

STR

EET

CHUR

CH S

TREE

T

ST. P

AULS

SQU

A

SHER

BOUR

NE S

TREE

T

STR

EET

HUNT

LEY

STRE

ET

MOUNT

PLE

ASAN

T RO

AD

key map

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

Planted bump outConcrete curb

Concrete curb

Prop

erty

line

Concrete pavement

Planted bump-outNew Tree

Concrete curb

Concrete pavement

New concrete curb

Drainage inlet

Painted line

Existing bicycle lane

Existing painted line /buffer

Vehicular lane

Property lineProperty lineEXISTING SURFACE TO REMAIN

STREETSCAPE OPPORTUNITIES

• New concrete pavement to replace sidewalk areas in poor condition

• 2 meter x 12 meter planted bump-out to include new tree planting and perennial planting

• Inlets to capture and reduce storm water run-off by allowing it to infi ltrate into the soil below

• Reduce heat island effect by providing additional shade and reducing the amount of dark paved surface

• Each planted bump-out location requires the removal of 2 parking spaces.

PLANTED BUMP-OUTEnhancements Include

PLAN VIEWnot to scale

SECTION - S2not to scale

S2

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

Page 12: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

key map

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

TED

ROG

ERS

WAY

RVIS

STR

EET

CHUR

CH S

TREE

T

ST. P

AULS

SQU

A

SHER

BOUR

NE S

TREE

T

STR

EET

HUNT

LEY

STRE

ET

MOUNT

PLE

ASAN

T RO

AD

BLOOR STREET EAST

ROSEDALE VALLEY ROAD

EXISTING CONDITIONS: Bloor Street East, south side looking west

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

Planted Bump-Out

STREETSCAPE OPPORTUNITIES

Page 13: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE IMPROVEMENTS

MATERIALS PALETTE

Trees planted in Continuous Soil Trenches

Where possible all new street trees should be planted in continuous soil trenches to allow adequate soil volumes. Trees should have tree grates to allow for greater pedestrian walking surface and guards to protect the trees.

Seating

Where possible precast concrete seats should be included. The typical City of Toronto bench from Astral Media should also be incorporated.

Planted Bump-outs

Where possible planted bump outs should be provided between Sherbourne and Parliament Street. These bump outs will enhance and soften the urban condition.

City of Toronto Waste and Recycling Receptacles

Provide City of Toronto waste and recycling receptacles in accordance with City of Toronto Coordinated Street Furniture Program.

Narrow Raised Planters

Narrow raised planters with perennial planting may be included if a maintenance agreement can be secured with the City. These planters could be located in areas where there is not enough space to plant trees.

Pedestrian Lighting

Provide pedestrian luminaires in areas that require additional lighting. Pedestrian lighting can be incorporated on the existing light posts. Accent lighting may also be considered if a maintenance agreement can be secured with the City.

Bloor Street East Sidewalk

Pedestrian sidewalks proposed to be City standard precast concrete unit pavers and are to be in accordance with the Toronto Urban Design Streetscape Manual, Provincial accessibility legislation and Toronto Green Standard

Bicycle Rack

Bicycle racks for Bloor Street East can be similar to the ones that are installed in the Bloor Yorkville BIA west of the project boundary or City of Toronto post and ring Bicycle rack.

Page 14: BBLOOR EAST STREETSCAPE LOOR EAST STREETSCAPE · pilot project to install bike lanes on Bloor between Avenue Road and Shaw Street. The results of this study will ... 12 15. Y ARE

Victor Ford and Associates Inc

Landscape Architects

Public MeetingJanuary 11, 2016

BLOOR STREET EAST STREETSCAPE Nor

th

How to Get InvolvedHow to Get Involved

Please provide your feedback! Please provide your feedback! Submit your comment cards at the registration table or email them to Kate Nelischer by February 15, 2016

Project staff will review the comments received and will develop fi nal designs for the streetscape. Final designs will be presented to the public in spring/summer 2016.

To keep up to date with the project, please contact our team to be added to the mailing list or visit the website below.

All of the images presented are concepts subject to funding and approvals. Pending permits and approvals, construction would take place in Spring/Summer 2017.

toronto.ca/bloorstreeteasttoronto.ca/bloorstreeteast

Contact:Contact:Kate NelischerSr. Public Consultation [email protected](416) 392-4360