Summit Lake Wind Project

Baraga County, Michigan

November 2017

Page 2: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

• Introductions• RES Overview• Summit Lake Wind Project• Questions & Discussion

Agenda

22017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

Page 3: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

RES Vision & History

32017 Renewable Energy Systems Americas Inc. Proprietary and Confidential

1898 – Glenfinnan Viaduct, Scotland

1923 – Wembley Stadium, London

2012 – Olympic Stadium, London

250 MW Cedar Point Wind Project

120 MW Comanche Solar Project

19.8MW / 7.8MWh Jake Energy

Storage Project

Our Vision: A future where everyone has access to affordable low carbon energy.

• Affiliated with UK-based Sir Robert McAlpine Group

• Built on a foundation of engineering & construction

• Active in renewables since 1982• Expertise in wind, solar, energy

storage, & T&D• Utility-scale & distributed

energy solutions • Over 12 GW (150+ projects)

constructed around the world

Page 4: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga
Page 5: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

>9,750>400

>1,000>128

=

=

=

=

MW

MW

miles

RES North American Construction Portfolio

MW

Page 6: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

Michigan Experience

62017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

• 149 MW wind project in Huron County. Completed in 2016. Developed by RES.

• 158 MW wind project in Huron County. Completed in 2016. Developed by RES.

Page 7: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

Summit Lake Wind Project

72017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

• ~120 MW in Baraga County, MI

• Four miles east of L’Anse, MI

• 27,235 acres• Anticipated

construction 2019

Page 8: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

82017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

General Project Schedule

• Interconnection Agreement – Spring 2018• Offtake agreement – Fall 2018• Township conditional use permits – Fall 2018• All other permits required prior to construction – Late 2018• Start of construction – Jan 2019• Project commissioned – Dec 2019

Page 9: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

Summit Lake – Land Cover Map

92017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

• 94% forest • 3% developed• 3% other

• 2017 Google Earth imagery indicates less forest

Page 10: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

• Desktop critical issues assessment & Tier 1 wildlife evaluation

• Aviation study• Telecommunication studies• NTIA radio frequency clearance• Raptor/eagle nest surveys

– 2-mile radius for all raptors; – 10-mile radius for known eagle

nests – March 2017• Spring raptor migration surveys• Historical & archaeological database

search (SHPO)

Environmental Studies - Completed

102017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

Page 11: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

• Consultation with USFWS & DNR• Site characterization study &

Tier 2 wildlife evaluation• NLEB desktop habitat

assessment• Avian/eagle use surveys began

April 2017 • General bat activity surveys

Environmental Studies – On-going

112017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

Page 12: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

• Raptor/eagle nest surveys (Feb/March 2018)

• Wetland survey (Spring/Summer 2018)

• Cultural resource survey (Spring/Summer 2018)

Environmental Studies - Planned

122017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

Page 13: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga

• Federal– FAA – Determination of No

Hazard– USACE – wetland delineation

approval, jurisdictional determination, & Section 404 nationwide permit

• State– DNR – easement on public land,

commercial forest withdrawal (for turbine pad locations), stormwater general permit

– DOT – tall structure permit, driveway access, utility permit, Oversize/Overweight Permit

Anticipated Permits and Approvals

132017 Renewable Energy Systems Americas Inc.

Proprietary and Confidential

• L’Anse Township– Conditional Use Permit– Road use agreement– Utility & driveway permits

• Baraga Township– Conditional Use Permit

(transmission line)• Baraga County

– Road Use Agreement

Page 14: Baraga County, Michigan November 2017 · 29/11/2017  · Summit Lake Wind Project 7 2017 Renewable Energy Systems Americas Inc. Proprietary and Confidential • ~120 MW in Baraga