Upload
galvin-mooney
View
35
Download
0
Embed Size (px)
DESCRIPTION
Backing into a pure play beta: Studio Entertainment. D/E = 35.02/64.98 = 53.89%. 1. Start with the regression beta (equity beta) of 1.57 2. Unlever the beta to get the beta for the movie company Unlevered beta = 1.57/ (1+ (1-.4) (.5389)) = 1.1864 3. Get the beta for the movie business - PowerPoint PPT Presentation
Citation preview
1
Backing into a pure play beta: Studio Entertainment
Aswath Damodaran
1
1. Start with the regression beta (equity beta) of 1.572. Unlever the beta to get the beta for the movie company
Unlevered beta = 1.57/ (1+ (1-.4) (.5389)) = 1.18643. Get the beta for the movie business
0.9107 (Beta of movie business) + 0.0893 (0) = 1.1864Beta of movie business = 1.1864/(1-.0893) = 1.3027
D/E = 35.02/64.98 = 53.89%