18
AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Embed Size (px)

Citation preview

Page 1: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

AWBA Water Supply and Demand Study

October 4, 2011AWBA Meeting

Page 2: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Comparison 1997 Base to Base

1997 Base

• 1997 Reservoir Elevations• 15,000 AF Indian Firming• Indian Firming thru 2097 • Pro Rata CAP/On-River• Probability Base Shortage

Determination

Base

• 2012 Reservoir Elevation• 23,724 AF Indian Firming• Indian Firming Thru 2108• Shortage Sharing Proposal• Stepped Shortage

Determination

Page 3: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

First Shortage YearBase vs. 1997 Base

Page 4: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Shortage VolumeBase vs. 1997 Base

Page 5: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Number of ShortagesBase vs. 1997 Base

Page 6: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Credits RemainingBase vs. 1997 Base

Page 7: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

General Assumptions

• Starting Reservoir Elevation Jan. 2012• Shortage Triggers• CAP Shortage Distribution• No Yuma Desalter• M&I Firming thru 2097• Indian Firming thru 2108• Indian Firming 23,724 AF

Page 8: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Base vs. Scenarios

Base

• On-River/CAP shortage distribution pro rata based on demand

Scenarios

• Director’s Shortage Sharing Recommendation

Page 9: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

ScenariosScenario

Upper Basin Depletion Schedule

On-River Tribal Schedule

Lake Mead Shortage Criteria

Mexico Shares in Shortage

Model Run Completed

AAWBA Upper Basin

AssumptionTen Tribes

Interim Guidelines Extended

Yes 8/29/2011

BAWBA Upper Basin

AssumptionTen Tribes

Interim Guidelines Extended

No 8/29/2011

CAWBA Upper Basin

AssumptionADWR 2010-2011

UpdateInterim Guidelines

ExtendedYes 8/30/2011

DAWBA Upper Basin

AssumptionADWR 2010-2011

UpdateInterim Guidelines

ExtendedNo  

EUpper Basin

ScheduleTen Tribes

Interim Guidelines Extended

Yes 8/29/2011

FUpper Basin

ScheduleTen Tribes

Interim Guidelines Extended

No 8/29/2011

GUpper Basin

ScheduleADWR 2010-2011

UpdateInterim Guidelines

ExtendedYes 8/29/2011

HUpper Basin

ScheduleADWR 2010-2011

UpdateInterim Guidelines

ExtendedNo 8/30/2011

Page 10: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Shortage VolumeBase, Scenario A and Scenario C

Page 11: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

First Shortage YearBase, Scenario A and Scenario C

Page 12: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Number of ShortagesBase, Scenario A and Scenario C

Page 13: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Credits RemainingBase, Scenario A and Scenario C

Page 14: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Shortage VolumeMedian Traces

Page 15: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

First Shortage YearMedian Traces

Page 16: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Number of ShortagesMedian Trace

Page 17: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Credits RemainingBase, Scenario A and Scenario C

Page 18: AWBA Water Supply and Demand Study October 4, 2011 AWBA Meeting

Discussion