MENGANALISA HE NETWORKING PADA CHILLING
TRAIN DI ETHYLENE PLANT PT. CHANDRA ASRI
PETROCHEMICAL
LAPORAN KERJA PRAKTEK
Disusun oleh :
1. EFA RUJATUL AMALIAH (3335100197)
2. RISKA RISTIYANTI (3335100599)
JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK
UNIVERSITAS SULTAN AGENG TIRTAYASA
CILEGON – BANTEN
2013
Menganalisa HE Networking pada Chilling Train di Ethylene
Plant PT.Chandra Asri Petrochemical
Laporan Kerja Praktek ini disusun sebagai syarat kelulusan
mata kuliah Kerja Praktek dan salah satu syarat
menempuh sarjana Strata I Teknik Kimia
Universitas Sultan Ageng Tirtayasa
Cilegon-Banten
Disusun oleh :
1. Efa Rujatul Amaliah (3335100197)
2. Riska Ristiyanti (3335100599)
\
JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK
UNIVERSITAS SULTAN AGENG TIRTAYASA
CILEGON – BANTEN
2013
iii
Menganalisa HE Networking pada Chilling Train di Ethylene
Plant PT.Chandra Asri Petrochemical
Disusun oleh :
1. Efa Rujatul Amaliah (3335100197)
2. Riska Ristiyanti (3335100599)
Komentar/Catatan
1. Pembimbing Lapangan
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
2. Dosen Pembimbing
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
Tempat Kerja Praktek : PT. Chandra Asri Petrochemical Tbk.
Divisi/Dinas/Bagian : Ethylene Department/Cold Section
Waktu Kerja Praktek : 2 September 2013 – 27 September 2013
Jumlah hari Kerja : 21 hari
Telah diperiksa dan disetujui
Dosen Pembimbing Pembimbing Lapangan/Perusahaan
Dr. Ing. Anton Irawan,ST., MT. Andang PungkaseNIP. 197510012008011007
iv
Menganalisa HE Networking pada Chilling Train di Ethylene
Plant PT.Chandra Asri Petrochemical
Disusun oleh :
1. Efa Rujatul Amaliah (3335100197)
2. Riska Ristiyanti (3335100599)
Telah disetujui dan dipertahankan di hadapan dewan penguji
dalam Seminar Kerja Praktek
tanggal .............................
Pembimbing Penguji
Dr. Ing. Anton Irawan, ST., MT ______________________NIP. 197510012008011007 NIP.
Mengetahui,
Ketua Jurusan Teknik Kimia
Dr. Ing. Anton Irawan, ST., MTNIP. 197510012008011007
v
Menganalisa HE Networking pada Chilling Train di Ethylene
Plant PT.Chandra Asri Petrochemical
Disusun oleh :
1. Efa Rujatul Amaliah (3335100197)
2. Riska Ristiyanti (3335100599)
Jurusan Teknik Kimia
Universitas Sultan Ageng Tirtayasa
Tempat Kerja Praktek : PT. Chandra Asri Petrochemical Tbk.
Divisi/Dinas/Bagian : Ethylene Department/Cold Section
Waktu Kerja Praktek : 2 September 2013 – 27 September 2013
Jumlah hari Kerja : 21 hari
Telah diperiksa dan disetujui
Manager HRD Pembimbing Lapangan/Perusahaan
Dwinanto Kurniawan Andang Pungkase
vi
KATA PENGANTAR
Assalamu’alaikum Wr Wb
Puji syukur kehadirat Allah SWT yang telah memberikan nikmat dan
karunia-Nya sehingga laporan kerja praktek ini dapat terselesaikan dengan baik.
Shalawat serta salam selalu tercurah pada nabi besar Muhammad SAW yang
menjadi inspirasi terbesar dalam melakukan suatu hal didunia.
Laporan kerja praktek ini merupakan hasil dari kerja praktek di PT.
Chandra Asri Petrochemical (PT. CAP) pada bagian ethylene plant, yang telah
dilaksanakan pada 2 september 2013 sampai dengan 27 september 2013.
Merupakan salah satu syarat untuk memperoleh gelar sarjana pada Jurusan Teknik
Kimia, Fakultas Teknik, Universitas Sultan Ageng Tirtayasa.
Selama kerja praktek dan penyusunan laporan ini tidak lepas dari
bimbingan, pengarahan dan bantuan yang diperoleh dari berbagai pihak. Oleh
karena itu pada kesempatan ini penulis mengucapkan terima kasih yang sebesar-
besarnya kepada :
1. Allah SWT yang telah memberikan nikmat kesehatan sehingga tugas akhir
ini terselesaikan dengan baik.
2. Kedua orang tua yang telah memberikan do’a, dukungan dan dorongan
baik moril maupun materil.
3. Bapak Wawan, Ibu Vera, Bapak Agus Setiawan dan seluruh personil dari
Human Resource Development yang telah mempermudah kami dalam
penerimaan kerja praktek di PT. Chandra Asri Petrochemical Tbk.
4. Bapak Dr. Ing Anton Irawan, ST, MT. Selaku ketua jurusan Teknik Kimia,
Fakultas Teknik, Universitas Sultan Ageng Tirtayasa sekaligus dosen
pembimbing yang telah banyak memberikan bimbingan, motivasi, arahan,
saran dan kritik yang membangun selama proses penyusunan laporan.
5. Bapak Andang Pungkase, selaku pembimbing lapangan di PT. Chandra
Asri Petrochemical yang telah banyak memberikan banyak petunjuk,
arahan dan limpahan ilmu yang begitu berharga selama pelaksanaan kerja
praktek berlangsung.
vii
6. Ibu Marta Pramudita, ST, MT. Selaku koordinator kerja praktek Jurusan
Teknik Kimia, Fakultas Teknik Sultan Ageng Tirtayasa.
7. Seluruh Tim Engineer dari Ethylene Hot Section maupun Ethylene Cold
Section yang telah memberikan curahan ilmu yang sangat berguna selama
pelaksanaan kerja praktek berlangsung.
8. Rekan- rekan Kerja Praktek teknik kimia UNTIRTA, terima kasih atas
kebersamaannya.
9. Semua pihak yang secara langsung maupun tidak langsung telah
membantu selama kerja praktek dan penyusunan laporan ini.
Terlepas dari keyakinan kuat yang kami miliki, selaku makhluk lemah tentu
masih banyak kekurangan dan kesalahan dalam Penulisan Laporan Kerja
Praktek ini. Oleh karena itu, penulis mengharapkan saran dan kritik yang
membangun guna perbaikan di kemudian hari. Dengan segala kerendahan
hati, kami berharap semoga laporan kerja praktek ini dapat bermanfaat bagi
semua pihak yang menggunakannya.
Cilegon, November 2013
Penulis
viii
DAFTAR ISI
Halaman
JUDUL LAPORAN ....................................................................................... i
LEMBAR PENGESAHAN .......................................................................... iii
LEMBAR PENGESAHAN SEMINAR ...................................................... iv
LEMBAR PENGESAHAN PERUSAHAAN ............................................ v
KATA PENGANTAR ................................................................................ vi
DAFTAR ISI .................................................................................................. viii
DAFTAR TABEL ......................................................................................... xi
DAFTAR GAMBAR ..................................................................................... xii
BAB I PENDAHULUAN
1.1 Sejarah Perusahaan .......................................................................... 1
1.2 Pelaksanaa Kerja praktek di PT. CAP Tbk ...................................... 3
1.1.1.Latar Belakang..................................................................... 3
1.1.2.Maksud dan Tujuan Kerja Praktek....................................... 4
1.1.3.Tempat dan Waktu pelaksanaan Kerja Praktek..................... 5
1.2. Lokasi dan Tata letak PT. Chandra Asri Petrochemical Tbk............ 5
1.3. Struktur Organisasi PT. CAP Tbk..................................................... 6
BAB II DESKRIPSI PROSES
2.1. Bahan Baku Utama ......................................................................... 10
2.2. Bahan Baku Penunjang ................................................................... 13
2.3. Uraian Proses di Ethyene Plant ....................................................... 15
2.4. Produk Utama ................................................................................. 44
BAB III ALAT PROSES DAN INSTRUMENTASI
3.1. Spesifikasi Alat Utama ................................................................... 47
3.2. Spesifikasi Alat Pendukung ............................................................ 62
3.3. Uraian dari sistem pemroses ........................................................... 66
3.3.1. Furnace ............................................................................... 66
3.3.2. Gasoline Fractionator dan PFO Stripper ........................... 68
3.3.3. Quench Tower .................................................................... 69
ix
3.3.4. PW Stripper dan Dillution Steam ....................................... 69
3.3.5. Charge Gas Compressor ..................................................... 70
3.3.6. Caustic Water Wash Tower ................................................ 73
3.3.7. Charge Gas Dryer ............................................................... 74
3.3.8. Chilling Train ..................................................................... 75
3.3.9. H2 Treating ........................................................................ 77
3.3.10. Demethanizer ................................................................... 79
3.3.11. Deethanizer ....................................................................... 82
3.3.12. Acetylene Converter ......................................................... 81
3.3.13. C2 Green KO Drum dan Ethylene Dryer ......................... 81
3.3.14. Ethylene Fractionator ....................................................... 82
3.3.15. Depropanizer .................................................................... 83
3.3.16. Propylene Dryer ............................................................... 84
3.3.17. MAPD Converter ............................................................. 84
3.3.18. Propylene Fractionator ..................................................... 85
3.3.19. Debutanizer ...................................................................... 86
3.3.20. C4/C5 Hydrogenation ...................................................... 86
3.3.21. DPG Unit .......................................................................... 87
3.3.22. Depentanizer ..................................................................... 88
3.3.23. BTX Tower ...................................................................... 89
3.4. Instrumentasi ................................................................................... 89
3.5. Laboratorium .................................................................................. 89
BAB IV UTILITAS DAN PENGOLAHAN LIMBAH
4.1. Area I .............................................................................................. 93
4.1.1. Sistem Pengambilan Air Laut (Sea Water Intake System) .. 93
4.1.2. Sistem Air Pendingin (Cooling Water System) .................. 96
4.1.3. Sistem Pemadam Kebakaran (Fire Fighting System) ......... 98
4.2. Area II ............................................................................................. 99
4.2.1. Sistem Pengolahan Air (Water Treatment System) ............ 99
4.2.2. Unit Desalinasi ................................................................... 102
4.3. Area III ............................................................................................ 104
x
4.3.1. Sistem Boiler ...................................................................... 104
4.3.2. Penyediaan Tenaga Listrik ................................................. 107
4.4.3. Penyediaan Udara Pabrik dan Udara Peralatan (Plant Air dan
Instrument Air ..................................................................... 110
4.4. Area IV ........................................................................................... 112
BAB V KESIMPULAN DAN SARAN
5.1. Kesimpulan ..................................................................................... 115
5.2. Saran ............................................................................................... 116
DAFTAR PUSTAKA
TUGAS KHUSUS
LAMPIRAN
xi
DAFTAR TABEL
Halaman
Tabel 1. Spesifikasi Bahan baku naphta ADNOC-Pentane plus ..................... 11
Tabel 2. Spesifikasi bahan baku ADGAS penthane plus ................................. 12
Tabel 3. Spesifikasi C3-LPG .......................................................................... 13
Tabel 4. Tahap Pendinginan di Chilling Train ................................................ 30
Tabel 5. Sifat Fisik Ethylene............................................................................ 44
Tabel 6. Tahap Pendinginan di Chilling Train ................................................ 75
Tabel 7. Kondisi Air Masuk dan Air Keluar Sistem Pengolahan Air ............. 103
Tabel 8. Tahap Pendinginan di Chilling Train................................................. 121
xii
DAFTAR GAMBAR
Halaman
Gambar 1. Peta Lokasi PT.Chandra Asri Petrochemical Tbk ....................... 5
Gambar 2. Layout PT. Chndra Asri Petrochemical Tbk ............................... 6
Gambar 3. Blok Diagram Over All Ethylene Plant ....................................... 15
Gambar 4. Skema Proses Hot Section ........................................................... 16
Gambar 5. Skema Proses Cold Section pada Ethylene Plant ........................ 23
Gambar 6. Furnace ........................................................................................ 46
Gambar 7. Gasoline Fractinator .................................................................... 48
Gambar 8. Quench Tower ............................................................................. 49
Gambar 9. PFO Stripper ................................................................................ 50
Gambar 10. Demethanizer ............................................................................ 52
Gambar 11. Deethanizer ................................................................................ 53
Gambar 12. Acetylene Converter .................................................................. 54
Gambar 13. Ethylene Fractionator ................................................................ 55
Gambar 14. Depropanizer ............................................................................. 56
Gambar 15. Popylene Fractionator ............................................................... 57
Gambar 16. Debuthanizer ............................................................................. 59
Gambar 17. Depentanizer .............................................................................. 59
Gambar 18. BTX Tower ............................................................................... 60
Gambar 19. C4/C5 Hydrogenation Reactor ................................................... 61
Gambar 20. Charge Gas Compressor ............................................................ 62
Gambar 21. Caustic Water Wash Tower ....................................................... 64
Gambar 22. Charge Gas Dryer ...................................................................... 64
Gambar 23. C2 Green Oil Knock Out Drum ................................................ 65
Gambar 24. Skema Sistem Pengambilan Air Laut ....................................... 93
Gambar 25. Skema Sistem Air Pendingin .................................................... 97
Gambar 26. Skema Sistem Pemadam Kebakaran ......................................... 99
Gambar 27. Sistem Pengolahan Air dan Desalinasi ...................................... 104
Gambar 28. Sistem Boiler .............................................................................. 106
xiii
Gambar 29. Sistem Penyediaan Uap.............................................................. 107
Gambar 30. Steam Turbine Generator ........................................................... 109
Gambar 31. Gas Turbine Generator ............................................................... 110
Gambar 32. Sistem Plant Air dan Instrument Air .......................................... 111
Gambar 33. Chilling train, coldbox dan demethanizer .................................. 120
Gambar 34. Rangkaian Seri Heat Exhanger (Chilling Train) ........................ 121
Gambar 35. Arah aliran HE: parallel (kiri), counter (tengah)
dan cross (kanan) ...................................................................... 128
Gambar 36. Algoritma Perhitungan Tugas Khusus ...................................... 121
Gambar 37. Grafik hubungan antara mass flow refrigerant EA-312
terhadap suhu keluaran chilling train ........................................ 131
Gambar 38. Grafik hubungan antara mass flow refrigerant EA-308 terhadap
suhu keluaran chilling train....................................................... 133
Gambar 39. Nilai ∆T/m tiap-tiap Heat Exchanger pada Chilling Train........ 134