13
MENGANALISA HE NETWORKING PADA CHILLING TRAIN DI ETHYLENE PLANT PT. CHANDRA ASRI PETROCHEMICAL LAPORAN KERJA PRAKTEK Disusun oleh : 1. EFA RUJATUL AMALIAH (3335100197) 2. RISKA RISTIYANTI (3335100599) JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA CILEGON BANTEN 2013

awal KP.pdf

Embed Size (px)

Citation preview

Page 1: awal KP.pdf

MENGANALISA HE NETWORKING PADA CHILLING

TRAIN DI ETHYLENE PLANT PT. CHANDRA ASRI

PETROCHEMICAL

LAPORAN KERJA PRAKTEK

Disusun oleh :

1. EFA RUJATUL AMALIAH (3335100197)

2. RISKA RISTIYANTI (3335100599)

JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK

UNIVERSITAS SULTAN AGENG TIRTAYASA

CILEGON – BANTEN

2013

Page 2: awal KP.pdf

Menganalisa HE Networking pada Chilling Train di Ethylene

Plant PT.Chandra Asri Petrochemical

Laporan Kerja Praktek ini disusun sebagai syarat kelulusan

mata kuliah Kerja Praktek dan salah satu syarat

menempuh sarjana Strata I Teknik Kimia

Universitas Sultan Ageng Tirtayasa

Cilegon-Banten

Disusun oleh :

1. Efa Rujatul Amaliah (3335100197)

2. Riska Ristiyanti (3335100599)

\

JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK

UNIVERSITAS SULTAN AGENG TIRTAYASA

CILEGON – BANTEN

2013

Page 3: awal KP.pdf

iii

Menganalisa HE Networking pada Chilling Train di Ethylene

Plant PT.Chandra Asri Petrochemical

Disusun oleh :

1. Efa Rujatul Amaliah (3335100197)

2. Riska Ristiyanti (3335100599)

Komentar/Catatan

1. Pembimbing Lapangan

…………………………………………………………………………………………

…………………………………………………………………………………………

…………………………………………………………………………………………

2. Dosen Pembimbing

…………………………………………………………………………………………

…………………………………………………………………………………………

…………………………………………………………………………………………

Tempat Kerja Praktek : PT. Chandra Asri Petrochemical Tbk.

Divisi/Dinas/Bagian : Ethylene Department/Cold Section

Waktu Kerja Praktek : 2 September 2013 – 27 September 2013

Jumlah hari Kerja : 21 hari

Telah diperiksa dan disetujui

Dosen Pembimbing Pembimbing Lapangan/Perusahaan

Dr. Ing. Anton Irawan,ST., MT. Andang PungkaseNIP. 197510012008011007

Page 4: awal KP.pdf

iv

Menganalisa HE Networking pada Chilling Train di Ethylene

Plant PT.Chandra Asri Petrochemical

Disusun oleh :

1. Efa Rujatul Amaliah (3335100197)

2. Riska Ristiyanti (3335100599)

Telah disetujui dan dipertahankan di hadapan dewan penguji

dalam Seminar Kerja Praktek

tanggal .............................

Pembimbing Penguji

Dr. Ing. Anton Irawan, ST., MT ______________________NIP. 197510012008011007 NIP.

Mengetahui,

Ketua Jurusan Teknik Kimia

Dr. Ing. Anton Irawan, ST., MTNIP. 197510012008011007

Page 5: awal KP.pdf

v

Menganalisa HE Networking pada Chilling Train di Ethylene

Plant PT.Chandra Asri Petrochemical

Disusun oleh :

1. Efa Rujatul Amaliah (3335100197)

2. Riska Ristiyanti (3335100599)

Jurusan Teknik Kimia

Universitas Sultan Ageng Tirtayasa

Tempat Kerja Praktek : PT. Chandra Asri Petrochemical Tbk.

Divisi/Dinas/Bagian : Ethylene Department/Cold Section

Waktu Kerja Praktek : 2 September 2013 – 27 September 2013

Jumlah hari Kerja : 21 hari

Telah diperiksa dan disetujui

Manager HRD Pembimbing Lapangan/Perusahaan

Dwinanto Kurniawan Andang Pungkase

Page 6: awal KP.pdf

vi

KATA PENGANTAR

Assalamu’alaikum Wr Wb

Puji syukur kehadirat Allah SWT yang telah memberikan nikmat dan

karunia-Nya sehingga laporan kerja praktek ini dapat terselesaikan dengan baik.

Shalawat serta salam selalu tercurah pada nabi besar Muhammad SAW yang

menjadi inspirasi terbesar dalam melakukan suatu hal didunia.

Laporan kerja praktek ini merupakan hasil dari kerja praktek di PT.

Chandra Asri Petrochemical (PT. CAP) pada bagian ethylene plant, yang telah

dilaksanakan pada 2 september 2013 sampai dengan 27 september 2013.

Merupakan salah satu syarat untuk memperoleh gelar sarjana pada Jurusan Teknik

Kimia, Fakultas Teknik, Universitas Sultan Ageng Tirtayasa.

Selama kerja praktek dan penyusunan laporan ini tidak lepas dari

bimbingan, pengarahan dan bantuan yang diperoleh dari berbagai pihak. Oleh

karena itu pada kesempatan ini penulis mengucapkan terima kasih yang sebesar-

besarnya kepada :

1. Allah SWT yang telah memberikan nikmat kesehatan sehingga tugas akhir

ini terselesaikan dengan baik.

2. Kedua orang tua yang telah memberikan do’a, dukungan dan dorongan

baik moril maupun materil.

3. Bapak Wawan, Ibu Vera, Bapak Agus Setiawan dan seluruh personil dari

Human Resource Development yang telah mempermudah kami dalam

penerimaan kerja praktek di PT. Chandra Asri Petrochemical Tbk.

4. Bapak Dr. Ing Anton Irawan, ST, MT. Selaku ketua jurusan Teknik Kimia,

Fakultas Teknik, Universitas Sultan Ageng Tirtayasa sekaligus dosen

pembimbing yang telah banyak memberikan bimbingan, motivasi, arahan,

saran dan kritik yang membangun selama proses penyusunan laporan.

5. Bapak Andang Pungkase, selaku pembimbing lapangan di PT. Chandra

Asri Petrochemical yang telah banyak memberikan banyak petunjuk,

arahan dan limpahan ilmu yang begitu berharga selama pelaksanaan kerja

praktek berlangsung.

Page 7: awal KP.pdf

vii

6. Ibu Marta Pramudita, ST, MT. Selaku koordinator kerja praktek Jurusan

Teknik Kimia, Fakultas Teknik Sultan Ageng Tirtayasa.

7. Seluruh Tim Engineer dari Ethylene Hot Section maupun Ethylene Cold

Section yang telah memberikan curahan ilmu yang sangat berguna selama

pelaksanaan kerja praktek berlangsung.

8. Rekan- rekan Kerja Praktek teknik kimia UNTIRTA, terima kasih atas

kebersamaannya.

9. Semua pihak yang secara langsung maupun tidak langsung telah

membantu selama kerja praktek dan penyusunan laporan ini.

Terlepas dari keyakinan kuat yang kami miliki, selaku makhluk lemah tentu

masih banyak kekurangan dan kesalahan dalam Penulisan Laporan Kerja

Praktek ini. Oleh karena itu, penulis mengharapkan saran dan kritik yang

membangun guna perbaikan di kemudian hari. Dengan segala kerendahan

hati, kami berharap semoga laporan kerja praktek ini dapat bermanfaat bagi

semua pihak yang menggunakannya.

Cilegon, November 2013

Penulis

Page 8: awal KP.pdf

viii

DAFTAR ISI

Halaman

JUDUL LAPORAN ....................................................................................... i

LEMBAR PENGESAHAN .......................................................................... iii

LEMBAR PENGESAHAN SEMINAR ...................................................... iv

LEMBAR PENGESAHAN PERUSAHAAN ............................................ v

KATA PENGANTAR ................................................................................ vi

DAFTAR ISI .................................................................................................. viii

DAFTAR TABEL ......................................................................................... xi

DAFTAR GAMBAR ..................................................................................... xii

BAB I PENDAHULUAN

1.1 Sejarah Perusahaan .......................................................................... 1

1.2 Pelaksanaa Kerja praktek di PT. CAP Tbk ...................................... 3

1.1.1.Latar Belakang..................................................................... 3

1.1.2.Maksud dan Tujuan Kerja Praktek....................................... 4

1.1.3.Tempat dan Waktu pelaksanaan Kerja Praktek..................... 5

1.2. Lokasi dan Tata letak PT. Chandra Asri Petrochemical Tbk............ 5

1.3. Struktur Organisasi PT. CAP Tbk..................................................... 6

BAB II DESKRIPSI PROSES

2.1. Bahan Baku Utama ......................................................................... 10

2.2. Bahan Baku Penunjang ................................................................... 13

2.3. Uraian Proses di Ethyene Plant ....................................................... 15

2.4. Produk Utama ................................................................................. 44

BAB III ALAT PROSES DAN INSTRUMENTASI

3.1. Spesifikasi Alat Utama ................................................................... 47

3.2. Spesifikasi Alat Pendukung ............................................................ 62

3.3. Uraian dari sistem pemroses ........................................................... 66

3.3.1. Furnace ............................................................................... 66

3.3.2. Gasoline Fractionator dan PFO Stripper ........................... 68

3.3.3. Quench Tower .................................................................... 69

Page 9: awal KP.pdf

ix

3.3.4. PW Stripper dan Dillution Steam ....................................... 69

3.3.5. Charge Gas Compressor ..................................................... 70

3.3.6. Caustic Water Wash Tower ................................................ 73

3.3.7. Charge Gas Dryer ............................................................... 74

3.3.8. Chilling Train ..................................................................... 75

3.3.9. H2 Treating ........................................................................ 77

3.3.10. Demethanizer ................................................................... 79

3.3.11. Deethanizer ....................................................................... 82

3.3.12. Acetylene Converter ......................................................... 81

3.3.13. C2 Green KO Drum dan Ethylene Dryer ......................... 81

3.3.14. Ethylene Fractionator ....................................................... 82

3.3.15. Depropanizer .................................................................... 83

3.3.16. Propylene Dryer ............................................................... 84

3.3.17. MAPD Converter ............................................................. 84

3.3.18. Propylene Fractionator ..................................................... 85

3.3.19. Debutanizer ...................................................................... 86

3.3.20. C4/C5 Hydrogenation ...................................................... 86

3.3.21. DPG Unit .......................................................................... 87

3.3.22. Depentanizer ..................................................................... 88

3.3.23. BTX Tower ...................................................................... 89

3.4. Instrumentasi ................................................................................... 89

3.5. Laboratorium .................................................................................. 89

BAB IV UTILITAS DAN PENGOLAHAN LIMBAH

4.1. Area I .............................................................................................. 93

4.1.1. Sistem Pengambilan Air Laut (Sea Water Intake System) .. 93

4.1.2. Sistem Air Pendingin (Cooling Water System) .................. 96

4.1.3. Sistem Pemadam Kebakaran (Fire Fighting System) ......... 98

4.2. Area II ............................................................................................. 99

4.2.1. Sistem Pengolahan Air (Water Treatment System) ............ 99

4.2.2. Unit Desalinasi ................................................................... 102

4.3. Area III ............................................................................................ 104

Page 10: awal KP.pdf

x

4.3.1. Sistem Boiler ...................................................................... 104

4.3.2. Penyediaan Tenaga Listrik ................................................. 107

4.4.3. Penyediaan Udara Pabrik dan Udara Peralatan (Plant Air dan

Instrument Air ..................................................................... 110

4.4. Area IV ........................................................................................... 112

BAB V KESIMPULAN DAN SARAN

5.1. Kesimpulan ..................................................................................... 115

5.2. Saran ............................................................................................... 116

DAFTAR PUSTAKA

TUGAS KHUSUS

LAMPIRAN

Page 11: awal KP.pdf

xi

DAFTAR TABEL

Halaman

Tabel 1. Spesifikasi Bahan baku naphta ADNOC-Pentane plus ..................... 11

Tabel 2. Spesifikasi bahan baku ADGAS penthane plus ................................. 12

Tabel 3. Spesifikasi C3-LPG .......................................................................... 13

Tabel 4. Tahap Pendinginan di Chilling Train ................................................ 30

Tabel 5. Sifat Fisik Ethylene............................................................................ 44

Tabel 6. Tahap Pendinginan di Chilling Train ................................................ 75

Tabel 7. Kondisi Air Masuk dan Air Keluar Sistem Pengolahan Air ............. 103

Tabel 8. Tahap Pendinginan di Chilling Train................................................. 121

Page 12: awal KP.pdf

xii

DAFTAR GAMBAR

Halaman

Gambar 1. Peta Lokasi PT.Chandra Asri Petrochemical Tbk ....................... 5

Gambar 2. Layout PT. Chndra Asri Petrochemical Tbk ............................... 6

Gambar 3. Blok Diagram Over All Ethylene Plant ....................................... 15

Gambar 4. Skema Proses Hot Section ........................................................... 16

Gambar 5. Skema Proses Cold Section pada Ethylene Plant ........................ 23

Gambar 6. Furnace ........................................................................................ 46

Gambar 7. Gasoline Fractinator .................................................................... 48

Gambar 8. Quench Tower ............................................................................. 49

Gambar 9. PFO Stripper ................................................................................ 50

Gambar 10. Demethanizer ............................................................................ 52

Gambar 11. Deethanizer ................................................................................ 53

Gambar 12. Acetylene Converter .................................................................. 54

Gambar 13. Ethylene Fractionator ................................................................ 55

Gambar 14. Depropanizer ............................................................................. 56

Gambar 15. Popylene Fractionator ............................................................... 57

Gambar 16. Debuthanizer ............................................................................. 59

Gambar 17. Depentanizer .............................................................................. 59

Gambar 18. BTX Tower ............................................................................... 60

Gambar 19. C4/C5 Hydrogenation Reactor ................................................... 61

Gambar 20. Charge Gas Compressor ............................................................ 62

Gambar 21. Caustic Water Wash Tower ....................................................... 64

Gambar 22. Charge Gas Dryer ...................................................................... 64

Gambar 23. C2 Green Oil Knock Out Drum ................................................ 65

Gambar 24. Skema Sistem Pengambilan Air Laut ....................................... 93

Gambar 25. Skema Sistem Air Pendingin .................................................... 97

Gambar 26. Skema Sistem Pemadam Kebakaran ......................................... 99

Gambar 27. Sistem Pengolahan Air dan Desalinasi ...................................... 104

Gambar 28. Sistem Boiler .............................................................................. 106

Page 13: awal KP.pdf

xiii

Gambar 29. Sistem Penyediaan Uap.............................................................. 107

Gambar 30. Steam Turbine Generator ........................................................... 109

Gambar 31. Gas Turbine Generator ............................................................... 110

Gambar 32. Sistem Plant Air dan Instrument Air .......................................... 111

Gambar 33. Chilling train, coldbox dan demethanizer .................................. 120

Gambar 34. Rangkaian Seri Heat Exhanger (Chilling Train) ........................ 121

Gambar 35. Arah aliran HE: parallel (kiri), counter (tengah)

dan cross (kanan) ...................................................................... 128

Gambar 36. Algoritma Perhitungan Tugas Khusus ...................................... 121

Gambar 37. Grafik hubungan antara mass flow refrigerant EA-312

terhadap suhu keluaran chilling train ........................................ 131

Gambar 38. Grafik hubungan antara mass flow refrigerant EA-308 terhadap

suhu keluaran chilling train....................................................... 133

Gambar 39. Nilai ∆T/m tiap-tiap Heat Exchanger pada Chilling Train........ 134