A Simple Project Report on AAC Block Plant :
Project at a Glance Capacity 50000 CBM (in shape of blocks of 0.75 density and size
600mmx200mmx200mm) Equivalent to 2.5 crores ordinary brick of density 1.9 sizes
230mmx110mmx75mm
S.No Description Estimated Cost (Rupees in
Crores) 1. Land 3 acres 1.50
2. Plant Machinery and Building including 5
delivery vehicles
11.00
2.a.
2.b.2 c.
3.
Plant Machinery,
(Mobile & Loading Equipments)
Building UtilitiesDelivery Vehicle
Working Capital 5000 CBM/Month
@Rs1800/Per CBM
8.50Cr.
1.75 Cr.0.75 Cr.
0.90
Total Capital Employed 13.10 Statement Showing Projected Profit & Loss Account Based on Production of
45000CBM/Annum Fly Ash Route
Particulars Per CBM Total (Rs. In Crores) Sales 3200 14.40
Variable Cost
Flyash 500 Kg.Lime (CaO) 100 Kg.
Cement 80 Kg.
Gypsum 75 Kg.
350350
480
150
1.581.58
2.16
0.67
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 2/9
Aluminum Powder
Power & Fuel
Electricity
Coal
Direct Wages
Total Variable CostContribution
Fixed Cost Salary and Wages
Annual Maintenance
Other Factory Over-Head
Sales Expenses
Total Fixed Cost
Total Cost of Sales
50
90
250
80
18001400
133
156
22
53
364
2164
0.22
0.40
1.13
0.36
8.106.30
0.60
0.70
0.10
0.24
1.64
9.74
Gross Profit Before Interest and
Depreciation 1036 4.66
Break Even Sales (Rs. In Crs.)
Break Even Sales (Qty.)
Break Even Sales (in %)
9.74
30600CBM/Yr.
68%
Sand Route
Particulars Per CBM Total(Rs. In Crores) Sales 3200 14.40
Variable Cost
Flyash 500 Kg.Lime (CaO) 100 Kg.
Cement 80 Kg.
Gypsum 75 Kg.
Aluminum Powder
Power & Fuel
Electricity
Coal
Direct Wages
Total Variable Cost
Contribution
Fixed Cost Salary and Wages
Annual Maintenance
Other Factory Over-Head
Sales Expenses
Total Fixed Cost
Total Cost of Sales
175350
480
150
50
90
250
80
1625
1575
133
156
22
53
364
1989
0.781.58
2.16
0.67
0.22
0.40
1.13
0.36
7.31
7.09
0.60
0.70
0.10
0.24
1.64
8.95
Gross Profit Before Interest and
Depreciation 1211 5.45
Break Even Sales (Rs. In Crs.)Break Even Sales (Qty.)
Break Even Sales (in %)
8.9527900CBM/Yr
62%
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 3/9
Process :
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 4/9
Equipments:
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 5/9
Market :
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 6/9
Comparison between Autoclaved Aerated Concrete (AAC) blocks and clay
bricks:
Sl.No.
Parameter AAC Blocks Clay Bricks
1 Soil Consumption Uses fly ash which is athermal power plant wasteproduct & thus noconsumption of top soil
One sq ft of carpet areawith clay brick walling willconsume 25.5 kg of topsoil
2 Fuel Consumption One sq ft of carpet areawith AAC blocks willconsume 1 kg of coal
One sq ft of carpet areawith clay bricks willconsume 8 kg of coal
3 CO2 Emission One sq ft of carpet areawill emit 2.2 kg of CO2
One sq ft of carpet areawill emit 17.6 kg of CO2
4 Labour Organized sector withproper HR practices
Unorganized sector withrampant use of child
labour5 Production Facility State-of-the-art factory
facilityUnhealthy workingconditions due to toxicgases
6 Tax Contribution Contributes to governmenttaxes in form of CentralExcise, VAT and Octroi
Does not contribute togovernment exchequer
7 Size 625 mm x 240 mm x 100-300 mm
225 mm x 100 mm x 65mm
8 Variation in Size 1.5 mm (+/-) 5 mm (+/-)
9 Compressive Strength 3.5-4 N/m2 2.5-3 N/m2
10 Dry Density 550-700 kg/m3 1800 kg/ m3
11 Fire Resistance (8" wall) Up to 7 hours Around 2 hours
12 Cost Benefit Reduction in dead weight
leading to savings in steeland concrete
None
13 Energy Saving Approximately 30% forheating and cooling
None
Consumption & Energy of Raw Material Comparison:
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 7/9
EquipmentsEquipment is depend of selection of process , base material , selection of automization etc.below is given general baseequipment
Raw material processing equipment:• Jaw crsher • Hoist conveyor • Block lime silo
• Electronic vibrating feeder • Ball mill –lime • Sand silo
• Electronic vibrating feeder • Belt conveyor • Ball mill -wet -sand
• Bucket elevator • Cement silo • Gypsum silo
Pouring processing equipment:• Main Slurry mixer –fly ash
• Main Mixer desert mortar after Cutting
• Weighted / batch slurry mixer • Balance desert mortar for per mould
•Lime –OPC – gypsum mixer
•Screw conveyor for lime
• Aluminum mixer • Main pouring mixer
• Lime &gypsum measure • Spiral gate valve
• Pneumatic controlling valve • Slurry measurer
• PLC electric measuring controlling system • Air compressor
• Mould • Mould bottom plate
• Steam curing car • Electronic platform balance
Cutting processing equipment:
• Hoist for mould move • Hoist for semi finish product
•Tractor
•Horizontal cutting machine with Arrangement
• Vertical cutting machine with arrangement
Hardening or curing process equipment:
• Autoclave • Steam boiler
• Coal crushing and handling equipment • Chimany
• Dust collector • Steam controlling valve
• Steam controlling penal
• Steam line
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 8/9
Energy & Mass Flow Diagram :
Layout:
7/23/2019 Autotherm -AAC Plant Project Report- Simple
http://slidepdf.com/reader/full/autotherm-aac-plant-project-report-simple 9/9
For More Details Contact Us:
Autotherm Equipments Corporation, S.F. No: 284, Vellan Thottam,Ganesh Nager, Malumichampatti, Coimbatore - 641 021,Tamilnadu,India. Email : [email protected]
Skype : albinindiaWebsite : www.autotherm.in
www.autothermindia.com Hand Phone : +91 98 948 96 996Telefax : +91 422 267 0004