CURRENT ON GOING PROJECT155 Warwick Shores Condominium Association 269-469-3536
C/O Your Property Management 6/26/2015500 W Buffalo Street, Ste 220 11/19/2015New Buffalo, MI. 49117 100%
1,403,768.00$ Engineer/Architect:Edgewater Resources518 Broad Street, Suite 200St. Joseph, MI. 49085 269-983-4502
Revetment Restoration 1100 feet
CURRENT ON GOING PROJECT154 Bob & Donna Salerno 269-469-9405
18200 Fern Glenn 7/23/2015New Buffalo, MI. 49117
100%
Bus: 269.469.3000 Fax: 269.469.3001
Donkersloot & Sons Marine Development, Co.
August 4, 2016
In 2009 sons Arie Donkersloot, Jr & Ronald Donkersloot, Sr. bought out their father's interest shares of
construction projects in a marine environment both as a general contractor and a valued subcontractor. For over 40 years, Donkersloot & Sons Marine Development Co. has been the "go to" organization for complex
OVERVIEW
technical training and practical experience in mechanical systems and construction techniques. Equally important, with him when he emigrated to the U.S. from his native Holland in the 1950's. The company began with Arie's Started in the 1960's by Arie Donkersloot, Sr. who brought his Dutch experience including acknowledge of harsh
he brought with him his positive "can do" attitude combined with his unique creative abilities.
and is a listed marine contractor with the US Army Corps of Engineers. This extensive work utilizes many innovativedesigns and construction concepts and techniques.
incorporated in Michigan as Donkersloot & Sons Marine Development Co. with Arie Donkersloot, Jr. being named His sons joined their father in the 1970's to form the family construction company. In 1989 the company
Donkersloot & Sons has completed projects both on and off shore in at least five states (MI, IN, WI, IL, and FL)
custom built, innovative 120 foot work vessel, the M/V Miss Jamie Lynn, to support their activities.
Donkersloot & Sons has received several awards in recognition of their outstanding work product. (see samples attached). A partial list of project references demonstrates the diverse capabilities of the company.
Reference Projects:
Projects History List
The company continues to expand their capabilities in the marine construction industry. In 1989 they added a
President and Ronald Donkersloot, Sr. named Vice President. Together the second and third generation continue the tradition of innovation and quality workmanship on all their projects.
Contract Amount
Mike Morphey
Percentage Completed
Provide Labor, Material & Equipment to Deconstruct an existing armor stone wall (approx. 5000 tons) ; Re build new single layer armor stone wall on a 2 on 1 slope; Provide 12"ounce filter clothe on new sand slope; 12" layer of mattress lime stone (4 to 6" diameter) with 1 layer on lime stone armor stone range 2000# to 4500# with larger stones used as the toe stones (Added 5500 Tons new Armor Stone)
Bob & Donna SalernoStart Date
Completion Date
Steve PaukowitsStart Date
Completion DateContractor's Work Force
Page 1 of 29
100%Stone Revetment Repair 192,292.00$
153 Carl Dissette 630-247-2395333 Canal Street, Unit 2202 6/13/2015Chicago, IL. 60606 6/18/2015
100%100%
EZ Dock Floating Dock System 36,556.60$ Peninsula Lot 10, New Buffalo, Michigan
152 Peter Liguori jlefresne*trilliumcdi.c123 south Green Street, # 1003B 6/9/2015Chicago, IL. 60607 6/15/2015
100%Lot #3 Foundation Support Piles 100%Unit # 30 Peninsula Drive, New Buffalo, Michigan 31,525.88$
James LeFresne - Trillium Capital Development42163 Sutters LaneNorthville, MI. 48168 734-673-0743
151 Dunewood Condominium Association 269-469-8100PO Box 536 4/18/2015New Buffalo, MI. 49117 6/24/2015
100%Engineer / Architect: 370,698.42$ Shabica & Associates, Inc.550 Frontage Road, Suite 3735Northfield. IL. 60093 847-446-1436
Revetment Restoration 295 feet
150 East Chicago Marina 219-391-84823301 Aldis St 4/7/2015East Chicago, IN 46312 4/14/2015
100%Pier & Pile Repair Spring 2015 92,630.00$
Provide Labor, Material & Equipment to Deconstruct an existing armor stone wall (approx. 1200 tons) ; Re build new double layer armor stone wall on a 2 on 1 slope; Provide 12"ounce filter clothe on new sand slope; 12" layer of mattress lime stone (4 to 6" diameter) with 2 layer on lime stone armor stone range 1500# to 4500# with larger stones used as the toe stones (Added 2323.0 Tons new Armor Stone)
Contract Amount
Mike G'Agostina - ManagerStart Date
Completion DateContractor's Work Force
Contract Amount
Stefanie Nagelbach, CPESC
Karl SamuelStart Date
Completion DateContractor's Work Force
Start Date
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Repair / Add / Placement of Armor Stone rip rap above the existing wall 275' long by 12' to increase the height of the existing wall. Consisting of 12 ounce Geotextile clothe; 12" layer of 4"x 6" mattress stone' 1 ton size Armor Stone. Deconstruct 40' long section of existing wall and rebuild on a 2/1 slope 12 ounce Geotxtile clothe; 12" layer of 4"x 6" mattress stone 1 to 2 ton size Armor Stone.
Carl Dissette
Contract Amount
James LeFresne
Provide Labor, Material and Equipment to Install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install 3/4" - 9.25" diameter pile cap plates on the (4) 9.625" dia piles
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
James LeFresne
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 50" wide x 70' long with (2) 12-step aluminum adjustable staircase and custom aluminum gangway landing 4'w x 4'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (2) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with (4) 3.5" OD x sch 40 galvanize pipe x 14' long and custom seawall mounting brackets
Start DateCompletion Date
Percentage CompletedContractor's Work Force
Page 2 of 29
149 South Cove Association 269-231-5450PO Box 192 3/24/2015New Buffalo, MI. 49117 3/26/2015
100%100%
Dock & Pile Repair Spring 2015 12,310.00$
149 Moorings Association 269-469-5790310 Oselka Drive, Ste 256 3/23/2015New Buffalo, MI. 49117 3/30/2015
100%100%
Dock Repair Spring 2015 30,285.00$
148 Onex Properties, LLC 269-469-3000PO Box 190 1/12/2015New Buffalo, MI 49117 1/21/2015
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 27,675.86$
147 David Cooney3842 N. Janssen Avenue 10/24/2014Chicago, IL. 60613-2822 2/26/2015
100%Residence 47009 Lakeview Avenue, Grand Beach, Michigan 49117 100%
99,751.52$
Bill McLinden 708-822-42041210brassie*comcast.net
146 Warwick Shores Condominium Association 269-469-3536C/O Your Property Management 12/4/2015500 W Buffalo Street, Ste 220 12/17/2015New Buffalo, MI. 49117 100%
100%Rip Rap Revetment Repair 60' 26,963.00$
Jan FerrellEstimated Start Date
Doreen KralEstimated Start Date
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Two (2) 9.625 Dia. x 50' long, Two (2) 8.625" Dia.x 50' Support Piles in Pleasure Isle Marina Slip # 28, New Buffalo Michigan
Arie Donkersloot, Jar
Contract Amount
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice. Remove and install new steel formed dock saddle; level dock and weld saddles to steel support pile. Cut off raised piles and reset dock on support pile level. Repair & Replace broken mooring pile PVC sleeves and caps
Start DateCompletion Date
Contractor's Work Force
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice. Remove and install new steel formed dock saddle; level dock and weld saddles to steel support pile
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to replace/repair missing and damaged corner bracket pipe guides, realign pier spud piles, drive down raised pier spud piles, realign pier gangway ramps on Pier E & F Pier from winter ice damage. Also remove & replace treated 2x6 fire damage decks board on an area 100' long x 8' wide main floating dock walkway
Provide Labor, Material & Equipment to Install 94' lineal feet section of Z-55 grade 55 Steel Sheet Wall by 25' long panels retaining wall along the north property line to protect the neighbors property / residential for the basement excavation installation. Excavate foundation & Backfill, Placement of drain tile around foundation. Install Styrofoam block behind lakefront retaining with filter cloth and drain tile, then backfill with clean sand.
PO Box 573New Buffalo, MI. 49117
David CooneyStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Dunescape Construction Services, Inc.
Steve PaukowitsStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Page 3 of 29
145 Lake Michigan Products 800-968-22995846 S. Straits Hwy. 10/22/2014Indian River, MI. 49746 10/24/2014
100%100%
EZ Dock Floating Dock System / Kayak Launch 9,980.00$
144 Steve & Wendy Smith mrsgrinddoc*gmail.com246 Fairs Court 10/8/2014Addison, IL. 60101 10/20/2014
100%Lot #8 Foundation Support Piles 100%Unit # 80 Peninsula Drive, New Buffalo, Michigan 34,580.00$
Bouwkamp Builders, Inc. - General ContractorPO Box 8006Holland, MI. 49422-8009 616-339-6888
143 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 9/8/2014Michigan City, IN 46360 10/2/2014
100%Engineer/Architect: 90,180.00$ Edgewater Resources518 Broad Street, Suite 200St. Joseph, MI. 49085 269-983-4502
Washington Park Marina Spot Dredging Project
142 Warwick Shores Condominium Association 269-469-3536C/O Your Property Management 8/13/2014500 W Buffalo Street, Ste 220 8/11/2014New Buffalo, MI. 49117 100%
100%Treated 6x6 Landscape Retaining Wall Replacement 12,503.75$
141 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 8/5/2014Michigan City, IN 46360 8/11/2014
100%Barge Service 7,930.00$
Contractor's Work ForceContract Amount
Provide Labor Only to Assemble and Install EZ Dock Floating Dock / Canoe / Kayak Launch System at the West Boardman Lake Trail in Traverse City, Michigan; Units consisting of (6) 80" x 10' dock sections, EZ Launch Components, 5' wide x 30' long Heavy Duty Gangway with Thru -Flow Decking, Bench Kit, Swim Ladder and (6) 3.5" OD x .250 wall galvanized spud pipe x 18' long
Greg McAvoyStart Date
Completion DatePercentage Completed
Provide Labor, Material & Equipment to remove 231 SF (72' long x various elevations) of existing rail road tie landscape retaining wall and replace with in ground treated 6x6 timber landscape retaining wall
Tim FrameStart Date
Completion DateContractor's Work Force
Contract Amount
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Steve PaukowitsStart Date
Tim FrameStart Date
Completion DateContractor's Work Force
Contract Amount
Mike Morphey
Provide Labor, Material & Equipment to Mechanically Excavate Dredge 1500 CY of material from 2 slips and approximately 350' along an interior wall. Work to perform by the M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), Barge
Steve & Wendy Smith Start Date
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install attach Six(6) HP12x53# I-beam to existing seawall H-piles for concrete grade beam support: Install 3/4" - 16"x16' pile cap plates on the (4) 9.625" dia piles and the existing (6) seawall HP12x53# h-piles
Randy Bouwkamp
Provide Labor, Material & Equipment to Repair / add additional Armor Stone to the top washed out area above the existing Stone Revetment wall along lake front from the northeast property line back approximately 60' to consist of: (approximately 700 sqft)
Page 4 of 29
140 Carl Dissette 630-247-2395333 Canal Street, Unit 2202 7/7/2014Chicago, IL. 60606 7/15/2014
100%Lot #1 Foundation Support Piles 100%10 Peninsula Drive, New Buffalo, Michigan 33,857.50$
139 East Chicago Marina 219-391-84823301 Aldis St 5/8/2014East Chicago, IN 46312 7/7/2014
100%Pile Repair Summer 2014 256,870.00$
138 Lori Beebe Weiss & Carol McMurray 630-278-52028521 Bucki Lane 708-567-8189Western Springs, IL. 60480 5/30/2014
7/11/2014100%
EZ Dock Floating Dock System 100%South Cove LHP Cabana Unit # 13, New Buffalo, Michigan 11,543.00$
137 Brent Stettler 574-536-059451264 North Shore Drive 4/30/2014Elkhart, IN. 46514-6362 6/6/2014
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 28,849.16$
136 David Schau 219-221-383711 Grand Beach Road 4/21/2014Michigan City, IN. 46360 4/28/2014
100%Quality Boatlifts 16,000# 4 Post Alum-A-Vator II 23,362.00$
135 Onex Properties, LLC 269-469-3000
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken PVC covers, replace/repair missing and damaged corner bracket pipe guides, realign pier spud piles, drive down raised pier spud piles, realign pier gangway ramps on Pier A, B, C, D, E, F, G, SE & SW Pier.
David SchauStart Date
Brent Stettler
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; C Keel Spreader, (1) 10x6x.410 w/carpet / wood std length, C Sailboat Support Stanchions w/carpet / wood pads, set of 4, Install Two (2) 9.625 Dia.x 46' long, Two (2) 8.625" Dia.x 46' Support Piles in South Cove Association LHP Unit # 13, New Buffalo Michigan
Arie Donkersloot, Jr
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; C Keel Spreader, (1) 10x6x.410 w/carpet / wood std length, C Sailboat Support Stanchions w/carpet / wood pads, set of 4, Install Four (4) 7" OD Dia.x 45' long Support Piles in LMYC Slip # 34, New Buffalo Michigan
Start DateCompletion Date
Contractor's Work ForceContract Amount
Carl Dissette Start Date
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install attach Six(6) W24x84# I-beam to existing seawall H-piles for concrete grade beam support
Karl Samuel
Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana IN Water Boat Show
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 50' long with 10-step aluminum adjustable staircase Anchored to the existing fix dock with Three(3) 3" OD x sch 40 galvanize pipe x 24' long and custom mounting brackets
Carol McMurrayStart Date
Completion DatePercentage Completed
Lori Beebe Weiss
Page 5 of 29
PO Box 190 4/16/2014New Buffalo, MI 49117 4/22/2014
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 28,816.26$
134 Lou & Sue Boers 630-234-2912912 Rob Roy Place 4/9/2014Downers Grove, Il. 60516 4/16/2014
100%100%
EZ Dock Floating Dock System 22,248.20$ Peninsula Lot 50, New Buffalo, Michigan
133 Moorings Association 269-469-5790310 Oselka Drive, Ste 256 4/8/2014New Buffalo, MI. 49117 4/16/2014
100%100%
Steel Sheet Wall Deadman Rods 15,260.00$
132 CIP II/UDG Peninsula, LLC 312-953-968311008 US 41 North 1/3/2014Palmetto, FL 34221 4/11/2014
100%100%
Pool House Foundation 68,611.15$
131 Ted Reese 219-878-12002306 Lakeshore Drive 9/9/2013Long Beach, IN. 46361 12/30/2013
100%95%
Engineer/Architect: 356,597.83$ Wightman & Associates2303 Pipestone RoadBenton Harbor, MI. 49022 877-927-0109
Ted Reese Residence 2306 Lake Shore Drive, long Beach, Indiana
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice heaving by driving down raised piles to the required elevation and add additional lengths to sunken piles.
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Jan FerrellEstimated Start Date
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 60' long with 12-step aluminum adjustable staircase and custom aluminum gangway landing 3'w x 3'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (1) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with 3" OD x sch 40 galvanize pipe x10' long and custom seawall mounting brackets
Contract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Two (2) 9.625 Dia. x 50' long, Two (2) 8.625" Dia.x 50' Support Piles in Pleasure Isle Marina Slip # 27, New Buffalo Michigan
Start DateCompletion Date
Contractor's Work ForceContract Amount
Sue BoersStart Date
Completion Date
Contractor's Work Force
Ted ReeseStart Date
Percentage Completed
Suzannah M. Deneau
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install 362' lineal feet of section Z-75 grade 55 Steel Sheet Wall by 20' long panels seawall along the Beach Lakefront. Install a concrete bulkhead cap wall 17" wide x 6' tall with top cap 22" wide with 10" face with associated reinforce rods. Placement of Thorocoat DOT texture coating on concrete outside face. Install 362' feet of 6" drain tile system with 4" PVC drain outlet sleeved through concrete cap spaced at 20' OC outlet. Contour grade behind wall level
Contract AmountContractor's Work Force
Provide Labor, Material and Equipment to install Two (2) 9.625" diameter x 125' long steel support foundation piles. Install 180' lineal feet of various dimensional structural concrete grade beams with associated reinforce rods. Install 412 square feet of 7" thick concrete slab on grade.
Rob Harte Start Date
Estimate Completion DatePercentage Completed
Page 6 of 29
130 The Drake Group 773-406-57991967 Johns Drive 8/30/2013Glenview, IL. 60025 9/6/2013
100%100%
Stephens Residence1410 Lake Shore Drive, Michigan City, Indiana 22,430.00$
129 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 8/20/2013Michigan City, IN 46360 8/26/2013
100%Barge Service 7,930.00$
128 George & Jennifer Ward 630-742-463715W175 60th Street 8/26/2013Burr Ridge, IL. 60527 8/29/2013
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 26,980.39$
127 East Chicago Marina 219-391-84823301 Aldis St 7/10/2013East Chicago, IN 46312 8/20/2013
100%Pile Repair Summer 2013 96,035.00$
126 Bob Lang 219-362-8236409 Lake Drive, Unit # 14 7/2/2013New Buffalo, MI. 49117 7/11/2013
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 28,596.96$
125 City of New Buffalo 269-469-1500224 W. Buffalo Street 4/24/2013New Buffalo, MI. 49117 7/25/2013
100%90%
Engineer/Architect: 382,481.58$ Wightman & Associates2303 Pipestone RoadBenton Harbor, MI. 49022 877-927-0109
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install 50' lineal feet section of Z-55 grade 55 Steel Sheet Wall by 15' long panels retaining wall along the north property line to protect the neighbors concrete retaining wall for residential basement excavation & poured installation
Percentage Completed
Tom DrakeStart Date
Completion Date
Contract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #13, New Buffalo Michigan
Contract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles and pier spud pipes from winter ice heaving by driving down to the required elevation, replace broken PVC covers, realign pier gangway ramps; replace/repair missing and damaged corner bracket pipe guides; Repair/replace damage EZ Dock Floating Dock Sections on Pier A, B, C, D, E, F, G, Southeast and Southwest Pier, EZ Dock Pier 630' & EZ Dock 234' Police Boat Dock.
Karl SamuelStart Date
Completion Date
George WardStart Date
Completion DateContractor's Work Force
Contractor's Work Force
Bob LangStart Date
Completion DateContractor's Work Force
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #24, New Buffalo Michigan
Tim FrameStart Date
Completion DateContractor's Work Force
Contract Amount
Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana Water Boat Show
Oscar Loveless, P.E.
Contract Amount
Ryan FellowsStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Page 7 of 29
City of New Buffalo 2013 Dredging From Bridge To Launch Project
124 LaFarge Corporation 269-983-6333200 N. Upton Drive 4/15/2013Sat, Joseph, MI. 49085 4/29/2013
100%Mechanically Dredge Facility Dock 61,923.50$
123 Pier 33 269-983-3333250 Anchors Way 4/1/2013St. Joseph, MI. 49085 4/3/2013
100%100%
Spring 2013 Lower Adjustable Docks 13,960.00$
122 Sergei Antipov 630-408-857850 Baybrook Lane 2/25/2013Oak Brook, Il. 60523 3/28/2013
100%100%
EZ Dock Floating Dock System 26,471.22$ Peninsula Lot 50, New Buffalo, Michigan
121 Ed Grywacz 708-790-883614010 Farmoy Avenue 2/20/2013Orland Park, Il. 60467 3/5/2013
100%Quality Boatlifts 16,000# 4 Post Alum-A-Vator II 20,000.00$
120 CIP II/UDG Peninsula, LLC 312-953-968311008 US 41 North 12/7/2012Palmetto, FL 34221 12/13/2012
100%100%
Lot #70 Foundation Support Piles 31,829.00$
119 The Drake Group 773-406-5799
Contract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #10, New Buffalo Michigan
Tighe CurranStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Lower Adjustable Docks to their summer Position
Ed GrywaczStart Date
Completion DateContractor's Work Force
Barge material to an off load area at Dock 63; The dredged spoils to be off load by Dock 63 Hitachi ZX600 hydraulic clam shell aclam shell and stock piled at no charge to D&S
Start Date
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 2361 CY of material from along the Dock Facility in the St Joseph River in the St Joseph Harbor, Michigan, in an area measuring 575' long by 125' wide;
Provide Labor, Material & Equipment to Mechanically Excavate Dredge 14998 CY of material from the Galien River and Harbor Pointe shores Slips in the New Buffalo Harbor, Michigan in an area measuring 1000 feet long by 100' wide; Barge material to an off load area at City of New Buffalo Launch Ramp Facility; Deposit dredge spoils into dump trucks and truck off to the designated Upland Disposal Site in New Buffalo, Michigan
Rick Moore - Manager
Completion Date
Mike HestonStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 60' long with 12-step aluminum adjustable staircase and custom aluminum gangway landing 3'w x 3'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (2) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with 3" OD x sch 40 galvanize pipe x10' long and custom seawall mounting brackets
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for each residence
Rob Harte Start Date
Tom Drake
Page 8 of 29
1967 Johns Drive 10/17/2012Glenview, IL. 60025 8/16/2013
100%95%
Engineer/Architect: 274,733.04$ Burns & Beyerl Architects1010 South Wabash Ave.Chicago, IL. 60605 312-212-4830
Smith Residence 2050 Lake Shore Drive, long Beach, Indiana
118 Great Lakes Towing 269-605-90364308 Willow, PO Box 632 10/29/2012Bridgeman, MI. 49016 11/14/2012
65%Salvage 57' Carver Voyager Vessel 24,491.44$
117 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 8/20/2012Michigan City, IN 46360 8/27/2012
100%Barge Service 7,930.00$
116 Lost Dunes Golf Club 269-465-99108910 Red Arrow Hwy 6/25/2012Bridgeman, MI. 49106 6/26/2012
100%Steve Jotzat - Superintendent 100%Clay Dike 4,560.00$
115 Pier 33 269-983-3333250 Anchors Way 5/3/2012St. Joseph, MI. 49085 6/4/2012
100%95%186,816.65$
2012 Morrison Channel Dredging Project
114 Moorings Association 269-469-5790
Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana Water Boat Show
Start DateCompletion Date
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120" long x 34" wide x 6' high) with crew to assist Great Lakes Towing personnel in salvaging 57' Carver Voyager Vessel from New Buffalo Harbor Rip Rap Breakwall, Michigan
Contractor's Work ForceContract Amount
Tim Frame
Contractor's Work ForceContract Amount
Completion DateStart Date
Provide Labor, Material & Equipment to Install 100' lineal feet section of Z55 grade 55 Steel Sheet Wall by 30' long panels seawall along the Beach Lakefront. Encapsulate the top 8' portion of wall with concrete facing with poured in place board form concrete; boards to be rough cut cedar face varying height 4" to 10". Install 4" drain tile system with 2" PVC drain outlet sleeved through concrete and shoring spaced at 8' OC daylight outlet. Install 120' lineal feet section of Z55 grade 55 Steel Sheet Wall by 20' long panels retaining wall along perimeter of south and east property line. Excavate building site of approximately 2456 cubic yards of debris and truck off; excavate & backfill foundation footings. Deliver and placement of 378 cubic yards of clean sand fill around perimeter of poured walls
Rich Lenardson
Contract Amount
Provide Labor, Material & Equipment to Hydraulically Dredge 8960 CY of material from the Morrison Channel in the St. Joseph, Michigan, in an area measuring 950 feet long by 80' to 120' wide; Pump dredge spoils into a confined disposal facility (CDF). Control Manage Turbidity outflow, facility integrity and spoil material build up in cell.
Cyndi Deadman
Completion Date
Contractor's Work ForcePercentage Completed
Start Date Completion Date
Tighe CurranStart Date
Percentage Completed
Start DateCompletion Date
Percentage Completed
Edward Twohey, AIA
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install Clay Dike to Dam off Lake to Consist 60 yard brown clay compacted. Dike dimensions 45' long by 5' tall by 8' wide bottom taper to 5' wide top. Sand bag and plywood off drain pipe end 3/4 coverage allowing 1/4 over flow drainage
Steve Jotzat
Page 9 of 29
310 Oselka Drive, Ste 256 3/14/2012New Buffalo, MI. 49117 6/15/2012
100%100%
Steel Sheet Wall Deadman Rods 23,415.00$
113 City of New Buffalo 269-469-1500224 W. Buffalo Street 4/12/2012New Buffalo, MI. 49117 5/2/2012
95%
Engineer/Architect: 164,510.56$ Wightman & Associates2303 Pipestone RoadBenton Harbor, MI. 49022 877-927-0109
City of New Buffalo 2012 Federal Channel Dredging Project
112 Bob & Donna Salerno 269-469-940518200 Fern Glenn 3/26/2012New Buffalo, MI. 49117 4/4/2012
100%100%
Stone Revetment Repair 29,292.00$
111 Cate Parthun 269-231-51741450 Shore Drive 3/12/2012New Buffalo, MI. 49117 4/6/2012
100%100%
Stone Revetment Repair 45,147.50$
110 CIP II/UDG Peninsula, LLC 312-953-968311008 US 41 North 2/18/2012Palmetto, FL 34221 2/25/2012
100%100%
Lot #50 & 60 Foundation Support Piles 58,632.50$
109 B & E Marine, Inc. 219-879-8301Washington Park 1/26/2012Michigan City, IN 46360 2/2/2012
100%Mooring Pile Repair 22,942.00$
Start DateBarry Bensz
Percentage Completed
Percentage Completed
Completion Date
Percentage Completed
Contract Amount
Completion Date
Bob & Donna SalernoStart Date
Oscar Loveless, P.E.
Completion Date
Contractor's Work Force
Provide Labor, Material & Equipment to Hydraulically Dredge 6248 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 2000 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline
Contractor's Work ForceContract Amount
Percentage Completed
Provide Labor, Material & Equipment to Repair/rebuild the existing Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 75' long
Cate ParthunStart Date
Contractor's Work ForceContract Amount
Completion Date
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Repair an existing Stone Revetment wall wash out in an area approximately 25' wide on a 2'/3' on 1' slope by 90' long
Contract Amount
Provide Labor, Material and Equipment to install deadman rod through peninsula to stabilize 107.5 feet of the steel sheet seawall
Ryan FellowsStart Date
Estimated Start DateEstimate Completion Date
Contractor's Work Force
Rob Harte Start Date
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for each residence
Page 10 of 29
108 National Railroad Passenger Corporation 215-349-363130th Street Station, mail Box 3 12 12/21/20122955 Market Street, 5th Floor South 3/8/2012Philadelphia, PA 19104 100%
100%Project Agent - Steve Mermlestein 380,626.00$ Trail Creek Bridge Fender System Repair502 Center Street 215-307-0041Michigan City, IN 46360
Trail Creek Bridge Fender System Repair
107 Mohammed Anjum 630-654-19893333 Chicago Drive 11/14/2011Stevensville, Mi. 49127 12/27/2011
100%Engineer/Architect: 100%Fishbeck, Thompson, Carr & Huber 159,200.00$ 5913 Executive Drive, Suite 100Lansing, Michigan 48911 517-887-4022
Shoreline Protection
106 Pier 33 269-983-3333250 Anchors Way 11/8/2011St. Joseph, MI. 49085 11/10/2011
100%100%
Fall 2011 Raise Adjustable docks 5,425.00$
105 Village of Colon 269-432-3889PO Box 50 10/25/2011110 N. Blackstone Ave. 11/10/2011Colon, MI. 49040 100%
100%Engineer/Architect: 45,230.00$ P.M. Blough, Inc 1640 Gladys AveGrand Haven, MI. 49417 616-847-2010
Provide & Install Raised Walkway System
104 Ted & Virginia Orlowski 847-358-0077
Provide Labor, Material & Equipment To Removal and Disposal of (9) existing 12" diameter wood mooring post. Replace Install with (8) 9.625" OD x .352 wall steel piles x 40' long with 10" dia. x 10' long PVC cover and cap
Contractor's Work Force
Virginia Orlowski
Marcia BlackmanStart Date
Completion DatePercentage Completed
Provide Labor, Material & Equipment to Install Approximately 129 LF of shoreline protection using 324 CY #1500-#2500 quarried limestone; 2 temporary access ramps (161 CY clean fill): 2000 CY clean fill behind seawall; remove and dispose of 30 LF failed seawall. Adhere to all requirements set forth in MDEQ, Berrien County SESC and Vegetative Assurance Permits
Contractor's Work ForceContract Amount
Thomas Bennet
Mohammed AnjumStart Date
Completion DatePercentage Completed
Provide Labor, Material & Equipment to Install EZ Trail Dock System 60" wide x 100' long Raised Walkway over Wetland Area
Contract Amount
Pam Blough
Tighe CurranStart Date
Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Raise Adjustable Docks to their Winter Position
Provide Labor, Material & Equipment To Remove, Disposal & Install Approximately 880 LF of 12x12 Creosote Heavy Timber; Removal of (6) existing wood deteriorate 12" support piles and replace with Hollow Fiberglass Reinforce Plastic Piles (FRPP); All in accordance to the contract specifications
Agent - Steven MermlesteinStart Date
Completion Date
Contractor's Work ForcePercentage Completed
Engineer- Kristin Leese
Contract Amount
Page 11 of 29
545 Windsor Road 10/25/2011Inverness, IL. 60067 11/3/2011
100%100%
Stone Revetment Repair 13,000.00$
103 Warwick Shores Condominium Association 269-469-3536C/O Your Property Management 10/1/2011500 W Buffalo Street, Ste 220 10/30/2011New Buffalo, MI. 49117 100%
100%Stone Revetment Repair 74,650.00$
102 Kenneth Brody 312-542-32191444 W. Henderson Street 6/6/2011Chicago, IL. 60657 6/28/2011
100%EZ Dock Floating Dock System 12,061.20$
101 City of New Buffalo 269-469-1500224 W. Buffalo Street 4/14/2011New Buffalo, MI. 49117 5/2/2011
95%Engineer / Architect: 102,250.60$ Wightman & Associates2303 Pipestone RoadBenton Harbor, MI. 49022 877-927-0109
City of New Buffalo 2011 Federal Channel Dredging Project
100 Lake Michigan Yacht Club 269-469-8100PO Box 358 3/29/2011New Buffalo, MI. 49117 3/30/2011
100%Additional 7" dia x 40" long Mooring Post 7,510.00$
99 George Miz 312-265-1124304 East Randolph Street, Apt 2001 3/14/2011Chicago, Il. 60601 3/16/2011
100%100%
Stone Revetment Repair 7,611.00$
Contractor's Work Force
George MizEstimated Start Date
Provide Labor, Material & Equipment to Install Three Additional 7" dia x 40' long Mooring pile align with the end dock post; install 8" dia x 20' long PVC sleeve with cap over mooring pile; Located in LMYC slip #1, 2/3 & 4/5 New Buffalo, Michigan
Estimate Completion DatePercentage Completed
Contract AmountContractor's Work Force
Contractor's Work Force
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System (80" wide x 30'Long w/6' wide x 10' long ramp; Four Aluminum Post 3"x3"x59" w/Ace Dock Cushions, Solar Light; Modify existing wood boardwalk in the Galien River, New Buffalo, Michigan at 505 Marquette Drive
Ryan FellowsStart Date
Contract Amount
Completion DateContractor's Work Force
Contract Amount
Mike D'Agostino - ManagerStart Date
Completion Date
Provide Labor, Material & Equipment to Repair/add additional Stone to the existing Stone Revetment wall along lakefront
Provide Labor, Material & Equipment to Hydraulically Dredge 3746 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 2000 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline
Jessica Minton Start Date
Oscar Loveless, P.E.
Completion Date
Contract Amount
Start DateCompletion Date
Percentage Completed
Start DateCompletion Date
Percentage CompletedContractor's Work Force
Contract Amount
Steve Paukowits
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Rebuild the existing Stone Revetment wall 25' wide on a 2' on 1' slope 200' along the lakefront shoreline; Consisting of #1500-#2500 quarried limestone
Page 12 of 29
98 Bill Kavouriaris 708-799-05254857 W 171st street 1/17/2011Country Club Hills, IL. 60478 2/25/2011
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 22,364.62$
97 John Wieclowski 630-858-13871 Marine Drive, Unit #1 1/4/2011Michigan City, In. 46360 1/28/2011
100%Quality Boatlifts 27,000# 4 Post Alum-A-Vator II 22,500.00$
96 East Chicago Marina 219-391-84183301 Aldis Street 10/6/2010East Chicago, IN. 46312 3/4/2011
100%EZ Dock Floating Dock System - 234 Feet Long Dock 80,802.47$
95 Marina Park South Condominium Association, Inc. 708-824-067015 Marine Drive 11/1/2010Michigan City, IN. 46360 2/26/2011
100%Paint Docks (2) 40', (14) 50', (4) 55' & (200 Staircases, Slips #1-40 110,081.33$
94 Ed Burke 630-505-8282PO Box 947 9/27/2010New buffalo, MI. 49117 10/7/2010
100%100%
Stone Revetment 39,940.50$
93 Joe & Beth Grayson 773-276-2646165 Church Road 8/3/2010Winnetka, IL. 60093 9/3/2010
100%100%
Stone Revetment 42,000.00$
Kerry & PaddyEstimated Start Date
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 65' long and 15' wide x 35' long wing wall; Consist of#1500-#2500 quarried limestone; Project located at 51017 Lake Park Drive Grand Beach, Michigan
Percentage Completed
Ed Burke
Contractor's Work ForceContract Amount
Provide Labor, Material & Equipment to Remove, Transport, Sandblast, Minor Repairs, Upgrade Wiring, Paint and Re install (2) 40' Re install (2) 40'Docks, (14) 50' docks & (4) 55' Docks for Marina Park South in the Trail Creek, Michigan City, Indiana
Estimated Start DateEstimate Completion Date
Completion Date
Start Date
Completion DateContractor's Work Force
Contract Amount
Start Date
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in MPW Slip #10, Michigan City, Indiana
Contract Amount
Karl Samuel-Harbor Master
Mike Wattman/Jim Arendas
Contract Amount
Contractor's Work Force
Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System (80" wide x 234' Long w/3' wide x 25' long ramp; Thirty Seven Aluminum Post 3"x3"x71" w/Ace Dock Cushions, Solar Light; Modify existing boardwalk in the East Chicago Marina, East Chicago, Indiana
Provide Labor, Material & Equipment to Repair/rebuild the existing Stone Revetment wall 20' wide on a 2'/3' on 1' slope by 8' long with a 20' return wall on the north end; Consist of#1500-#2500 quarried limestone; Project located at 48017 Ridge Road Grand Beach, Michigan
Bill Kavouriaris
John Wieclowski
Completion DateContractor's Work Force
Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 10.75" Dia. x 40' long support Piles in MPW Slip #13, Michigan City, Indiana
Start Date
Completion Date
Start Date
Page 13 of 29
92 Shintani (Kerry) & Paddy Lauber 773-276-26462256 N. Kedzie Blvd. 8/3/2010Chicago, IL. 60647 9/7/2010
100%100%
Stone Revetment 42,000.00$
91 Jim Gray 312-362-4211440 LaSalle Street, Ste 650 7/12/2010Chicago, Il. 60605 8/3/2010
100%100%
Stone Revetment 64,080.60$
90 Harbor Landing Condominium Association 269-469-8100PO Box 328 4/9/2010New Buffalo, MI. 49117 4/27/2010
90%Harbor Landing Facility Channel & Slip Dredging 61,645.90$
89 Roxanne Martino 312-762-67971468 Garywood Drive 3/18/2010Burr Ridge, IL. 60527 4/1/2010
100%Quality Boatlifts 16,000# 4 Post Alum-A-Vator II 25,986.18$
88 Lake Michigan Yacht Club 269-469-8100PO Box 358 3/15/2010New Buffalo, MI. 49117 4/7/2010
100%Add Additional 15' length To Existing Docks #1/2, 3/4 & 5/6 16,950.00$
87 Hillary Bubb 269-469-25691221 Shore Drive 10/7/2009New Buffalo, MI. 49117 2/19/2010
100%City of New Buffalo Larry Bubb Memorial 21,628.00$
Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 100' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10963 Marquette Drive New Buffalo, Michigan
Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 100' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10975 Marquette Drive New Buffalo, Michigan
Estimate Completion DatePercentage Completed
Contractor's Work ForceContract Amount
Kerry & Paddy
Contract Amount
Provide Labor, Material & Equipment to Add an additional 15' length of dock section to the existing dock; Fabricate A-36 steel formed section by 15' long in length to match the same material gauge; Add Two(2) additional 72" long by 4" square 7 gauge steel tube bumper posts; All new steel sandblast, epoxy base primer and one coat finish with a non slip walking surface; Placement of a camber in the dock and attaching a 1/4"-2.5"x 2.5" angle iron; Install junction box, splice additional length of wiring to Powerheads, nose cone, light, Telephone and water line.
Hillary BubbStart Date
Completion DateContractor's Work Force
Contract Amount
Mike D'Agostino - ManagerStart Date
Completion DateContractor's Work Force
Roxanne Martino
Contract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and GEM remote; Install Four (4) 7" Dia. x 40' long support Piles in South Cove Association HID Cabana Unit Slip #4, New Buffalo, Michigan
Completion DateStart Date
Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 140' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10945 Marquette Drive New Buffalo, Michigan
Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 970 CY of material from the Facility Channel Entrance off of the Galien River in the New Buffalo Harbor, in an area measuring 150' long by 140' wide; Barge material to an off load area; deposit dredge spoils into dump trucks and truck off to an off site disposal yard
Contract Amount
Mike D'Agostino - ManagerStart Date
Completion Date
Contractor's Work ForceContract Amount
Jim GrayEstimated Start Date
Estimate Completion DatePercentage Completed
Estimated Start Date
Contractor's Work Force
Contractor's Work Force
Page 14 of 29
86 Moorings Association 269-469-5790310 Oselka Drive, Ste 256 11/27/2009New Buffalo, MI. 49117 12/5/2009
100%Fasten Angle Iron Whaler 24,865.00$
85 Lake Michigan Yacht Club 269-469-8100PO Box 358 12/22/2009New Buffalo, MI. 49117 4/10/2010
100%Seawall Repair 145,811.10$
84 Moorings Association 269-469-5790310 Oselka Drive, Ste 256 11/25/2009New Buffalo, MI. 49117 12/22/2009
100%Steel Sheet Wall Deadman Rods 24,785.00$
83 Berrien County Community Development Department 269-983-7111701 Main Street 9/30/2009St. Joseph, Michigan 49085 11/14/2009
100%Engineer/Architect: 235,560.40$ ECT Environmental Consulting & Technology, Inc.115A W. Main StreetBenton Harbor, MI. 49022 269-927-3366
Contractor's Work ForceContract Amount
Contractor's Work Force
Provide Labor, Material and Equipment to install deadman rod through peninsula to stabilize 80 feet of the steel sheet seawall; Install 80' of 6" C-channel whaler on face of steel sheet wall on each side of peninsula; Install Thirteen (13) Dywidag deadman rod through peninsula to fasten steel sheet walls together; Attach fasten 80' of angle iron cap whaler to steel sheet with 3/4" bolts spaced approximately 3' apart; Re attach fasten 80' of existing I-beam whaler to steel sheet; Excavate fill behind wall for deadman installation and straighten wall within reason; Mooring Peninsula C Slips # 117-127
Dan Fette - DirectorStart Date
Completion Date
FY2009 Recreational Waterway Maintenance Dredging; Bid No.: 0609010
Contract Amount
rc Florian, CPG, RG, CUSTP
Contractor's Work ForceContract Amount
Provide Labor, Material and Equipment to Fasten the Angle Iron Whaler to the Steel Sheet Seawall; Peninsula B - 687 Feet & Peninsula C - 1261 Feet; Align angle iron whaler to steel sheet seawall; Attach fasten angle iron cap whaler to steel sheet with 3/4" bolts spaced approximately 3' apart; Weld/Splice angle iron butt joints as needed.
Placement of clean sand fill compacted to grade; Placement of a 14"t x 18" wide seawall cap bulkhead with 12'6" wide x 5" thick x 56' patio/walkway; Placement of 86 lineal feet of 4" to 6" limestone rip rap 2' deep taper out 4' wide at the seawall panel
Cyndi DeadmanStart Date
Completion Date
Completion Date
Contract Amount
Provide Labor, Material & Equipment to remove and replace 56 lineal feet of concrete seawall panels, bulkhead and patio/walkway; Remove/disconnect and re install Two(2) docks. (To be stored on site). Remove and reinstall Two(2) light fixtures, Six(6) seawall cleats, One(2) seawall ladder, slip electrical & water for slips 1, 2, 3, 4, 5,& 6. Removal and discard of 56' x 14' wide existing concrete walkway and 56' x 12' long seawall panels Installation of Six (6) HP12 x 53# seawall support piles x 50 feet long on 10' spacing; Fabrication of H-pile to conform to corner at slip #6 to connect into existing seawall panel; Fabricate 6 panels 9'8" wide by 6" thick by 20' long with #6 grade 60 steel reinforcing bars on 12" spacing; 6" c-channel frame around perimeter panel with 4000 psi concrete compressive strength; Placement of Thorocoat DOT texture coating on seawall face from the water line up to under the seawall bulkheads to match existing new seawall section along slip #1, 2 and Federal channel. Installation of 100' of Z55 grade 50 by 15' and 25' length deadman steel sheet wall; Installation of #9 Dywidag Rods 20 feet long from H-pile lugs to steel sheet wall.
Mike D'Agostino - ManagerStart Date
Completion DateContractor's Work Force
Cyndi DeadmanStart Date
Provide Labor, Material & Equipment to Fabricate and install Stainless Steel Memorial Structure to consist of: Artist Paul Fujawa drawing of a 4" sq Tubing x 1/4" - 4"sq 304 Stainless Steel Tubing 180 Grit x 40' long; Polished
Page 15 of 29
82 Neal Shevin 269-469-181816500 Timber Lane 7/8/2009New Buffalo, MI. 49117 7/31/2009
100%Quality Boatlifts 16,000# 4 Post Alum-A-Vator II 25,370.74$
81 Peninsula Drive, LLC 708-822-4204PO Box 573 9/5/2007105 N. Thompson St 5/31/2009New Buffalo, MI 49117 100%
3,879,794.01$ Engineer/Architect:Wightman & Associates2303 Pipestone RdBenton Harbor, MI 49022 877-927-0109
Peninsula Club Phase I & II
80 City of New Buffalo 269-469-1500224 W. Buffalo Street 4/29/2009New Buffalo, MI. 49117 5/9/2009
100%Engineer/Architect: 83,421.80$ Wightman & Associates2303 Pipestone RoadBenton Harbor, MI. 49022 877-927-0109
City of New Buffalo 2011 Federal Channel Dredging Project
79 The Moorings Association 269-469-5790310 Oselka Dr 1/24/2009Suite 256 1/31/2009New Buffalo, MI 49117 100%
35,100.00$ Level Docks Peninsula D &E
Bill D McLinden
Oscar Loveless, P.E.
Fabrication and installation of 2,100' precast concrete seawall panels 10' wide x 25' long and 6" thick. Each panel inserted between W12 x 53# H-piles driven to 40 ton bearing load which consisted of each H-pile length of 120' long. Hydraulically dredge 17,760 cubic yards of sand material through a 10" pipeline approximately 4,000' long onto the beach nourishment area.
Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 4788 CY of material from the St. Joseph River Channel in the City of St Joseph, Michigan, in an area measuring 460' long by 50' wide; Barge work vessel, M/V Miss Jamie Lynn, is a 120’ x 34’ x 6’ self propelled vessel with four hydraulic spuds to stabilize and lock down from movement. Aboard the M/V Miss Jamie Lynn will be a containment cell 26’ x 26’ to contain the dredge spoils An excavator will be placed on the M/V Miss Jamie Lynn deck to remove the shoal and place the material in the containment cell on the deck. The work vessel will dredge the full width of the channel as it advances. Once the cell is filled the M/V Miss Jamie Lynn will transport to the Whirlpool disposal site where the excavator will unload the spoils. A loader will be utilized to relocate and stock pile the dredge spoils to its designated destination on site. Dredging will begin at the downstream side of the dredge area and advance upstream.
Completion DateContractor's Work Force
Contract Amount
Provide Labor, Material & Equipment to Remove section of the Dock support pile to level dock with the seawall bulkhead; Peninsula "D" Dock 228-299 (37) and Peninsula "E" Dock 300-369 (35)
Contract Amount
Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and GEM remote; Install Four (4) 7" Dia. x 40' long support Piles in Harbor Landing Slip #1, New Buffalo, Michigan
Start Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contract Amount
Neal ShevinStart Date
Completion DateContractor's Work Force
Oscar Loveless, P.E.
Provide Labor, Material & Equipment to Hydraulically Dredge 5274 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 600 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline
Cyndi Deadman
Ryan FellowsStart Date
Completion DateContractor's Work Force
Page 16 of 29
78 City of New Buffalo 269-469-1500224 W. Buffalo St. 1/22/2009New Buffalo, MI 49117 2/18/2009
100%Rehab Launch Ramp Skid Piers 19,320.00$
77 The Moorings Association 269-469-5790310 Oselka Dr 10/14/2008Suite 256 12/26/2008New Buffalo, MI 49117 100%
27,205.67$ Seawall Repair Slip # B-47
76 East Chicago Marina 219-391-84823301 Aldis St 10/28/2008East Chicago, IN 46312 11/17/2008
100%EZ Dock Floating System Phase I, II, III 249,772.25$
75 Sea Brex Marine, Inc. 269-408-17253121 Oak Lane 10/26/2008Stevensville, MI 49127 11/2/2008
100%Salvage Vessel 23,121.25$
74 East Chicago Marina 219-391-84823301 Aldis St 7/18/2008East Chicago, IN 46312 8/8/2008
100%Pile Repair Spring 2008 90,900.00$
73 Joe Francaviglia 630-587-24481227 Quarterhouse 4/21/2008St. Charles, IL 60174 5/20/2008
100%Quality Boat Lifts 13,000lbs 4 Posts Alum-A-Vator II 19,965.05$
72 The Moorings Association 269-469-5790310 Oselka Dr 12/14/2007Suite 256 5/15/2008
Cyndi DeadmanStart Date
Completion Date
Completion DateContractor's Work Force
Contract Amount
Installation of Quality Boat Lifts 13,000lbs post Alum-A-Vator II with Gem remote controls on four 7" x .312 wall x 40' long steel support piles with 8" schedule forty PVC pipe sleeve covers by 20' long. Installed in Dunewood Harbor Side slip 22, New Buffalo, MI.
Contract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier A, B, C, D, E, F, G, Southeast and Southwest Pier.
Joe FrancavigliaStart Date
Richard NovakStart Date
Completion DateContractor's Work Force
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120" long x 34" wide x 6' high) with crew to assist Sea Brex Marine personnel in salvaging 19' x 24' barge off the Burns Ditch Indiana breakwall.
Installation of EZ Dock floating dock system consisting of 80" wide dock sections x 10' long for a total length of approximately 630' long with 3 access aluminum gangway 5' wide x 25' long and associated dock edging and cleats in the East Chicago Marina Facility.
Mike TrappStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Excavate and pull back steel sheet wall to correct position and install Dywidag Deadman rods and additional sea channel Whaler to secure wall in position.
Remove, transport, sandblast, minor repairs, paint, replace 2 x 6 treated decking and 6 x 6 timber posts, Install Ace dock cushions and deliver back to site.
Cyndi DeadmanStart Date
Completion DateContractor's Work Force
Contract Amount
Completion DateContractor's Work Force
Contract Amount
Richard Novak
Chuck DobbinsStart Date
Page 17 of 29
New Buffalo, MI 49117 100%394,423.00$
46 Dock Replacement Phase II
71 City of St. Joseph Water Plant 269-983-1240700 Broad St 8/8/2007St. Joseph, MI 49085 8/9/2007
100%Retrieve Water Intake Riser Extensions 4,975.00$
70 East Chicago Marina 219-391-84823301 Aldis St 7/24/2007East Chicago, IN 46312 7/31/2007
100%Gas Dock 2 x 6 Decking Replacement 7,265.00$
69 East Chicago Marina 219-391-84823301 Aldis St 7/13/2007East Chicago, IN 46312 7/28/2007
100%Gas Dock, Slip # 33 and 34 Bumper Post 29,885.00$
68 Hammond Marina 219-659-7678701 Casino Center Drive 6/26/2007Hammond, IN 46320 6/26/2007
100%Install Swim Buoys 2,695.00$
67 Eagle Pointe Condominiums 269-469-3536C/O First American Management Co, Inc. 4/30/2007139 N. Whittaker St. 6/11/2007New Buffalo, MI 49117 100%
35,985.00$ Dock Replacement, St. Joseph, MI
66 East Chicago Marina 219-391-84823301 Aldis St 5/4/2007East Chicago, IN 46312 5/25/2007
100%Southeast Star Dock Pier Spud Pile Replacement 16,760.00$
Completion DateContractor's Work Force
Contract Amount
Contract Amount
Removal of existing fiberglass docks and fabrication and installation of 4 Donkersloot & Sons patented steel design 35' docks with associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions.
Richard NovakStart Date
Steve PaukowitsStart Date
Completion DateContractor's Work Force
Completion DateContractor's Work Force
Contract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to set 3 marker buoys along the outside perimeter of the harbor breakwall.
Removal of existing upright 6 x 6 post and horizontal guard rail post above water line on the 96 lineal feet of gas docks and installation of new 6 x 6 timber posts with replacement dock cushions.
Keith CareyStart Date
Completion DateContractor's Work Force
Contract Amount
Contract Amount
Removal and replacement of approximately 100 treated 2 x 6 decking boards.
Richard NovakStart Date
Richard NovakStart Date
Completion DateContractor's Work Force
Completion DateContractor's Work Force
Contract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to assist Sea Brex Marine in salvaging of a steel intake riser (6' dia. x 4' tall) at the City of St. Joseph water intake in approximately 27' water depth.
Contract Amount
Remove and discard existing steel/wood deteriorated docks. Fabrication and installation of Donkersloot & Sons patent steel design 13 - 30' docks and 33 - 35' docks, and associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" style cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles.
Michael O'MalleyStart Date
Contractor's Work Force
Page 18 of 29
65 George Miz 312-265-112448017 Ridge Road 1/4/2007Grand Beach, MI 49117 5/25/2007
100%Lake Front Stone Revetment 58,616.00$
64 Harbor Landing Association 269-426-4043PO Box 328 4/26/2007New Buffalo, MI 49117 5/24/2007
100%Concrete Seawall Bulkhead Replacement 28,041.40$
63 The Moorings Association 269-469-5790310 Oselka Dr 1/1/2007Suite 256 4/30/2007New Buffalo, MI 49117 100%
297,543.20$ 28 Dock Replacement Phase I
62 East Chicago Marina 219-391-84823301 Aldis St 4/24/2007East Chicago, IN 46312 4/20/2007
100%Pile Repair Spring 2007 55,855.00$
61 Dunewood Condominium Association 317-815-8064PO Box 536 9/26/2006New Buffalo, MI 49117 1/4/2007
100%Paint Docks 134,042.50$
60 East Chicago Marina 219-391-84823301 Aldis St 11/16/2006East Chicago, IN 46312 12/19/2006
100%Pier C Spud Pile Replacement 49,716.60$
Contract Amount
David Gibbons
Richard NovakStart Date
Start DateCompletion Date
Completion DateContractor's Work Force
Contract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to lower mooring piles from winter ice heaving down to required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier A, B, C, D, E, F, G, and Southeast Star Dock.
Contract Amount
Remove and discard existing steel/wood deteriorated docks. Fabrication and installation of Donkersloot & Sons patent design 7 - 30' docks, 7 - 35' docks, and 14 - 40' docks with associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD 3.365 wall x 40' steel dock support piles.
Disconnect and transport 2 - 35' docks, 15 - 50' docks, 5 - 55' docks to our shop facility. Remove all fixtures and repair minor dents and damages. Sandblast complete dock and install one coat of epoxy primer and one coat of gloss enamel finish. Install anti-slip to the walk way and reassemble all fixtures. Reinstall steel docks.
Contractor's Work Force
Contract Amount
Richard NovakStart Date
Completion DateContractor's Work Force
Cyndi DeadmanStart Date
Completion DateContractor's Work Force
Completion DateContractor's Work Force
Contract Amount
Labor, material and equipment to remove and replace 104 lineal feet of concrete bulk head and walkway at the Harbor Landing Association Slips 6-11.
Contract Amount
Placement of a stone revetment wall 21' wide on a 1' slope x 100' long, consisting of 8" to 12" mattress stone with 12oz filter fabric and 1,000 - 2,000lb armor stone.
Dave ArneyStart Date
George MizStart Date
Completion DateContractor's Work Force
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to remove 4 existing spud piles and replace with 4 - 9.625" OD x 75' long spud piles with spud guides and 10" dia. x 20' long PVC cover and cap.
Page 19 of 29
59 East Chicago Marina 219-391-84823301 Aldis St 7/28/2006East Chicago, IN 46312 8/17/2006
100%Pier B Spud Pile Replacement 43,739.80$
58 East Chicago Marina 219-391-84823301 Aldis St 7/10/2006East Chicago, IN 46312 7/27/2006
100%Southeast Star Dock Pier Ramp Replacement 38,840.00$
57 Blue Chip Casino 888-624-96182 Easy St 7/6/2006Michigan City, IN 46360 7/19/2006
100%Steel Dock and Mooring Piling Removal 71,635.00$
56 Tom Kulesia 574-848-5195802 W. Vistula St 5/20/2006Bristol, IN 46507 6/1/2006
100%Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator 29,520.15$
55 Pier 33 269-983-3333250 Anchors Way 10/21/2005St. Joseph, MI 49085 4/27/2006
100%40', 45', and 50' Dock Replacement with 37.5' Adjustable 483,866.00$ System Phase II
54 East Chicago Marina 219-391-84823301 Aldis 4/18/2006East Chicago, IN 46312 4/26/2006
100%Pile Repair Spring 2006 16,760.00$ Contract Amount
Richard NovakStart Date
Completion DateContractor's Work Force
Contractor's Work ForceContract Amount
Remove and discard existing fiberglass deteriorated docks. Fabrication and installation of Donkersloot & Sons Patent steel design 17 - 40', 15 - 45', and 7 - 50' docks with associated accessories including 37.5" adjustable system, five-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles.
Installation of Quality Boat Lifts 27,000lbs post Alum-A-Vator (motors up) with Gem remote controls on four 7" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 10' long. Installed in Waterfront Association #14, St. Joseph, MI.
Tighe CurranStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contract Amount
Supply M/V Miss Jamie Lynn (120' long x 34' wide x 6' high) with crew to remove and dispose of 28 - 10" steel piles, 54 - 7" steel piles, and 4 - 40' fiberglass docks from Trail Creek, Michigan City, IN.
Tom Kulesia
Rich CorbettStart Date
Completion DateContractor's Work Force
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to remove existing gangway ramps and replace with 5' wide x 25' long aluminum gangway with railings. Also installed 2 - 7" OD x 3.17 wall steel spud pile by 40' long with 8" x 10' long PVC cover with spud guide along each side of the pier entrances.
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 35 - 4.5" piles and replace with 12 - 10.75" OD x 43' long spud piles with spud guides and 12" dia. x 15' long PVC cover and cap.
Richard NovakStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 35 - 4.5" piles and replace with 9 - 10.75" OD x 43' long and 1 - 7" OD x 40' long spud piles with spud guides and 12" dia. x 15' long and 8" dia. x 50' long PVC cover and cap.
Richard Novak
Page 20 of 29
53 East Chicago Marina 219-391-84823301 Aldis St 2/2/2006East Chicago, IN 46312 4/26/2006
100%Pier F Spud Pile Replacement 69,905.00$
269-426-404352 Harbor Landing Association 3/28/2006
PO Box 328 4/10/2006New Buffalo, MI 49117 100%
29,950.00$ Mooring Pile Repair
51 Steve Lempera 708-479-690019701 S. 97th Ave 1/3/2006Mokena, IL 60448 3/18/2006
100%Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator 23,905.43$
50 Riverside Pointe Condo Association 269-556-2576C/O Countrywide Property Management, Inc. 10/10/2005609 Market St. 3/3/2006St. Joseph, MI 49085 100%
157,460.00$ 35' Dock Replacement, St. Joseph, MI
49 The Moorings Association 269-469-5790310 Oselka Dr 10/24/2005Suite 256 11/10/2005New Buffalo, MI 49117 100%
10,374.45$ Seawall Whaler Repair
48 Bob Simenas 708-567-70005612 West 79th St 12/15/2004Burbank, IL 60459 10/5/2005
100%Excavate Channel and Install Dock System 57,471.40$
Mechanically excavate area 60' wide x 130' long to 6' depth and removal of dredge material off site. Installation of an EZ Dock floating dock system with 60" walkways and 2 slips - 35' long with cleats, lights, and electric.
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Repair I-beam Whaler splice joints by welding and bolting steel stiffener plates at each joint.
Bob Simenas
Cyndi DeadmanStart Date
Completion Date
Completion DateContractor's Work Force
Contract Amount
Removal of existing fiberglass docks and fabrication and installation of 20 Donkersloot & Sons patent steel design 35' docks with four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions.
Contract Amount
Installation of Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator (motors up) with Gem remote controls on four 8.625" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 10' long. Installed in Dunewood Harbor Side slip 21, New Buffalo, MI.
Mike OrosStart Date
Steve LemperaStart Date
Completion DateContractor's Work Force
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 20' pipe extensions and driving down to the required elevation.
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 50 - 4.5" piles and replace with 12 - 9.625" OD x 75" long spud piles with spud guides and 10" dia.x 20' long PVC cover and cap.
Dave ArneyStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier B, D, E, and G.
Richard Novak
Page 21 of 29
47 Bill Kay 630-561-9095832 Woodland Ave 4/13/2005Naperville, IL 60540 5/28/2005
100%Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator 25,863.72$
46 Thomas Danielson 630-986-5302110 Surray Lane 5/2/2005Burr Ridge, IL 60527 5/28/2005
100%Quality Boat Lifts 13,000lbs 4 Posts Alum-A-Vator 19,118.26$
45 Pier 33 269-983-3333250 Anchors Way 2/22/2005St. Joseph, MI 49085 5/24/2005
100%30' and 35' Dock Replacement with 37.5" Adjustable 496,471.00$ System Phase I
44 Pleasure Isle Marina 269-469-3000512 Lake Drive 4/3/2002New Buffalo, MI 49117 5/27/2005
100%Pleasure Isle Marina Phase I & II 1,278,157.12$
43 Robert A. Pastrick Marina 219-391-84823301 Aldis St 6/3/2003East Chicago, IN 46312
100%Pile Repairs & Concrete Debris Removal 103,802.00$
42 City of New Buffalo 269-469-1500224 W. Buffalo St 4/1/2003New Buffalo, MI 49117
100%Removal of 312 Wooden Piles 30,162.50$
41 Coastline Builders, Inc. 312-925-1072
Removal of 312 wooden pilings 12" diameter x 26' long from the Harbor Entrance Cove area. Extract with barge crane, transport to unloading area, load onto semi trailer and haul off site.
Jeff Price
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Repaired slip mooring piles, pier spud piles and guides from winter ice damage. Removal of 270 tons of concrete debris between Pier A & B fairways. Excavator with thumb grab material in fairways placed in containers on barge, transport to unloading area and loaded into semi trucks.
Chuck Dobbins
Develop a twenty-six slip marina facility consisting of 720' of concrete seawall, thirteen 42' slips, thirteen 30' boat-lift slips, and a 2,880 square foot bathhouse, office and condo rental building.
Andy VozarStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Remove and discard existing fiberglass deteriorated docks. Fabrication and installation of Donkersloot & Sons patent steel design 29 - 30' docks, 18 - 35' docks with associated accessories including 37.5" adjustable system, five-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles.
Arie Donkersloot
Installation of Quality Boat Lifts 13,000lbs post Alum-A-Vator with Gem remote controls on four 7" x .312 wall x 40' long steel support piles with 8" schedule forty PVC pipe sleeve covers by 20' long. Installed in South Cove Harbor Isle Drive cabana unit 36, New Buffalo, MI.
Tighe CurranStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Installation of Quality Boat Lifts 27,000lbs posts Alum-A-Vator with Gem remote controls on four 8.625" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 20' long. Installed in South Cove Harbor Isle Drive boathouse unit 46, New Buffalo, MI.
Thomas Danielson
Bill KayStart Date
Completion Date
Page 22 of 29
3230 Yankee Road 3/1/2003Niles, MI 49120
100%Support Piles & Concrete Grade Beams 179,251.00$
40 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 7/1/2002Michigan City, IN 46360
100%Trail Creek Outer Harbor Shoal Removal 2002 51,842.80$
39 Marina Park East, South & West Condo Slip Association 219-874-7290Pioneer Lumber Slip Facility 3/1/2002320 E. 2nd StreetMichigan City, IN 46360 100%
398,270.00$ Dredge Slips Trail Creek Michigan City, IN
38 City of New Buffalo 269-469-1500224 W Buffalo St 3/1/2002New Buffalo, MI 49117
100%Harbor Channel Entrance Shoal Dredging 2002 33,748.00$
37 City of New Buffalo 269-469-1500224 W Buffalo St 10/1/2001New Buffalo, MI 49117
100%Rehabilitation of 11 Steel Finger Piers 21,780.00$
36 Mr. Elmar Johsen 269-469-340427 Pokagon 9/1/2001New Buffalo, MI 49117
100%265 Sea Ray Flybridge "Ship Happens" 5,500.00$
35 Coastline Builders, Inc. 312-925-10723230 Yankee Road 9/1/2001Niles, MI 49120
100%Installation of Private Slip Facility 69,137.94$
Contractor's Work ForceContract Amount
Installation 85' of 5' W x 14' L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, fabricate & install 1 - 45' telescopic steel dock, piles, electrical and plumbing.
Raise sunken vessel in marina Park South Slip # 2 and transport to B & E Marina Travel Lift Facility.
Jeff PriceStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Lower docks 14" and extend ramps 28".
Elmar Johsen
Hydraulically dredge 5,240 cubic yards of shoal sediment in the federal channel and place material on the beach nourishment area.
Chuck DobbinsStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Mechanically dredge slips to a depth of 6.5'. Place material in storage cell on barge, transport to dock, and unload into semi trucks and deliver to the Deercroft Landfill Michigan City, IN.
Chuck Dobbins
Mechanically dredge 6,326 cubic yards of shoal sediment from the harbor entrance, load onto barge, transport 1 mile west and unload in 6' deep water at the disposal area.
Dan RadtkeStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Installation of 19 8.625" OD support steel piles driven to 15-50 ton load with an average length of 120' long. Placement of 555' of heavy reinforcement concrete grade beam 12" thick by 3' and 6' tall. The purpose is to support a million plus home in a wet land environment.
Scott Westphal
Start DateCompletion Date
Page 23 of 29
34 Chicago Marine Salvage & Towing 312-243-22296348 N. Milwaukee Avenue 8/1/2001Suite 389Chicago, IL 60646 100%
11,000.00$ 32' Bayliner Sailboat Recovery "Sun Maid"
33 Moorings Condominium/Dock Association 269-469-5790310 Oselka Drive 4/12/2001Suite 256 7/1/2001New Buffalo, MI 100%
342,140.95$ Emergency Dredging
32 Philip Donahue 708-524-483111900 Marquette Dr 1/27/2001New Buffalo, MI 49117 6/17/2001
100%Dredge Private Channel 52,309.00$
31 Edward Burke 630-505-82822580 Hanford Lane 10/1/2000Aurora, IL 60504
100%Stone Revetment 62,275.00$
30 Lake Michigan Yacht Club 219-876-5480PO Box 358 7/1/2000New Buffalo, MI 49117
100%Seawall Repair Slips #1 & 2 53,620.00$
29 Moorings Condominium/Dock Association 269-469-5790310 Oselka Dr 6/1/2000Suite 256New Buffalo, MI 49117 100%
41,377.04$ Channel A & B Dredging
28 City of New Buffalo 269-469-1500224 W. Buffalo St 5/1/2000New Buffalo, MI 49117
100%Completion Date
Contractor's Work Force
Hydraulic dredge 2,795 cubic yards onto beach nourishment site and 2,080 cubic yards into a dewatering facility.
Chuck DobbinsStart Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Replace seawall with 40' of 10' W x 22' L precast concrete panels, install 28" adjustable steel dock, pile, electrical, and plumbing
Karen Pietroski
Placement of 1,630 cubic yards of clay to rebuild bluff and install 160' of armor stone revetment on a 2:1 slope 30' wide.
Jerry LooneyStart Date
Completion Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contractor's Work ForceContract Amount
Mechanically dredge private channel 30' wide x 300' long to a depth of 5' deep and removal of dredge material off site. Placement of 80' small rip rap along shoreline and construct a 12' wide x 42' long wood treated dock.
Edward Burke
Hydraulic dredge 4 fairways approximately 650' long each, 75 - 30'/35' long slips and 75 40'/45' long slips consisting of 14,973 cubic yards into beach dewatering facility, truck silty material off and contour grade sandy material on beach.
Philip DonahueStart Date
Completion Date
Completion DateContractor's Work Force
Contract Amount
M/V Miss Jamie Lynn crane barge removed sailboat off racks and wood piles along shoreline 3 miles south of St. Joseph, MI. Set vessel on deck, transported to New Buffalo Harbor and unloaded onto Dockside Nautical Marine Service hydraulic boat trailer.
Karen PietroskiStart Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Jack Manley
Page 24 of 29
Timber Pile Removal 41,360.00$
27 Robert A. Pastrick Marina 219-391-84823301 Aldis St 4/1/2000East Chicago, IN 46312
100%Pier G Spud Pile Replacement 52,435.00$
26 City of New Buffalo 269-469-1500224 W. Buffalo St 3/1/2000New Buffalo, MI 49117
100%Federal Channel Shoal Dredging 31,890.45$
25 Lake Michigan Yacht Club 219-876-5480PO Box 358 10/2/1999New Buffalo, MI 49117 1/30/2001
100%Shore Stabilization & Beautification 303,886.00$
24 Masterplan, Inc. 630-215-7415125 W. 55th St 8/1/1999Suite 200Clarendon Hills, IL 60514 100%
4,000.00$ Fastball Band Concert - Absdut Mandrin
23 Timber Lane Homeowners Association16599 West Way 8/1/1998New Buffalo, MI 49117
100%Stone Revetment 173,755.00$
22 Chicago Marine Salvage & Towing 312-243-22296348 N. Milwaukee Ave 5/1/1998Suite 389Chicago, IL 60646 100%
12,625.00$ 49' Grand Banks Alaskan "Cloud Vision"
Hydraulic dredge 6,131 cubic yards of shoal sediment I, II, III in the federal channel and city marina shoal and place material on the beach nourishment area.
Completion DateContractor's Work Force
Contract Amount
M/V Miss Jamie Lynn crane barge raised vessel off the shore line of Mount Baldy, Indiana. Transported to Oselka's Marina in New Buffalo Harbor to hoist out with travel lift.
Contract Amount
Placement of clay as needed to rebuild bluff and install 631' of armor stone revetment on a 2:1 slope 25' wide for individual home owners. Hydro seed crown vetch on upper remaining portion of bluff.
Jack ManleyStart Date
Thomas BoydStart Date
Completion DateContractor's Work Force
Completion DateContractor's Work Force
Contract Amount
Provided M/V Miss Jamie Lynn barge for entertainment crew, company set up band on bow of barge. Barge transported band and crew to Stop #2 Sheridan Beach Michigan City, IN. Barge spud down off beach in 6' of water for a 2.5 hour private concert party.
Mary Jo BlytheStart Date
Completion DateContractor's Work Force
Contract Amount
Installation of steel I-beams, 185' of 10'W x 22'L precast concrete seawall panels, 445' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 5' and 14' wide walkway, lights, and railing.
Start Date
Start DateCompletion Date
Contractor's Work ForceContract Amount
Contract Amount
M/V Miss Jamie Lynn crane barge removed existing spud pile system and install twelve 9.625" OD piles by 75' long.
Chuck Dobbins
Jerry Looney
Andy VozarStart Date
Completion DateContractor's Work Force
Contract Amount
Removal of 170 wooden pilings with diving crew in Channels A & B entrance and along the New Buffalo Transient Marine pump out dock. Extract with barge crane, transport to unloading area, load onto semi trailer and haul off site.
Page 25 of 29
21 Ronald Farina 269-469-222210925 Marquette Dr 5/1/1998New Buffalo, MI 49117
100%Stone Revetment 48,760.00$
20 Bill Deputy 269-46-4860606 Lake Drive 10/1/1997New Buffalo, MI 49117
100%Sunset Shores Beach Revetment Project 115,057.86$
19 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 6/1/1997Michigan City, IN 46360
100%700/800 Dock Replacement - Expansion 1,581,832.16$
18 Windham Bremer 219-778-47901353 East 1000 North 11/1/1996LaPorte, IN 46350
100%Boat Slip - Taylor St. Michigan City, IN 116,565.00$
17 B & E Marine, Inc. 219-879-8301Washington Park 8/1/1996Michigan City, IN 46360
100%Launch Ramp Rehabilitation 190,829.55$
16 K & S Testing & Engineering, Inc. 219-924-52319718 Kennedy Ave 12/1/1995Highland, IN 46322
100%Sediment Samples from Michigan City Harbor 25,635.00$
15 Moorings Condominium/Dock Association 269-469-5790310 Oselka Drive 5/1/1995Suite 256New Buffalo, MI 49117 100%
310,000.00$ Peninsula A Rehab & A/B Headwall Rehab
Contractor's Work Force
Contractor's Work ForceContract Amount
Removal of floating docks and wooden spud and mooring piles, construct 1,180' pier on piles with a 12' and 14' wide concrete deck, fabricate and install 76- 35' and 40' telescopic docks, piles, electrical, and plumbing.
Contractor's Work ForceContract Amount
Demolish building, excavation of private boat well, design & install precast tongue & groove seawall panels with 14" bulkhead and 10' wide walkway, steel dock, boat house roof with steel piles, I-beams, & corrugated steel roof.
Windham BremerStart Date
Completion Date
Contract Amount
Completion Date
Start DateCompletion Date
Start Date
Ronald FarinaStart Date
Completion DateContractor's Work Force
Placed 782' of armor stone revetment wall along dune bluff on a 2:1 slope 20' wide for individual home owners.
Scott Westphal
Contract Amount
Placement of 2,000 cubic yards of clay to rebuild bluff and install 130' of large armor stone revetment on a 2:1 slope 35' wide. Hydro seed crown vetch on upper remaining portion of bluff.
Bill Deputy
Completion Date
Completion Date
Contractor's Work Force
Removal of existing launch ramp & steel sheet wall, design & install 400' of 5'W x 12'6" L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, install new launch ramp & boat well, steel railing, & block retaining wall.
Contract Amount
Barry BenszStart Date
Contractor's Work Force
Set up K & S Engineering drill rig on M/V Miss Jamie Lynn work barge. Assisted K & S to perform sediment sample drilling of lake bottom on the Trail Creek River mouth.
Ron HosekStart Date
Contract Amount
Contract Amount
Completion DateContractor's Work Force
Karen PietroskiStart Date
Page 26 of 29
14 Chicago Park District 312-747-1524425 East McFetridge Drive 5/1/1995Chicago, IL 60605
100%199,997.00$
Dredging at Jackson Park Outer Harbor & Lincoln Park Wilson Ave Launch Ramp
13 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 4/1/1995Michigan City, IN 46360
100%Bulkhead Improvements 156,314.60$
12 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 6/1/1994Michigan City, IN 46360
100%800 Dock Additions 519,524.00$
11 US Army Corps of Engineers 219-923-1763Calumet Area Office 5/1/1994906 Griffith BlvdGriffith, IN 46319 100%
286,059.16$ M/D Trail Creek, Michigan City, IN
10 Kadinger Marine Service, Inc. 414-383-2040401 E. Greenfield Ave 11/1/1993Milwaukee, WI 53204
100%Michigan City, IN Zebra Mussel Project 12,228.56$
9 US Army Corps of Engineers 219-923-1763Calumet Area Office 6/1/1993906 Griffith BlvdGriffith, IN 46319 100%
3,800.00$ Sediment Sample Collection Burns Harbor Lake Michigan, Burns Harbor, IN
8 Chicago Park District 312-747-1524425 East McFetridge Drive 6/1/1993Chicago, IL 60605
100%218,742.32$
Completion DateContractor's Work Force
Contract Amount
Hydraulically dredge 25,330 cubic yards of sediment in harbor channels and placement of material on nearby beaches.
Removal of steel sheet wall and install 185' of 5'W x 12'6"L precast tongue & groove seawall panels with 14" bulkhead and 10' wide walkway.
Scott WestphalStart Date
Arvind ModiStart Date
Completion DateContractor's Work Force
Remove docks and steel sheet wall, design and install 600' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, fabricate and install 16 - 40' steel docks and piles, electrical, and plumbing.
Thomas A. Deja, P.E.Start Date
Start DateCompletion Date
Contractor's Work Force
Completion Date
Completion DateContractor's Work Force
Hydraulic dredge 32,500 cubic yards into a dewatering facility, truck spoils off site 3 miles to contract berm.
Contract Amount
Arvind ModiStart Date
Completion Date
Contractor's Work ForceContract Amount
Design & construct 460' pier on piles with 14' wide concrete deck, fabricate & install 28 - 35' and 40' telescopic docks, piles, electrical, and plumbing
Scott Westphal
Start DateCompletion Date
Contractor's Work Force
Thomas A. Deja, P.E.
Contract Amount
Utilized our Toyo Pump to remove large amounts of zebra mussels and sand from crib intake as pigs pushed out.
David Kadinger, Sr.Start Date
USACOE personal and equipment set up on barge and took sediment samples of harbor bottom.
Contract AmountContractor's Work Force
Contract Amount
Contract Amount
Page 27 of 29
Dredging Harbors in Various Parks and at Wilson Ave Boat Launching Ramp
7 US Army Corps of Engineers 219-923-1763Calumet Area Office 5/1/1993906 Griffith BlvdGriffith, IN 46319 100%
1,084,592.36$ East Pier Resurfacing, Michigan City, IN
6 B & E Marine, Inc. 219-879-8301Washington Park 4/1/1993Michigan City, IN 46360
100%Construct Gas Dock & Concrete Seawall 60,000.00$
5 Michigan City Port Authority 219-872-1712200 Heisman Harbor Drive 8/1/1992Michigan City, IN 46360
100%Southeast Seawall Construction Project 142,410.00$
4 City of New Buffalo 269-469-1500224 W. Buffalo St 3/1/1992New Buffalo, MI 49117
100%Harbor Channel Dredging 14,050.00$
3 US Army Corps of Engineers 313-266-3825Detroit Area Office 8/1/1991PO Box 09258Detroit, MI 48209-0258 100%
193,407.09$ M/D Bolles Harbor, Michigan
2 US Army Corps of Engineers 219-923-1763Calumet Area Office 4/1/1990906 Griffith BlvdGriffith, IN 46319 100%
22,500.00$ Michigan City Outer H