    The world’s most liveable city 

    B  C  4 1  4  0 

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    2/22

     

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    3/22

    OUTCOME 1:A FAIR, SAFE AND

    HEALTHY AUCKLANDThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME1A FA IRSA FEA NDHEA LTHYA UC KLA ND

    T

    hA

    k  l

    dPl

    |  A

    lI

    l

    i

    U

    d

    2014

    Target 1.1Ensure that by 2017, all pre-school children receive allwellchecks, including the B4school check, and are up-to-date with childhood immunisation.

    Immunisation is not compulsory in New Zealand;however, a range of free vaccinations are offered tobabies, children and adults to protect against serious and

    preventable diseases (refer to the National ImmunisationSchedule).

    B  C  4 1  4  0 

    Target 11.5Increase residential dwelling construction consents from3,800 in 2011 to at least 10,000 on average per annumfrom 2020.

    Ensuring there is an adequate supply of dwellings inAuckland will facilitate future growth and minimise thenegative issues that arise from constrained housing

    supplies (overcrowding, poor quality housing).

    Target

    Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    4/22

    TARGETSNumber of targets to track ourprogress towards this outcome

    29

    9Targets trackingtowards endtarget

     5Targets trackingaway from endtarget

     15Targets with nobaseline or current data

    Childhood immunisation Participation of ECE  School achievementsPost-secondary education   Criminal offences  Domestic violenceSense of community  Access to sportsfields  Residential consents

    Perception of safety  Alcohol/Drug impaired driving  Home ownershipHomelessness   Disparity of home ownership

     Actions in progress tohelp guide projects andprogrammes

    54

    37 Actions on track for completion

    4 Actions withelements at risk

     13   Actions at risk

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “Auckland Council and the government have collaborated to develop and enact a new regulatoryregime via the Housing Accord and Special Housing Areas (HASHA) Act 2013. This enables the fasttracking of housing policy development and consents. Through establishing the Housing ProjectOffice, we have integrated planning, policy, consenting and master-planning in one office, functionsthat had originally been split.

    The first phase of the Housing Project Office has focused heavily on SHA identification andestablishment. Our next phase will increasingly focus on defining an overarching housing role for Auckland Council so we can lead our communities in this critical area of well-being for Aucklanders.”

    -Ree Anderson, Project Director HPO

     Adoption of “I am Auckland” – Children &

     Young People’sStrategic Action Plan in

    September 2013.

    Retrofit Your Home scheme showing a

    Social Return on

    Investment (SOI) of$3.10 for every $1 invested.

    New artificial turfs and improved quality ofexisting facilities has

     increased usage andextended the playing season.

    Council and industries working together to

    employ 700 youththrough the YouthConnectionsProgramme.

    Over 80 CrimePrevention Through

    Environmental Design(CPTED) assessments carried out across the

    region.

    Completion of Sportand Recreation

    Strategic Action Plan,

     co-sponsored byCouncil and One Voice:Sport and Recreation

     Auckland.

    63 Special Housing Areas are expected to supply about 10,000dwellings or sections

    over the three years ofthe accord and willdeliver some 30,000dwellings over time.

    First lot of qualityhomes built within SHA will be ready to move

     into in late 2014 in Waimahia (Manurewa)

    Ministry of SocialDevelopment conductedthe Social Sector Trial

     in Ranui which focusedon improving youthoutcomes aroundtruancy, youth

    offending, drug and

    alcohol use,engagement in

    education, training andemployment.

     14  Actions completed

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    5/22

    OUTC OME2A GR

    EENA UC KLA ND

    Th

    A

    k  l

    dPl

    |  

    A

    lI

    l

    t  t  i

    U

    d

    t  

    2014

    OUTCOME 2:A GREEN AUCKLANDThe Auckland Plan | Annual Implementation Update 2014

    Target 7.1Reduce gross per capita water consumption from 2004 levels by15 per cent by 2025

    As the population of Auckland increases, so do the demandson potable water sources and associated water infrastructure.Reducing per capita water consumption delays the need fordevelopment of new water sources and costly infrastructure.Using water efficiently is important to ensure that natural

    water resources are managed sustainably. It also reduces theneed to discharge wastewater containing contaminants intothe environment.

    B  C  4 1  4  0 

    Target 8.1Reduce the amount of human-induced greenhouse gasemissions by:a. 10%-20% by 2020 based on 1990 emission levels;b. 40% by 2040 based on 1990 emission levelsc. 50% by 2050 based on 1990 emission levels.

    As New Zealand’s largest and fastest-growing city, transforming

    Auckland to a sustainable, low-carbon future brings majoropportunities for our economy and for the enhancement of ourenvironment and overall liveability.

    Target

    Target

    Target

    Target

    Data not available at the time of reporting

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    6/22

    TARGETS

    Number of targets to track ourprogress towards this outcome

    14

    4Targets trackingtowards endtarget

    0Targets trackingaway from endtarget

     10Targets with nobaseline or current data

     Water consumption    Air pollution    Renewable energy sourcesPreparedness against natural hazards

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “We are fortunate to live in Auckland with its beautiful natural environment and recreational areas including spectacular coastlines and bush. Our environmental programs, education and partnershipsbenefit local environments across Auckland. The Proposed Auckland Unitary Plan has been designed to

     improve the environment and move us towards a “Green Auckland” which is fundamental to achievingthe vision of the Auckland Plan.

    Preserving and protecting what we have may not be transformational, however projects such as WaiOra Wai Māori Tāmaki Makaurau; Auckland’s Freshwater Programme, Tai Timu Tai Pari - Sea Change,and the Environmental Strategic Action Plan give us the opportunity to deliver those transformational

     shifts required to make Auckland the world’s most liveable city.”

    Greg Holland, Manager Air, Land Water and Coastal

    The Low Carbon

     Auckland Action Plan was officially launched in July 2014.

    Environment Strategic Action Plan currentlyunderway to explore

    the risks and

    opportunities associated with environmental

    outcomes for Auckland.

    Guidance for managingthe effects of vehicleemissions from hightraffic generating

    activities included inProposed Auckland

     Unitary Plan.

    Proposed Air QualityBylaw aims to controlemissions from woodburners and open fires

    and contribute toachieving compliance

     with Air Quality NationalEnvironmental

    Standards (AQNES).

     Active protection andrestoration of

     indigenous ecosystemsand habitats through arange of community-

    based initiatives.

    Identified significant values of wetlands andoutstanding freshwater

    bodies through Wai Ora– Wai Māori TāmakiMakaurau, Auckland’s

    Freshwater Programme.

    Re-establishment ofover 8 hectares of newhabitat through planting

    native species onregional parks.

    Sea Change – Tai TimuTai Pari is underway to

     secure a healthy,

    productive and sustainable future forthe Hauraki Gulf.

     Jointly worked withDepartment of

    Conservation on the “Treasure Island”

     campaign to ensure

    Hauraki Gulf islandsremain pest-free.

    31 Actions on track for completion

     Actions in progress tohelp guide projects andprogrammes

    38

    4 Actions withelements at risk

    3  Actions at risk

    21  Actions completed

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    7/22

    OUTCOME 3:AN AUCKLAND OF PROSPERITY

    AND OPPORTUNITYThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME3A NA 

    UC KLA NDOFPROSPERITYA NDOPP

    ORTUNITY

    Th

    A

    k  l

    dPl

    |  A

    lI

    l

    t  t  i

    U

    d

    t  

    2014

    Target 6.2Increase annual average productivity growth from 1% p.a. forthe last decade to 2% p.a. for the next 30 years.

    Productivity relates to how efficiently a firm or any otherorganisation can turn its inputs, such as labour and capital, intooutputs in the form of goods and services. Labour productivityis a measure of the amount produced for a certain amount oflabour effort. It is closely related to individual incomes (i.e.

    wages and salaries) and living standards, and it can bemeasured with reasonable reliability. The simplest measure isoutput per worker (GDP per capita) which can increase ifworkers produce more in the hours they work, or if they worklonger hours. The main measure, therefore, is output (GDP) perhour worked. The main advantage of this is it takes variations inthe number of hours worked per worker into account.

    B  C  4 1  4  0 

    Target 6.4Increase annual average real GDP growth from 3% p.a. in thelast decade to 5% p.a. for the next 30 years.

    The GDP growth rate measures how fast an economy isgrowing. A strong Auckland economy means more jobs andmore money in more people’s pockets. It allows people,families and communities the freedom to pursue their ownprosperity, infrastructure such as roads and rail to be

    improved, social services such as libraries and youth centres tobe expanded, and more amenities such as parks andcommunity halls to be developed. This in turn attracts moreskilled workers, businesses and investment.

    Target  Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    8/22

    TARGETSNumber of targets to track ourprogress towards this outcome

    8

     1Targets trackingtowards endtarget

    4Targets trackingaway from endtarget

    3Targets with nobaseline or current data

     Average real GDP growth

    OECD Ranking  Average productivity growth  Average export growth Added value to the Auckland economy by rural sector

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “Overall, 2013-2014 has been a satisfying year as our combined efforts to build relationships andestablish platforms to better implement chapter six of the Auckland Plan and the AucklandEconomic Development Strategy have come to fruition. The Shared Economic Agenda and the

    Business Leadership Group in particular herald a step-change. As the highlights illustrate, there hasalso been significant progress on the delivery of events, projects and programmes.”

    -Harvey Brookes, Manager Auckland Strategy & Research

    Mayoral delegation tothe World Cities

    Summit in Singaporethis year is the first

     step to raise Auckland’s global visibility and to position Auckland for Lee Kuan Yew World City Prize in

    2016.

    GridAKL opened thefirst stage of the

    Innovation Precinct inthe renovated Polperro

    Building in WynyardQuarter, home to high-tech ITC and digital

    tenants.

    Clevedon District Centre was redesigned and

    new technology installed in the old post

    office for public use including high-speed internet access and Wi-

    Fi.

    NRL Nines surpassedexpectations delivering$9.35 million in GDP to

     Auckland, with 68,000 visitor nights and more

    than one million viewers of live telecast.

    COMET Auckland andthe Auckland Chamberof Commerce held the

     Auckland YouthEmployability forum with Auckland

    employers and youngpeople.

    Medlands community ofGreat Barrier Islandnow has access to

     Vodafone’s 3G networkand fixed wireless Rural

    Broadband Initiative(RBI) broadband plans.

     Around 200,000 peopleattended major events

    over the weekend of 14-16 February 2014.

     A joint investigation with Education New Zealand on an inter-regional partnership

    programme connecting international students with high growth

     sectors such as ICT.

    The Shared Economic Agenda identified theareas of focus over the

    medium term forCouncil and the

    Business LeadershipGroup to address

     Auckland’s pressingeconomic barriers and

    opportunities.

     12 Actions on track for completion

     1 Actions withelements at risk

    8  Actions at risk

     14  Actions completed

     Actions in progress tohelp guide projects andprogrammes

    21

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    9/22

    OUTCOME 4:A WELL CONNECTED AND

    ACCESSIBLE AUCKLANDThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME4A WE

    LLC ONNEC TEDA NDA C C ESSIBLEA U

    C KLA ND

    Th

    A

    k  l

    dPl

    |  A

    l

    I

    l

    i

    U

    d

    2014

    Target 13.1Double public transport from 70 million trips in 2012 to 140million trips by 2022.

    Increasing the use of public transport reduces congestion,pollution and reduces the need to increase capacity ofexisting roads.

    B  C  4 1  4  0 

    Target 13.4Reduce congestion levels for vehicles on the strategic freightnetwork to at or below the average of 2006-2009 levels(average daily speed of 45kph and average delay of 32seconds per kilometre) by 2021.

    Ease of movement along Auckland's strategic freightnetwork is central to the efficient movement of goods, and

    to generating positive economic outcomes. The averageamount of time taken to travel around the region is anindicator of the reliability of using the road network.

    Target

    Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    10/22

    TARGETSNumber of targets to track ourprogress towards this outcome

    5

    2Targets trackingtowards endtarget

    2Targets trackingaway from endtarget

     1Targets with nobaseline or current data

    Reduce congestion level  Public transport trips

    Reduce car crash fatalities  Public transport trips to city centre duringmorning peak

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “Government is continuing to invest heavily in Auckland, ata rate of about $1billion per year. In Budget 2014, theGovernment provided $375 million to the NZ Transport Agency to accelerate the three key motorway corridors inthe North, South and at the Airport and to ensure ongoingdevelopment of the AMETI and the East-West Connectionsprojects. The Government has also committed for a

     construction start in 2020 on the City Rail Link and will consider an earlier start if city centre employment and railpatronage growth hit thresholds well before 2020. The NZTransport Agency continues to work closely with AucklandTransport on key projects and operating the transport system from a One Network approach.”

    - New Zealand Transport Agency

    On 3 March 2014 Auckland Transport

    received arecommendation from

     independent commissioners to

     confirm the City RailLink (CRL) Notices ofRequirement (NoR).

    Preferred programmeoptions identified for

    the East-West Link.

    Evident traffic improvements along

    Tiverton Road to Wolverton Street since

    the completion of theroad widening worksand installation of new

    traffic signals.

    Completed the roll-out

    of AT HOP cardtechnology for trains,ferries and buses.

    Since the opening ofPanmure Station in

     January 2014, there hasbeen a 57% increase in

    passenger numbers, with an average of 1,116passengers per day in comparison to 100

    passengers per day in2003.

    First new electric train services went into

     service on theOnehunga line in April

    2014.

    New ManukauStation/MIT building

    opened on June 2014.

    EnvironmentalProtection Authority's

     consent given to

    Notice of Requirementfor Puhoi to Warkworth. 

    Design changes toredevelop the existingMt Eden Station and

     connect it to the CRL will save over $150

    million. This eliminatesthe need for the verydeep Newton Station

     which will also reduce construction disruption

     in Upper SymondsStreet.

     “Better connections and accessibility within Auckland isbeing progressed with the delivery of a number of significant public transport initiatives over the last year.These initiatives will encourage greater use of publictransport as travel times and reliability improves. Major

    local roads improvements associated with SH20 Waterview and SH16 upgrades are progressing well. Auckland Transport continues to work closely withNZTA to develop and manage the transport networksas one system. ”

    -  Kevin Wright, Manager Transport Strategy

     Actions in progress tohelp guide projects andprogrammes

    6

    4 Actions on track for completion

    0 Actions withelements at risk

    2  Actions at risk

    4  Actions completed

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    11/22

    OUTCOME 5:A BEAUTIFUL AUCKLAND

    THAT IS LOVED BY ITS PEOPLEThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME5A BEA 

    UTIFULA UC KLA NDTHA TISLOVEDBYITSPEOPLE

    Th

    A

    k  l

    dPl

    |  A

    lI

    l

    i

    U

    d

    2014

    Target 4.1Increase the number of scheduled historic heritage places by100% from 2,100 to 4,200 by 2030.

    Scheduling of historic heritage places and areas and Māoricultural heritage sites and places provides protection andmanagement of these heritage values within the planningframework. This is the key statutory process that ensures our

    historic heritage is protected and conserved for the benefitand enjoyment of present and future generations.

    B  C  4 1  4  0 

    Target 10.2Increase the proportion of residents who feel a sense ofcommunity in their local neighbourhood from 61% in 2010to 90% by 2040.

    A sense of community can contribute to the overall liveabilityof a city, as it can enable the establishment of socialnetworks and build social capital.

    Target

    Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    12/22

    TARGETSNumber of targets to track ourprogress towards this outcome

    8

     5Targets trackingtowards endtarget

     1Targets trackingaway from endtarget

    2Targets with nobaseline or current data

    Number of scheduled historic heritage places  Supply of residential dwellingsSatisfaction with heritage management  Sense of communityPopulation in city centre

    Proud of how their local area looks and feels

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “Planning helps to create the kinds of places where people want to live, work and relax – oftentermed as “shaping places”. Planning is about improving places by helping them to functionbetter socially, environmentally and economically.

    The Council’s first Unitary Plan will be a key toolfor directing and managing beneficialdevelopment.”

    -Penny Pirrit,Manager Regional & Local Planning

    The Hurstmere Greenupgrade took home the supreme award at theNew Zealand Concrete

     Award as well asbranch and nationalawards from the New Zealand Institute of

     Architecture.

    Detailed heritage survey for Point

    Chevalier included thedocumentation ofbungalows, state

    houses, shops and services to tell the

     story of life during the interwar period.

    Heritage surveys were completed for

    Papatoetoe, Pukekohe

    and Point Chevalier.

    The $13millionrevolving Built Heritage Acquisition Fund will

    help save historicbuildings and builtfeatures that may be atthe risk of destruction

    or neglect.

    The Waitākere RangesHeritage Area

    Monitoring Report shows Council was

     successful inaccommodating small

     scale development withminimal change to the

    area’s landscape.

    Council was able tonegotiate with the new

    owner to conserve andadaptively reuse the

    Guy Homestead.

     Area andneighbourhood planshave commenced orbeen completed for

    Devonport-Takapuna,

    Otara-Papatoetoe,Pukekohe, Karangahape

    Road, Newton andPonsonby Road plans.

     Airedale Cottages andThomas Doo Jnr

    Building were acquiredby Council to retain

    their place as importantreferences to

     Auckland’s past.

    Over 9,000 submissions were received on the

    Proposed Auckland Unitary Plan. These submissions will beheard over 2014-16 byan Independent Hearing

    Panel, appointed byCentral Governmentand chaired by Judge

    David Kirkpatrick.

     “Our heritage reinforces our sense of place and identity –adding to the reasons Tāmaki Makaurau / Auckland is loved by its people. A focus hasbeen on identification of our heritage because as we re-learn our history, our stories can be told. An important focus for 2015 will be improvingoutcomes for our Māori heritage. This is anexciting project with significant outcomes for all Aucklanders.”

    – Noel Reardon,Manager Heritage

     Actions in progress tohelp guide projects andprogrammes

    20

     12 Actions on track for completion

    3 Actions withelements at risk

     5  Actions at risk

     10  Actions completed

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    13/22

    OUTCOME 6:A CULTURALLY RICH

    AND CREATIVE AUCKLANDThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME6A C ULTURA LLYRIC HA NDC REA TIVEA UC K

    LA ND

    Th

    A

    k  l

    dPl

    |  A

    lI

    l

    i

    U

    d

    2014

    Target 3.1Increase the number of Aucklanders actively participating inthe arts from 48% in 2010 to 75% by 2040.

    The Auckland Plan recognises cultural wealth and creativityas important sources of comparative advantage, and the artsas a major contributor to achieving Auckland’s vision ofbeing the world’s most liveable city.

    B  C  4 1  4  0 

    Target 3.4Increase the number of residents who are conversant inmore than one language from 25 percent in 2006 to 50 percent in 2040.

    Auckland is the most ethnically diverse region in NewZealand. At the last census more than 150 ethnicities wererecorded, and two-thirds of the nation’s Pacific and Asian

    populations resided in Auckland. Ethnic and cultural diversitywill remain a key feature of Auckland’s social landscape andit is vital that languages are kept alive. Diversity of languageboth reflects and drives a vibrant city.

    Target

    Target

    Data not available at the time of reporting

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    14/22

    TARGETS

    Number of targets to track ourprogress towards this outcome

    4

    3Targets trackingtowards endtarget

    0Targets trackingaway from endtarget

     1Targets with nobaseline or current data

    Employment in creative sector    Visitor guest nightsConversant in more than one language

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     ACSAP featured aliterature review, artist’s survey, consultation

     workshops andmeetings with creativeand cultural sector

    organisations, individualartists, practitioners.

     Work from Katy Wallace in the Eden Valley village drewpositive reaction with

    plenty of interactionand discussion fromlocals and visitors.

    Nine public art projects were completed thisyear with a further 15

    planned for the comingyear.

     An estimated 17,647people were engaged with Creative POP

    Projects such as Walking in Trees, The

    Park, The Roots:Pollinate and Bee Jam.

     Artstation Toi Tū was

    re-launched as StudioOne Toi Tū in June.

    The refurbished StudioOne Toi Tū includes

    new galleries, studio forhire, creative workshop space and an upgrade

    to the cell block.

     ‘Ko nga Manu a teMahurangi – Birds ofthe Mahurangi’ wereunveiled and blessedby Ngāti Whatua o

    Kaipara and NgātiManuhiri

    representatives at adawn ceremony in May.

    POP project unite strangers, fuse

     creativity and create an

     instant community onevery street corner.

    Draft Arts and CultureStrategic Action Plan(ACSAP) was openedfor submission in Julyand is a good example

    of cross-sector

     collaboration involvingkey players in creative industries.

     “Over the course of 2013-2014, efforts continued to focus on implementing the Auckland Plan through integrating arts and culture into the everyday lives of Aucklanders. This past year saw a new emphasis beingplaced on programming that brings art and culture into public spaces in new ways where experiences can beenjoyed easily by all Aucklanders. New sector partnerships have been formed and existing ones

     strengthened, helping to increase and diversify the reach of activities as well as assisting with thedevelopment of a new strategic arts and culture action plan for Auckland.”

    Kaye Glamuzina, Manager Arts & Culture

     Actions in progress tohelp guide projects andprogrammes

    9

    3 Actions on track for completion

    0 Actions withelements at risk

    6  Actions at risk

     10  Actions completed

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    15/22

    OUTCOME 7:A MAORI IDENTITY THATIS AUCKLAND’S POINT OF

    DIFFERENCE IN THE WORLDThe Auckland Plan | Annual Implementation Update 2014

    OUTC OME7A MA ORIIDENTITYTHA TISA UC KLA ND’  SPOINTOFDIFFERENC EINTHEWORLD

    Th

    A

    k  l

    dPl

    |  A

    lI

    l

    i

    U

    d

    2014

    Target 2.1Increase the number of papakainga in the Auckland regionfrom 3 to 18 by 2040.

    Increasing the number of papakāinga is a key goal for bothAuckland Council and mana whenua of Auckland. As part ofAuckland Council’s contribution to Māori well-being, theestablishment of papakāinga represents a significanttransformational shift that will address the lack of housing,the aspiration to support Māori community development,

    and facilitate the reconnection of Māori with their identityand their ancestral land.

    Target 2.2Establish reciprocal decision-making processes andarrangements that promote shared governance over mattersof significance to iwi from 1 to 16 by 2040.

    Reciprocal decision making is a significant issue concerningMāori and is a primary pillar for Māori well-being andcapacity.

    Target

    Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    16/22

    TARGETS

    Number of targets to track ourprogress towards this outcome

    6

    2Targets trackingtowards endtarget

    0Targets trackingaway from endtarget

    4Targets with nobaseline or current data

    Number of papakāinga  Number of reciprocal decision-making arrangements

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

    61 sites of significanceto Māori including waahi

    tapu are scheduled inthe Proposed Auckland

     Unitary Plan.

    Eight mana whenuarepresentatives are onthe Project Steering

    Group in the SeaChange Project.

    The Maunga Authority(Tūpuna Maunga oTāmaki Makaurau

     Authority) isestablished

    Papakāinga and MāoriHousing Programme is

    underway with a stocktake and work to

    understand mana whenua aspirations

     completed by HPO andthe Independent Māori

    Statutory Board.

     Work underway withNgā Pū Waea to deliver

     Ultrafast Broadband tomarae across Auckland.

    Eight marae received

    grants to supportdevelopmentaspirations.

    Council continued to support existing joint working arrangements with mana whenua forparks and open space

     such as Te Motu aHiaroa GovernanceTrust for Puketutu

    Island.

    COMET Auckland hasdelivered a number of initiatives, including

    distributing the TāmakiMakaurau Māori

    Education Snapshot andpresentations to various

    marae across Auckland.

    The Waimahiadevelopment led byTāmaki Makaurau

    Community Housing Ltd(a Joint venture

    between the TāmakiCollective and Housing

    New Zealand) is

     currently underway todeliver 282 affordablehomes over the next 3

    years.

     “2013/14 was a year that focused on progressing Auckland Council’s commitments around TreatySettlements and embedding Māori Responsiveness in the way we work. The preparation for, and subsequentenactment of the Ngā Mana Whenua o Tāmaki Makaurau Collective Redress Act 2014 was an historicachievement and signals a transformation in both the way that Mana Whenua and Council partner indecision-making and how Council is transforming the way it plans, develops, prioritises and delivers itsactivities. We are now beginning to see a shift from strategic intention to delivering better outcomes with

    Māori and mutual benefits for all Aucklanders. We are working alongside Māori to help realise theirpapakāinga and marae development aspirations. The formalisation of other co-management arrangementsrepresents a significant shift in how we work together in partnership. As part of our Māori ResponsivenessDelivery Framework, the Council will continue to promote and identify practical opportunities for collaboration

     with others, and invest in actions that significantly lift Māori economic, social and cultural well-being”

     Johnnie Freeland, Manager Te Waka Angamua

     Actions in progress tohelp guide projects andprogrammes

    9

    8 Actions on track for completion

    0 Actions withelements at risk

     1  Actions at risk

     16 Actions on track for completion

    Refer to Auckland Plan Targets: Monitoring Report 2014 for full details.

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    17/22

    CITY CENTREThe Auckland Plan | Annual Implementation Update 2014

    C ITYC ENTRE

    Th

    A

    k  l

    dPl

    |  A

    lI

    l

    i

    Ud

    2014

    B  C  4 1  4  0 

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    18/22

    HIGHLIGHTS

    COMMENTARY “City Centre is the heart of Auckland. Its success is critical to the economic wellbeing of the wholeregion. While huge progress has been made todate, considerable further work is needed to coordinate development and investment across the council and its CCOs to maximise the potential ofthe city centre.”

    - Rick Walden, General Manager City CentreIntegration

    Quay Street re-designRe-design of Quay Street will involvemajor streetscape improvements with

    more pedestrian priority, areas forrecreation, landscaping, widenedfootpaths and better connection

    between the city and the harbour.

     Upper Queen St/Grafton Gully/Beach Road (Stage One) cycle route opens to the publicThe completion of this new addition to Auckland’s cycling network will provide cyclists safe and direct access into the heart of

     Auckland City. This is a joint effort between NZ Transport Agency, Auckland Transport, Auckland Council and the centralgovernment.

     “All great cities have vibrant and pulsating city centres. Think Melbourne, Vancouver, Barcelona,London and New York. In recent years Aucklandhas shown an ambition for its city centre whichrivals these other cities and to which Aucklandersand visitors are getting excited about. The changeshave been dramatic and they have been quick. Nolonger “The city of cars” Auckland has turned a corner. Instead, it is being transformed into apeople friendly business and tourist destination

     where the show never stops. There is a palatablebuzz in the air and it is gaining worldwide attentionfor its efforts. We just need to keep themomentum building. ”

    - Ludo Campbell-Reid, Design Champion andManager Environmental Strategy & Policy

    City Rail Link design changeDesign change to redevelop the existing Mt EdenStation and connect it to the CRL will save over

    $150million. This eliminates the need for the verydeep Newtown Station which will also reduce the

     construction disruption in Upper Symonds Street. It willprovide better modal transfer as well as required less

    acquisition of existing properties.

    Streetscape enhancementsand place-making

    programmeFederal Street and O’Connell Street shared space are now open to the

    public and work is currently underwayfor Bledisloe Lane, linking AoteaSquare to Wellesley Street and to

    Myers Park.

    SkyPath resource consentlodged in August

    SkyPath will complete the criticalmissing gap in Auckland’s cycling and walking networks. Once built, it willprovide a walking and cycling routebetween North Shore and the City

    Centre.

    22,190 residents now live in the city centre, up from 19,200 in 2006(Auckland Plan target: 57,000 by 2040)

    6.67 million guest nights were recorded in 2013, up by 17.2% from 2010 level with the averageannual growth of 5.4%.(Average Plan target: 2.8% average annual growth by 2022)

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    19/22

    THE SOUTHERN

    INITIATIVEThe Auckland Plan | Annual Implementation Update 2014

    THESOUTHERNIN

    ITIA TIVE

    Th

    A

    k  l

    dPl

    |  A

    l

    Il

    i

    U

    d

    2014

    Target TSI1Increase effective engagement of parents in quality culturallyappropriate, early childhood learning services (BPS Target)

    As described in Target 1.2. Although there is no statutoryrequirement in New Zealand for children to attend ECE,research suggests that involvement in quality early childhoodeducation can improve long-term educational outcomes.

    B  C  4 1  4  0 

    Target TSI15By 2020, 95 per cent of children (8 months) are immunised.

    Immunisation is not compulsory in New Zealand; however,a range of free vaccinations are offered to babies, childrenand adults to protect against serious and preventablediseases (refer to the National Immunisation Schedule).

    Target

    Target

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    20/22

     

    TARGETSNumber of targets to track ourprogress towards this outcome

    17

     10Targets trackingtowards endtarget

     1Targets trackingaway from endtarget

    6Targets with nobaseline or current data

     Access to ECE   Māori and Pacifika participation with ECE   Reduce truancyTransition from school to work or further study  Reduce NEETReduce benefits dependency  Access to internet  Immunisation  SmokingBus service between Onehunga to Airport

    Māori and Pacifika home ownership

    ACTIONS

    HIGHLIGHTS

    COMMENTARY

     “Delivery of TSI will only be achieved by everyone working together. Central government has providedtangible support, particularly in the areas of housing, education, health, and business, innovation andemployment. Auckland Council and its local boards have invested in South Auckland through physicaland social infrastructure and programmes including roads, parks, libraries, leisure centres, arts centresand events. In addition, the physical and social environment has been positively influenced through

     Auckland Council’s regulatory and advocacy roles.

    Other stakeholders including non-government organisations, major businesses and industry, thephilanthropic sector, the private sector and local communities have all shown tremendous support for this initiative. The stage is now set to leverage the good will and efforts of a growing number of supporters.”

    -  Manager Southern Initiatives

    TSI InfrastructureConsortium will

    facilitate up to 200

    trainees per year intoapprenticeships and

     sustainableemployment.

    20 interns from the MITInternships Scheme

    have been placed with Auckland Airport, with

     50% been offeredpermanent

    employment.

    The $45mredevelopment of theManukau District Court

     will bring approximately$13m worth of

     contracts withinManukau, Penrose and

    South Auckland.

    Te Papa Tongarewahas announced its

    proposal for Manukau

    as the location of anew Centre for

    Collections, Educationand Exhibitions.

    The Matanikolo Project

     is offering 22affordable rentalhouses in Mangere.

     Up to 3,000 families will benefit from the

     Warm Up CountiesManukau Scheme thisyear for free home

     insulation.

     10,000 studentsparticipated in this

    year’s ASB Polyfest,

    the world’s largestMāori and Pacific Islandfestival.

    The new MIT ManukauCampus can

    accommodate 5,000

     students and connect20,000 wirelessdevices at one time.

    TSI InfrastructureConsortium has secured$7.5m of governmentfunding over the next

    three years through theTertiary Education

    Commission and the

    Ministry of Business,Innovation andEmployment.

     Actions in progress tohelp guide projects andprogrammes

    9

    9 Actions on track for completion

    0 Actions withelements at risk

    0  Actions at risk

    0  Actions completed

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    21/22

    AUCKLANDPLAN ACTIONSThe Auckland Plan | Annual Implementation Update 2014

    A UC KLA ND

    PLA N

    C TIONSTh

    A

    k  l

    dPl

    |  A

    lI

    l

    i

    U

    d

    2014

    B  C  4 1  4  0 

    The Auckland Plan actions are those things identified by the

    Auckland Plan as needing to be done to implement the Plan.

    They are sorted according to the thirteen strategic directions

    of the Auckland Plan and reported quarterly.

    The summary page contains three pieces of key information:

    (1) Actions completedOriginal action has been completed. However thecompletion of this may have led to new actions that requireongoing monitoring.

    (2) Status of actions in progressProgress according to their red, amber or green (RAG) rating.

    Red - Requires corrective action. This may also be given if

     no data has been provided on the action so progress can’t

    be assessed. If the data is unable to be collected due to

    the action being outside of Council’s reporting system

    and/or there is no agreed action owner then this also

    requires corrective action.

    (3) Progress on actions since last reporting cycleThis will be reported against in the future as this summarysets the baseline for future reporting.

    A full list of Auckland Plan Actions and commentary on 

    their progress from action owners is contained within the

    Auckland Plan Intranet Page.

     Amber  - Elements at risk but manageable – One or more of

    the actions viability  such as resource , cost, scope is at risk.

    However this is within acceptable limits and able to be

    managed. Amber actions should be monitored closely

    between reporting cycles to ensure they don’t become Red.

    Green – Action is on track

  • 8/21/2019 Auckland Plan Annual Implementation Update Summary 2014

    22/22

    83% 0%

     17%

    68% 5% 80% 20% 63% 13%

    27% 0% 25%

    89% 0% 47% 7% 57% 0%

     11% 47% 43%

    33% 0% 80% 13% 56% 25%

    67% 7% 19%

     58% 17% 88% 0% 67% 0%

    25% 13% 33%

     % on track

    progress against previous Qtr

     % elements at risk

     % at risk

    SUMMARYJUN 2014

    SD1

    9

    37

    SD2

    SD3

    SD4

    SD5

    SD6

    SD7

    SD8

    SD10

    SD11

    SD12

    SD13

     completed

     in progress

     16

    9

     109

    2

     12

     1

     10

    9

    6

    88

     5

     15

    4

     7

     13

    30

     13 16

    886

    SD9KEY