Attachment J
Accident Prevention & Emergency
Response
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
ii
TABLE OF CONTENTS
1 INTRODUCTION ...................................................................................... 1
2 HEALTH & SAFETY ................................................................................ 1
3 SPILL CONTAINMENT ............................................................................ 2
4 FIRE RESPONSE ..................................................................................... 3
Emergency Response Plan
Fire Water Risk Assessment
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
1
1 Introduction
The following information describes the support systems on-site in the event
of an emergency with potential for environmental damage. AbbVie’s main
document covering emergencies is the Emergency Response Plan and this is
included with this attachment.
2 Health & Safety
The operation of the facility is carried out in strict accordance with all Irish and
European regulations governing safety in the work place with specific regard
to the regulations implemented under the Safety, Health & Welfare at Work
Act, 2005 (as amended). Full relevant training in the operating procedures for
equipment and processes are provided to each employee. In the case of a fire
the Emergency Response Plan will be activated and necessary personnel
have been fully trained to deal with such emergencies. AbbVie also operates
a Health and Safety Management System certified to OHSAS 18001.
Regulation in relation to the prevention of major accidents is set out in Seveso
III Directive (2012/18/EU), transposed by the Chemicals Act (Control of Major
Accident Hazards Involving Dangerous Substances) Regulations 2015 and by
the Planning and Development Regulations, 2001-2013. The Directive defines
major-accident hazard sites (COMAH sites) as those that store or could
generate quantities of dangerous substances in excess of specified
thresholds. As per the assessment completed for the IE licence application to
the EPA, Chemicals Act (Control of Major Accident Hazards Involving
Dangerous Substances) Regulations 2015 do not apply to the AbbVie facility
as storage of dangerous substances falls below the qualifying quantities for
gas oils and extremely flammable gases.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
2
3 Spill Containment
During the operation of the facility, there will be a high degree of containment
and bunding of materials on-site and no direct discharges to ground. All
production will take place exclusively within the production buildings and
loading and unloading of materials will only take place on designated hard-
standing areas.
As a requirement of the IE Licence, AbbVie will be required to maintain its
Environmental Management Programme (EMP) which will include detailed
measures for the prevention of pollutant release to the storm water drainage
system. Preventative measures which are in place at the AbbVie site include
full secondary containment (bunding) of all internal and external vessels
containing potentially polluting materials. These preventative measures will be
applied to all proposed new infrastructure as required, in the form of either
local bunding, or remote bunding. All bunds and underground process
infrastructure will be integrity tested as per EPA guidelines.
Procedures are in place for the use, handling and storage of all chemicals on-
site to ensure that the risk of spills is minimised. Training is provided to staff in
relation to the handling and storage of all chemicals on-site to ensure the risk
of spills is minimised.
Regular routine maintenance programmes are in place for the process
equipment, environmental process equipment, continuous monitors,
laboratory equipment and sampling equipment.
The emergency response teams are also trained in containment measures
with respect to spillages including procedures for containment including; use
of spill kits, spill cleaning and safe disposal of clean-up materials.
Storage areas, production facilities and roadways have impervious surfaces,
which drain to collection systems. Plant and vehicles are serviced regularly to
minimise leaks. Fuels, oils and lubricant are stored in designated bunded
areas.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
3
4 Fire Response It is AbbVie’s policy that, in the event of a fire, the safe-guarding of life takes
precedence over all other matters. AbbVie provides Emergency Response
Teams (ERT) training to all core ERT team members and conduct emergency
drills bi-annually. In the event of a fire, the Emergency Response Plan is
implemented. The plan addresses in depth the actions to be taken in the
event of a fire; gas release; bomb threat; chemical spillage and environmental
incident. It is site policy that there is always an Emergency Response Team
and Leader available to respond to an accident or incident. In the event of a
fire, the primary objectives are extinguishment and containment. Fire
detection, fire protection and firefighting equipment is provided on-site and
maintained in accordance with recognised standards. This equipment may be
outlined as follows:
Fire detection and alarm system;
Fire Hydrants;
Fire Extinguishers;
Spill Response Equipment and Materials;
Sprinkler System;
Suppression Systems;
Two way radios.
The site is serviced by Midleton Fire Brigade, based at Market Green,
Midleton, which is approximately 10 kilometres from the site. In the event of a
fire alarm being raised, travel time from this fire station to AbbVie would be
estimated to be approximately 10 minutes depending on traffic. The site’s
Emergency Response Plan states that it is responsibility of the “site incident
controller” to alert emergency services. Members of Midleton fire station have
visited AbbVie to familiarise themselves with the layout of the facility, location
of services and to offer general advice to management. The AbbVie site
typically operates 24/5, however there is a 24/7 security presence at the site.
Once an IE licence has been issued, in the event of an accident or incident,
AbbVie will notify as appropriate; the EPA, Local Authority, Fire Service,
Health Service Executive, Gardaí, Health and Safety Authority, Fisheries
Board, Sanitary Authority, Food Safety Authority and/or Harbour Masters, of
all incidents relating to the environment. Approval and guidance from the EPA
will be sought prior to the disposal of materials and retained fire water.
A fire-water risk assessment undertaken in July 2016 has concluded that,
based on the assessment and the EPA’s Guidance Note, firewater retention
facilities for the AbbVie site at Carrigtwohill, Co Cork are not required. This
report in full has been appended to this attachment.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Emergency Response Plan
For in
spec
tion p
urpo
ses o
nly.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Document applies to the following areas:
Department
Name:
Yes = No = x Department
Name:
Yes = No = x
Quality Assurance Engineering
Quality Control Finance
EHSE HR
Regulatory Affairs IT
Site Technology Supply Chain
Production
1. OBJECTIVE
The purpose of this Plan is to ensure that all company personnel are informed of the correct actions
to be taken in the event of an emergency and to ensure that efforts in response to an emergency are
organised and co-ordinated so that it may be brought under control with minimum risk to personnel,
property or the environment.
The Emergency Procedures detailed in this document are a main component of the sites Business
Continuity Plan (BCP).
In the event of a Significant Incident; Senior Management will refer to the BCP.
2. APPLICABLE DOCUMENTS
DOCUMENT NUMBER DOCUMENT TITLE
N/A Safety Statement & Standards Manual
N/A Employee Handbook
N/A BCP (Business Continuity Plan)
N/A Synergy Security Assignment Instructions
CK-EHSE-0000145209 EHS&E Near Miss & Incident Reporting
& Investigation Procedure
CK-EHSE-0000145210 EHS&E Regulatory Reporting
CK-EHSE-0000515295 EHS&E Visitor & Contractor
Management Programme Procedure
SOLID 0000145216 Control And Maintenance Of The Fire
Detection System
CK-EHSE-0000145220 Electing Site Safety Representative
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
CK-EHSE-0000145222 Operating Instructions for the Orwak
Balers, DMR Compactor and Dechimber
CK-EHSE-0000167248 Procedure for Man Down Alarms
CK-EHSE-0000506844 EHS&E Manual Handling Training
Procedure
CK-EHSE-0000506845 EHS&E Risk Assessment Procedure for
Pregnant, Post Natal & Breastfeeding
Employees
CK-EHSE-0000506846 EHS&E Setting Objectives, Targets and
Programs
CK-EHSE-0000506848 EHS&E Communications, Participation
and Consultation Procedure
CK-EHSE-0000506849 EHS&E Identification, Control and
Compliance with Legislation and other
Requirements
CK-EHSE-0000506850 EHS&E Internal Audit Procedure
CK-EHSE-0000506851 EHS&E Management Review
CK-EHSE-0000506852 EHS&E Monitoring & Measurement
Procedure
CK-EHSE-0000506853 EHS&E Hazard Identification, Risk
Assessment and Risk Control Procedure
CK-EHSE-0000507694 EHS&E Management of Change
CK-EHSE-0000508566 EHS&E Identification of Aspects and
Evaluation of Impacts
3. ABBREVIATIONS
TERM DEFINITION
SOP Standard Operating Procedure
BCP Business Continuity Plan ERP Emergency Response Plan
EHS&E Environmental, Health, Safety & Energy
ISO International Organisation for Standards
OHSAS Occupational Health and Safety
Assessment Series
BGU Break Glass Unit
ERT Leader Emergency Response Team Leader
ERT Emergency Response Team
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
SIC Site Incident Controller
4. ENVIRONMENTAL HEALTH & SAFETY
This plan applies to a number of credible situations, primarily those which may interrupt normal
operations, require an immediate co-ordinated management response and finally, whereby an event
has the potential to focus media and public attention on the activities of the organisation.
The responses to each defined circumstances have been reviewed in accordance with the specific
elements of ISO 14001: 2004 (4.4.7 of the Environmental Management Standard) OHSAS 18001:
2007 (4.4.7 of the Occupational, Health & Safety Management Standard) and the specific elements
of the ISO 50001: 2011 Energy Management Standard.
Subsequently, the company has identified a broad range of emergency situations presenting a risk to
the company.
These areas are as follows:-
Environmental Risk
Physical Security Risk
Stock Interruption risk
Social emergency
Information technology emergency
Information leak
Public health.
In the context of this Plan, an Emergency is defined as ‘an unplanned event/incident requiring the
evacuation of personnel from all or part of the site or require containment/action on an
environmental incident, which may significantly affect site operations and / or personnel and / or the
environment’.
An emergency response may be declared in any of the following events :-
Fire
Explosion / Loss of containment
Gas release
Serious Danger (immediate / delay, inside / outside)
Bomb Threat / Warning (Animal Rights Activists)
Major Chemical spillage
Pandemic
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Any of the above events may result in the Emergency Response Plan being implemented. This
plan addresses in depth the actions to be taken in the event of a fire; gas release; bomb threat;
chemical spillage and environmental incident. An evacuation of the site may not be warranted in
the event of a social crisis, for example, but will in effect result in a number of members of the
Emergency Management Team convening.
Note: To avoid confusion for future Regulatory, Corporate and Independent Audits, AbbVie has
been used as the Company name in this Procedure instead of the legal trading name; Fournier
Laboratories Ireland Ltd. (FLI).
5. ATTACHMENTS
There are 7 attachments to this procedure.
ATTACHMENT NUMBER TITLE
Attachment 1 (1 page) Incident Emergency Log
Attachment 2 (1 page) Emergency Evacuation Roles & Responsibilities
Attachment 3 (2 pages) Emergency Response Contact Information
Attachment 4 (1 page) Emergency Response Equipment
Attachment 5 (2 pages) Emergency Bomb Threat Form
Attachment 6 (1 page) Pandemic Influenza Questionnaire for Personnel
Travelling from Abroad
Attachment 7 (1 page) Emergency Evacuation Checklist
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
TABLE OF CONTENTS
SECTION PAGE(S)
1.0 Objective 1
2.0 Applicable Documents 1-2
3.0 Abbreviations 2-3
4.0 Environmental, Health & Safety 3-4
5.0 Attachments 4
Table Of Contents 5
6.1 Emergency Response Organisation Structure 5-6
Table 1: - Roles & Responsibilities of the Emergency Response Team 6-8
6.2 Emergency Response Procedures 8-9
6.2.1. First Knock Response & Alarm Investigation Procedure 9-10
6.3 Emergency Response Procedures - Fire. Normal Office Hours 10-21
6.4 Emergency Response Procedures – Outside Normal Office Hours 21-27
6.5 Emergency Response Procedures – Threat 27-30
6.6 Response Procedure – Animal Rights Activists 30-31
6.7 Escape Of Natural Gas 31
6.8 Major Chemical Spillage On-Site 31-34
6.9 Pandemic Preparedness 35-40
6.10 Environmental Protection 41
6.11 Resources 42-43
7.0 Revision 43-44
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
6. PROCEDURE
6.1. EMERGENCY RESPONSE ORGANISATION STRUCTURE
6.1.1. General
The Emergency Response Organisation Structure is included below. Depending on the nature
and severity of the emergency situation, the Site Incident Controller may appoint additional
individuals to assist and support the Emergency Response Team.
6.1.2. Roles
Personnel who are designated to fill the Emergency Response Plan roles are listed at
Attachment 2 to this Plan.
Figure 1: Emergency Response Structure
Site Incident Controller
ERT Members/
Fire Marshals
First Aiders
Event Recorder
Security
ERT Leader
Roll Call
Officers
Sprinkler System
Controller
First Aid
Co-ordinator
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
6.1.3. External Emergency Services
The company recognises the limitations of its internal emergency response capability and
consequently the need to summon immediate assistance from the External Emergency Services.
The company is aware that the Officer in Charge of the Fire Services takes overall control of all
fire fighting activities on arrival at the scene.
6.1.4. Responsibilities
The responsibilities, as described hereunder in Table 1, are intended to supplement the good
judgement and experience of the various appointment holders. The Site Incident Controller may
assign responsibilities in addition to those outlined hereunder depending on the actual
circumstances of the emergency.
Table 1: - Roles & Responsibilities of the Emergency Response Team
ROLE RESPONSIBILITIES
Site Incident
Controller Directing and co-ordinating the activities of the Emergency Response Team.
Liaison with, and assisting, the External Emergency Services.
Keeping senior management informed of the situation.
Ensuring that a written record of events is maintained.
Ensuring that all personnel on site are accounted for.
Controlling all personnel at the Assembly Points.
Security Ensuring that the site information files are readily available.
Distributing the designated two-way radios.
Distributing the muster list to the appropriate assembly area coordinators.
Contacting external emergency services and other agencies/organisations as
directed by the Site Incident Controller and other member of the Emergency
Response Team.
Updating the Emergency organisation Chart on a daily basis
Recording the details of threatening phone calls to the site
ERT Leader Directing and co-ordinating the activities of the ERT members.
Reporting events to Site Incident Controller.
ERT Members /
Fire Marshals Investigating the cause of the emergency.
Reporting events to ERT leader.
Ensuring that personnel are evacuating from their area of responsibility.
Searching the area of responsibility during evacuation.
Sprinkler
System
Controller
In the event of an emergency requiring the activation of the sprinkler system
the sprinkler system controller will isolate and shut off control valves and
pumps in consultation with the ERT Leader, the SIC and the emergency
services.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Roll Call Officer Ensuring evacuation areas and all personnel therein are accounted for
Reporting any missing persons to the Site Incident Controller.
First Aid
Co-ordinator Assembling First Aid Personnel.
Ensuring that First Aid is rendered as necessary.
Liaison with the Ambulance Service, Company Doctor and/or Medical
Services.
Prepares first aid equipment and paramedic boxes.
Prepares first aid safe lay down area.
Co-ordinates the response to the first aid unit.
First
Aid Personnel Rendering First Aid.
Carrying out instructions as directed by the First Aid Co-ordinator.
Event Recorder
Compiles history of events as they unfold.
Note: Who and which organisations have contacted the site seeking
information on the incident.
Note: What commitments have been given in relation to public information?
6.1.5. Daily Incident Response Team
Before the commencement of normal office hours each day, personnel are nominated to fill
the various roles as described in the ‘Daily Incident Response Team, which is located in the
security area.
The compilation of the ‘Daily Incident Response Team’ will ensure that a confirmed
emergency response capability exists and that there is an immediate and co-ordinated
response in the event of an emergency.
It is the responsibility of Security to update the Incident Response Team Chart on a Daily
basis.
6.1.6. Outside Normal Office Hours
If an emergency occurs outside normal office hours, then the Production Shift Supervisor will
assume the role of Site Incident Controller and will follow the procedures as described in
Section 6.3.2 of this Plan.
6.2. EMERGENCY RESPONSE PROCEDURES
The actions as described in Section 6.3 of this Plan are primarily concerned with the actions to
be carried out should a Fire occur on site. Although the focus is on Fire, this set of emergency
response actions and the emergency response organisation as described in
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Section 6.1.1 of this Plan provides an effective framework to enable the company to respond to
other emergency situations that may occur.
Notwithstanding the above, the company recognises that emergency situations other than fire
may demand different or additional responses and that an emergency may occur outside of
normal office hours and at weekends. In this regard, emergency actions have been developed
for the following:
Major Emission e.g. escape gas
Fire
Bomb Threat / Warning
Major Chemical spillage
Any of the above events may result in the Emergency Response Plan being implemented.
6.2.1. FIRST KNOCK RESPONSE & ALARM INVESTIGATION PROCEDURE
During Normal Business Hours
If the alarm is activated (first knock), ERT members will go to the repeater panel located
beside the maintenance office in the main corridor.
One member of the team will make contact with the security officer on duty.
This person will remain at the panel in contact with the security officer.
A minimum of 2 other ERT members will investigate the activation based on the information
displayed on the panel; points and zone details etc.
If it is discovered that the activation is a false alarm, the ERT team leader will silence the
alarm and take the appropriate action to rectify the situation, discover the root cause, record
his findings and submit these to the ERT team, Security, the SIC and if necessary the Site
Director and the senior management team.
If the alarm is deactivated at the first knock level, a member of the ERT or security will make
an appropriate announcement detailing the reason for the activation.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
If the activation is found to be a genuine alarm condition, the ERT member at the repeater
panel will activate the general alarm to evacuate the building, in advance of the system
progressing to this stage.
At this stage all personnel will assemble at the evacuation assembly area and await further
instruction.
Outside Normal Office Hours
If the alarm is activated (first knock), an ERT member and/or maintenance technician will go
to the repeater panel located beside the maintenance office in the main corridor.
He will make contact with the security officer on duty.
The production supervisor on duty will also go to the repeater panel.
An investigation will be carried out and the best course of action will be determined in line
with the steps detailed above.
An investigation can only be carried out by 2 people, one of whom must be an ERT member.
6.3. EMERGENCY RESPONSE PROCEDURES - FIRE. NORMAL OFFICE HOURS
6.3.1. STAFF MEMBERS
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your safety or the safety of others.
On discovery of a fire:
1. Alert all occupants in the immediate vicinity to the danger.
2. Go to the nearest Break Glass Unit (BGU) and sound the evacuation siren.
3. Alert your Supervisor and/or Fire Marshal, if safe to do so.
4. In the event of a minor fire, try to contain it using the appropriate extinguisher only if is
safe to do so and never on your own. Attack the fire without delay, as speed is essential
when dealing with a small fire.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Note: Remain on the exit side of the fire.
5. If you are no longer able to contain the fire then vacate the building immediately by the
nearest Clear Exit. If it is safe to do so close all doors behind you, in order to prevent the
spread of smoke and fumes.
6. Report to your Site Incident Controller at your Assembly Point and inform him/her of the
situation at the scene of the incident, outlining how far advanced the fire was as you left
it.
7. Remain at your Assembly Point and follow the instructions of your Site Incident
Controller.
8. Do not leave your Evacuation Point unless given the all clear.
On hearing the fire alarm or if an evacuation of the facility is ordered:
1. Evacuate the building by the nearest Clear Exit.
2. Close all doors behind you, if it is safe to do so.
3. Report to your Assembly Point and assist in establishing the whereabouts of persons who
are not accounted for.
4. Remain at your Assembly Point and follow the instructions of your Site Incident
Controller.
5. Do not leave your Evacuation Point unless given the all clear.
Assembly Points
The Evacuation Assembly Points are located at the entrance to the site near the security
building. These areas are marked out by green signs and when the alarm sounds or an
evacuation of the site is ordered, staff will report to their respective areas as detailed
hereunder. Each area has its own Role call officer (and in his/her absence there are
designated substitutes). It is their responsibility to account for staff in their area and to
report the results of the roll call to the Site Incident Controller.
Note: Contractors and visitors evacuate within the same area but a specifically assigned
location.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
6.3.2. SITE INCIDENT CONTROLLERS
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm or on being notified of the occurrence of an incident:
1. Evacuate to the assembly areas by the nearest clear exit.
2. Collect a walkie-talkie from the Security guard.
3. Ensure that all members of the Emergency Response Team are alerted.
4. Appoint an Event Recorder and instruct him/her to maintain a written record of
events (An ‘Incident Emergency log’ is attached as Attachment 1 to this Plan).
5. Establish contact with the ERT Leader by walkie-talkie. Determine the cause of
alarm activation and/or location of the incident.
6. If the alarm is as a result of any of those listed in section 4, instruct for the Fire /
Emergency service to be called and maintain communication as required.
7. If any staff / visitors or contractors are unaccounted for after the Roll Call, notify
the ERT Leader and provide him with as much information as is available.
Instruct him to organise a search of the site in order to locate the missing
person(s) (priority to be given to establishing an accurate evacuation status of the
site).
8. If the ERT Leader confirms that the cause of alarm activation was fire, then
instruct the Security Guard to call the Fire Service / Emergency Service
immediately. If additional pertinent information in regard to the incident becomes
available then ensure that the Emergency Services are updated, even though they
may only be on route to the site.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
9. If necessary, appoint staff as Traffic Controllers to ensure that there is easy access
to the site and to the scene of the incident for the Emergency Services when they
arrive. Control access to the site throughout the perimeter.
10. Ensure that every support and assistance is provided to the ERT in regard to:
Chemical safety and chemical hazard avoidance.
Making safe plant and equipment.
Isolation of services / utilities.
11. If casualties are reported ensure that the Ambulance Service is called via (Security
Guard) and that first aid is arranged (First Aid Co-ordinator).
12. Ensure that all personnel are moved to the safest area (e.g. upwind of smoke, to the
car park or to an off-site location or to the canteen depending on the nature of the
incident and your assessment of the risk to which staff are exposed).
13. Following consultation with the General Manager, ensure that the relevant people
in Corporate are contacted.
14. Meet with, and brief the Officer in Charge of the Fire Service when he arrives on
site. The Officer in Charge of the Fire Service will require information in regard
to the following:
Evacuation Status of Site (includes missing persons and/or casualties and
their whereabouts, if known).
Nature and Location of Fire (person who discovered the incident will be
very helpful in providing this information).
Fire Suppression Systems (includes pumps and isolation devices).
Location of Water Sources (hydrants, wet and dry mains and any other
available sources).
Isolation of Services/Utilities (electricity, gas, ventilation etc.).
Special hazards (chemicals, fuels etc. – including quantities, hazardous
properties and the nature of effects on man and the environment and an
outline of the use and storage of the materials on site).
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Environmental Protection Measures (collection and storage of hazardous
material and firewater.
Material Safety Data Sheets
Site Map Drawings
Access to buildings
Salvage Priorities
Salvage Priorities.
When briefing the Officer in Charge of the Fire Services use the information pack
(at the ERT Command Centre), which at a minimum contains the following
information:
Site Drawings
List of Key Personnel
MSDS Files
15. If required ensure that the following personnel are available to assist / support /
advise the Officer in Charge:
Person who discovered the incident.
Production personnel with a detailed knowledge of chemicals (hazard and
hazard avoidance) and processes
Maintenance personnel with knowledge of plant and services/utilities.
EHS&E personnel with knowledge of environmental, health and safety
protection measures.
16. Ensure that the First Aid Co-ordinator meets the Ambulance Service when they
arrive.
17. Ensure that the EHS&E Manager is advised in regard to possible notification of
the incident to the Health and Safety Authority, Cork County Council, South
Western Regional Fisheries Board.
18. In consultation with the Officer in Charge of the Fire Service, issue the ‘ALL
CLEAR’ for re-entry to buildings.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
19. Initiate restoration and clean-up activities. This may require the assistance of
external specialist contractors.
20. Compile an incident / accident report where applicable.
6.3.3. SECURITY GUARD
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Distributing the designated two-way radios to the SIC, ERT lead and the ERT. The
Security Guard will keep one two way radio.
2. Collect the print out (muster list) of staff TMS system and distribute to all nominated
parties.
In relation to dealing with Contractors and Visitors, the muster list; whether hand
written or electronic, will be controlled and checked by the Security guard on duty.
3. If called upon to do so, the Security guard will distribute the evacuation muster list.
4. Collect the Emergency pack from security. Make sure that it is available should the
emergency services arrive on site.
5. Evacuate to the assembly area.
6. Do not call the Fire Brigade unless instructed to do so by the Site Incident Controller.
7. Call the Ambulance Service and Company Doctor only if instructed to do so by the
Site Incident Controller
8. Deal with incoming routine calls using the following statement:
“We are unable to deal with your call at present. If you would like to leave your name,
organisation, telephone number, I shall ensure your message is passed on to the
appropriate person”.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
Do not delay. Telephone lines must be kept free for incoming and outgoing
emergency calls.
Directions for Fire Brigade from Midleton First Emergency Response Unit followed by Cobh and finally the city.
Turn immediately right on existing Middleton Fire Station; go to the roundabout; take
the fourth exit, onto the Old Cork road, take the second left into the N25 towards Cork.
From the dual carriage way take the second slip road sign posted Carrigtwohill &
Cobh, at the roundabout take the first exit. At the immediate following roundabout
take the third exit.
Early Morning / Rush hour: As Above
6.3.4. ROLL CALL OFFICER
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm, or if an evacuation of the site is ordered:
1. Go immediately to the Assembly Point(s)
2. Carry out a Roll Call and account for those personnel for whom you are responsible.
3. Give a situation report to the Site Incident Controller regarding the results of your roll
call.
4. Ensure that personnel for whom you are responsible remain at their Assembly Point
unless otherwise directed by the Site Incident Controller.
Only the Site Incident Controller has the authority to issue the ALL CLEAR and
instruct personnel to return to work.
5. Carry out any other tasks as directed by the Senior Roll Call Officer.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
6.3.5. FIRST AID CO-ORDINATOR
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go to your Assembly Point and ensure that you are accounted for immediately.
2. Inform the Site Incident Controller of your whereabouts
3. Prepare whatever number of First Aiders are available among evacuated staff to
assist in dealing with casualties should there be any.
4. Respond to the situation as directed by the Site Incident Controller.
5. Prepare a lay down area for causalities; this needs to be up wind of any potential
fumes and smoke.
In the event of a major emergency and casualties being reported:
1. Ensure that the Security Guard contacts the Company Doctor and the Ambulance
Service.
2. Proceed to the area where casualties have been reported.
3. Assess the casualty situation and call on additional First Aiders as required as well
as organising for them to bring the necessary equipment to the scene.
4. Organise appropriate and adequate treatment on a priority basis.
5. Arrange for the casualties to be moved, where possible, to a secure and safe
location.
6. Organise for ongoing treatment of casualties as required.
7. Liaise with the Personnel Officer and provide details in regard to casualties to
him/her.
8. Once the Company Doctor and/or Ambulance Services are on-site, pass over a
detailed report outlining all injuries and any First Aid given to any Casualty. This
should be reported directly and not over the walkie-talkie circuit.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
9. If casualties are evacuated to hospital, ensure that you record the following details
and that you provide such details to the Site Incident Controller:
Name(s) of casualty(s).
Nature of the casualty(s) injuries.
Hospital to which the casualty(s) have been taken.
Point of contact in hospital.
10. If any causality is evacuated to hospital are affected by exposure to chemicals
ensure that copies of the relevant MSDS’s (Material Safety Data Sheets)
accompany them to the hospital.
6.3.6. FIRST AID PERSONNEL
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go to your Assembly Point and ensure that the relevant Roll call officer
accounts you for immediately.
2. Carry out instructions as directed by the First Aid Co-ordinator.
3. However, if instructed to do so by the SIC, go to the appropriate safe casualty area
and administer First Aid as required.
4. Report Casualty details to either the First Aid Co-ordinator or the SIC.
6.3.7. EVENT LOGGER
1. Gather information on the situation from the Site Incident Controller, First Aid
Co-ordinator and record details as in the Incident Emergency Log as in
Attachment 1.
2. Precise details emphasising times of events & event details, as well as recording
details of commitments given to outside bodies for information must be recorded
in the Incident / Emergency Log as in Attachment I. This information could be
critical in the aftermath.
3. The event logger should also assist the Site Incident Controller by relaying
information such as repeating details already given etc.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
6.3.8. ERT LEADER
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go immediately to the Security Building and establish contact with the Site
Incident Controller, via walkie-talkie. Once you have established contact with the
Site Incident Controller:
View the Fire Alarm Panel in the Security area first, as it may not be safe to
enter the plant floor area if the release is related to the fire suppression system.
Discuss a plan of action with the Site Incident Controller.
2. Brief the ERT members in regard to the location and nature of the incident.
3. Give a status check on the ERT members to the Site Incident controller.
4. Begin directing ERT operations. If you require information/advice in regard to
the following then contact the Site Incident Controller:
Chemical Hazards and Chemical Hazard avoidance.
Environmental protection measures
(e.g. for treatment of contaminated water run-off)
5. Maintain contact with the Site Incident Controller as the situation develops.
Note: The ERT Leader’s role is to direct and co-ordinate the actions of the ERT
members only.
6. Gather as much information as possible in regard to the incident in order to
direct the ERT as efficiently as possible and in order to assist the Emergency
Service.
7. Once the Fire Services have arrived on-site, the attendant Fire Officer will
assume control of all operations, as is their right. The ERT will then act
under his instructions.
8. Provide all necessary assistance to the Fire Services while they are on-site.
9. Accept control of the site back from the Emergency Services one they leave the
site.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
10. Initiate clean-up activities as directed by the Site Incident Controller.
11. Assist the Site Controller in the compilation of the incident report.
6.3.9. EMERGENCY RESPONSE TEAM
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go immediately to the Security Area.
2. Collect the ERT Walkie-talkie(s).
3. Remain at Security until the ERT Leader arrives.
4. Carry out tasks as directed by the ERT Leader:
5. The ERT follows the ERT Leaders instructions at all times.
6. On the discovery of any casualty, inform the ERT Leader of the need for First Aid
assistance. Where possible remove the casualty to a safe place for treatment.
Remain with the casualty until a First Aider arrives to the Casualty and begins to
treat the casualty.
7. Stand by for further orders.
8. Assist the Fire Services when they arrive on site as directed by the ERT Leader.
6.3.10. SPRINKLER SYSTEM CONTROLLER
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so,
and, if you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
In the event of an emergency requiring the activation of the sprinkler system the
sprinkler system controller will isolate and shutoff control valves and pumps in
consultation with the ERT Leader, the SIC and the emergency services. This person will
be appointed as the emergency or situation changes. All of the ERT can perform the duties of
the Sprinkler Controller and have received the appropriate training as part of their
maintenance/PM duties.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
On hearing the alarm:
1. Go immediately to the Security Area.
2. Collect the ERT Walkie-talkie(s).
3. Remain at Security until the ERT Leader arrives.
4. Carry out tasks as directed by the ERT Leader:
5. Assist the Fire Services when they arrive on site as directed by the ERT Leader
6. The Valve Controller follows the ERT Leaders instructions at all times.
7. The system consists of local isolating valves; ICV1 and ICV 2 and their associated
risers which control the distribution of water into 2 separate zones. Zone 1 is
everything west of reception, Zone 2 is east.
If it is a genuine fire; check that the system is supplying water.
Check that the system is maintaining the required pressure, (gauges on the risers).
Verify which pump is running; depending on the nature of the fire consult with
the ERT leader and the emergency services to decide if the most appropriate
pump for the type of fire is running.
Once the fire is under control and extinguished, if advised by the SIC and ERT
leader in consultation with emergency services, repair any impairments to the
system and validate the integrity of the system.
In the event of a broken or defective sprinkler head, identify the affected zone and
isolate the riser for that zone; Stop the fire pump and drain the zone via the 2 inch
drain line. Repair/replace defective head. De-isolate/re-open closed valve to refill
the system and carry out the 2 inch drop test.
As soon as possible, and if required, inform FM Global of the impairment and any
other pertinent details.
8. Stand by for further orders.
6.4. EMERGENCY RESPONSE PROCEDURES – OUTSIDE NORMAL OFFICE HOURS
6.4.1. GENERAL
If an emergency occurs outside normal office hours (17:00 to 0800) or during the
weekend SECURITY will assume the role of Site Incident Controller, (if a nominated
Site Incident Controller is not on site), and will follow
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
the procedures as described below. Prior to the commencement of each shift, the Shift
Supervisor will ensure that he is aware of the identity of the Manager on Call and that the
ERT is nominated. The shift Team lead will assume the roll of Emergency Response
Team lead and follow the procedures as described below.
Figure 2: Emergency Call Out Procedure - Outside normal office hours
Emergency
Response
Team
PRODUCTION SUPERVISOR SECURITY GUARD
Emergency
Response
Team Leader
Shift Maintenance
Technician
CALLS
]
CALLS
Site Senior
Management Team
Site Incident
Controller
]
CALLS
Senior Managers
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:17
EMERGENCY CALL OUT PROCEDURE
An Emergency Event: Fire, Flooding, Major Storm Damage
Unauthorised Access, any event that puts personnel at risk, property damage or adulterates the
production process
Priority 1: Personnel
Priority 2: Facility
Priority 3: Product
In the event of site emergency event outside of normal
working hours (08:00 – 17:00) the following call out procedure is to be implemented.
(ALL CASES)
Notify on-site Maintenance Technician
Maintenance Technician evaluates site risk (personnel, property and product).
In the event to risk to personnel and/or property call emergency services and follow escalation
process
Escalation Level 1
Maintenance Technician to call Maintenance Supervisor
Escalation Level 2
Maintenance Supervisor evaluates risk and calls EHS&E
or Managing Director
Escalation Level 3
Site Incident Controller implements Emergency Response Plan
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
6.4.2. SITE INCIDENT CONTROLLER (Security)
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm or on being notified of the occurrence of an incident:
1. Go immediately to Security and don identity fluorescent over-garment.
2. Collect SIC Walkie-talkie.
3. View the Fire Alarm Panel and in conjunction with the Security Guard/ERT
Leader/ERT discuss a plan of action with him.
Note: The main Fire Alarm Panel is located in the Plant Floor, which may also be
viewed at the security if access to the Plant room is not possible.
4. Go to the Assembly Points area and ensure that all personnel on-site are
accounted, including staff, contractors and visitors.
(Refer to Notes 2 & 3 below).
Note 2: Staff
On hearing the alarm, staff evacuate to their Assembly Points. Outside normal office
hours (17:00 to 08:00), the Production supervisor must account for staff using the TMS
FOB System Print out of staff remaining on site and TMS and Contractor/visitor log book
or the Frontdoor security visitors and contractors screen.
Note 3: Contractors and Visitors
Contractors and Visitors evacuate to their Assembly Points. A badge system is in place
for Contractors and Visitors.
Visitors and contractors are controlled and managed using the Frontdoor system. The
Frontdoor system is an electronic Visitor notification and Contractor permit to work
system which is used to book in a visitor to the site and create work permits which are,
sponsored locally by the person requiring the work to be carried out and, and approved by
the EHS&E Manager or an equivalent counterpart set up on the system as an approver of
permits. The visitor’s details and the approved permits can be viewed, downloaded and
printed.
When Contractors and Visitors arrive on site they are required to report to security where
they are issued with a badge and details such as their time on-site and their company
contact is recorded in a Log Book. Their departure from the site is also recorded in this
Log Book. Information from this Log Book is transferred to security after 1700 hours
listing remaining Contractors and Visitors on site. As people depart the site after 1700,
they sign themselves on this sheet and leave their badge at security. This Log Book and
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
associated sheet (Contractors and Visitors List) is used to call the roll for Contractors and
Visitors.
1. Appoint an Event Recorder and instruct him/her to maintain a written record of
events (an ‘Incident Emergency Log’ is attached as Attachment I to this Plan).
One of the shift technicians can fulfil this role.
2. If necessary, organise a search and rescue party with the ERT.
3. If deemed necessary call the Fire Services
4. Observe the development of the incident and determine the need to move
assembled personnel to a safe location i.e. upwind of smoke and fumes.
5. If a false alarm has occurred issue the ALL CLEAR and instruct personnel to
return to work.
6. Note: Only the Site Incident Controller (or the Shift Supervisor) has the
authority to issue the ALL CLEAR and instruct personnel to return to work.
7. If it is a genuine alarm then carry out the following procedures.
8. Call the Company Doctor, Ambulance Service and Gardaí as necessary.
9. Inform neighbouring companies of the situation as deemed necessary or as
directed by management. All emergency telephone numbers are available on the
Emergency Response Contact Information, a copy of which is available in the
Security Folder (also at Attachment 3 to this Plan).
10. Ensure the appropriate information and documentation is readily available for the
Emergency Services when they arrive on site: such as Material Safety Data Sheets
and Site Drawings etc.
11. Update yourself with the situation by maintaining contact with the Emergency
Response team by Walkie–Talkie.
12. Meet with, and brief, the Emergency Services when they arrive on site. Use the
documentation as described previously and ensure that the ERT Leader is
available to assist. The Officer in Charge will require information in regard to the
following:
Evacuation Status of Site (includes missing persons and/or casualties and
their whereabouts, if known).
Nature and Location of Fire (person who discovered the incident will be
very helpful in providing this information).
Fire Suppression Systems (includes pumps and isolation devices).
Location of Water Sources (hydrants, wet and dry mains and any other
available sources).
Isolation of Services/Utilities (electricity, gas, ventilation etc.).
Special hazards (chemicals, fuels etc. – including quantities, hazardous
properties and the nature of effects on man and the environment and an
outline of the use and storage of the materials on site).
Environmental Protection Measures (collection & storage of hazardous
material & fire water).
Access to buildings.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Salvage Priorities.
Site drawing.
Material Safety Data Sheets.
Note: The Officer in Charge of the Fire Services takes control over all fire
fighting
activities when the Fire Services arrive.
13. Provide assistance to the Officer in Charge while the Fire Services are on
site.
14. Brief management when they arrive on site.
15. Assist with the compilation of an incident report.
6.4.3. ERT LEADER
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so,
and, if you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go immediately to the Security and establish contact with the Site Incident
Controller, via walkie-talkie. Once you have established contact with the Site
Incident Controller:
View the Fire Alarm Panel in the Security area first, as it may not be safe to
enter the plant floor area if the release is related to the fire suppression
system. Discuss a plan of action with the Site Incident Controller.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
2. Brief the ERT members in regard to the location and nature of the incident.
3. Give a status check on the ERT members to the Site Incident controller.
4. Begin directing ERT operations. If you require information/advice in regard to
the following then contact the Site Incident Controller:
Chemical Hazards and Chemical Hazard avoidance.
Environmental protection measures (e.g. for treatment of contaminated water
run-off)
5. Maintain contact with the Site Incident Controller as the situation develops.
Note: The ERT Leader’s role is to direct and co-ordinate the actions of the ERT
members only.
6. Gather as much information as possible in regard to the incident in order to
direct the ERT as efficiently as possible and in order to assist the Emergency
Service
7. Once the Fire Services have arrived on-site, the attendant Fire Officer will assume
control of all operations, as is their right. The AbbVie ERT Leader and ERT will
then act under his instructions.
8. Provide assistance to the Fire Services while they are on-site.
9. Accept control of the site back from the Emergency Services once they leave the
site.
10. Initiate clean-up activities as directed by the Site Incident Controller.
11. Assist the Site Controller in compilation of an incident report
6.5. EMERGENCY RESPONSE PROCEDURES – THREAT
6.5.1. GENERAL – Bomb threats
Bomb threats may be received by telephone; letter or notes left in conspicuous places and
can be an effective means of disrupting business. The response to a bomb threat will be
handled in a similar manner as for any other emergency as detailed in this Emergency
Response Plan. There are, however, some specific details required in the case of a bomb
threat, which are described in this Section of the Plan. All bomb threats should be treated
as bona fide and should not be regarded as hoaxes.
6.5.2. ACTION BY RECIPIENT OF THREAT
The Security Guards are the most likely persons to receive the call, but any member of
staff who has a direct line might also receive a threat. The recipient of the call should
carry out the following actions. Similar procedures should be followed if the threat is
received by letter or by notes left in conspicuous places:
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
1. Remain calm and allow the caller to finish his/her message without interruption.
2. After the caller has given his/her message, try to keep the caller in conversation
for as long as possible, and if possible, ensure that the information as detailed in
‘CHECKLIST - WHAT TO DO IF YOU RECEIVE A TELEPHONE BOMB
THREAT’ is obtained. This Checklist is attached as part of this plan, Section
6.5.4.
3. Keep the line open even when the caller has hung up - i.e. do not replace your
telephone handset.
Note: A copy of the above mentioned Checklist should be located by the telephones, at
the Security building and at all direct line users.
4. Contact the Site Controller (refer to emergency notice board at reception)
immediately. Do not forget to bring the Checklist as per section 6.4 with you if
you have to leave your work desk.
Note: If outside normal working hours or at weekends, then the Shift Supervisor or
Security Officer should contact the Manager on Call or a member of
management and then carry out the procedures as described hereunder at
Section 6.5.3
6.5.3. SITE INCIDENT CONTROLLER
1. If details received in regard to the bomb/device are unclear then contact the
Gardaí and give them as much detail as is available. You should have the
recipient of the call at your side in case the Gardaí wish to speak with that person.
Follow the advice of the Gardaí, which may include evacuation.
2. If the caller has given precise details in regard to the location of the bomb/device
and indicated that the bomb is likely to explode imminently, then initiate
evacuation immediately. If time permits alert the Fire Marshals and
Management to the reason for evacuation and advise them to direct personnel
away from the suspect bomb / device and to instruct personnel to bring their
personal belongings with them.
3. Once all staff members have been accounted for at their Assembly Points, instruct
them to move to an alternative location not less than 400 metres away from the
affected building.
4. Alert neighbouring industries and local residents to the danger and provide them
with details of what has happened and what actions you have taken.
5. Once the Gardaí have arrived in the area, hand over control to them until they give
the “ALL CLEAR” that the building is safe to re-occupy. They will cordon off the
area in order to control the movement of people and vehicles. Every assistance
should be provided to them in regard to:
Searching for the suspect bomb/device.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Evaluation of the threat (the completed ‘CHECKLIST’ and the recipient of
the call will be very helpful in this regard) which should include:
Text of message.
Caller’s approximate age.
Specific characteristics of the threat.
Current labour problems, if any.
Recently dismissed, disciplined, or disaffected employees.
6.5.4. CHECKLIST – TELEPHONE THREAT
Checklist - What to do if You Receive a Telephone Bomb Threat
If possible, tell someone else immediately so that they can tell the Site Incident Controller,
but do not put down the handset or stop the conversation.
Ask the caller which town or area they are speaking from.
Try to keep the caller talking (apologise for a bad phone line, ask him or her to speak up,
and so on). Get as much information as you can.
Fill in the form as in Attachment 5. Ask the questions in the form if the caller does not
give you the information that you need. Try and ask them in the order they appear so that
you don’t miss any out.
6.5.5. Action by Recipient of Threat – Mental/physical
This information is applicable to all employees and especially key/card holders and senior
managers.
AbbVie recognises and advises that any employee who may be approached and asked to
facilitate a breach or breaches in security should report this approach and all other
pertinent details to the appropriate person(s), only when it is safe to do so.
Notwithstanding the underlying threat to other persons within AbbVie that a breach in
security may incur, AbbVie recommends that any member of staff who is mentally or
physically placed under duress during an approach for information or a means of access
to the AbbVie facility, should relinquish said items and details without question. This
incident should be reported to the appropriate person(s) as soon as it is safe to do so. Any employee who may be approached should contact the security officer immediately
after the incident and inform the Site Incident Controller on duty as described in the
‘Daily Emergency Organisation Chart.
6.6. RESPONSE PROCEDURE – ANIMAL RIGHTS ACTIVISTS
6.6.1. General Information
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
It is a fact, unfortunately, that animal rights activism is becoming more and more of a
problem throughout Europe. Particularly targeted are companies of the chemical and
pharmaceutical industry, which have to conduct animal experiments in order to establish
safety and efficacy of their products. The activities of these activist groups can take place
within the framework of legislations, which means that demonstrations can take place
directly on the spot. However, a distinction needs to be made between such
demonstrations and activities from more extreme groups which operate outside laws and
regulations and who can directly or indirectly harm the company and its employees (e.g.
fire attacks and home visits).
6.6.2. Actions of animal rights activists at the sites can either be known in advance, because
they are often announced on the intranet by the groups, or they can arise unexpectedly.
When appropriate warning systems are put in place, on site security personnel should be
informed in advance. The following recommendations are given:
The main goal is to protect people and premises. "It is a security crisis"
The local crisis management procedures should be applied
If relevant, inform neighbours via mail, personally or eventually through the local press
(if there is some) in advance of a scheduled demonstration
Information can also be given to neighbours right afterwards, to explain what happened
Do not communicate externally more broadly on the principle of animal testing at the
occasion of an animal activists action
No dialogue should be engaged with the activists, especially during the crisis. The risk for
them to hold any declaration against us must be considered
Immediately inform personnel (via Intranet or other channel) about what to do, how to
behave, how to leave the buildings.
If relevant: inform concerned managers (who can be targeted by activists) about the
coverage of their personal property
6.7. ESCAPE OF NATURAL GAS
6.7.1. General
A possible area that could give rise to an escape of gas is the natural gas line, which
supplies the boiler.
6.7.2. Action by Person Detecting the Failure
On discovery of a Gas Leak and / or suppression system leak:
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Contact Maintenance Department and/or EHS&E Department to carry out
investigation.
On confirmation of gas leak activate fire alarm and follow procedures as laid out
in section 6.3.
6.8. MAJOR CHEMICAL SPILLAGE ON-SITE
6.8.1. General
A major chemical spillage is defined in general terms as the spillage of any chemical in
quantities greater than 200 kg and /or in radius greater than 1 meter. The type and nature
of any spillage will determine the seriousness of the potential incident i.e. 20 kg of a very
odorous material may be more difficult to deal with then 2000 kg of a simple alcohol
albeit it is highly flammable.
The Site Incident Controller and/or the ERT Leader may deem the spillage of a smaller
quantity of particular compounds as a major chemical spillage if these compounds have
particularly hazardous properties.
While such spillages may occur anywhere on-site areas of higher risk pertaining to a solid
material spill are Production, and the Warehouse. Liquid chemical spillages would be
higher risk area in the laboratory areas.
The main risk with such spillages is the risk of fire if they are flammable. Other
compounds may be odorous, gaseous, or very volatile and disperse off-site in a plume.
6.8.2. Action by person detecting the failure
On discovery of a Major Chemical Spillage:
1. Alert all occupants in the immediate vicinity to the danger.
2. Go to the nearest Break Glass Unit (BGU) and sound the evacuation siren.
3. Alert your Supervisor and/or Site Incident Controller, if safe to do so.
4. Vacate the area immediately by the nearest Clear Exit. If it is safe to do so,
close all doors behind you in order to prevent the spread of fume and vapours.
5. Report to your Site Incident Controller at your Assembly Point and inform
him/her of the situation at the scene of the incident, outlining how far advanced
the spillage was as you left it.
6. Remain at your Assembly Point and follow the instructions of your Site Incident
Controller.
6.8.3. Site Incident Controller
On hearing the alarm or on being notified of the occurrence of an incident:
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so,
and, if you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
1. Carry out all actions as defined in Section 6.3 previously.
2. On becoming aware that the nature of the incident is a major chemical spillage,
ascertain the wind direction and ensure that evacuated staff is safe from any
potential associated plumes and fumes. If necessary, arrange with Site Incident
Controller to move staff to an upwind location or to a safe internal area.
3. Liaises with the ERT Leader on the best method of containing the spillage (if still
continuing) or cleaning it up by using one of the Chemical Spill Kits on-site.
4. Monitor the movement of any plume from the spillage and checks whether it is
moving off-site
5. He must also organise for the Security Guard to call the Emergency Services (Fire
Brigade and Gardai) and inform them that there is an off-site incident developing
following the spillage of a chemical on-site.
6. Liaise with the Emergency Services when they arrive and offer them and any
affected area help and support.
7. Arrange for notification of Cork County Council, Health and Safety Authority and
other applicable regulatory bodies via the EHS&E Manager, where deemed
necessary.
6.8.4. ERT Leader
Note: The actions as described hereunder should be carried out only if it is safe to
do so. Do not take any risks that could threaten your own safety or the safety of
others.
On hearing the alarm:
1. Go immediately to the Reception area and establish contact with the Site
Incident Controller via Walkie talkie.
2. Once you have established contact with the Site Incident Controller:
View the Fire Alarm Panel in Reception to get details as to the location of the gas release.
Discuss a plan of action with the Site Incident Controller.
Note: If it is safe to do so for the purposes of additional information, the main panel may
be accessed in the Plant Room.
3. Join the ERT and brief them in regard to the location and nature of the
incident.
4. Try and identify the material spilled by reference to drum or tank labelling,
by taking a sample for analysis if possible and safe to do so etc.
5. Begin directing ERT operations. If you require information/advice in regard
to the following then contact the Site Controller:
Chemical Hazards and Chemical Hazard avoidance.
Environmental protection measures
6. Maintain contact with the Site Incident Controller as the situation develops.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Note: The Emergency Response Team Leader’s role is to direct and co-ordinate the
actions of the Fire Crew only.
7. Gather as much information as possible in regard to the incident in order to
direct the ERT as efficiently as possible and in order to assist the Emergency
Services.
8. Once the Fire Services have arrived on-site, the attendant Fire Officer will assume
control of all fire fighting, as is their right. The AbbVie ERT Leader and Fire
ERT will then act under his instructions.
9. Provide the necessary assistance to the Fire Services while they are on-site.
10. Accept control of the site back from the Emergency Services once they leave the
site.
11. Initiate clean-up activities as directed by the Site Controller.
12. Assist the Site Incident Controller in compilation of an incident report.
6.8.5. ERT
Important:
The actions, described hereunder, should be carried out, only if it is safe to do so, and, if
you have been trained to do so.
Do not take any risks which could threaten your own safety or the safety of others.
On hearing the alarm:
1. Go immediately to the Reception area to meet with the ERT Leader.
2. Carry out tasks as directed by the ERT Leader:
This may involve the use and wearing of specialised Personal Protective Equipment such
as acid suits, safety Wellington boots; hand and eye protection in addition to respiratory
protection. Information and or request for such material should be transmitted via Walkie -
Talkie where possible. In addition, a designated member{s} may be requested to retract
emergency spill kit material located throughout the site. ERT members must be prepared
in the event the spilled material ignites and threatens a major fire on-site.
2 members to bring up one or more of the Chemical Spill kits from the Production Plants
or the Fire Hut. Prepare bags, containers etc. for collection of the spilled material.
3. Follows the ERT Leaders instructions at all times.
4. On the discovery of any casualty, inform the ERT Leader of the need for First
Aid assistance. Where possible remove the casualty to a safe place for treatment.
Remain with the casualty until a First Aider arrives to the Casualty and begins to
treat the casualty.
5. Stand by for further orders.
6. Assist the Fire Services when they arrive on site as directed by the ERT Leader.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
6.9. PANDEMIC PREPAREDNESS
6.9.1. Pandemic Influenza General Information
What is Pandemic Influenza?
Pandemic flu is a contagious human flu that causes a global outbreak, or pandemic, of
serious illness. Because there is little natural immunity, the disease can spread easily from
person to person.
What makes it different from ordinary flu?
Pandemic influenza is different from ‘ordinary’ seasonal flu, which for most people is an
unpleasant illness but runs its natural course (sometimes referred to as ‘self-limiting’) and is
not life-endangering. Pandemic flu can occur when a new influenza virus emerges which is
markedly different from recently circulating strains and to which humans have little or no
immunity. Because of this lack of immunity the virus is able to:
Infect more humans over a large geographical area;
Spread rapidly and efficiently from person to person;
Cause clinical illness in a proportion of those infected.
It is easily passed from person to person when an infected person talks, coughs or sneezes.
It can also spread through hand/face contact after touching anything that may become
contaminated with the virus. Illness develops a few days (average 2-3) after being infected.
Everyone is susceptible, although only about a quarter of the populations are expected to
become ill. Another 25% may catch the infection without getting any symptoms.
What is bird Influenza (avian influenza)?
Bird Influenza —avian influenza—is an infection caused by avian (bird) influenza (flu)
viruses, such as influenza A (H5N1) subtype. Influenza A infection occurs mainly in wild
birds worldwide, which carry the viruses in their intestines, but usually do not get sick
from them. However, avian influenza is very contagious among birds and can make some
domesticated birds, including chickens, ducks, and turkeys, very sick and kill them.
What are the symptoms of avian influenza in humans?
Symptoms of avian influenza in humans have ranged from typical human influenza-like
symptoms (fever, cough, sore throat, and muscle aches) to eye infections, pneumonia,
severe respiratory diseases (such as acute respiratory distress syndrome), and other severe
and life-threatening complications. The symptoms of avian influenza may depend on
which specific virus subtype and strain caused the infection.
What is Swine Influenza (influenza A H1N1v)
Swine flu is a respiratory illness caused by the type A influenza (H1N1) virus.
The influenza pandemic (commonly known as swine flu) in countries around the world
has been caused by a new version (strain) of the virus named as Pandemic (H1N1) 2009
by World Health Organization (WHO).
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Transmission of this virus is thought to occur in the same way as seasonal flu. The
infection can be effectively treated with antiviral medication.
6.9.2. Organisation, Identification And Roles Of Pandemic Influenza Team Members
Pandemic Influenza Coordinator – EHS&E Manager
Devise and implement the EHS Pandemic flu contingency plan
Identify team members and allocate & coordinate tasks
Act as first point of contact in the event of discovery of a suspected case
Devise a questionnaire for personnel exhibiting Pandemic flu symptoms
Coordinate Pandemic flu awareness training for First Aiders
Introduce an awareness campaign site wide
Distribute the Pandemic Preparedness Hygiene kits
Pandemic Influenza Co-ordinator Substitute
Devise and implement the EHS Pandemic Influenza contingency plan
Coordinate the implementation of the AbbVie recommendations into the local plan
Organize the purchase and storage of adequate quantities of PPE approx. 4 weeks supply
Act as substitute in the absence of the Pandemic Influenza coordinator
Assist in all aspects concerning the implementation of the plan
Pandemic Influenza Appointed Medical Practitioner – DR Brian Gallagher EHA
Provide essential medical advice and support concerning the implementation of the plan
Act as appointed medical practitioner for the Fournier EHS Pandemic Influenza
Contingency Plan
First Aiders – list including contact details is included in Attachment 3; Emergency
Response Contact Information
Act as first point of medical contact given the discovery of a suspected human case
Attend Pandemic Influenza awareness training for First Aiders provided by the appointed
avian Influenza trainer
Contact the Pandemic Influenza coordinator or substitute given the discovery of a
suspected case
Pandemic Influenza trainer – Doctor Brian Gallagher
Provide Pandemic Influenza awareness training to all First Aiders on site
Provide ongoing training and information regarding Pandemic Influenza preparedness to
Personnel as required by the Pandemic Influenza coordinator or substitute.
Pandemic Influenza PPE Suppliers
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
If required; Provide a backup supply of PPE, in addition to the Pandemic Preparedness
Hygiene kits, as and when required by the Pandemic Influenza coordinator or substitute
Hold a buffer stock of specific items of PPE for all staff
To be capable of providing these supplies within one week of placing the order.
Security
During the course of a defined Pandemic; the classification of which will be determined
by the corporation in line with WHO directives and standards, the security officer will be
informed when and to whom they should supply the Pandemic Influenza Questionnaire
for Personnel Travelling from Abroad to.
Other instructions will be given to the security personnel by the Pandemic co-ordinator,
such as; enforcing hygiene controls to all visitors and contractors which include the hand
disinfectant dispensers located at security and at the entrances to the main production
building and in the porta cabins.
If and when instructed, by the Pandemic co-ordinator, limiting or restricting access to the
site.
Outlining any changes to the site pandemic preparedness policy through verbal
communications to callers to the site, either on the phone or in person.
6.9.3. RISK CATEGORISATION OF PERSONNEL
High Risk
Personnel travelling abroad (if travelling within the attached high risk areas)
Personnel arriving back from abroad (if travelled within the attached high risk areas)
Personnel making deliveries to the plant (if travelled within the attached high risk
areas).
Personnel exhibiting Influenza like symptoms and respiratory problems and having
answered yes to question 1 and / or yes to questions 2 and any of the questions from 3
to 7 in the Pandemic Influenza questionnaire. (Attachment 6 of this procedure)
Medium risk
Personnel travelling abroad (if not travelling within the attached high risk areas)
Personnel arriving back from abroad (if have not travelled within the attached high
risk areas)
Personnel exhibiting Influenza like symptoms and having answered no to all
questions in the proposed Pandemic Influenza questionnaire.
Personnel having respiratory problems and having answered no to all questions in the
proposed Pandemic Influenza questionnaire.
Personnel having direct contact with live poultry or birds
Low risk
Personnel not travelling or having travelled abroad
Personnel not displaying Influenza like symptoms or having respiratory problems
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Personnel answering no to all questions in the proposed Pandemic Influenza
questionnaire
Personnel not in direct contact with live poultry or birds
6.9.4. TRAVELLERS
The Pandemic Influenza questionnaire is located at reception and also at the main
warehouse for personnel arriving from abroad. Advice notes for travellers are attached
and are located in all departments.
6.9.5. HYGIENE
Basic hygiene information signs to be posted in all areas regarding the importance of
washing hands at regular intervals.
An adequate supply of alcohol based hand rub to be purchased and held in stock and to
be distributed to all departments given a confirmed outbreak. All personnel to be asked
to use this product at regular intervals to prevent spread of the disease.
6.9.6. CONTROL MEASURES
The Pandemic Influenza coordinator and substitute to chair meetings with all departments to
provide information and introduce control measures to combat a possible pandemic situation
arising and also to derive information from all departments with a view to identifying high
risk factors and control measures to be introduced.
Training to be provided to all First Aiders and to involve the identification of symptoms and
what to do in the event of a suspected case being identified, this training to be provided by
the appointed avian Influenza trainer.
A questionnaire to be prepared for First Aiders to assist them in identifying possible avian flu
symptoms in a suspected case.
Information to be provided to all departments given the discovery of dead bird or a suspected
case.
Information signage and a questionnaire to be located at reception for personnel having
travelled from abroad and if the risk classification is high then reception will be asked to
contact the avian Influenza coordinator or substitute, who will then ascertain as to whether or
not this person should be allowed entry to the plant or referred to the avian Influenza medical
practitioner.
Information signage and a questionnaire will also be located in the warehouse and personnel
travelling from abroad will be asked to complete the questionnaire, if as above the risk is
classified as high, the warehouse manager / supervisor will contact the avian Influenza
coordinator or substitute who will ascertain as to whether or not this person should be
allowed entry to the plant or referred to the avian Influenza medical practitioner.
A procedure will be devised for the possible discovery of a dead bird / birds, i.e. first point of
contact, call the emergency helpline (1890 252 283) – (Dep’t of agriculture and food) who
will arrange for analysis and disposal of the dead bird / birds i.e. (double plastic bags,
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
incineration etc.), health surveillance for all in direct contact with the dead bird / birds,
emergency PPE to be worn, area to be cordoned off.
Information sheets and fact sheets to be distributed to all area managers for distribution to all
personnel intending to travel abroad.
In the event of a confirmed avian Influenza case, restricted areas will be identified and
cordoned off, these areas will be categorized according to the following criteria,
Given the discovery of a confirmed case where the suspected case was located and
areas where the suspected case had travelled to / from.
Given the discovery of confirmed case involving a dead bird / birds, all locations
where the dead birds were found.
Canteen access will be restricted in order to prevent the virus from becoming
pandemic
Information / warning signs to be posted at all access points to the plant and buildings
warning visitors that the avian Influenza virus is present within the plant and information
concerning restricted access to personnel visiting the plant
All suspected human cases of avian Influenza will be referred without delay to the appointed
avian Influenza medical practitioner.
All personnel who have been in direct contact with a suspected case of avian Influenza will
be referred to the appointed avian Influenza medical practitioner for examination.
6.9.7. SANITARY FACILITIES
The basic requirements for sanitary facilities to be checked daily to ensure that a sufficient
supply of sterilizing hand wash is available to last approx 4 weeks.
6.9.8. TRAINING / INFORMATION
List of personnel for Pandemic Influenza awareness training are listed below,
o All First Aiders on site,
o All members of the Pandemic Influenza team.
6.9.9. PERSONAL PROTECTIVE EQUIPMENT INVENTORY
320 disposable masks to the FFFP2 standard to be located on site which will suffice for all
First Aider for 1 week in the event of an outbreak – RISS to hold a buffer stock for all staff
for 4 weeks and be capable of delivery within 1 week.
The type and quantity of disinfectant hand cleanser currently being used on site to be
reviewed to ensure that a grade 1 hand cleanser of sufficient quantity to last 4 weeks is on
hand.
6.9.10. ORGANISATION OF URGENCY OF CARE
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Given an outbreak of an Influenza Pandemic, the company appointed medical practitioner
will be contacted immediately who will in turn contact the CUH to arrange for ambulance
services to be provided.
In the event of a singular case of suspected avian/swine influenza being detected, the
appointed medical practitioner will be contacted immediately who will review the patient and
arrange for ambulance services to be provided.
In the event of a multiple case situation arising the appointed medical practitioner will decide
on the priority of those to be treated initially.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
6.10. ENVIRONMENTAL PROTECTION
In the event of an emergency all materials spilled must be collected, stored and tested
prior to discharge to the environment.
When the emergency is over no water may be discharged from these tanks without its
composition being determined and only on the authorisation of the EHS&E Manager.
It is the responsibility of the Site Incident Controller to arrange for the EHS&E Manager
to contact the Cork County Council and inform the Authorities of the situation pertaining
on-site. It is also EHS&E Managers responsibility to either organise EHS&E and/or
laboratory staff to take samples of firewater, to take air quality samples (where a plume is
involved or there has been an emission to air) etc. If the incident is after-hours EHS&E
Manager should organise for staff to be called in.
Other Agencies to be contacted may include:-
The Industrial Development Authority.
South Western Regional Fisheries Board.
Health & Safety Authority (if applicable).
All information and actions regarding this hazard must also be forwarded to relevant
persons within the Corporation, Head Office.
Environmental incidents that may occur within the site may be tabulated as follows, and
subsequent procures to be followed therein:-
Source Cause Action Responsibility
Chemical Spill / Oil
spill
Spillage due to lack of
containment; impact;
human error; leak from
drum
Isolate the source and
collect the spilled
material. Repair any
leaking equipment /
containers if possible
and is safe to do so.
As per Chemical Spill
procedures
Boiler Equipment not
maintained; faulty part;
failure of equipment
Repair equipment.
Ensure adequate spares
of critical equipment
Maintenance
Fugitive emissions Spill within the process
leading to contamination
of HVAC system of
release to atmosphere
Clean up spill. Repair
equipment. Investigated
source of solvent.
Maintenance in
conjunction with
relevant department
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
6.11. RESOURCES
6.11.1. General
Company personnel have been assigned preparatory actions in order to ensure that
appropriate physical resources and facilities are serviceable and readily available should
an emergency occur. It is the responsibility of the EHS&E Department to ensure that the
resources are serviceable and readily available at all times.
6.11.2. Communications
There are 5 Walkie-Talkies in total located in Security. These are kept fully charged at
all times
1. Site Incident Controller
2. ERT Team
3. ERT Leader
4. Security
5. Sprinkler Control/Back up/Emergency Services.
These people are named in Attachment 2 – Key Company Personnel.
6.11.3. Fire Detection, Fire Protection and Fire Fighting Equipment
Fire detection, fire protection and fire fighting equipment are provided on-site and are
checked, inspected and maintained in accordance with recognised standards. This
equipment may be outlined as follows:-
Fire detection and alarm system;
Fire Hydrants
Fire Extinguishers
Spill Response Equipment and Materials
Sprinkler System
Suppression Systems
Two way radios
6.11.4. Evacuation Points
The six Emergency Evacuation Points are located opposite the Security Building in the
car park area and are clearly marked. A printer, which is located in the Reception area,
provides a printout in approximately 2 minutes from alarm activation.
6.11.5. Badge systems and log books – Contractors and visitors
Non-routine Contractors and Visitors evacuate to Assembly Area 6.
An Access Control system is in place for Contractors and Visitors.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
When Contractors and Visitors arrive on site they are required to report to Security where
they are issued with a pass or permit. Each pass has the evacuation procedure listed on
the back of the pass.
Details such as their time on-site and their COMPANY contact is recorded in the Security
Log Book. Their departure from the site is also recorded in this Log Book. This Log
Book (Contractors and Visitors List) is used for the roll call for Contractors and Visitors.
Routine contractors are on the COMPANY Swipe Card system, and their evacuation
point is in the Contractors and Visitors Area.
6.11.6. Emergency services Liaison Information
In order to assist the External Emergency Services when they arrive on site, the site has
prepared information and associated drawings, which are located at the ERT Command
Centre.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
7. REVISION
Revision
No:
Effective Date Reason for Revision
6.0 See Effective
Date
Updated SOP
Updated Section 2 Abbreviations – removed reference to TMS
– Time Management System
Updated Section 6.3.10 Sprinkler System Controller –
clarified that the Sprinkler Controller will be identified as the
situation develops; all of the ERT can perform the duties of
the Sprinkler Controller
Updated Section, 6.4.1 to state that SECURITY will assume
the role of Site Incident Controller outside normal office hours
Updated Section 6.9.1 Pandemic Influenza General
Information – removed information related to specific types of
Avian and Swine influenza
Updated Section 6.11.5 to reflect the procedure for access
control and management of visitors and contractors.
Updated Section 6.11.6 - the location of all emergency
information (drawings etc.) is now the ERT Command Centre.
Updated Attachment 3 Emergency Response Contact
Information to reflect title and personnel changes.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Firewater Risk Assessment
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Firewater Risk Assessment 2016
04 July 2016
Ref P465380 Prepared for: AbbVie, Carrigtwohill, Co. Cork
Prepared by: AECOM
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page i
REVISION SCHEDULE
Rev Date Details Prepared by Reviewed by Approved by
1 05 July, 2016 Final Issue Jonathan Ward Danny Ward Danny Ward
REVISION RECORD
Rev Date Details Prepared by Reviewed by Approved by
0 04 July, 2016 Issued to client Jonathan Ward Danny Ward Danny Ward
1 05 July, 2016 Final Issue Jonathan Ward Danny Ward Danny Ward
AECOM Infrastructure & Environment Ireland Limited
4th Floor, Adelphi Plaza, Adelphi Centre,
George’s Street Upper,
Dun Laoghaire,
Co. Dublin,
Ireland.
.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page ii
Limitations
AECOM Infrastructure & Environment Ireland Limited (“AECOM”) has prepared this Report for the sole use
of AbbVie, Carrigtwohill, Co. Cork in accordance with the Agreement under which our services were
performed. No other warranty, expressed or implied, is made as to the professional advice included in this
Report or any other services provided by AECOM. This Report is confidential and may not be disclosed by
the Client or relied upon by any other party without the prior and express written agreement of AECOM.
The information contained in this Report is based upon information provided by others and upon the
assumption that all relevant information has been provided by those parties from whom it has been
requested and that such information is accurate. Information obtained by AECOM has not been
independently verified by AECOM, unless otherwise stated in the Report.
The methodology adopted and the sources of information used by AECOM in providing its services are
outlined in this Report. The work described in this Report is based on the conditions encountered and the
information available during the said period of time. The scope of this Report and the services are
accordingly factually limited by these circumstances.
AECOM disclaim any undertaking or obligation to advise any person of any change in any matter affecting
the Report, which may come or be brought to AECOM’s attention after the date of the Report.
Certain statements made in the Report that are not historical facts may constitute estimates, projections or
other forward-looking statements and even though they are based on reasonable assumptions as of the date
of the Report, such forward-looking statements by their nature involve risks and uncertainties that could
cause actual results to differ materially from the results predicted. AECOM specifically does not guarantee
or warrant any estimate or projections contained in this Report.
Unless otherwise stated in this Report, the assessments made assume that the sites and facilities will
continue to be used for their current purpose without significant changes.
Copyright
© This Report is the copyright of AECOM Infrastructure & Environment Ireland Limited, a wholly owned
subsidiary of AECOM. Any unauthorised reproduction or usage by any person other than the addressee is
strictly prohibited.
For in
spec
tion p
urpo
ses o
nly.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page iii
TABLE OF CONTENTS 1. INTRODUCTION .......................................................................4
1.1 Requirement for a Firewater Risk Assessment ....................4
1.2 Study Approach .......................................................................4
2. SITE DESCRIPTION IN RELATION TO FIRE RISK ................5
2.1 Current Site Description .........................................................5
2.2 Hardstanding Areas of the Site ..............................................6
2.3 Site Developments ..................................................................6
2.4 Nature of Substances Used on Site.......................................6
2.5 Site Drainage System ..............................................................7
2.5.1 Stormwater Drainage ..............................................................7
2.5.2 Process and Foul Drainage ....................................................7
2.6 Fire Fighting System ...............................................................7
2.7 Emergency Response .............................................................8
2.8 Off-site Fire Safety Services ...................................................8
2.9 Prevention and Control Measures .........................................8
3. RISK ASSESSMENT ................................................................9
3.1 Fire Risk ...................................................................................9
3.2 Environmental Risk .............................................................. 11
3.2.1 Receptors .............................................................................. 11
3.2.2 Carrigtwohill WWTP ............................................................. 11
3.2.3 Soil and Groundwater .......................................................... 11
3.2.4 Surface Water ....................................................................... 11
3.2.5 Substances Released and Containment Provisions ........ 12
3.3 Firewater Runoff Risk .......................................................... 16
3.4 Generation of Firewater and Run-Off ................................. 16
3.4.1 Rain Water ............................................................................. 16
3.4.2 Firewater Generation through Firefighting and Scenario 16
3.4.3 Firewater Generated Based on Scenario ........................... 17
3.5 Requirement for Firewater Retention Facilities ................ 17
3.5.1 Materials with R50 to R53 risk phrases Stored at the Site 17
3.5.2 Sensitive receptors .............................................................. 19
4. CONCLUSION AND RECOMMMENDATIONS ..................... 20
FIGURE 1 – SITE LAYOUT
APPENDIX A – LIST OF MATERIALS USED AT THE SITE
APPENDIX B – FIREWATER RISK ASSESSMENT METHODOLOGY
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 4
1. INTRODUCTION
AECOM Ireland Ltd. (AECOM) was requested by AbbVie, Carrigtwohill, Co. Cork (the site) to prepare an update of their existing firewater risk assessment.
1.1 Requirement for a Firewater Risk Assessment
Condition 3.2 of the site’s current Wastewater Discharge License WP(s) 9/05r requires that a study of a requirement for a firewater retention facility is undertaken. The study should be completed in accordance with the Environmental Protection Agency’s (EPA) “Guidance to Industry on the Establishment of Firewater Retention Facilities” (1995) (The EPA’s Guidance Note).
The original firewater risk assessment study and associated report for the site was prepared by PM in 2004 and updated by URS in 2014. The 2004 and 2014 assessments concluded that firewater retention facilities were not required due to the type and quantity of materials held at the site at that time.
This report takes into account significant changes that took place, or are expected to take place since 2014. The methodology used in this report is based on the EPA’s Guidance Note.
According to the EPA’s Guidance Note, firewater retention facilities are, in general, required if:
• The site stores dangerous substances classified under one of the risk phrases R50 to R53 in
quantities that exceed the listed limits shown in Table 1.1 below; or
• The site discharges surface run-off water into sensitive receiving waters.
Table 1.1: Storage Limits
Risk Phrase Reference Description Volume (Tonnes)
R50 Very toxic to aquatic organisms 1
R51 Toxic to aquatic organisms 10
R52 Harmful to aquatic organisms 100
R53 May cause long-term adverse effects in the aquatic environment
1,000
1.2 Study Approach
To determine the extent, if any, of firewater retention required for current and proposed operations at the site, the following was undertaken:
• The firewater risk assessment from 2004 and 2014 were reviewed;
• The most likely foreseeable fire scenarios were assessed. Based on a site walkover, discussion
with site representative and review of the FM Global Loss Prevention report. These scenarios
are:
� Scenario 1: Fire in the Production Area;
� Scenario 2: Fire in the Warehouse (not yet built);
� Scenario 3: Fire in the Chemstore Building;
� Scenario 4: Fire in the Tank Farm (not yet built); and,
� Scenario 5: Fire in the Waste Store
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 5
• An assessment of the type and quantities of materials used and present at the site as well as
materials which will be used and stored at the site once the proposed new developments
proceed;
• Assessment of environmental setting, including relevant sensitive receptors;
• Identification of known pathways and potential pathways to environmental receptors; and,
• Likely environmental impact consequences, in terms of extent and severity, of the pollutant
and/or firewater quantities and flows.
2. SITE DESCRIPTION IN RELATION TO FIRE RISK
2.1 Current Site Description
AbbVie is a modern “bulk tablet” finish facility, which manufactures solid and capsule formulations using innovative technologies.
Active Pharmaceutical Ingredient (API) particle size reduction is achieved by a nano-milling process resulting in lower dosage formulation. The highly sophisticated technology on site enables delivery of products and processes from small scale clinical trial supply to larger commercial manufacturing.
The facility manufactures a range of products to reduce the cholesterol levels in patients at risk. The processes employed on site include milling, blending, granulation, drying, sieving, tableting, coating and packaging.
Bulk raw materials are stored in a warehouse located of off-site and are brought on site as required; the amount and type of material is described in Appendix A. Minimal quantities of solvents are used on site as cleaning products or in the on-site laboratory. Most of the raw materials used for production are solids (powder or granules). These are mixed with purified water.
The main areas of the site, as shown in Figure 1 (this figures includes the proposed new developments as described below), include:
• Production building with two equipment trains creating 6 products;
• Solvent bulk storage tank farm (not yet built);
• Regenerative Thermal Oxidiser (RTO) (not yet built);
• Ancillary facilities, including a nitrogen skid;
• Up-scale facility (process development);
• Laboratory;
• Product warehouse for storing of raw materials and finished products (not yet built);
• Offices and canteen;
• Waste store building;
• Chemstore building;
• Boiler room;
• pH treatment facility;
• Fire pump house; and,
• Electrical switchrooms;
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 6
2.2 Hardstanding Areas of the Site
The total approximate roof surface area for the buildings present on site is 9,219 m2 which accounts
for the proposed warehouse extension currently under development1.
There are also several other hardstanding areas of the site as follows:
• The employee car parking lots and access roads that is covered with asphalt and is located
along the southern and northern boundary of the site
• An area in the south-western corner of the site in front of the warehouse building
• An area between the western site boundary, the warehouse and the production building
• Walking pathway along the eastern and northern side of the production building
The total area of the hardstanding area described above is 11,843 m2
The total hardstanding area at the site includes buildings roofs and paved ground is approximately 21,062 m
2.
2.3 Site Developments
No significant changes have occurred to the site since 2014 albeit significant developments are proposed. The main changes proposed include:
• The construction of a new warehouse on site to store raw materials on-site;
• The extension of process areas (formerly used for warehousing purposes) to accommodate a
new processes on site;
• The installation of a bulk solvent tank farm and thermal oxidiser;
This update to the firewater risk assessment for the site considers both existing and proposed features of the site as if all were present and operating at the site.
2.4 Nature of Substances Used on Site
Raw materials used in the processes at the site are held in a warehouse in the northern part of the site. In total, there is approximately 53,415
2 tonnes of raw materials being held at the site at any one
time. Other materials held at the site include:
• Chemstore: This building contains coating solution, laboratory waste, oils and lubricants,
reagents and detergents. The quantity of materials that passes through the Chemstore annually
is 25.5 tonnes of coating solution (contains opadry, non-hazardous substance) and 10.5 tonnes
of laboratory chemicals, lubricants, cleaning products. Quantity of flammable materials in
Chemstore at the time of writing this report was approximately 5 tonnes.
• Waste Store: This area usually contains approximately 60 x 200 litre drums of waste granules
(API). It also contains baled contaminated plastic waste. The quantity of materials that passes
through the Waste store annually is approximately 100 tonnes.
• There are two diesel tanks (1,500 litres each) located along the eastern site boundary and
adjacent to the sprinkler pump (see Figure 1).
• Raw materials are present in the main production building in process vessels; up to 9 tonnes at
any one time.
1 Figure described are approximate and account for known proposed expansions plans currently under consideration.
2 Approximate value taken from the current materials list presented in Appendix A.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 7
Flammable materials stored at the site include:
• Approximately 3,000 litres of diesel stored in two tanks;
• Dodecyl sodium sulphate, raw material, brought to the site as required (maximum two 200 litres
drums a day);
• IPA surface disinfectant (held in the Chemstore), 395 litres;
• Oils, greases and lubricants held in Chemstore, 1,560 litres;
• Solvents in small quantities held in the Chemstore and the laboratory, approximately 2,200
litres;
• Acetone is held in a 32,000 litre bulk tank (future development); and,
• A recovery solvent tank is also present on site and is emptied on a 2 week rotation (future
development).
Explosive materials used or present at the site include:
• Combustible dusts in production areas (formed from raw materials); and,
• Simvastatin which is brought to the site daily, maximum quantity is two 200 litre drums.
A comprehensive list of substances used at the site, together with associated risk and safety phrases is provided in Appendix A of this report.
2.5 Site Drainage System
2.5.1 Stormwater Drainage
Stormwater drainage at the site is collected separately from the process drains and foul drains. The stormwater drainage is a conventional gravity system. The stormwater drainage network serves the parking lot, roofs of the buildings and other outdoor areas of the site. Drainage occurs via a series of gullies & drains that discharge the surface water run-off into a dedicated existing surface water network which then discharges, via petrol interceptors, into the Cork County Council stormwater sewer serving the IDA Business Park. Stormwater drains cannot be isolated, i.e. there is no shut off valves on the stormwater drainage network.
The Cork County Council sewer also serves other facilities in the IDA Business Park within which AbbVie is located. The combined surface water is discharged from the Cork County Council stormwater sewer to the receiving waters in the Great Island Channel.
2.5.2 Process and Foul Drainage
Process effluent from all production areas and the warehouse is routed to the main process effluent sump located on the grass verge in front of the production building’s main door. There is one smaller collection sump that feeds into the main sump located upstream of the main sump. From the main process effluent sump, the process effluent is routed to the pH Correction Plant. From the pH correction plant, process effluent is combined with the foul effluent from the offices adjacent to the production areas and discharged to the Cork County Council foul sewer that runs beneath the road in front of the site.
Foul effluent consists of the canteen and sanitary effluent from the office and canteen building located to the west of the main production building. This effluent is routed along the western boundary of the site into the Cork County Council foul sewer.
2.6 Fire Fighting System
The detection system comprises:
• Fire Alarm System analogue addressable system consisting of:
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 8
� Sounders
� Addressable interface (IO) units (fire dampers)
� Manual call points
� Automatic smoke/heat detectors
• Duct detection installed in all HVAC extract and intake ducting; and,
• Break glass type addressable manual call points;
The current fire suppression system comprises:
• Automatic fire suppression on the tank farms utilizing a 100 litre bladder tank and alcohol
resistant foam (future development).
• Firewater fighting tank 584 m3;
• 2 Firewater pumps (5.68 m3/min);
• Diesel fire pump;
• Electric fire pump;
• Automatic Sprinkler System fed by a 584 m3 firewater fighting tank – covers all areas of the site,
except the Chemstore building;
• 7 fire hydrants (H 1 to H7);
• 150 mm firewater main; and,
• Fire extinguishers throughout all areas of the site.
2.7 Emergency Response
An Emergency Response Plan has been prepared for the site and an Emergency Response Team is also in place at the site. Emergency drills are conducted bi-annually. In case of a fire emergency, the main task of emergency response team is to assist the local fire brigade only.
2.8 Off-site Fire Safety Services
The site is located within the area covered by Midleton Fire Brigade. This fire station is located on Market Green, Midleton, approximately 10 km from the site. In the event of a fire alarm being raised, once the call is received by fire brigade, travel time to AbbVie would be expected to be approximately 10 to 20 minutes depending on traffic. The site’s Emergency Response Plan states that it is responsibility of the “site incident controller” to alert emergency services.
Members of Midleton fire station visited AbbVie to familiarise themselves with the layout of the facility, location of services and to offer general advice to management. The AbbVie site operates 24/7 and there is 24 hours security presence at the site.
2.9 Prevention and Control Measures
AbbVie incorporate a number of measures into daily operations at the facility which reduces the risk of fire at the facility. These are as follows:
• AbbVie have carried out a Hazardous Area Classification Study.
• Hazardous chemicals are present on site and most are stored in a dedicated Chemstore
building, with segregation of materials, concrete floor, underground sump (intended to provide
containment of potential spills in the Chemstore) and automatic fire extinguishers.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 9
• There is a Spill Prevention Technical Standard in place at the site.
• Electrical Safety Procedure and Hot Work Permits are in place.
• Appropriate training is provided to all employees on spill prevention and management, electrical
safety, fire extinguishers, emergency preparedness.
• Smoking is prohibited on the entire site except for the dedicated smoking area.
3. RISK ASSESSMENT
Four classification criteria are used in this risk assessment. These are:
• Fire Load;
• Fire Risk;
• Environmental Load; and
• Environmental Risk.
Fire Load is considered a function of the quantities of flammable, combustible and oxidising materials being stored in the assessment area.
Fire Risk refers to the likelihood of fire occurring in the assessment area and involves factors such as potential for ignition, ignition sources, fire-fighting equipment, emergency response and fire detection.
3.1 Fire Risk
When undertaking the fire risk assessment the following was identified:
• Potential hazards;
• People who may be at risk; and
• Fire prevention, detection and mitigation measures.
These hazards were then evaluated given a low, medium or high-risk rating based on the likelihood and severity tables detailed in Appendix B.
Table 3.1 below details the findings of the fire risk assessment for each considered scenario. The fire risk assessment is based on:
• Information provided by the site around new developments and operationally changes and the
site visit carried out in 2016;
• Site observations made during site visit by URS in 2014 and information provided by the site
staff; and
• FM Global Loss Prevention Report 2012.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 10
Table 3.1: Findings of the Fire Risk Assessment
Scenario
No.
Hazard People at Harm Potential consequence Fire Prevention, Detection and
Mitigation Measures
Likelihood Severity Risk Rating
(likelihood of
Severity)
1 Production areas fire: fuel includes general office materials, stainless steel production units and process materials.
• Production personnel
• Fire Brigade personnel
Fire and heat damage to production building, equipment and piping.
• Fire detection system.
• Sprinkler System.
• Smoke detectors in HVAC vents.
• Containment and fire isolation measures.
• Fire retardant materials used throughout the building.
• Explosion vent in the roof.
• Automatic closure of HVAC vents.
Unlikely (2)
Severe (3) Medium (6)
2 Warehouse fire: Materials, packaging and office supplies with the warehouse
• Production personnel
• Fire Brigade personnel
Fire and heat damage to the warehouse building, equipment loss of materials.
• Fire detection system.
• Sprinkler System.
• Smoke detectors in HVAC vents.
• Containment and fire isolation measures.
• Fire retardant materials used throughout the building.
• Explosion vent in the roof.
• Automatic closure of HVAC vents.
Somewhat unlikely (3)
Severe (3) Medium (9)
3 Chemstore building fire Fuel: Flammable materials present in Chemstore
Fire Brigade personnel
Fire and heat damage to Chemstore building.
• Materials segregated.
• Smoke detector.
• Automated Fire Extinguishers (each containing 6 kg of ABC Dry Powder).
Unlikely (2)
Significant (2) Low (4)
4 Fire in the Tank Farm Fire Brigade personnel
Fire and heat damage to the tank farm building.
• Fire detection system.
• Deluge System.
Somewhat unlikely (3)
Severe (3) Medium (9)
5 Fire in the Wastestore Fire Brigade personnel
Fire and heat damage to Waste store building.
• Smoke detector.
• Manual Fire Extinguisher.
Unlikely (2)
Significant (2) Low (4)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 11
3.2 Environmental Risk
Environmental Risk refers to the likelihood of there being an adverse effect on the environment during or following a fire event. The likelihood of adverse effect will depend on circumstances such as pathway(s) taken by the released substances, the estimated volume of fire water involved, the provisions for containing released substances and the receptors of the released substances.
The five considered fire scenarios were then evaluated and given a low, medium or high-risk rating based on the likelihood and severity tables referenced in Appendix B. The results of environmental risk assessment are shown in table 3.3 below.
3.2.1 Receptors
Potential receptors of contaminated firewater are:
1. Carrigtwohill Waste Water Treatment Plant (WWTP);
2. Soil and groundwater underneath the site; and
3. Great Island Channel.
3.2.2 Carrigtwohill WWTP
Carrigtwohill WWTP is considered a sensitive receptor in the event of unconfined or uncontrolled loss of contaminated firewater mixtures from AbbVie. The pathways to Carrigtwohill WWTP are process drains. In the event of Scenario 1 and 2, there is a potential that contaminated firewater would enter process drains. If the process drains are not isolated from the Council drains, the contaminated firewater could reach Carrigtwohill WWTP in short time, which is located approximately 1km to the south of the site.
There is no WWTP on site, only a pH balancing tank, which is full most of the time. Also, there are two sumps; however, these are also at least partially full most of the time. Therefore, it would be difficult to contain firewater in process drains at the site.
3.2.3 Soil and Groundwater
There are several areas of the site that are not hardstanding. Therefore, the sensitivity of soil and groundwater as a receptor is considered moderate in the context of a fire scenario on the site. In addition, according the Geological Survey of Ireland on-line maps, the vulnerability of aquifer beneath the site is classified as high.
Groundwater at the site is monitored annually and the most recent monitoring results show no dissolved metals, VOCs, SVOCs or alcohols were detected above detection limits. Also, no TOC, COD or phosphorous readings above relevant environmental guideline values were recorded for groundwater in any of the three wells in 2013. Elevated suspended solids detected in the wells are due to the turbid groundwater encountered during sampling, related to the silty aquifer material. Suspended solids have no direct health of sanitary significance.
3.2.4 Surface Water
Surface water bodies are considered the sensitive receptor in the event of unconfined or uncontrolled loss of contaminated firewater mixtures from AbbVie.
The surface water sewer system discharges ultimately to Slatty Bridge, at a point located approximately 0.8 km south of the site. This is part of Great Island Channel; a Special Area of Conservation and a Proposed National Heritage Area.
Great Island Channel is extremely important for wintering waterfowl. The site is an integral part of Cork Harbour which is a wetland of international importance for the birds it supports. It also supports a good invertebrate fauna. While the main land use within the site is aquaculture (Oyster farming), the greatest threats to its conservation significance come from road works, infilling, sewage outflows and possible marina developments
3.
3 Information taken from the National Parks and Wildlife Service Site Synopsis.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 12
According to the EPA document ‘Water Quality in Ireland 2007 – 2009, the receiving waters for AbbVie’s stormwater are classified as:
• North Channel Great Island – potentially eutrophic
• Cork Harbour – intermediate water quality.
The pathway to surface waters is the stormwater drainage system. The stormwater drainage system has been described in Section 2.6. This system would be the principal means of conveyance of polluting matter to the Great Island Channel. In the event of firewater entering the site’s stormwater drainage system, such firewater will reach the Great Island Channel in a short period of time. There is no diversion system, containment system or isolation system in place to mitigate against this occurrence.
3.2.5 Substances Released and Containment Provisions
In the event of a fire at AbbVie in one of the key risk areas, the substance released will be contaminated firewater runoff that may or may not include rain water. The pollution potential of the firewater runoff will be largely due to the chemical content and BOD, caused by:
• Substances at the location of fire; and
• Firefighting media.
In order to approximately estimate potential toxicity of firewater, the United States Fish and Wildlife Service (FWS) scale is used, which is provided in Table 3.2 below.
Table 3.2: Potential Toxicity of Firewater
Relative Toxicity Aquatic EC50 (mg/L) or LC50(mg/L
Super Toxic <0.01
Extremely Toxic 0.01-0.1
Highly Toxic 0.01-0.1
Moderately 1 - 10
Slightly Toxic 10-100
Practically Nontoxic 100 – 1,000
Relatively Harmless >1,000
There are several raw materials at the site that have slight toxicity (Sodium Dodecyl Sulphate Docusate Sodium, Methacrylic Acid, Fenofibrate tablets – for detail see Appendix A.) Sodium Lauryl Sulphate is moderately toxic and fenofibrate in pure form is highly toxic. However, it should be noted that the amounts of these substances at the site are relatively low (see Table 3.8 and 3.9 below), and it is likely that large proportion of these substances would burn off. Typical firefighting foams would be considered slightly toxic to practically non-toxic
4.
There are no dedicated containment areas at AbbVie for firewater at present except:
1. Final process effluent sumps x 2;
2. Trilipix effluent UST (20 m3);
4 UK Fire Industry Association “Aquatic Toxicity of Fire Fighting Foams”
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 13
3. Trilipix AST (7 m3);
4. Waste store and Chemstore sumps (2 x 1.1 m3).
Containment areas 1-4 could only be used in Scenario 1, and containment area 4 could be used in Scenarios 3 (Chemstore building fire) and 2 (Warehouse building fire).
Table 3.3 below details the findings of the environmental risk assessment carried out for each of the 5 scenarios considered. The environmental risk assessment is based on the following:
• Information provided by the site around new developments and operationally changes and the
site visit carried out in 2016;
• Site observations made during site visit by URS in 2014; and
• FM Global Loss Prevention Report 2012.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 14
Table 3.3: Findings of the Environmental Risk Assessment
Scenario No.
Hazzard Consequence Prevention & Mitigation measures
Contamination Source Transport Potential Damage Potential
Likelihood Severity Risk Rating
1 Production areas fire
• Accumulation of firewater in the production building
• Fire water escapes from the production facility and soaks into the ground around the facility and stormwater drainage systems.
Trilipix area effluent can be collected in a UST and an AST, 2 sumps and drainage system.
Office materials present will likely burn off before exiting the building. In case of fire spreading, it is still unlikely that raw materials would contaminate fire water, as these are in steel process vessels or closed steel IBCs and there is a minimum quantity held within the production area.
• If the firewater exits the Production Building, it could be transported into groundwater through the flow of water from the automatically opened emergency doors.
• Firewater may also enter the process drains within the production area. In this instance the material would be transported to the process and foul drain system.
• The potential for firewater reaching storm sewer is high, as the fire doors would be open at the time of a fire incident.
Contamination of groundwater and surface water with firewater with low levels of contamination, but it is unlikely that any materials with risk phrases R50-R53 would be contained in the firewater due to the low amount kept on site.
Low (2) Moderate (3)
Medium (6)
2 Warehouse building fire
• Accumulation of firewater in Warehouse;
• Firewater is released from the building through the goods-in door and open fire exits.
None Firewater could potentially get contaminated with raw material, including materials with R values R52. Other general warehouse supplies including cardboard, woods and packaging is unlikely to be mobilised during a fire.
• There is potential for groundwater contamination due to unmade ground areas outside the warehouse.
• The potential for firewater reaching storm sewer is high, due to the location of the nearest storm drain and the lack of opportunities for control.
Contamination of groundwater and surface water from firewater with low levels of contamination, potentially containing low levels of materials with R52 risk phrase.
Low (2) Moderate (3)
Medium (6)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 15
3 Chemstore building fire
• Accumulation of firewater in Chemstore.
• Firewater is released from the building and soaks into unmade ground in behind the Chemstore building or into the site stormwater system.
There is a 1,100 litre underground sump connected to the Chemstore.
Firewater is likely to get contaminated with solvents, lubricants and greases, and other materials in Chemstore, none of which have risk phrases R50-R53.
• There is some potential for groundwater contamination due to unmade ground areas near the chemstore.
• The potential for firewater reaching storm sewer is high, due to the location of the nearest storm drain.
Contamination of groundwater and surface water with firewater containing low levels of contamination. However, there will no materials with risk phrases R50-52 contained in the firewater runoff.
Low (2) Minor (2) Low (4)
4 Fire in the tank farm
Release of fire water associated with the deluge of the solvent tank farm
Bund storage with capacity of 110% of the tank volume.
Firewater is likely to get contaminated with solvents, and other materials in the tank farm.
• There is potential for groundwater contamination due to unmade ground areas near the fire tank farm.
• The potential for firewater reaching storm sewer is low, due to the location of the nearest storm drain.
Contamination of groundwater and surface water with firewater with low levels of contamination, but no materials with risk phrases R50-53, Acetone, the main product held at the tank farm will evaporate over time or be burnt off quickly during the fire.
Low (2) Minor (2) Low (4)
5 Fire in the Wastestore
• Accumulation of firewater in Waste store;
• Firewater is released from the building and soaks into unmade ground in behind Waste Store
There is a 1,100 litre underground tank that serves as a sump connected to the Waste store.
Firewater could potentially get contaminated with waste API (fenofibreate R52) that may be stored in the Waste store.
• There is some potential for groundwater contamination due to unmade ground areas near waste store building.
• The potential for firewater reaching storm sewer is low, due to the location of the nearest storm drain.
Contamination of groundwater and surface water with firewater with low levels of contamination, potentially containing low levels of materials with R52.
Low (2) Moderate(3)
Medium (6)
For in
spec
tion p
urpo
ses o
nly.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 16
3.3 Firewater Runoff Risk
Table 3.4 below summarises the findings of the firewater risk assessment carried out on each of the scenario areas considered by this report. Overall firewater risk is considered medium-to-low for all five scenarios considered.
Table 3.4: Firewater Risk Assessment
Scenario No. Hazzard Risk Rating
Fire Risk (From Table 3.1)
Environmental Risk (From Table 3.3)
Overall Risk
1 Production Area Fire
Medium Medium Medium
2 Warehouse Fire Medium Medium Medium
3 Chemstore Fire Low Low Low
4 Tank farm Fire Medium Low Low
5 Wastestore Fire Low Medium Low
3.4 Generation of Firewater and Run-Off
3.4.1 Rain Water
In accordance with EPA guidance5 the rainfall value used in the assessment was the maximum 24
hour rainfall event between 1961 and 1991, for cork airport was 86.7 mm. The value for rainfall over 90 minutes was then calculated (90 minutes represents a worst case scenario of a fire burning). This value was the multiplied by the hard standing area of the site (21,062m
2 – see section 2.2) to give
rainfall over the entire area of 115 m3 with the potential to be contaminated.
3.4.2 Firewater Generation through Firefighting and Scenario
The fire water application rate, and subsequent volume of water generated is based on the information provided in Table 3.5.
Table 3.5: Fire Fighting
Fire Fighting Unit Discharge/Rate
Sprinkler System6 9.62 m
3/min. Depositing 865.98 m
3 in 90 min
7.
Rain water 115 m3 in 90 min over the entire area
Fire Tenders (assumed that tenders connects to fire hydrant at site and pumps at maximum capacity for
duration of fire)
320 m3 in 80 min (2000 litres per minute per tender x
2 tenders = 4000 litres per minute)8
Tank farm water bladder 100 litres (0.1 m3 )
5 Environment Agency, Pollution prevention Guidelines: PPG 18. EPA, Guidance Note to Industry on the Requirements for Fire-Water
Retention Facilities. 6 The sprinkler system in the Production Area and Warehouse are considered to have the same approximate rate and subsequently
generate the same volume of firewater. 7 A worst case scenario is assumed whereby the sprinklers operate at full capacity for 90 minutes is assumed. This is based on the
recharge capabilities of the firewater holding tank (584 m3) in 18 minutes resulting in no reduction in flow.
8 Values based on AECOM experience with similar sites. 80 minutes reflects a 90 minute fire minus 10 minutes of mobilisation.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 17
3.4.3 Firewater Generated Based on Scenario
Each fire scenario has the potential to generate different volumes of firewater. Table 3.6 quantifies the volume of material for each scenario.
Table 3.6 Firewater Generated by Scenario
Scenario Volume of Firewater Generated Comment
1. Production Area Fire
1,300.98 m3 Sources of firewater in the production area are:
• Sprinkler system 865.98 m3
• Rainfall 115 m3
• Fire tender water 320 m3
2. Warehouse Fire 1,300.98 m3 Sources of firewater in the warehouse area are:
• Sprinkler system 865.98 m3
• Rainfall115 m3
• Fire tender water 320 m3
3. Chemstore Fire 410 m3 Sources of firewater in the chemstore area are:
• Rainfall 115 m3
• Fire tender water 320 m3
4. Tank Farm Fire 467.1 m3
(500.1 m3 - 33 m
3)
The bund storage (110%) of the volume of the tank has the capacity to contain 33 m
3 of fire water.
Sources of firewater in the tank farm are:
• Tank content 30 m3
• Waste solvent tank 35 m3
• Rainfall 115 m3
• Fire tender water 320 m3
• Deluge system 0.1 m3 with alcohol
resistant foam suppression system; typical alcohol resistant foams do are bio-degradable and are of low toxicity to aquatic organisms.
5. Waste Store Fire 433.9 m3
(435 m3 – 1.1 m
3)
Sources of firewater in the waste store area are:
• Rainfall 115 m3
• Fire tender water 320 m3
There is a 1,100 litre (1.1 m3) underground tank
that serves as a sump connected to the Waste store.
3.5 Requirement for Firewater Retention Facilities
3.5.1 Materials with R50 to R53 risk phrases Stored at the Site
In the EPA’s Guidance Note, materials with risk phrases R50 to R53 are listed as having storage limit requirements, above which fire water retention facilities are required, as shown in table 3.7. Corresponding Hazzard Statements are also shown.
Table 3.7: Storage limits
Risk
Phrase
reference
Risk Phrase Reference Risk
Volume
Hazzard
Statement
Reference
R50 Very toxic to aquatic organisms
1 H373 May cause damage to organs through prolonged or repeated exposure
R51 Toxic to aquatic organisms 10 H400 Very toxic to aquatic life
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 18
R52 Harmful to aquatic organisms
100 H401 Toxic to aquatic life
R53 May cause long-term adverse effects in the aquatic environment
1,000
H402 Harmful to aquatic life
H410 Very toxic to aquatic life with long-lasting effects
H411 Toxic to aquatic life with long-lasting effects
H412 Harmful to aquatic life with long-lasting effects
H413 May cause long-lasting harmful effects to aquatic life
Table 3.8 below presents estimated quantities of materials with risk phrases R50 to R53 at the site and their locations.
Table 3.8: The Materials Used at the Site With R50 to R53 Phrases
Substance Site Location Risk
Phrase
Reference
Risk phrase Maximum Quantity
Stored At Specific
Location(Tonnes)
Tricor Fenofibrate 145mg US
Production Building / Warehouse
R53 H413 23.63 Tonnes
Tricor Fenofibrate 48mg EU
Production Building / Warehouse
R53 H413 0.005 Tonnes
USP/EP Sodium Lauryl Sulphate
Production Building / Warehouse
R53 H412 1.9 Tonnes
Trilipix FR 135mg Production Building / Warehouse
R53 H413 0.56 Tonnes
Choline Fenofibrate Warehouse R52 / R53 H413 3.7 Tonnes
Fenofibrate Warehouse R53 H413 1.6 Tonnes
USP/EP Docusate Sodium Warehouse R52 H402 0.2 Tonnes
USP/EP Micronised Fenofibrate (ES)
Warehouse R53 H413 0.2 Tonnes
USP/EP Micronised Fenofibrate (FR)
Warehouse R53 H413 19.9 Tonnes
Fenofibrate USP/EP NonMicronised FR
Warehouse R53 H413 0.4 Tonnes
Ombitasvir GN (EXT) V1 Verkauf
Warehouse R53 H413 0.8 Tonnes
Talc U ABT-333 API (A.998821.5)SP, Non-asbestos containing.
Warehouse R53 H413 1.7 Tonnes
HCV Quad Warehouse N/A H413 3.15 Tonnes (used annually)
ABT450 Extrudate DE Warehouse R22 H413 0.04 Tonnes (used annually)
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 19
ABT267 Extrudate DE Warehouse R22 H413 0.2 Tonnes
API waste Waste store R52 H413 There is a potential for 60 x 200 litre
drums of waste API extrudate to be held in here. In the worst case, if this is 100% API, it would amount
to 12 tonnes of fenofibrate.
All listed quantities are at least a magnitude of value lower than storage thresholds listed in Table 3.9.
Table 3.9: Storage Limits
Risk Phrase
reference
Risk Phrase Reference Storage Threshold (as per
EPA guidance)
Volume Stored
on Site9
R50 Very toxic to aquatic organisms 1 0
R51 Toxic to aquatic organisms 10 0
R52 Harmful to aquatic organisms 100
< 43 R53 May cause long-term adverse
effects in the aquatic environment 1,000
3.5.2 Sensitive receptors
Sensitive receptors for firewater at AbbVie are Carrigtwohill WWTP, groundwater underneath the site and Surfacewater Receptors (i.e. the Great Island Channel).
Firewater reaching Carrigtwohill WWTP would most likely arise in Scenario 1and 2, such firewater would potentially be contaminated with raw ingredients from the process. The only raw material with low degradability is eudragit used for Trilipix tablet coating. The only raw material with R50 – R53 risk phrase is Tricor Fenofibrate 145 mg US, Tricor Fenofibrate 48 mg EU and USP/EP Sodium Lauryl Sulphate. Given that process effluent at AbbVie only receives pH balancing treatment before being discharged into council sewer, trace amounts of fenofibrate are being released into the sewer on continuous basis with no adverse effects on the WWTP. Also, AbbVie effluent has been tested for sludge inhibition, and the results were negative. Therefore, it is unlikely that firewater from Scenario 1 would have long term negative impacts on the Carrigtwohill WWTP.
In all five likely fire scenarios there is a potential that contaminated firewater reaches groundwater underneath the site. It can be assumed that most of the flammable and combustible materials would be burned off before contaminating firewater and reaching groundwater. Furthermore, most of the substances present in the Chemstore, will dissociate/biodegrade rapidly in groundwater, thus any resulting damage to groundwater would be short term and reversible.
In all five likely fire scenarios there is a potential that contaminated firewater discharges to stormwater drains and ultimately discharges to surface water; however, a lot of contaminants would be burned off, and some firewater would soak into the unmade ground areas before reaching the stormwater drains. Therefore, only a portion of firewater would reach stormwater drains and Great Island Channel. In the case of a fire in the production area and warehouse there is a potential that
9 The volume presented is based on materials stored on site. From time to time there are minimal quantities of R50, R51 and R52
materials present which are not included in this calculation. This volume would be less than 30 litres (0.03 m3) associated primarily with
laboratory processes and do not alter the storage limits).
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
60501481 ABBVIE UPDATED FWRA 05-07-2016 ISSUE 2.DOCX
July 2016 Page 20
materials with risk phrases R52 or R53 (waste APIs) would be present in the firewater, however it is noted that the environmental risk rating associated with a fire in this area is not considered high.
4. CONCLUSION AND RECOMMMENDATIONS
The assessment presented in this report demonstrated that risk of adverse impact on the environment caused by firewater is low to medium for the AbbVie site primarily due to the nature and quantity of materials stored at the site:
• The amount of flammable materials stored at site is approximately 39,755 litres comprising
diesel (stored in aboveground storage tanks), oils and greases in Chemstore, solvents in tank
farm and laboratory, and cleaning materials in Chemstore.
• The maximum amount of materials with risk phrases R52 and R53 stored at the site is
approximately 43 tonnes.
• The production building, utilities, product warehouse, laboratory and scale-up facility are
covered by fire alarm and an automatic sprinkler system;
• Chemstore has automatic fire extinguishers and a smoke detector;
• Flammable materials are stored following best practice.
The worst case scenario envisaged would be a fire in the Wastestore (not protected by sprinkler system or automatic fire extinguishers), which would result in firewater potentially contaminated with R52 or R53 reaching the Great Island Channel. Importantly, the likelihood of such fire is low, and the approximate maximum amount of R52 material potentially present is approximately 12 tonnes (nearly 10 times less than the threshold in the EPA Guidance Note).
In conclusion, based on the above assessment and the EPA’s Guidance Note, firewater retention facilities for the AbbVie site at Carrigtwohill, Co Cork are not required.
In order to further reduce environmental risks posed by firewater at the site, AECOM recommends that the following is implemented at the site as a best practice:
• Installation of a manual or an automatic shut off valve at the place where the stormwater drain
exits the site, in order to contain potential firewater or any other potentially contaminated
stormwater leaving the site and entering surface water.
• The site should investigate the feasibility of installing automatic fire extinguishers in the
Wastestore similar to what is installed on the chemstore.
• The site should consider paving the unpaved gravel area immediately around and between the
Wastestore and Chemstore buildings. This would prevent firewater contaminating soil and
groundwater underneath the site. It would also provide protection to soil and groundwater
against spills of hazardous materials.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
FIGURE 1 – SITE LAYOUT
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
CREON DR
EXISTING FACILITY
CANTEENOFFICES
SERVICE AREA
ERT
SECURITY
SHORT TERM
CAR PARK
CAR PARK
ESB
WATER
TANKAHV
PLINTH
GAS
PUMP
HS.
BIO
MASS
CAR PARK
PROPOSED
EXTENSION
PROPOSED PIPE RACK
PROPOSED
SOLUTION &
WASTE TANKS
WAREHOUSE
(BY OTHERS)
THERMAL
OXIDISER
LIQUID
NITROGEN
SKID
TRANSIT
AREA
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE DPSSTEELWORK SPECIFICATION AND SCOPE OF WORKS.
2. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. ALL
DIMENSIONS TO BE CHECKED ON SITE. ENGINEER TO BE INFORMEDIMMEDIATELY OF ANY DISCREPANCIES BEFORE WORK PROCEEDS.
3. ALL LEVELS ARE IN METRES, ALL DIMENSIONS ARE IN MILLIMETRES.
4. ANY DISCREPANCIES TO BE REPORTED TO THE ENGINEER
IMMEDIATELY.5. ALL SETTING OUT INDICATED THUS * IS INDICATIVE ONLY AND
SHOULD BE VERIFIED ON SITE BY THE CONTRACTOR IN CONJUNCTION
WITH THE CONSTRUCTION MANAGEMENT TEAM.
LEGEND
EXISTING BUILDINGS
PROPOSED EXTENSION
PROPOSED PIPE RACK
PROPOSED SOLUTION & WASTE TANKS
PROPOSED LIQUID NITROGEN SKID
WAREHOUSE BY OTHERS
THERMAL OXIDISER
EXISTING CREON DR
EXISTING TRANSIT AREA
THIS DRAWING IS THE PROPERTY OF DPS AND SHALL NOT BE USED, REPRODUCED ORDISCLOSED TO ANYONE WITHOUT THE PRIOR WRITTEN PERMISSION OF DPS AND SHALL BE
RETURNED UPON REQUEST.
PROJECT
TITLE
CLIENT
STATUS
REV DATE DESCRIPTION CHKD.DES.DRN. APPR.
PROJECT No. A1 SCALE
CLIENT DRAWING NO. REVDRAWING NO.
DISCIPLINE
SHT
NOTES
P:\2015\115222\Drawings\3D BIM\Revit\Model\CSA\115222-AbbVie.rvt
CREON DR
PROPOSED SITE LAYOUT
115222-AE-002 A
115222
CONCEPT
ARCHITECTURAL
A 01.03.2016 ISSUED FOR CONCEPT
1:500
SCALE: 1 : 500
PROPOSED SITE LAYOUT
For in
spec
tion p
urpo
ses o
nly.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
APPENDIX A – LIST OF MATERIALS USED AT THE SITE
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Ref.No or
Code
Material/Substance Amount Stored (Tonnes) Annual Usage (Tonnes) Nature of Use Hazard Statement
H373 - May cause damage to organs through prolonged or repeated
exposure
H413 - May cause long-lasting harmful effects to aquatic life
H373
H413 - May cause long-lasting harmful effects to aquatic life
H228
H302
H332
H315
H318
H335
H412 - Harmful to aquatic life with long-lasting effects
H302
H318
H373
H413 May cause long-lasting harmful effects to aquatic life
H302
H318
H373
H413 - May cause long-lasting harmful effects to aquatic life
H302
H318
H373
H412 - Harmful to aquatic life with long-lasting effects
H373
H413 - May cause long-lasting harmful effects to aquatic life
H315
H318
H402 ‑ Harmful to aquatic life
H373
H413 - May cause long-lasting harmful effects to aquatic life
H373
H413 - May cause long-lasting harmful effects to aquatic life
H373
H413 - May cause long-lasting harmful effects to aquatic life
44 Ombitasvir GN (EXT) V1 Verkauf 0.8 Raw Material API H413 - May cause long-lasting harmful effects to aquatic life
45 Talc U ABT-333 API (A.998821.5)SP, Nonasbestos
containing
1.7 1.8 Raw Material API H413 - May cause long-lasting harmful effects to aquatic life
H302
H319
H351
H361
H413 - May cause long-lasting harmful effects to aquatic life
H302
H413 - May cause long-lasting harmful effects to aquatic life
70 ABT267 Extrudate DE 0.2 Raw Material API H413 - May cause long-lasting harmful effects to aquatic life
1
(this is litres)
H290 87 Diphenylamine Solution 3 (this is litres) Lab Analytical Method
85 Potassium Permanganate Lab Analytical Method H410 - Very toxic to aquatic life with long-lasting effects
69 ABT450 Extrudate DE 0.04 Raw Material API
68 HCV Quad 3.15 Drug Product
29 Fenofibrate USP/EP NonMicronised FR 0.4 Raw Material API
25 USP/EP Micronised Fenofibrate (FR) 19.9 79 Raw Material API
24 USP/EP Micronised Fenofibrate (ES) 0.2 Raw Material API
20 USP/EP Docusate Sodium 0.2 1.7 Raw material
16 Fenofibrate 1.6 79 Raw Material API
14 Choline Fenofibrate 3.7 15.6 Raw Material API
13 Trilipix FR 135mg 0.56 23.69 Finished Product
11 Trilipix Choline Fenofibrate 45g US 0.68 2.77 Finished Product
8 USP/EP Sodium Lauryl Sulphate 1.9 4.8 Raw Material
2 Tricor Fenofibrate 48mg EU 0.005 6.39 Finished Product
1 Tricor Fenofibrate 145mg US 23.63 341.21 Finished Product
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
H314
H318
H330
H350
H370
H372
H400 - Very toxic to aquatic life
H402 ‑ Harmful to aquatic life
H302
H319
H335
H410 - Very toxic to aquatic life with long-lasting effects
H351
H360Df
H373
H410 - Very toxic to aquatic life with long-lasting effects
H228
H302
H332
H315
H318
H335
H412 - Harmful to aquatic life with long-lasting effects
H302
H315
H318
H332
H351
H372
H401 - Toxic to aquatic life
H272
H302
H332
H318
H360Df
H373
H410 - Very toxic to aquatic life with long-lasting effects
H290
H302 + H312,
H315
H317
H319
H351
H373
H410 - Very toxic to aquatic life with long-lasting effects
H290
H300 + H310 + H330,
H370
H372
H410 - Very toxic to aquatic life with long-lasting effects
H302
H350
107 Hydrazinium Sulphate Lab Smalls, low quantity Lab Analytical Method
104 Potassium cyanide 0.000026 Lab Analytical Method
100 Hydroxylamine Hydrochloride 0.001 Lab Analytical Method
99 Lead Nitrate 12.9 (this is litres) Lab Analytical Method
98 Potassium Pyroantimonate Lab Smalls, low quantity Lab Analytical Method
96 Sodium Laurel Sulphate Lab Smalls, low quantity Lab Analytical Method
94 Lead Acetate 0.0005 Lab Analytical Method
88 Chlorine Tablets Lab Smalls, low quantity Lab Analytical Method
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
H410 - Very toxic to aquatic life with long-lasting effects
H225
H319
H336
H302
H315
H319
H350
H412 - Harmful to aquatic life with long-lasting effects
H302
H314
H335
H400 - Very toxic to aquatic life
H302
H314
H411 - Toxic to aquatic life with long-lasting effects
H300
H314
H341
H361f
H372
H410 - Very toxic to aquatic life with long-lasting effects
H330
H373
H410 - Very toxic to aquatic life with long-lasting effects
H300 + H310 + H330
H373
H410 - Very toxic to aquatic life with long-lasting effects
H272
H302
H317
H334
H341
H350i
H360F
H410 - Very toxic to aquatic life with long-lasting effects
H350i
H360F
H411 - Toxic to aquatic life with long-lasting effects
H225
H304
H315
H336
H361f
H373
H411 - Toxic to aquatic life with long-lasting effects
H319
H335
H401 - Toxic to aquatic life
H302+H312+H332
H412 - Harmful to aquatic life with long-lasting effects
155 Ammonium Thiocyanate Lab Smalls, low quantity Lab Analytical Method
147 Acetaminophen Lab Smalls, low quantity Lab Analytical Method
143 Hexane 2.5(this is litres) Lab Analytical Method
142 Slica Gel Self Indicating Lab Smalls, low quantity Lab Analytical Method
141 Cobalt (II) Nitrate 0.001 Lab Analytical Method
136 Mercury (II) Iodide Red 0.0001 Lab Analytical Method
135 Mercury (II) Iodide 0.00025 Lab Analytical Method
134 Mercury (II) Chloride 0.00005 Lab Analytical Method
127 Thymol 0.0001 Lab Analytical Method
123 Ammonium hydroxide 8(this is litres) Lab Analytical Method
110 Thioacetamide Lab Smalls, low quantity Lab Analytical Method
109 Acetone 18 (this is litres) Lab Analytical Method
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
H301
H314
H410 - Very toxic to aquatic life with long-lasting effects
H302
H315
H319
H410 - Very toxic to aquatic life with long-lasting effects
H302
H410 - Very toxic to aquatic life with long-lasting effects
H311
H314
H351
H400 - Very toxic to aquatic life
H401 - Toxic to aquatic life
H411 - Toxic to aquatic life with long-lasting effects
H302
H350
H410 - Very toxic to aquatic life with long-lasting effects
H302
H319
H411 - Toxic to aquatic life with long-lasting effects
H373
H411 - Toxic to aquatic life with long-lasting effects
H301+H311+H331,
H373
H411 - Toxic to aquatic life with long-lasting effects
201 Methyl Red 0.00025 Lab Analytical Method H411 - Toxic to aquatic life with long-lasting effects
H225
H304
H315
H336
H410 - Very toxic to aquatic life with long-lasting effects
208 n-Pentane 26(this is litres) Lab Analytical Method
H225
H304
H336
H411 - Toxic to aquatic life with long-lasting effects
222 Potassium hexacyanoferrate trihydrate 0.00025 Lab Analytical Method H412 - Harmful to aquatic life with long-lasting effects
H272
H302
H314
H410 - Very toxic to aquatic life with long-lasting effects
H301
H331
H410 - Very toxic to aquatic life with long-lasting effects
H302
H314
H410 - Very toxic to aquatic life with long-lasting effects
H315
H319
H412 - Harmful to aquatic life with long-lasting effects
256 Zinc Chloride 0.1N Lab Smalls, low quantity Lab Analytical Method
255 Zinc Chloride 0.004 (this is litres) Lab Analytical Method
251 Thorin Lab Smalls, low quantity Lab Analytical Method
232 Silver nitrate 0.1 M 0.00005 Lab Analytical Method
211 Pentane Lab Smalls, low quantity Lab Analytical Method
206 n-Heptane 39(this is litres) Lab Analytical Method
195 Melting Point Standard 4-nitrotoluene Lab Smalls, low quantity Lab Analytical Method
192 Manganese (II) Sulfate Hydrated 0.001 Lab Analytical Method
188 Igepal 0.1(this is litres) Lab Analytical Method
186 Hydrazinium Sulphate Lab Smalls, low quantity Lab Analytical Method
177 Fehling's reagent, solution A 13(this is litres) Lab Analytical Method
170 Dichloroacetic Acid 0.0205(this is litres) Lab Analytical Method
168 Copper Oxide Wire Lab Smalls, low quantity Lab Analytical Method
167 Copper (II) Sulfate 0.001 Lab Analytical Method
160 Benzethonium Chloride 0.00375 Lab Analytical Method
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
H319
H412 - Harmful to aquatic life with long-lasting effects
H319
H412 - Harmful to aquatic life with long-lasting effects
H314
H332
H412 - Harmful to aquatic life with long-lasting effects
H302
H314
H317
H400 - Very toxic to aquatic life
H412 - Harmful to aquatic life with long-lasting effects
272 Klercide x 350 (this is litres) Disinfectant
265 Trifluoroacetic Acid 0.08 Lab Analytical Method
258 Zinc Sulphate 0.1M 0.25 (this is litres) Lab Analytical Method
257 Zinc Sulphate 0.05M Lab Smalls, low quantity Lab Analytical Method
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
APPENDIX B – FIREWATER RISK ASSESSMENT METHODOLOGY
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Firewater Risk Assessment Methodology
Identification of Potential Hazards
For a fire to start, three things are needed: a source of ignition, fuel and oxygen.
Should any of these three elements be missing a fire cannot start.
Some typical sources of ignition that may occur in the assessment area around
the site include:
• Naked flames, i.e. gas or liquid-fuelled open-flame equipment;
• Hot processes/hot work, e.g. welding by contractors or shrink wrapping;
• Heat sources, such as gas, electric, microwaves, radio frequency,
thermal fluids;
• Frictional generated heat from mechanical equipment;
• Static charge from mechanical equipment i.e. pumps;
• Poor electrical installations, i.e. overloads, heating from bunched cables,
damaged cable;
• Faulty or misused electrical equipment;
• Light fittings and lighting equipment, e.g. halogen lamps or display
lighting or overhead lights too close to stored products;
• Hot surfaces and obstruction of equipment ventilation; and
• Spontaneous ignition and self-heating, e.g. oil soaked rags, paint
scrapings.
The main source of oxygen for a fire is in the air around us. Additional sources of
oxygen that may be introduced to the assessment area include:
• Some chemicals (oxidizing materials), which can provide a fire with
additional oxygen and so help it burn.
• Oxygen supplies from cylinder storage and piped systems, e.g. oxygen
used in welding processes.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Identification of People who may be at Risk
The risk assessment considers people who may be at harm including the
following:
• People who are in isolated areas, e.g. maintenance staff, truck drivers;
• People who are unfamiliar with the premises, e.g. contractors, visitors
and customers;
• People in the immediate vicinity of the premises; and
• Emergency response personnel.
Fire Prevention, Detection and Mitigation Measures
As part of a fire risk assessment the following control measures should be taken
into account:
• Fire prevention measures in place.
• Fire protection measures in place.
• Fire fighting equipment and facilities.
• Fire containment measures.
• Emergency preparedness and response.
• Escape routes.
• Signs and notices.
• Recording, planning, informing, instruction and training systems in place
at the facility.
Evaluating the Fire Risk
The risk of a fire occurring is the product of the likelihood of a fire occurring by
the consequence of such a fire.
Risk = Likelihood x Consequence
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Table C1: Likelihood of a fire occurring
Category Definition
1 Very unlikely No fuel source is present at any time or
No ignition source is present at any time.
2 Unlikely No fuel source is present during normal operation or
No ignition source is present during normal operation.
3 Somewhat
unlikely
Fuel source is present at any time.
Low potential for ignition source to be present at any time.
Or
Low potential for fuel source to be present at any time.
Ignition source is present at any time.
4 Probable Fuel source is present at any time.
Moderate potential for ignition source to be present at any time.
Or
Moderate potential for fuel source to be present at any time.
Ignition source is present at any time.
5 Very
probable
Fuel source is present at any time or
Ignition source is present at any time.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Table C2: Consequence of a fire occurring
Category Definition
1 Minor • No risk of injury
• Good fire protection measures in place
• Good fire fighting equipment and facilities in place
• Minor quantities of flammable material in the assessment
area
• Good fire containment measures
• Good emergency preparedness and response
2 Significant • Risk of minor injury
• Adequate fire protection measures in place
• Adequate fire fighting equipment and facilities in place
• Limited quantity of flammable material in the assessment area
• Adequate fire containment measures
• Adequate emergency preparedness and response
3 Severe • Risk of serious injury
• Some fire protection measures in place
• Some fire fighting equipment and facilities in place
• Quantity of flammable material in the assessment area is
equal to the lower tier SEVESO threshold limits.
• Some fire containment measures
• Some emergency preparedness and response
4 Major • Risk of multiple serious injuries or fatality
• Inadequate fire protection measures in place
• Inadequate fire fighting equipment and facilities in place
• Quantity of flammable materials in the assessment area is
above the lower tier SEVESO threshold limits.
• Inadequate fire containment measures
• Inadequate emergency preparedness and response
5 Catastrophic • Risk of multiple fatalities
• Inadequate fire protection measures in place
• Inadequate fire fighting equipment and facilities in place
• Quantities of flammable material in the assessment area are
above the upper tier SEVESO threshold limits.
• Inadequate fire containment measures
• Inadequate emergency preparedness and response
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Table C3: Fire Risk Assessment Matrix
Severity of Consequence L
ikelih
oo
d o
f o
ccu
rren
ce Minor Significant Severe Major Catastrophic
Very unlikely 1 2 3 4 5
Unlikely 2 4 6 8 10
Somewhat
unlikely 3 6 9 12 15
Probable 4 8 12 16 20
Very probable 5 10 15 20 25
Note:
1. Low (4 or less)
2. Medium (5 to 10)
3. High (12 or more)
Environmental Risk Assessment Methodology
In assessing the hazard rating to the aquatic environment the assessment
considered:
• Source: It is important to be clear that in the context of assessing
hazard, source refers solely to the hazardous materials
present on the site. Other site related factors such as
management, the presence or absence of alarms or fail-
safe devices, and the effectiveness of existing primary
containment and any secondary containment relate to
the risk of release of pollutant.
• Pathway: the means by which any pollutant can escape to the
aquatic environment (including both surface and
groundwater). Pathways may be internal (i.e. within the
boundaries of the site) or external.
The assessment defines the pathway in terms of low,
moderate or high transport potential, i.e. short runoff time
between source and surface water or direct drainage
links between source and receiving water or treatment
plant.
• Receptor: humans, animals, fish, plants and biota which would be
affected (directly or indirectly) by the escape of the
pollutants to the receiving water.
The assessment defines the receptor in terms of low,
moderate or high damage potential, i.e. Waters used
extensively for recreational purposes or treatment works
whose function could be adversely affected or whose
capacity overwhelmed by a release of pollutant.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
Evaluating the Environmental Risk
Table C5: Consequence of a fire occurring
Rating
/Score
Category Description
1 Trivial No damage or negligible change to the environment
2 Minor Minor impact/localised or nuisance
3 Moderate Moderate damage to the environment
4 Major Severe damage to the environment
5 Massive Massive damage to a large area, irreversible in medium
term
Frequencies are assigned into bands 1 to 5 using the following scheme:
Table C6: Likelihood of a fire occurring
Rating/
Score
Category Description
1 Very Low Very low chance of hazard occurring in 30 yr period
2 Low Low chance of hazard occurring in 30 yr period
3 Medium Medium chance of hazard occurring in 30 yr period
4 High High chance of hazard occurring in 30 yr period
5 Very High Greater than 50% chance of occurring in 30 yr period
By summing the frequency of events for each consequence or severity level, a
picture of the overall risk on the site may be obtained. The overall cumulative
frequency can be predicted for each severity level and then compared against an
appropriate risk matrix as shown below.
Table C7: Environmental Risk Assessment Matrix
Representative
Frequency
Severity Level
1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
Note:
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:18
1. High Priority: This level of risk could represent an intolerable risk under the company
risk criteria. Action must be taken to reduce the risk to below the intolerable level.
Risks must be brought to the immediate attention of the site.
2. Medium Priority: Priority corrective action should be implemented to reduce the risk
to a lower level. Further studies may be required to determine appropriate risk
reduction measures. Remaining at this level requires concurrence with the site that
the overall risk of this event and other related events is as low as reasonably
practicable.
3. Low Priority: The risks indicated are broadly acceptable. Significant corrective action
or further analysis is not required.
Evaluating the Firewater Risk
Table C4 below details the ratings used to evaluate the firewater risk.
Table C4: Firewater Risk Assessment Ratings
Fire Risk
High
(15 or more)
Medium
(5 to 12)
Low
(4 or less)
En
vir
on
men
tal
Ris
k
High High High Medium
Medium High Medium Low
Low Medium Low Low
Note:
1. High: Firewater runoff containment will be required if further risk reduction measures
are not implemented.
2. Medium: Firewater runoff containment may not be required if further risk
reduction measures are implemented.
3. Low: Firewater runoff containment not required.
For in
spec
tion p
urpo
ses o
nly.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
ABOUT AECOM In a complex and unpredictable world, where growing demands have to be met with finite resources, AECOM brings experience gained from improving quality of life in hundreds of places. We bring together economists, planners, engineers, designers and project managers to work on projects at every scale. We engineer energy efficient buildings and we build new links between cities. We design new communities and regenerate existing ones. We are the first whole environments business, going beyond buildings and infrastructure. Our Europe teams form an important part of our worldwide network of nearly 100,000 staff in 150 countries. Through 360 ingenuity, we develop pioneering solutions that help our clients to see further and go further. www.aecom.com Follow us on Twitter: @aecom
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
Attachment K Decommissioning Management Plan
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
Decommissioning Management Plan for AbbVie Final 28th October 2016
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
ii
Document Control
Status Draft Final Draft Final Final (rev. 1)
Date 27/04/16 28/09/16 26/10/2016 28/10/2016
Version # 1 2 3 4
Written
Approved
This report has been prepared by Environet Consulting Ireland Ltd, with all appropriate care and diligence within the terms of the Contract with the client. This Contract incorporates our Terms and Conditions and takes account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of works. This report is confidential to the client and we accept no responsibility to third parties to whom this report, or any part thereof, is made known. Such parties rely on the report at their own risk.
Dungarvan Business Centre Fairlane Shandon Dungarvan Co. Waterford Ireland Tel: 058-51155 Fax: 058-51231 Email: [email protected] www.environet.ie
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
iii
TABLE OF CONTENTS
1 EXECUTIVE SUMMARY ......................................................................... 5
1.1 Activity Details .................................................................................... 5
1.2 Report Preparation .............................................................................. 5
1.3 Comparison with Previous Plans ...................................................... 5
1.4 Overview of the Plan ........................................................................... 6
1.5 Scoping ................................................................................................ 6
1.6 Cost Summary ..................................................................................... 6
1.7 Financial Provision ............................................................................. 6
1.8 Review .................................................................................................. 6
2 INTRODUCTION ..................................................................................... 7
2.1 Site Description ................................................................................... 7
2.2 Site History .......................................................................................... 8
2.3 Classes of Activity Licensed .............................................................. 9
2.4 Application Requirements ................................................................ 10
3 SITE EVALUATION .............................................................................. 11
3.1 Operator Performance ...................................................................... 11
3.2 Environmental Pathways and Sensitivity ........................................ 12
3.3 Operations ......................................................................................... 13
3.4 Processes .......................................................................................... 14
3.5 Inventory of Main Buildings & Infrastructure ................................. 16
3.6 Inventory of Raw Materials and Products ....................................... 19
3.7 Annual Waste Arisings ..................................................................... 20
3.8 Major Plant & Equipment .................................................................. 22
4 CLOSURE TASKS AND PROGRAMMES ............................................ 26
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
iv
5 CRITERIA FOR SUCCESSFUL CLOSURE ......................................... 27
6 CLOSURE PLAN VALIDATION ........................................................... 28
7 CLOSURE PLAN COSTING ................................................................. 29
8 CLOSURE PLAN UPDATE AND REVIEW ........................................... 33
9 RESTORATION/AFTERCARE MANAGEMENT PLAN ........................ 34
10 FINANCIAL PROVISION ...................................................................... 34
SITE LAYOUT PLAN .................................................................................... 35
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
5
1 Executive Summary
1.1 Activity Details
Name: AbbVie Limited
Address: IDA Industrial Estate, Carrigtwohill, Co. Cork
Activity (proposed): 12.2.1 The surface treatment of substances,
objects or products using organic solvents, in
particular for dressing, printing, coating,
degreasing, waterproofing, sizing, painting,
cleaning or impregnating, with a consumption
capacity of more than 150 kg per hour or more
than 200 tonnes per year.
1.2 Report Preparation
This report was prepared on behalf of the operator by Environet Solutions.
Environet Solutions
Dungarvan Business Centre
Dungarvan
Co. Waterford
1.3 Comparison with Previous Plans
This will be the first Decommissioning Management Plan (DMP) for the site as
previously site activities were not specified in the First Schedule to the
Environmental Protection Agency Act 1992, as amended.
Year Cost Financial Instrument Expiry of Financial
Instrument
2016 €2.5M To be agreed with the
Agency
No time limit
Table 1: Decommissioning Management Plan History
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
6
1.4 Overview of the Plan
This DMP was prepared in accordance with the EPA documents ‘Guidance on
Assessing and Costing Environmental Liabilities’, 2014 and ‘Guidance on
assessing and costing environmental liabilities Unit cost rates for verification’,
2014.
1.5 Scoping
Based on all available documentation it has been determined that the site has
no potential long term environmental liabilities and there has been no history
of spillages resulting in soil or groundwater contamination (see Baseline
Report from Bluerock Environmental and Groundwater Monitoring Report
2015 from consultants AECOM in Attachment I.4 of the IE Licence
Application). Therefore, a clean closure is envisioned for the site and neither
restoration nor aftercare management are expected to be required post
closure.
1.6 Cost Summary
The total cost associated with the closure, restoration and aftercare
management of the facility has been estimated to be €2.5M.
1.7 Financial Provision
AbbVie confirms that costs associated with the management of all liabilities
from decommissioning and aftercare will be underwritten. AbbVie will agree
with the EPA the form of financial instrument to be put in place.
Type Description Source/Method
of Quantification
Amount of
Provision
Financial
Instrument
Known liabilities
associated with the
closure of the site
As detailed
in this DMP
As detailed in
Table 10 of this
report
€2.5 M To be agreed with
the Agency
Table 2: Financial Instrument
1.8 Review
This closure and restoration/aftercare plan will be reviewed annually and any
updates will be notified to the EPA.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
7
2 Introduction
2.1 Site Description
The site is situated approximately 1 km west of the centre of Carrigtwohill, Co.
Cork, a town with a population of approximately 7,000. Carrigtwohill is located
approximately 10km to the east of Cork city and 6km to the west of Midleton.
The existing development has a total building area of approximately 14,000m2
over two stories. The total site area at AbbVie is c. 5 ha. The total
hardstanding area of the site, including buildings’ roofs, roads and paved
ground, is c. 2 ha.
The principal buildings on-site at present are identified below:
Production buildings;
Up-scale facility (process development);
Laboratory;
Product warehouse for storing finished products;
Offices and canteen;
Waste store building;
Chemstore building;
Boiler room;
Effluent treatment facility;
Fire pump house;
Electrical switch-rooms.
Approximately 135 permanent staff are currently employed at AbbVie. Staff
numbers may increase to 175-195 by 2020-2021 following commissioning and
commencement of commercial operations in the new Creon DR Production
building. In addition to the permanent staff, approximately 30-40 contract staff
are routinely on-site supporting projects and commercial volume. The plant
operates a combination of days, 24-hours, five and seven day operations.
AbbVie has a 24-hour security presence on-site at all times. Access to the
facility is controlled via secured access gates.
A Site Layout Plan is included as an appendix to this report and a Site
Location Map is included in Attachment B.2 to the IE Licence Application.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
8
2.2 Site History
Table 3 gives an overview of many of the main activities and events at the site
since 1978.
Date History
1978 The site was first developed by Island Pharmaceuticals for
blending and packaging of powder form pharmaceuticals.
1987 Jouvenal Manufacturing took over the site.
1988 Jouvenal began production of their anti-biotic nasal.
1997 Warner Lambert acquisitioned Jouvenal Manufacturing.
2000 Pfizer acquisitioned Warner Lambert and used the facility for
storage.
2001 Site was purchased by Fournier Laboratories who expanded the
site by adding a tabletting plant including production,
warehousing, staff & office areas, laboratory, services, security
& utility buildings, tank & assoc. works.
2002 There was more investment with an extension to the main
building to provide additional production rooms & associated
equipment accommodation and extension to boiler house.
2004 The site completed commissioning and went into full production
of Fenofibrate tablets. Further expansion with construction of
new three storey office and laboratory building with enclosed
link corridor to existing facility and a temporary prefabricated
administration building.
2005 Solvay Pharmaceuticals acquisitioned Fournier Laboratories.
2006 There was significant investment and two new production
facilities were constructed. This included the construction of 2
storey extension to existing manufacturing building comprising
of production and plant space and alterations to existing
gowning suite and associated works including drainage, hard
standings, bund, extension to car-parking and roadways and
provision of footpaths.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
9
Date History
2007 Further investment Construction of first floor laboratory
extension to existing research and development laboratory
building, concrete apron, footpath and associated site works.
2010 Abbott acquisitioned Solvay Pharmaceuticals. Production
continued as before.
2013 AbbVie becomes an independent company.
2016 AbbVie applied to the EPA for an IE Licence.
Table 3: Site Operational History
2.3 Classes of Activity Licensed
AbbVie is applying for an IE licence to the EPA for the following activity;
12.2.1 The surface treatment of substances, objects or products using
organic solvents, in particular for dressing, printing, coating,
degreasing, waterproofing, sizing, painting, cleaning or impregnating,
with a consumption capacity of more than 150 kg per hour or more than
200 tonnes per year.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
10
2.4 Application Requirements
The preparation of the Decommissioning Management Plan (DMP) is a
requirement under the IE licence Application (the Environmental Liability
Directive (2004/35/EC):
‘Describe the existing or proposed measures to minimise the impact
on the environment after the activity or part of the activity ceases
operation, including provision for post-closure care of any potentially
polluting residuals.
There is an explicit requirement in EU and Irish law for financial
provision for landfills and extractive waste facilities. For new activities
subject to the requirements of the Landfill Directive (1999/31/EC) and
the Extractive Waste Directive (2006/21/EC) that are not already
licensed by the Agency, state whether the following have been
prepared:
- an Environmental Liabilities Risk Assessment (ELRA);
- a Closure, Restoration and Aftercare Management Plan
(CRAMP); and
- a proposal for Financial Provision that covers all liabilities
identified in the ELRA and CRAMP.
Regard should be had by applicants to relevant Agency guidance on
these matters.
The Agency may prioritise other sectors (e.g. contaminated land, risk
of waste facility closure liabilities, risk based on Seveso classification)
and require the preparation of a proposal for financial provision before
making a decision on a licence application. Applicants are advised to
discuss the requirement for financial provision with the Agency prior to
making an application.’
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
11
3 Site Evaluation
3.1 Operator Performance
The AbbVie site operates an Environmental Management System certified to
ISO 14001, Health and Safety Management System certified to OHSAS
18001 and Energy Management System certified to ISO 50001.
AbbVie is committed to implementing and employing the highest EHS
standards. Environmental awareness is a priority of the company. The
Environmental Health & Safety (EHS) Manager and EHS Department ensures
that day-to-day operations of the facility are conducted with minimal risk of
harm to humans and the environment.
AbbVie prepares an annual Environmental Management Programme, which is
fully integrated into the site management system. Targets are set, for between
one and five years, for the programme objectives. At the end of each year the
progress against the targets is formally reviewed at senior management level.
The programmes are adjusted as required in the light of ongoing experience
and advances in knowledge and technology. Targets and goals in the
programmes are set to ensure that resources and systems are put in place to
achieve the targets. The success of the programme is measured by the
effectiveness of the systems installed, as well as results in meeting targets. A
copy of the Annual Environmental Report is made available on request to the
general public.
Prior to the issuing of an IE Licence, the site’s activities, in terms of effluent
management and the resulting wastewater discharges, have been deemed
appropriate to be licenced under Section 16 of the Local Government (Water
Pollution) Acts 1977 to 2007. The site currently operates under a Discharge to
Sewer (DTS) License from Irish Water; Licence Number (Reg. Ref.): IW-DTS-
685667-01 which was issued in 2014. Previous to this, the site operated under
a Trade Effluent Licence issued by Cork County Council (Licence No. W.P (S)
09/05).
In general, Environet Solutions found the site to be very well managed and
highly compliant with the requirements of its DTS Licence.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
12
3.2 Environmental Pathways and Sensitivity
The bedrock geology in the area consists of Dinantian Lower Impure
Limestones and Dinantian Pure Unbedded Limestones. Groundwater
vulnerability is classified as High (on a scale of Low, Moderate, High,
Extreme) and is located on a gravel aquifer which has been classified as
Regionally Important - Karstified (diffuse) (Rkd). In general groundwater is
assumed to follow the local topographical gradient, migrating southward and
ultimately discharging to Cork Harbour. There are no discharges to ground
from the AbbVie facility.
A stream (Tibbotstown 010) runs north to south through the industrial estate
(within 100m of the site) from Anngrove to join the Slatty Water at Slatty
Bridge, 800 m south of the site. The EPA Map Viewer lists the River
Waterbody WFD status this stream as ‘unassigned’. There are no emissions
from the site to this stream.
The site discharges pre-treated process effluent to County Council Sewer.
Surface waters are continuously monitored and discharged, via the local
authority network, to the Slatty River Estuary (Slatty Water) which in turn
feeds into the Great Island Channel, part of Cork Harbour.
Uncontaminated surface water is discharged, via the Local Authority
stormwater sewer, to the Slatty Water which is situated approximately 800m
southwest of the site. Slatty Water is part of the Great Island Channel Special
Area of Conservation (site code 001058), the Cork Harbour Special Protection
Area (site code 004030) and is a proposed Natural Heritage Area. The Slatty
Waters are part of Lough Mahon which itself forms part of Cork Harbour.
Lough Mahon has a Transitional Waterbody WFD Status 2010-2012
designation of Poor.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
13
3.3 Operations
The operation is a modern bulk tablet finish facility, manufacturing solid and
capsule formulation using state-of-the-art technology. The facility specialises
in Active Pharmaceutical Ingredient (API) particle size reduction resulting in
lower dosage formulations. The highly sophisticated technology on-site
enables delivery of products and processes from small scale clinical trial
supply to larger commercial manufacturing. AbbVie’s focus is on developing
medicines that can provide strong clinical performance, measurable patient
benefit and economic value, particularly in areas where there is significant
need, such as hepatitis C, neuroscience, immunology, oncology, chronic
kidney disease, cardiovascular disease and women’s health.
The processes employed on-site include milling, blending, granulation, drying,
sieving, tableting, coating and packaging. The site also operates a 1/10th
scale-up facility.
Most of the raw materials used for production are solids (powder or granules)
which are mixed with purified water or solvent. Currently, the facility is used
for the commercial manufacture of six solid oral dose products for human use:
TriCor - is a film coated tablet manufactured in two dosage
strengths (145mg and 48mg)
TriLipix - is manufactured as a 135mg and 45mg capsule
Kaletra - is a single strength film coated tablet (200mg/ 50mg)
Cholib - is a film coated tablet manufactured in two dosage
strengths 145/20 mg and 145/40 mg
Viekirax - is a single strength film coated tablet (12.5/75/50 mg)
Aluvia - is a Red film coated tablet, manufactured in one strength,
200mg/50mg.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
14
3.4 Processes
The processes employed on-site include milling, blending, granulation, drying,
sieving, tableting, coating and packaging. A generic description of the current
processes used in the manufacture of the existing products is as follows:
Material Purchasing
Receipt to Warehouse
Sampling and Testing
Dispensing
Milling
Sieving
Blending
Compression into tablets
Coating of tablets
Packing
Receipt into Warehouse
Material Purchase
The first step is to purchase the Raw Material. The purchasing department
carries out this function by placing a purchase order with the supplier.
Receipt into Warehouse
On receipt of delivery the material is received into the warehouse. It is visually
inspected by the Warehouse Operator. The Warehouse Operator enters the
material details onto SAP and labels the material as per Goods Receipt from
Suppliers procedure.
Sampling/Testing by Quality Control
The material is sampled by the Quality Control department in accordance with
Sampling of Raw Materials procedure. The material is tested and assigned a
status in accordance with the Receipt, Testing & Approval of Samples in the
QC Laboratory procedure. Once the material is assigned a status by the
Quality Department, the material is placed in the appropriate location.
Dispensing
The material is now available to be dispensed. Dispensing is carried out in
accordance with general dispensing procedure. The residual weight (where
applicable) is calculated, and attached to the container.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
15
Batch Assembly
Materials that have been dispensed are correctly labelled and held in the
designated batch assembly area until further processing occurs.
Milling/ Nano-milling
The dispensed extrudate is milled in the mill in accordance with the appropriate procedure to reduce the particle size.
Sieving/Sifting
A portion of the milled extrudate along with the dispensed quantities of other
required raw materials are sieved or sifted and then combined with the
remaining milled extrudate.
Blending
The mixture is charged to an IBC and then blended with extranular excipients
to afford blended material suitable for compression into a matrix tablet. The
Blend is then weighed.
Compression
This blend is then compressed to form uncoated tablets. Tests for weight
(individual and average), hardness, thickness and visual are performed on the
uncoated tablets to ensure they are of the correct quality.
Coating
The uncoated tablets are coated in accordance with the relevant procedural
method. The tablets are tested for mass and are also visually inspected during
the coating process.
Packing
The Finished Product tablets or capsules are packed in accordance with
packaging procedures.
Receipt into Warehouse
The finished products are received into the warehouse.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
16
3.5 Inventory of Main Buildings & Infrastructure
The table below lists the main buildings located at the facility. During the site
audit there was no evidence of asbestos containing materials being present in
roofing materials or pipe lagging. Site management confirmed that to their
knowledge asbestos containing materials are not present at the site.
Building Construction Area
Sq.m Activity
Ground Floor
WH1 Production
Building
Steel frame & 70mm Kingspan profile
insulated PIR cladding
760 Production
Boiler House Steel frame & 70mm Kingspan profile
insulated PIR cladding
385 Power and heat
generation
Offices Concrete block 530 Administration
Warehouse Concrete block with single skin external
cladding facade
2,480 Storage
Transit Area Steel frame & 70mm Kingspan profile
insulated PIR cladding
365 Goods In/Out
Scale-up Facility Cleanroom panel with Rockwool fill 405 Product
Development
Waste
Compound
Steel frame & single skin profile cladding 360 Waste Storage
Offices &
Canteen
Portacabin structures 840 Storage
Trilpix & Train B
Production
Cleanroom panel, steel stud with 3mm
sheetrock. Steel frame with PIR insulated
cladding external.
3,220 Production
Creon Dr
Production (due
for completion
early 2018)
Cleanroom panel, steel stud with 3mm
sheetrock. Steel frame with PIR insulated
cladding external.
1,808 Production
Security & First
Aid Building
Concrete block & 70mm Kingspan profile
insulated PIR cladding.
72 Site Security &
First Aid
First Floor
QC Laboratories
& Offices
Roof: 50mm steel deck with I x layer PIR
insulation and 2 x layers of torch-on felt
Walls: Concrete block with metal stud
partition (internal). 70mm Kingspan profile
insulated PIR cladding (external).
Floor: Concrete slab
1,005 Quality Control
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
17
Building Construction Area
Sq.m Activity
Equipment Room Roof: 50mm steel deck with I x layer PIR
insulation and 2 x layers of torch-on felt
Walls: 70mm Kingspan profile insulated PIR
cladding (external).
Floor: Concrete slab
3,380 Production
Total 15,610
Table 4: Inventory of Main Buildings
AbbVie keeps an inventory of all process tanks on-site. Table 5 below lists all
external tanks on-site and Table 6 lists all internal tanks on-site. All laboratory
chemicals are stored within designated self-contained flame proof cabinets
with the laboratories and are not included in the tank inventory in Table 6
below.
Location Description Capacity (litres)
External Fire Water Tank 500,000
External Virgin Acetone solvent (proposed) 30,000
External Effluent Holding Tank (proposed) 30,000
External Diesel tank 1 1,500
External Diesel tank 2 1,500
Table 5: External Tanks
Tank Description Construction Material
Contained
Capacity
(litres)
CIP Holding Tank Stainless Steel CIP washings 450
CIP Holding Tank Stainless Steel CIP washings 450
Nitrogen Skid Tank Carbon Steel Nitrogen gas 750
Nitrogen Skid Tank Stainless Steel Nitrogen gas 750
Nitrogen Skid Tank Stainless Steel Nitrogen gas 2,000
Nitrogen Skid Tank Stainless Steel Nitrogen gas 2,000
Nitrogen Skid Tank Stainless Steel Nitrogen gas 2,000
Nitrogen Skid Tank Stainless Steel Nitrogen gas 2,000
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
18
Tank Description Construction Material
Contained
Capacity
(litres)
Purified Water Skid Tank Stainless Steel Purified Water 100
Purified Water Skid Tank Stainless Steel Purified Water 10,000
Purified Water Skid Tank Stainless Steel Purified Water 1,000
Purified Water Skid Tank Stainless Steel Purified Water 1,000
Purified Water Skid Tank Stainless Steel Purified Water 2,000
Purified Water Skid Tank Stainless Steel Purified Water 1,500
Purified Water Skid Tank Stainless Steel Purified Water 1,000
Purified Water Skid Tank Stainless Steel Purified Water 450
Purified Water Skid Tank Stainless Steel Purified Water 450
Nitrogen Skid Tank Stainless Steel Nitrogen gas 1,000
Nitrogen Skid Tank Stainless Steel Nitrogen gas 1,000
Nitrogen Skid Tank Stainless Steel Nitrogen gas 230
Chilled Water Tank Stainless Steel Purified Water 15,000
R25 M101-TA-001 Stainless Steel TBC 1,000
R26 M104-TA-002 Stainless Steel Water 1,000
R204 M302-TA-007 Stainless Steel Slurry Prep. 1,700
R204 M302-TA-004 Stainless Steel Slurry Prep. 450
R204 M302-TA-006 Stainless Steel Slurry Prep. 1,700
R205 M302-TA-002 Stainless Steel TBC 1,000
R208 M302-TA-005 Stainless Steel Slurry Prep. 1,000
R208 M302-TA-001 Stainless Steel Slurry Prep. 1,000
R208 M302-TA-003 Stainless Steel Slurry Prep. 1,000
R303 M102-TA-001 Stainless Steel Water 1,000
R303 M102-TA-002 Stainless Steel Water 1,000
Solution Prep Tanks x 6 Stainless Steel Aqueous based
coating solution
200
R94 Condensate Tank (U-801-CL-001) Stainless Steel Condensate 500
R94 Hot Water Cylinder (U-801- CL-001) Stainless Steel Water 1,000
Glycol Tank - Plant Room Stainless Steel Water 21,700
Purified Water Tank Plant Room - U58 -1 Stainless Steel Purified water 10,000
Table 6: Internal Tanks
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
19
3.6 Inventory of Raw Materials and Products
Table 7 below is an estimate of raw material stored on-site.
In order to arrive at an estimated cost of waste removals it has been
conservatively assumed that 100% of the raw materials inventory, chemicals
and fuels will need to be removed as part of the DMP process.
It is envisaged that all finished products will be shipped to an AbbVie sales
distribution centre as part of the decommissioning process.
Type Hazardous
(Y/N)?
Storage Area Storage Type Maximum
Storage
Capacity
(tonnes)
Disposal/
Recovery
Option
Solvents Y Chemical Store
& Tank
Bunded Tank &
Store
30 Disposal/
Recovery
Cleaning Materials Y Cleaning Store Chemical Cabinets
& Bunded Pallets
4 Disposal/
Recovery
Equipment
Lubricants
Y Chemical Store Bunded Store 0.5 Disposal/
Recovery
Raw Materials N Warehouse Palleted
Warehouse
200 Disposal/
Recovery
API Raw Material Y Warehouse Palleted
Warehouse
65 Disposal/
Recovery
Finished Product N Warehouse Palleted
Warehouse
10 Shipped to
Customers
Laboratory
Chemicals
Y Labs Flammables
Cabinets
2 Disposal/
Recovery
Effluent Treatment
Chemicals
Y WWTP Bunded Tank 2 Disposal/
Recovery
Fuels Y External Double skinned
tank
3 Disposal/
Recovery
Packaging N Warehouse Palleted
Warehouse
10 Disposal/
Recovery
Table 7: Inventory of Materials
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
20
3.7 Annual Waste Arisings
Table 8 below contains a list of all waste materials generated at the site in
2015. For the purposes of the DMP we assume that 50% of this material will
require disposal in a closure scenario.
Waste Description EWC Code Hazardous
(Y/N)
Quantity
produced
t/annum
Sodium and potassium hydroxide 06 02 04* Y 0.349
Other bases 06 02 05* Y 0.005
Other organic solvents, washing liquids and mother
liquors
07 05 04* Y 0.456
Solid wastes containing hazardous substances 07 05 13* Y 50.518
Wastes not otherwise specified 13 08 99* Y 0.026
Paper and cardboard packaging 15 01 01 N 9.180
Plastic packaging 15 01 02 N 10.540
Packaging containing residues of or contaminated by
hazardous substances
15 01 10* Y 0.596
Absorbents, filter materials (including oil filters not
otherwise specified), wiping cloths, protective clothing
contaminated by hazardous substances
15 02 02* Y 10.934
Discarded equipment containing hazardous
components1 other than those mentioned in 16 02 09
to 16 02 12
16 02 13* Y 1.042
Inorganic wastes containing hazardous substances 16 03 03* Y 0.164
Organic wastes containing hazardous substances 16 03 05* Y 1.928
Organic wastes other than those mentioned in 16 03
05
16 03 06 N 2.720
Gases in pressure containers (including halons)
containing hazardous substances
16 05 04* Y 0.012
Laboratory chemicals, consisting of or containing
hazardous substances, including mixtures of
laboratory chemicals
16 05 06* Y 0.613
Discarded inorganic chemicals consisting of or
containing hazardous substances
16 05 07* Y 0.013
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
21
Waste Description EWC Code Hazardous
(Y/N)
Quantity
produced
t/annum
Discarded organic chemicals consisting of or
containing hazardous substances
16 05 08* Y 24.912
Peroxides, for example hydrogen peroxide 16 09 03* Y 0.039
Wastes whose collection and disposal is subject to
special requirements in order to prevent infection
18 01 03* Y 0.006
Biodegradable kitchen and canteen waste 20 01 08 N 7.534
Fluorescent tubes and other mercury-containing
waste
20 01 21* Y 0.077
Mixed municipal waste 20 03 01 N 16.280
Table 8: Annual Waste Arisings
In 2015, total hazardous waste generated at the site was approximately 90
tonnes and total non-hazardous waste was approximately 50 tonnes. Site
Management has confirmed that no PCBs or Asbestos Containing Materials
are expected to be present on-site.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
22
3.8 Major Plant & Equipment
An inventory of all major plant and equipment is provided in Table 9 below.
Plant/Equipment Location
Sprinkler System Plant Room
Chiller Plant Room
Pre-filter steam air heater Plant Room AHU
Humidifier for process air Plant Room AHU
Dehumidifier for process air Plant Room AHU
Final HEPA Filter for process air Plant Room AHU
Pre-filter steam air heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
LIFT SYSTEM In Main Bldg
Pre Filter steam air heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
Pre-filter Steam Air Heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
Pre-filter steam air heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
Pre filter steam air heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
Pre filter steam air heater Plant Room
Humidifier Plant Room
Dehumidifier Plant Room
HEPA Filter Plant Room
Pre-filter steam air heater Roof of Labs
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
23
Plant/Equipment Location
Humidifier Roof of Labs
Dehumidifier Roof of Labs
HEPA Filter Roof of Labs
Purified Water Distribution Loop Plant Room
AHU001 Plant Room
AHU002 Plant Room
AHU003 Plant Room
Chiller Roof
AHU 3501 Plant Room
AHU 901 Plant Room
HVAC Ducting Plant Room
HVAC Ducting Plant Room
Warehouse AHU Warehouse 2
Production Skid Production
VSD Drive Production
CIP System Central Technical Corridor
Wash Water preparation station Central Technical Corridor
Steam Heating System for wash water Central Technical Corridor
Coating Unit Production
Pressurisation Unit Plant Room
Hot Water Skid Plant Room
Chemical Dosing Skid Plant Room
Pumping Skid Plant Room
Loop realisation and UV Boards Plant Room
Tablet Press Production
Tablet Press Production
Post Hoists 1200kg Production
Frame for sifter Production
Post Hoists 1200kg Production
Cond Receiver 2 Eastern Tech Corridor
Post Hoist Eastern Tech Corridor
Sifter Production
Validation Coater Plant Room
Dryer Production
Co-Mill Production
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
24
Plant/Equipment Location
Fume Hoods Outside Room 67
Compressor 1 Plant Room
Compressor 2 Plant Room
Receiver Plant Room
Dryer 1 Plant Room
Dryer 2 Plant Room
UPS Battery Room Main Bldg - UPS Room
TCM Modules Skids Niro Vessel A Plant Room
TCM Modules Skids Niro Vessel B Plant Room
Top Spray Coater Plant Room
Tablet Press Production
Dust Extraction Plant Room
Tablet Coater Production
IBC Washer Plant Room
Pure Water Storage Vessel Pre Treatment skid 1 Plant Room
Coating Soln. LAF Booth Production
Weigh Scales Technical Corridor
Tablet Press Post Hoist Production
Sifter Room Post Hoist Production
Boiler Boiler Room
Mill Production
Granulator Production
Dryer Production
Dryer Machine Tower Production
Inlet Air Handler Plant Room
Exhaust Air System Plant Room
CIP Skid Plant Room
Capsule Filling Machine Production
Blender Production
Powder Transfer System Production
Post Hoist 1 Central Technical Corridor
Post Hoist 2 Production
Separator Production
Chiller 1 Roof
Chiller 2 Roof
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
25
Plant/Equipment Location
CIP Skid Pilot Plant
Tablet Press Production
Post Hoist Production
Pre Treatment Skid Plant Room
Nitrogen Generator Plant Room
Nitrogen Plant Skid Plant Room
Compressor Plant Room
Chiller External
Ozone Generator Plant Room
Effluent Pumping Station 1.5M Chamber & Inlets Effluent Building
Dispensary Room Hoist Production
Dispensary Room Hoist Production
QC Fumehood QC Lab
Hoist Production
Nitrogen Generator & Air Compressor Plant Room
Air Compressor QC Lab 3
Mill Production
Nitrogen Skid Plant Room
Hoists Production
Hoists Production
Hoists Production
Biomass Boiler Biomass Boiler House
Mill Production
Comill Production
Table 9: Inventory of All Major Plant and Equipment
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
26
4 Closure Tasks and Programmes
This section focuses on the closure aspects for the activity. The closure plan
includes the decommissioning and decontamination of all of the structures
and the management and safe removal of any residuals arising as a result of
decommissioning.
The purpose of the closure process is to ensure that the site no longer poses
a risk of environment pollution and is considered to be environmentally inert.
It is not envisaged that any of the plant and/or equipment will have to be
demolished. These elements, once decommissioned and decontaminated, will
be tested to ensure there is no risk of environmental pollution remaining. The
following steps will be carried out in sequential order to achieve closure of the
production area of the site:
Decontamination and decommissioning of production buildings using
standard clean in place (CIP) procedures. All wash waters discharged
to Carrigtwohill WWTP for treatment. All residual waste and materials
removed to waste storage areas.
Emptying of warehouses and decontamination of warehouse buildings.
Raw materials, chemicals and fuels labelled and dispatched to waste
storage areas. Finished products will be forwarded to customers.
Emptying, decontamination and decommissioning of tanks. No
residuals to remain in tanks or pipelines. Residuals to be treated on-
site or recovered/disposed off-site at appropriate facilities. Shutdown,
decontaminate and decommission boilers. Residual fuels to be
removed from tanks and pipelines.
Removal of all residual waste to waste storage areas.
Clear and clean all office and administration areas. WEEE to be
removed by suitably permitted operator. All other wastes to be
dispatched to waste storage areas.
It is expected that the above operations will take approximately 26
weeks. Tasks and timings are detailed in Section 7 of this report.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
27
5 Criteria for Successful Closure
The following criteria have been established to set the benchmark for the
successful closure of the site:
All plant will be safely decontaminated using standard procedures and
trained personnel;
All waste will be handled, packaged, temporarily stored, recovered
and/or disposed of in a manner which complies with regulatory
requirements and best practice;
All relevant records relating to movement, transfer or disposal of waste
will be managed and retained throughout the closure process and will
be available for review by the EPA;
No soil within the site boundary will be contaminated to a level that
poses a risk to human health or neighbouring properties;
Access to monitoring locations will be maintained at all times during the
closure process;
The site will remain in compliance with its IE licence during the closure
process and until the date of licence surrender;
That any remaining issues are closed out in a timely manner following
the EPA site closure audit;
That the site is left in an environmentally inert state;
That sufficient funds are available to cover the full cost of closure.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
28
6 Closure Plan Validation
Once the closure plan has been implemented the licensee will arrange for an
Independent Closure Audit (ICA) to be carried out by an independent third
party consultant. The qualification and experience of the independent auditor
will be provided and agreed with the EPA prior to the ICA commencing. The
scope of the audit will be agreed in advance with the EPA and, following
approval, the chosen independent auditor will complete the validation audit.
The completed Validation Audit report will be submitted to the EPA for
approval.
The EPA may then elect to carry out a final closure audit to verify compliance.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
29
7 Closure Plan Costing
Closure plan costing is presented in Table 10 below:
Task Description Quantity Unit Unit Rate (€)
Cost (€) Source
Plant & Equipment Decontamination Tank decontamination 1–5 tonne 20 unit 1 1,200 24,000 AbbVie
Tank decontamination 5–20 tonne 1 unit1 2,500 2,500 AbbVie
Tank decontamination 20-50 tonne 5 unit1 6,000 30,000 AbbVie
Tank decontamination 50–100 tonne 1 unit1 10,000 10,000 AbbVie
Decontamination of utilities (chillers, boilers, cooling towers, generators, transformers, etc.)
10 day 2 2,400 24,000 AbbVie
In-situ bunds 5 day 2,200 11,000 AbbVie
Misc. Chemical & Storage Tanks 5 day 2,200 11,000 AbbVie
Decontamination of Buildings/Areas Creon DR Production 10 day 2,200 22,000 AbbVie
Trilpix Production 10 day 2,200 22,000 AbbVie
Train B Production 10 day 2,200 22,000 AbbVie
Scale-up Facility 5 day 2,200 11,000 AbbVie
QC Laboratories 5 day 2,200 11,000 AbbVie
Equipment Room 5 day 2,200 11,000 AbbVie
Air Abatement Equipment 10 day 2,200 22,000 AbbVie
Boiler House 2 day 2,200 4,400 AbbVie
Site Drainage Cleaning 6 day 2,200 13,200 AbbVie
Decommissioning of Buildings/Areas Trilpix Production 20 day 2,200 44,000 Mech. Contractor
Train B Production 20 day 2,200 44,000 Mech. Contractor
1 Assumes 1 supervisor & 3 operatives 2 Assumes 1 supervisor & 5 operatives
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
30
Task Description Quantity Unit Unit Rate (€)
Cost (€) Source
Creon DR Production 20 day 2,200 44,000 Mech. Contractor
Scale-up Facility 20 day 2,200 44,000 Mech. Contractor
QC Laboratories 10 day 2,200 22,000 Mech. Contractor
Equipment Room 10 day 2,200 22,000 Mech. Contractor
Air Abatement Equipment/HVAC 20 day 2,200 44,000 Mech. Contractor
Thermal Oxidiser 10 day 2,200 22,000 Mech. Contractor
Boiler House 10 day 2,200 22,000 Mech. Contractor
Wastewater Treatment Plant Equipment 5 day 2,200 11,000 Mech. Contractor
Plant & Equipment Transport & Disposal
WEEE Removal 40 tonne 60 2,400 Mech. Contractor
Plant & Equipment transport 250 tonne 60 15,000 Mech. Contractor
Recovery cost (note nil cost) 290 tonne - - Mech. Contractor
Non-Hazardous & Hazardous Waste
Removal (>1 tonne) 3 Non-halogenated organic solvents, washing liquids and mother liquors 4 0.5 tonne 450 225 Waste Contractor
solid wastes containing hazardous substances 25.3 tonne 400 10,120 Waste Contractor
paper and cardboard packaging 4.6 tonne 100 460 Waste Contractor
plastic packaging 5.3 tonne 100 530 Waste Contractor
absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by hazardous substances
5.5 tonne 700 3,850
Waste Contractor
organic wastes other than those mentioned in 16 03 05
1.4 tonne 400 560 Waste Contractor
discarded organic chemicals consisting of or containing hazardous substances
12.5 tonne 450 5,625 Waste Contractor
biodegradable kitchen and canteen waste 3.8 tonne 100 380 Waste Contractor
3 Assuming 50% of waste arisings for the year will require removal 4 Assuming the max. volume that can be stored on-site is 30 m3
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
31
Task Description Quantity Unit Unit Rate (€)
Cost (€) Source
mixed municipal waste 8.1 tonne 100 810 Waste Contractor
Residual waste from decontamination Phase 200 tonne 350 70,000 Waste Contractor
Materials Removal
Off-site transport and disposal/recovery of residual fuels
3 tonne 130 390 Waste Contractor
Solvents, chemicals & lubricants disposal/recovery
35 tonne 450 15,750 Waste Contractor
API Raw Materials disposal 65 tonne 200 13,000 Waste Contractor
Raw Materials disposal/recovery 200 tonne 120 24,000 Waste Contractor
Packaging disposal/recovery 10 tonne 100 1,000 Waste Contractor
Environmental Monitoring Wastewater Monitoring (Weekly) 26 sample 320 8,320 AECOM
Post-closure groundwater sampling 2 sample 2,600 5,200 AECOM
Validation Audit Consultant 9 day 900 8,100 Environet
Management Costs Utilities (assuming production has ceased) 6 month 50,000 300,000 AbbVie
Security 6 month 12,500 75,000 AbbVie
Management 6 month 15,000 90,000 AbbVie
Administration 6 month 12,000 72,000 AbbVie
Rates 6 month 15,000 90,000 AbbVie
External sware/hware 6 month 9,000 54,000 AbbVie
Insurance 6 month 18,750 112,500 AbbVie
Canteen 6 month 6,500 39,000 AbbVie
Safety Costs 6 month 10,000 60,000 AbbVie
IE Licence Licence surrender fee 1 item 8,888 8,888 EPA
SUB-TOTAL 1,657,208
Plus 50% Contingency 828,604
TOTAL 2,485,812
Table 10: Closure Plan Costing
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
32
The schedule for site closure and remediation works is summarised below:
Table 11: Gantt Chart
Action Wk. 2 Wk. 4 Wk. 6 Wk. 8 Wk. 10 Wk. 12 Wk. 14 Wk. 16 Wk. 18 Wk. 20 Wk. 22 Wk. 24 Wk. 26
Cease production
Notify EPA and Cork County Council of closure
Post-closure environmental monitoring; wastewater &
groundwater sampling
Decontaminate any plant/equipment
Arrange for all waste to be taken off-site and
recycled/disposed in an appropriate manner
Arrange for sale/recycling of plant/ equipment
Arrange for sale/disposal of any product or raw materials
located at the site at the time of closure
Internal Closure Validation audit carried out by or on
behalf of AbbVie
External closure audit by the EPA
Closure Validation Certification issued by the EPA to
indicate formal acceptance of the closure of the site.
Surrender the IE Licence to the EPA
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
33
8 Closure Plan Update and Review
As per typical IE licence requirements:
‘The plan shall be reviewed annually and proposed amendments thereto
notified to the Agency for agreement as part of the AER. No amendments
may be implemented without the agreement of the Agency.’
AbbVie confirms its intention to review and update the DMP annually and to
inform the EPA of any changes thereto.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
34
9 Restoration/Aftercare Management Plan
As the most recent Groundwater Monitoring Report by consultants AECOM
and baseline report by consultants Bluerock Environmental has concluded
that there are no significant groundwater contamination issues at the site it
has been decided that the site will opt for a ‘Clean Closure’. Therefore, other
than the requirement to continue to monitor wastewater and surface water
emissions until the licence is surrendered and the management costs
associated with the site, there are not expected to be any other significant
aftercare costs.
10 Financial Provision
AbbVie has agreed to cover the closure liabilities identified in this report by
way of a financial instrument to be agreed with the Agency.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
AbbVie
35
Site Layout Plan
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
TEL 021-4396960 E-MAIL [email protected] WEB www.fgcl.ie2a RIVER HOUSE, BLACKPOOL PARK, BLACKPOOL, CORK.
CONSULTING ENGINEERS
NOTES:
1. ALL LEVELS RELATE TO ORDNANCE SURVEY
DATUM, MALIN HEAD
2. CO-ORDINATES TO IRISH GRID PROJECTION
LEGEND:
SITE BOUNDARY
FOURNIER LABORATORIESIRELAND LTD.,
IDA Industrial Estate, Carrigtohill,County Cork, Ireland.
A
CREON OPTIMISED
1000 SITE LAYOUT PLAN
16415-L-03
SITE LAYOUT PLAN
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
Attachment L
Statutory Requirements
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
ii
Table of Contents
1 STATUTORY REQUIREMENTS .............................................................. 1
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
1
1 Statutory Requirements
The following describes how the facility will comply with the requirements as
specified in Section L of the IE Application Form. The questions in the
application form are in italics below.
Indicate how the requirements of section 83(5)(a)(i) to (v) and (vii) to (xa)
of the Act of 1992 shall be met, having regard, where appropriate, to any
relevant specification issued by the Agency under section 5(3)(b) of that
Act or any applicable best available techniques (BAT) conclusions
adopted in accordance with Article 13(5) of the Industrial Emissions
Directive and the reasons for the selection of the arrangements
proposed. Namely;
83(5)(a)(i) any emissions from the activity will not result in the
contravention of any relevant air quality standard specified under
section 50 of the Air Pollution Act 1987, and will comply with any
relevant emission limit value specified under section 51 of the Air
Pollution Act 1987.
The facility will not lead to a contravention of the above ambient air quality
standards and emissions limit values specified above will be complied with.
An Air Dispersion Modelling Report has been provided in Attachment I and
confirms compliance with statutory emission limit values and ambient air
standards.
83(5)(a)(ii) any emissions from the activity will comply with, or will not
result in the contravention of, any relevant quality standard for waters,
trade effluents and sewage effluents and standards in relation to
treatment of such effluents prescribed under section 26 of the Local
Government (Water Pollution) Act 1977.
The facility will comply with the above legislation. Process effluent is sent to
Carrigtwohill WWTP following pre-treatment on-site. Emissions will be in
compliance with the emission limit values specified in the IE Licence. Clean,
uncontaminated storm water is discharged, via petrol interceptors to Slatty
Water which discharges to Lough Mahon, part of Cork Harbour. It is AbbVie’s
intention to install automated slam shut valves linked to the fire pump control
panel for use in the event of an emergency to prevent fire water run-off
entering the stormwater network.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
2
83(5)(a)(iii) any emissions from the activity or any premises, plant,
methods, processes, operating procedures or other factors which affect
such emissions will comply with, or will not result in the contravention
of, any relevant standard including any standard for an environmental
medium prescribed under regulations made under the European
Communities Act 1972, or under any other enactment,
The facility will not lead to a contravention of any relevant standards
prescribed under the European Communities Act 1972, or under any other
enactment. There are no predicted significant impacts associated with the
proposed facility.
83(5)(a)(iv) any noise from the activity will comply with and will not
result in the contravention of, any regulation under section 106.
As detailed in Section I.7 of this application, noise from the activity will comply
with, or will not result in the contravention of, any regulations under section
106.
83(5)(a)(v) any emissions from the activity will not cause significant
environmental pollution.
Emission from the activity will not cause significant environmental pollution. A
full assessment of environmental impacts has been detailed in Section I of the
application.
83(5)(a)(vii) having regard to Part III of the Act of 1996, production of
waste in the carrying on of the activity will be prevented or minimised or,
where waste is produced, it will be recovered or, where that is not
technically or economically possible, disposed of in a manner which will
prevent or minimise any impact on the environment,
The facility will comply with the provisions of the Act of 1996. This will be
achieved through the implementation of BAT and waste management best
practice.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
3
(viia) without prejudice to subparagraph (vii), waste generated in the
carrying on of an industrial emissions directive activity, in order of
priority in accordance with section 21A (inserted by Regulation 7 of the
European Communities (Waste Directive) Regulations 2011) of the Act of
1996, will be prepared for re-use, recycled, recovered or, where that is
not technically or economically possible, disposed of in a manner which
will prevent or minimise any impact on the environment,
The proposed facility has been designed in accordance with the relevant
sectoral BAT guidance (see section I.8). Its operation will be in accordance
with an Environmental Management System and appropriate specific
operating procedures. AbbVie is committed to compliance with the Waste
Management Act 1996 as amended and its associated regulations, and as
such will ensure production of waste will be minimised. Where waste
generation is unavoidable, waste will be recovered or disposed in the most
advantageous means possible in line with the current Waste Hierarchy.
83(5)(a)(viii) energy will be used efficiently in the carrying on of the
activity.
Energy efficiency is a critical part of design considerations and ongoing
operations at the facility. Refer to Attachment G.2 of this application.
83(5)(a)(ix) necessary measures will be taken to prevent accidents in the
carrying on of the activity and, where an accident occurs, to limit its
consequences for the environment and, in so far as it does have such
consequences, to remedy those consequences.
All measures are taken to prevent and limit the severity of accidents at the
facility. Refer to Attachment J of this application.
83(5)(a)(x) necessary measures will be taken upon the permanent
cessation of the activity (including such a cessation resulting from the
abandonment of the activity) to avoid any risk of environmental pollution
and return the site of the activity to a satisfactory state.
Decommissioning management costs have been estimated and the site will
be returned to an environmentally inert state in the event of closure. Refer to
Attachment K of this application.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
4
(xa) in the case of an industrial emissions directive activity, necessary
measures referred to in subparagraph (x) including measures of
appropriate duration shall be taken in accordance with section 86B,
A soil and groundwater baseline report has been provided with Section I.4 of
this application and in combination with the DMP report provided in Section K
will enable AbbVie take the necessary measures required by Section 86B.
Indicate whether or not the activity is carried out, or may be carried out,
or is located such that it is liable to have an adverse effect on –
(a) a site placed on a list in accordance with Part 3 of S.I. 477 of 2011, or
(b) a site where consultation has been initiated in accordance with
Article 5 of the EU Habitats Directive (92/43/EEC).
Undertake a screening for Appropriate Assessment and state whether
the activity, individually or in combination with other plans or projects,
is likely to have a significant effect on a European Site(s), in view of best
scientific knowledge and the conservation objectives of the site(s).
Where it cannot be excluded, on the basis of objective scientific
information, following screening for Appropriate Assessment, that an
activity, either individually or in combination with other plans or
projects, will have a significant effect on a European Site, provide a
Natura Impact Statement, as defined in Regulation 2(1) of the European
Communities (Birds and Natural Habitats) Regulations (S.I. No. 477 of
2011). Where based on the screening it is considered that an
Appropriate Assessment is not required, provide a reasoned response.
The proposed site is not protected under SAC, SPA, NHA or pNHA
designation. The closest protected site is the Slatty Water to which the site
discharges uncontaminated surface waters. The Slatty Water is designated as
a SAC and SPA. An Appropriate Assessment prepared by Moore Group
Environmental Services is included in Section B.6 of the IE application. It is
not expected that the activity will have any impact on this area.
Indicate whether or not the activity is liable to have an adverse effect on
water quality in light of the European Communities Environmental
Objectives (Surface Water) Regulations 2009 (S.I. No. 272 of 2009).
The activity is not expected to have any adverse impact on surface water
quality. Process effluent is treated onsite prior to discharge in compliance with
emission limit values to Carrigtwohill municipal wastewater treatment plant.
Only uncontaminated surface water is discharged directly to the Slatty Water.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
5
Indicate whether or not the activity is liable to have an adverse effect on
water quality in light of the European Communities Environmental
Objectives (Ground Water) Regulations 2010 (S.I. No. 9 of 2010).
There are no direct discharges to ground from the activity. Preventative
measures which are in place at the AbbVie site include full secondary
containment (bunding) of all internal and external vessels containing
potentially polluting materials.
Indicate whether any of the substances specified in the Schedule of the
EPA (Industrial Emissions) (Licensing) 2013, S.I. No. 137 of 2013, are
discharged by the activity to the relevant medium.
The following substances will be emitted to atmosphere in accordance with
appropriate emission limit values:
Oxides of nitrogen and other nitrogen compounds.
Carbon monoxide.
Volatile organic compounds.
Dust including fine particulate matter.
The following substance will be emitted to sewer in accordance with
appropriate emission limit values:
Materials in suspension.
Substances which contribute to eutrophication (in particular, nitrates
and phosphates).
Substances which have an unfavourable influence on the oxygen
balance (and can be measured using parameters such as BOD, COD,
etc.).
Indicate if the best environmental practices are in place for control of
diffuse emissions from the installation as set out in the following
legislation:
(a) a BAT Conclusions Implementing Decision published by the EC.
Best Available Techniques are in place at the facility. Please refer to
Attachment I.8
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
6
(b) a specification prepared by the Agency in accordance with
Section 5 of the Environmental Protection Agency Act 1992 as
amended;
Best Available Techniques are in place at the facility. Please refer to
Attachment I.8
(c) the Urban Waste Water Treatment Regulations 2001 (S.I. No. 254
of 2001) as amended by the Urban Waste Water Treatment
(Amendment) Regulations 2004 (S.I. No. 440 of 2004) or any future
amendment thereof;
While not directly applicable treated effluent from the facility is discharged to
the Carrigtwohill municipal wastewater treatment plant. However, it is
considered that this will have no significant impact on the municipal plant due
to the relatively small nature of the discharge.
(d) the European Communities (Good Agricultural Practice for
Protection of Waters) Regulations 20 (S.I. No. 610 of 2010) or any
future amendment thereof;
Not applicable.
(e) the Local Government (Water Pollution) Act, 1977 (Control of
Cadmium Discharges) Regulations 1985 (S.I. No. 294 of 1985);
Not applicable.
(f) the Local Government (Water Pollution) Act, 1977 (Control of
Hexachlorocyclohexane and Mercury Discharges) Regulations
1986 (S.I. No. 55 of 1986);
Not applicable.
(g) the Local Government (Water Pollution) Acts, 1977 and 1990
(Control of Carbon Tetrachloride, DDT and Pentachlorophenol
Discharges) Regulations 1994 (S.I. No. 43 of 1994); and,
Not applicable
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 14-11-2016:15:22:19
7
(h) measures or controls identified in a pollution reduction plan for
the river basin district prepared in accordance with Part V of the
EC Environmental Objectives (Surface Waters) Regulations 2009
S.I. No. 272 of 2009 for the reduction of pollution by priority
substances or the ceasing or phasing out of emissions,
discharges and losses of priority hazardous substances.
The proposed facility will not discharge priority substances as outlined in EC
Environmental Objectives (Surface Waters) Regulations, SI 272 of 2009.