47
HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST MECHANICAL M-01 PENTHOUSE EXISTING LAYOUT M-02 PENTHOUSE NEW LAYOUT M-03 PENTHOUSE ROOF NEW LAYOUT M-04 PENTHOUSE WEST ELEVATION M-05 PENTHOUSE SOUTH ELEVATION M-06 PENTHOUSE EAST ELEVATION M-07 PENTHOUSE NORTH ELEVATION M-08 LEVEL 3, TOP FLOOR LAYOUT M-09 LEVEL 2, GROUND FLOOR LAYOUT M-10 LEVEL 1, BASEMENT LAYOUT M-11 BOILER ROOM LAYOUT M-12 BOILER VENT LAYOUT M-13 BOILER VENT ELEVATIONS M-14 EQUIPMENT SCHEDULES M-15 BAS SCHEDULES M-16 BAS SCHEDULES M-17 LEGEND M-18 PENTHOUSE EXISTING SCHEMATIC M-19 PENTHOUSE NEW SCHEMATIC M-20 BOILER ROOM EXISTING SCHEMATIC M-21 BOILER ROOM NEW SCHEMATIC ELECTRICAL E-1 BOILER ROOM LAYOUT E-2 PENTHOUSE DEMOLITION E-3 PENTHOUSE NEW LAYOUT E-4 PENTHOUSE ROOF LAYOUT E-5 SPECIFICATIONS, LEGEND & DETAILS E-6 SCHEDULES E-7 SINGLE LINE DIAGRAM ATTACHMENT #2 McDONNEL STREET WATER STREET Toronto, ON. 416.298.8448 LAPAS CONSULTING ENGINEERSLTD 970 Lawrence AvenueW.Suite#801 Toronto, ON. M6A 3B6 416.955.9088 Structural Forensic & RehabilitationServices Barrie - 36 Macmillan Cres., Barrie,ON.L4N7H1 Toronto - 605-3500 Dufferin St.,Toronto,ONM3K1N2 416.876.4357 Toronto, ON. 416.418.7375 905.409.8677 Established in 1977 Lennis Trotter Architect Oshawa, Ontario 905.576.6869 STRUCTURAL S1-01 GENERAL NOTES & SITE PLAN S1-02 EXISTING CONDITIONS - PLAN VIEWS S1-03 PENTHOUSE FRAMING DETAILS S1-04 ROOF FRAMING DETAILS S1-05 STEEL LADDER FRAMING DETAILS ROOFING R-1 ROOF FLASHING DETAILS (ROOF PLAN & NOTES) R-2 ROOF FLASHING DETAILS (ROOF CURB SECTIONS) R-3 ROOF FLASHING DETAILS (ROOF REPAIR & HATCH SECTIONS) ARCHITECTURAL A1.1 GENERAL NOTES & CONDITIONS A2.1 DEMOLITION FLOOR PLAN - PENTHOUSE A2.2 DEMOLITION ROOF PLAN - PENTHOUSE A2.3 NEW FLOOR PLAN - PENTHOUSE A2.4 NEW ROOF PLAN - PENTHOUSE A3.1 WEST ELEVATION - PENTHOUSE A3.2 SOUTH ELEVATION - PENTHOUSE A3.3 EAST ELEVATION - PENTHOUSE A3.4 NORTH ELEVATION - PENTHOUSE A4.1 DETAILS - PENTHOUSE

ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

Embed Size (px)

Citation preview

Page 1: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

HVAC RENOVATIONS TOPETERBOROUGH POLICE STATION

SITE LOCATION

DRAWING LIST

MECHANICALM-01 PENTHOUSE EXISTING LAYOUTM-02 PENTHOUSE NEW LAYOUTM-03 PENTHOUSE ROOF NEW LAYOUTM-04 PENTHOUSE WEST ELEVATIONM-05 PENTHOUSE SOUTH ELEVATIONM-06 PENTHOUSE EAST ELEVATIONM-07 PENTHOUSE NORTH ELEVATIONM-08 LEVEL 3, TOP FLOOR LAYOUTM-09 LEVEL 2, GROUND FLOOR LAYOUTM-10 LEVEL 1, BASEMENT LAYOUTM-11 BOILER ROOM LAYOUTM-12 BOILER VENT LAYOUTM-13 BOILER VENT ELEVATIONSM-14 EQUIPMENT SCHEDULESM-15 BAS SCHEDULESM-16 BAS SCHEDULESM-17 LEGENDM-18 PENTHOUSE EXISTING SCHEMATICM-19 PENTHOUSE NEW SCHEMATICM-20 BOILER ROOM EXISTING SCHEMATICM-21 BOILER ROOM NEW SCHEMATIC

ELECTRICALE-1 BOILER ROOM LAYOUTE-2 PENTHOUSE DEMOLITIONE-3 PENTHOUSE NEW LAYOUTE-4 PENTHOUSE ROOF LAYOUTE-5 SPECIFICATIONS, LEGEND & DETAILSE-6 SCHEDULESE-7 SINGLE LINE DIAGRAM

ATTACHMENT #2

McDONNEL STREET

WA

TER

STR

EET

Toronto,ON.416.298.8448

LAPASCONSULTINGENGINEERSLTD970LawrenceAvenueW.Suite#801Toronto,ON.M6A3B6416.955.9088

StructuralForensic&RehabilitationServicesBarrie-36MacmillanCres.,Barrie,ON.L4N7H1Toronto-605-3500DufferinSt.,Toronto,ONM3K1N2416.876.4357

Toronto,ON.416.418.7375905.409.8677

Established in 1977Lennis Trotter Architect

Oshawa, Ontario 905.576.6869

STRUCTURALS1-01 GENERAL NOTES & SITE PLANS1-02 EXISTING CONDITIONS - PLAN VIEWSS1-03 PENTHOUSE FRAMING DETAILSS1-04 ROOF FRAMING DETAILSS1-05 STEEL LADDER FRAMING DETAILS

ROOFINGR-1 ROOF FLASHING DETAILS (ROOF PLAN & NOTES)R-2 ROOF FLASHING DETAILS (ROOF CURB SECTIONS)R-3 ROOF FLASHING DETAILS (ROOF REPAIR & HATCH SECTIONS)

ARCHITECTURALA1.1 GENERAL NOTES & CONDITIONSA2.1 DEMOLITION FLOOR PLAN - PENTHOUSEA2.2 DEMOLITION ROOF PLAN - PENTHOUSEA2.3 NEW FLOOR PLAN - PENTHOUSEA2.4 NEW ROOF PLAN - PENTHOUSEA3.1 WEST ELEVATION - PENTHOUSEA3.2 SOUTH ELEVATION - PENTHOUSEA3.3 EAST ELEVATION - PENTHOUSEA3.4 NORTH ELEVATION - PENTHOUSEA4.1 DETAILS - PENTHOUSE

Page 2: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

D

C

B

2 5432a

Cx

Bx

Bz

LEGEND

Page 3: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

C

B

2 5432a

Cx

Bx

Bz

LEGEND

CM-05

AM-04

FM-06

BM-04

DM-05

EM-06

HM-07

GM-07

Page 4: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

C

B

2 5432a

Cx

Bx

Bz

LEGEND

CM-05

AM-04

EM-06

GM-07

Page 5: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

43 52a

43 52a

WEST ELEVATION - EXTERIOR

WEST ELEVATION - INTERIORBM-02

AM-02

LEGEND

Page 6: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

CD BBxCx Bz

CD BBxCx Bz

SOUTH ELEVATION - EXTERIOR

SOUTH ELEVATION - INTERIORDM-02

CM-02

LEGEND

Page 7: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

4 35 2a

4 35 2a

EAST ELEVATION - EXTERIOR

EAST ELEVATION - INTERIORFM-02

EM-02

LEGEND

Page 8: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

C DB Bx CxBz

C DB Bx CxBz

NORTH ELEVATION - EXTERIOR

NORTH ELEVATION - INTERIORHM-02

GM-02

LEGEND

Page 9: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

C

B

A

2 765431

NOTE

Page 10: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

C

B

A

2 765431

NOTE

Page 11: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

C

B

A

2 765431

NOTE

Page 12: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

65

E

D

65

BOILER ROOM - NEW LAYOUTBM-11BOILER ROOM - EXISTING LAYOUTA

M-11

Page 13: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

65

E

D

65

BOILER ALTERNATE VENT LAYOUTBM-12 BOILER BASE VENT LAYOUTA

M-12

NOTES

AM-13

AM-13

Page 14: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

6 75432

BOILER BASE & ALTERNATE VENT ELEVATIONSAM-13

WEST EXTERIOR ELEVATION

Page 15: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

EXISTING EQUIPMENT SCHEDULE

Tag Location Serving Make & Model Data Notes

ACS-1 Penthouse2nd Floor

Air HandlerTrane Climate Changer

31-HF-MP14,000 CFM

15 HP VFD FanRemove & Dispose

ACS-2 Penthouse3rd Floor

Air HandlerMcQuay

MSL122DH13,050 CFM

10 HP VFD FanRemove & Dispose

ACRE-1 Penthouse2nd Floor

Return Air FanAAF-Canada

4W-2H11,625 CFM @ 1" ESP

5 HP VFD FanTo Remain

ACRE-2 Penthouse3rd Floor

Return Air FanAAF-Canada

4W-2H11,650 CFM @ 1" ESP

5 HP VFD FanTo Remain

H-1 Penthouse 2nd FloorNeptronic Humidifier

SK-31440 lb/hr steam

Remove & Relocate,Provide new Neptronic wand tomatch new ducting arrangement

H-2 Penthouse 3rd FloorNeptronic Humidifier

SK-31030 lb/hr steam

To Remain,Provide new Neptronic wand tomatch new ducting arrangement

GC-1 Penthouse Glycol ChillerMcQuay

WHR100D

87.5 ton total50 HP Comp. 160 HP Comp. 2

Pump-out, Reclaim Refrigerant,Safely dispose Glycol,

Remove & Dispose Equipment

GP-1 Penthouse Glycol PumpArmstrong

4380-3x3x8192 usgpm @ 62 ft hd

5 HPRemove & Dispose

GT-1 PenthouseGlycol Expansion

Tank- - Remove & Dispose

GE-1 Penthouse General ExhaustGreenheckBSQ-9-3

725 cfm1/3 HP

Remove & Dispose

TE-2 Penthouse Toilet ExhaustGreenheckBSQ-10-7

1650 cfm3/4 HP

To Remain, replace EA damperpneumatic actuator with electric

UH-1 Penthouse Unit Heater - - Remove & Relocate

C-1 RoofCondenser forGlycol Chiller

Snyder GeneralAPD120CV12

(10) 1 HP Fans Remove & Dispose

RTU-1 Roof1st Floor

Roof Top UnitAAON - To Remain

ERV-1 Roof1st Floor

Energy RecoveryVentilator

Spinnaker - To Remain

ACC-1CRU-1

RoofRoom 307

Split A/C SystemComm. Room 307

Liebert - To Remain

ACC-2CRU-2

RoofRoom 307

Split A/C SystemComm. Room 307

Liebert - To Remain

ACC-3CRU-3

RoofRoom 224

Split A/C SystemServer Room 224

Liebert - To Remain

ACC-4CRU-4

RoofRoom 136

Split A/C SystemData Room 136

Liebert - To Remain

B-1 Boiler Room Hydronic BoilerBryan

HECLM210-W-FDG

2100 mbh input1785 mbh output

Remove & Dispose

B-2 Boiler Room Hydronic BoilerClever Brooks

M-5 2000

2000 mbh input1600 mbh output

Remove & Dispose

DWH-1 Boiler RoomDomestic HotWater Heater

RheemG76-200

76 usgal,200 mbh input

Remove & Dispose

HWT-1 Boiler RoomDomestic HotWater Tank

- 200 usgal Remove & Dispose

T-1 Boiler RoomHydronic

Expansion Tank- - To Remain

P-1(rename P-1A)

Boiler RoomModulation

Hydronic LoopArmstrong

4380 2x2x8131 usgpm @ 48 ft hd

3 HP VFD

Base - To RemainOption - Remove & Relocate

P-2(rename P-2A)

Boiler RoomMain

Hydronic LoopArmstrong

4380 1.5x1.5x860 usgpm @ 45 ft hd

2 HP VFD

Base - To RemainOption - Remove & Relocate

P-3 Boiler Room B-1Armstrong

4380 3x3x6160 usgpm @ 27 ft hd

2 HP VFDRemove & Relocate

P-4 Boiler Room B-2Armstrong

4380 3x3x6160 usgpm @ 21 ft hd

1.5 HP VFDRemove & Relocate

P-5 Boiler Room DHW Recirc.B&GK48

1/12 HP To Remain

NEW EQUIPMENT SCHEDULE

Scope Tag Location Serving Make & Model Performance Data (per unit)

BaseAHU-1AHU-2

Roof2nd Floor3rd Floor

HaakonCustom AirPak

Airflow : 14,000 CFM @ 2.5" ESP, 20 HP premium efficiency, 3/60/208V, VFD Fan, Class II PressureDX Cooling Coils : 2 totalling 500.0 mbh (41.2 tons), R410a, 45F suction, 77.0F db/65F wb EAT, 54.4F db/53F wb LATCooling EAT based on 4,200 cfm OA @ 79.3F db/66.7F wb ERV supply mixing with 9,800 cfm RA @ 76F db/64F wbHeating Coils : 2 totalling 580.5 mbh, 50% E.G., 155F EWT, 125F LWT, 44.4 usgm, 3.0 ft WPD, 62.1F EAT, 100F LATHeating EAT based on 1,500 cfm OA @ -20F db/-15F wb mixing with 12,500 cfm RA @ 72F db/54F wbPre Filter : 2" MERV 8, Final Filter : 12" MERV 14Factory starter panel & control box with one 3/60/208V & one 1/60/120V feeds, BACnet comm. cardMin. 15" high factory roof curb, Orientation of coil connections and door locations to suit layout

BaseCU-1CU-2

RoofAHU-1AHU-2

McQuayRCS045D

Cooling Capacity : 2 circuits totalling 512.4 mbh (42.7 tons), R410a, 45F suction, 95F ambient, 4 compressor, 4 stepcapacity control, Hot gas bypass, Condenser with hail protection, Low ambient fan control to 45FFactory starter panel & control box with one 3/60/208V & one 1/60/120V feeds, BACnet comm. cardRoof curbs & spring isolators

OptionERV-2ERV-3

PenthouseAHU-1AHU-2

CookERV-5500

Arrangement H

Supply Airflow : 4,200 CFM @ 1" ESP, 3 HP premium efficiency, 3/60/208V FanReturn Airflow : 4,200 CFM @ 0.75" ESP, 3 HP premium efficiency, 3/60/208V FanFrost Control Preheat : 2 stage 208V, 9 kWFactory starter panel & control box with one 3/60/208V feed, BACnet comm. cardMount on existing concrete pads using neoprene isolation pads

Base HX-1 Penthouse AHU Heating CoilsB&G GPX

P64 PN:BY5418

Gasketed PHE, 304 SS Plates, Nitrile HT Gaskets, 150 psig ASME design pressure, Suitable for fluids servicedHot Side : 79.3 usgpm Hydronic Hot Water from 160F to 130F, 3.5 psig max. pressure dropCold Side : 88.8 usgpm 50% EG from 125F to 155F, 5.0 psig max. pressure drop, 1,170.7 mbh capacityMount on galvanized steel fully welded drip pan with valved drain connection

Option P-1B Boiler Room

ModulationHydronic Loop

(Standby Pump)

Armstrong4380 2x2x8

Capacity : 131 usgpm 160F Hydronic Hot Water @ 48 ft hd, Non-overloading Impeller, Bronze fitted construction3 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor3 x 2 suction guide, Danfoss VLT VFD starter

Option P-2B Boiler Room

MainHydronic Loop

(Standby Pump)

Armstrong4380 1.5x1.5x8

Capacity : 60 usgpm 160F Hydronic Hot Water @ 45 ft hd, Non-overloading Impeller, Bronze fitted construction2 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, Danfoss VLT VFD starter

Base P-6 Penthouse HX-1 HW sideArmstrong

4380 2x2x8

Capacity : 80 usgpm 160F Hydronic Hot Water @ 30 ft hd, Non-overloading Impeller, Bronze fitted construction5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor3 x 2 suction guide, 2" Belimo B349 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter

Base P-7 PenthouseHX-1 EG side

to AHU-1Armstrong

4380 2x2x10

Capacity : 45 usgpm 155F 50% EG @ 40 ft hd, Non-overloading Impeller, Bronze fitted construction7.5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, 2" Belimo B347 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter

Base P-8 PenthouseHX-1 EG side

to AHU-2Armstrong

4380 2x2x10

Capacity : 45 usgpm 155F 50% EG @ 40 ft hd, Non-overloading Impeller, Bronze fitted construction7.5 HP premium efficiency, inverter duty, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor2.5 x 2 suction guide, 2" Belimo B347 3 way mixing valve with 24V modulating actuator, Danfoss VLT VFD starter

Base GT-1 Penthouse EG expansion tankArmstrong

AX-15V

Pre-charged, diaphragm style, vertical expansion tank125 psig working pressure, ASME designCapacity : 5 usgal acceptance volume, 8 usgal total volume

Base PF-1 PenthouseEG heating loopHydronic loop

General Filtration PF2X4PChemical Pot Feeder

Capacity : 2 usgal volume

BaseF-1F-2

PenthouseBoiler Room

EG heating loopHydronic loop

Pall LMO-10-3/4Filter Cartridge & Housing

Cast iron head, stainless steel shell, 3/4" NPT inlet & outlet connections, 10" cartridge length

BaseW-1W-2

PenthouseH-1H-2

NeptronicHumidifier

Wands

Replacement Neptronic wands to match existing humdifier rating and new ducting arrangement

Base L-1 (x1) Penthouse AHU EA LouvresTamco

Series 4400

Exterior flange mounting frame, continuous blade, optional aluminum bird screen with frame54"W x 72"H

Option L-2 (x2) Penthouse ERV OA LouvresTamco

Series 3400 & 7000

Exterior flange mounting frame, continuous blade, optional aluminum bird screen with frame42"W x 48"Hwith Back Draft Damper

Base D-1 (x2) Penthouse AHU EA DampersTamco

Series 9000 insulated

50"W x 30"H, Belimo 24V modulating actuator

OptionD-2 (x2)D-3 (x2)

PenthouseERV EA DampersERV SA Dampers

TamcoSeries 9000 insulated

24"W x 18"H, Belimo 24V modulating actuator30"W x 12"H, Belimo 24V modulating actuator

Base B-1,2 Boiler Room Hydronic BoilersDeDeitrich

Gas 310-8 Eco Series

All standard accessories; 1-LH & 1-RH unit; A=control display facing short side; Full modulation burner; 0-10vDC BASremote signal; Local/remote switch; Supply manifold with ASME 60 psig relief, Low water cut-out, Air vent, TP gauge,Safety high limit; Neutralization kit; 4"- 14" WC natural gas; 120v power; Optional flue gas damper;1785 mbh input, 1703 mbh output; 160 usgpm@ 11 ft. press. drop

Base DWH-1 Boiler RoomDomestic HotWater Heater

RheemGE80-200

80 usgal tank volume, 199 mbh input, 187 mbh output, 10.5" WC max. natural gas; 120v power,Neutralization kit & condensate pump

Base HWT-1 Boiler RoomDomestic HotWater Tank

LochinvarGVG200JR

200 usgal tank volume, Glass lined, Jacketed Round, ASME 125 psig certified, Pre-piped 120v Agitator pump (P-10)Armstrong Model THWX-08018-4-1 copper double wall tube bundle, Tube side; 50 usgpm 160F Hydronic waterTube Side; 166.1 mbh, 1.2 psi PD, Tank Side; 166.1 mbtu total in 1 hr, 140F final temp

Base P-9 Boiler RoomHWT-1

Tube BundleArmstrong

4380 2x2x6

Capacity : 50 usgpm 160F Hydronic Hot Water @ 15 ft hd, Non-overloading Impeller, Bronze fitted construction1.5 HP premium efficiency, 1.15 SF, 1800 rpm, ODP, 3/60/208V motor,2 x 2 suction guide, Combination magnetic starter

Base T-2 Boiler RoomDomestic Hot

Water ExpansionTank

ArmstrongAST-5

Pre-charged, diaphragm style, vertical expansion tank for potable water150 psig working pressure, ASME designCapacity : 2.1 usgal acceptance volume, 3.5 usgal total volume

OptionEWSS-1EWSS-2

PenthouseBoiler Room

Combination EyeWash Safety

Shower

BradleyS19314SB

Plastic drench showerhead with pull handle, Eyewash with stainless steel bowl, Galvanized steel assembly with safetyyellow coating, Universal identification sign and inspection tag

Page 16: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

EXISTING BAS SCHEDULE

Floor Tag Serving Digital I/O Analog I/O Notes

Penthouse ACS-1 Air Handler for Level 2

Supply Fan ACS-1 start/stopReturn Fan ACRE-1 start/stopHumidifier H-1 start/stopChiller GC-1 enableChiller pump GP-1 start/stop

Supply Fan ACS-1 VFD speed controlReturn Fan ACRE-1 VFD speed controlSupply Fan ACS-1 VFD speed feedbackReturn Fan ACRE-1 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidityExhaust, Return, Outside Air dampersHot/Cold deck Air damperHeat, Cool valves

Remove & Dispose ACS-1,Reuse ACRE-1 & connect to new BAS,Reuse H-1 & connect to new BAS,Remove & Dispose GC-1 & GP-1

Penthouse ACS-2 Air Handler for Level 3

Supply Fan ACS-2 start/stopReturn Fan ACRE-2 start/stopHumidifier H-2 start/stopChiller GC-1 enableChiller pump GP-1 start/stop

Supply Fan ACS-2 VFD speed controlReturn Fan ACRE-2 VFD speed controlSupply Fan ACS-2 VFD speed feedbackReturn Fan ACRE-2 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidityExhaust, Return, Outside Air dampersCool valve

Remove & Dispose ACS-2,Reuse ACRE-2 & connect to new BAS,Reuse H-2 & connect to new BAS,Remove & Dispose GC-1 & GP-1

RoofRTU-1 &

ERV-1Rooftop Unit & ERVfor Level 1

RTU-1 start/stopRTU-1 run statusERV-1 start/stopERV-1 run status

Return, Supply Air temps

Reuse RTU-1, ERV-1 & connect to new BAS

Level 3, Top Floor VAV 3.01

315A NE Corner Office317 Storage318 Media/Training

Electronic modulating reheatElectronic modulating radiationTemp sensor 3.01 in 315A office

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.02

315A Corridor319 Locker320 Professional Standards321 Resource

Electric 2 position radiation Electronic modulating reheatTemp sensor 3.02 in 315A corridor

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.03325 Deputy Chief Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.03 in 325Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.04326 Admin. Assistant Electronic modulating reheat

Temp sensor 3.04 in 326Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.05327 Chief Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.05 in 327Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.06331 Boardroom Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.06 in 331Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.07

309 Server329 Storage330 Storage334 Corridor

Electronic modulating reheatTemp sensor 3.07 in 334

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.08

308 Community Supervisor335 Assoc. Office336 Corridor332 Kitchenette

Electronic modulating reheatTemp sensor 3.08 in 335

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.09310 Crime Stoppers302 Central Records

Electronic modulating reheatTemp sensor 3.09 in 302

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.10301 Waiting Room Electronic modulating reheat

Temp sensor 3.10 in 301Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.11315 Corridor311 Copy Room312 File Room

Electronic modulating reheatTemp sensor 3.11 in 311 Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.12337/338 Kitchen/Lunch339 Quiet Room

Electric 2 position radiation Electronic modulating reheat, BC#5,6Temp sensor 3.12 in 337

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.13314 Switchboard313A Storage

Electric 2 position radiation Electronic modulating reheatTemp sensor 3.13 in 314 Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.14303 Mgr Admin. Support Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.14 in 303 Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.15304 Human Res. Clerk305 Court Office

Electric 2 position radiation Electronic modulating reheatTemp sensor 3.15 in 304 Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.16306 F.O.I. Office Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.16 in 306Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.17

307 Communications Pnuematic modulating reheatTemp sensor 3.17 in 307

Reuse VAV & connect to new BAS,Reuse stand alone AC system with temp &humidity control (Option - connect to BAS)

Level 3, Top Floor VAV 3.18

340 Intel. Crime Analysis341 Intel. Crime Analysis342 Intel. Crime Analysis343 Intel. Crime Analysis

Electric 2 position radiation Electronic modulating BC#7,8,9,10Temp sensor 3.18 in 343

Reuse VAV & connect to new BAS

Level 3, Top Floor VAV 3.19333 Board Admin. Assist. Electric 2 position radiation Electronic modulating reheat

Temp sensor 3.19 in 333Reuse VAV & connect to new BAS

EXISTING BAS SCHEDULE

Floor Tag Serving Digital I/O Analog I/O Notes

Level 2, Ground Floor VAV 2.01

212 EOC / Briefing Room Fan powered box fan relay Electronic modulating reheatElectronic modulating radiationTemp sensor 2.01 in 212

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.02

213 Uniform Report218 Fleet Office228 CIB Ident229 CIB Ident

Electronic modulating reheatElectronic modulating radiationTemp sensor 2.02 in 229

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.03

230 CIB Ident Electronic modulating reheatElectronic modulating radiationTemp sensor 2.03 in 230

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.04227 CIB Ident225 CIB Power / Cold Case210 Corridor

Electronic modulating reheatTemp sensor 2.04 in 210 Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.05

224 Computer Server223 Computer Tech222 Traffic Sergeant221 Community Sergeant219, 245, 240 Corridors

Electronic modulating reheatTemp sensor 2.05 in 222

Reuse VAV & connect to new BAS,Reuse BAS work station in 222,Reuse stand alone AC system with temp control in 224(Option - connect to BAS)

Level 2, Ground Floor VAV 2.06226 CIB Electronic modulating reheat

Temp sensor 2.06 in 226Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.07203 Lobby Electronic modulating reheat

Temp sensor 2.07 in 203Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.08

214 Quality Control220 Data Entry206 Reception207 Staff Sergeant245 Corridor

Electronic modulating reheatTemp sensor 2.08 in 206

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.09

205 Accident Report244 Interview243 Interview242 Interview

Electronic modulating reheatElectronic modulating radiationTemp sensor 2.09 in 244

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.10

204 Public Meeting Fan powered box fan relay Electronic modulating reheatElectronic modulating radiationTemp sensor 2.10 in 204

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.11

241 Interview239 Victim Serv/Volunteer238 Victim Services

Electronic modulating reheatElectronic modulating radiationTemp sensor 2.11 in 241

Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.12211 Operations Inspector210 Corridor

Temp sensor 2.12 in 211Reuse VAV & connect to new BAS

Level 2, Ground Floor VAV 2.13

231 CIB Fraud/Firearm232 CIB Ident233 CIB Ident234 Monitor Room235 Victim Soft Room

Electronic modulating reheatElectronic modulating radiationTemp sensor 2.13 in 232 Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.01102 Weapons & EquipmentStorage

Electronic modulating reheatTemp sensor 1.01 in 102 Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.02121 Exercise Fan powered box fan relay Electronic modulating reheat

Temp sensor 1.02 in 121Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.03117 Female Locker Electronic modulating reheat

Temp sensor 1.03 in 117Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.04

104 Booking105 Video Remand Station106 Mug/Breath107 Telephone

Electronic modulating reheatTemp sensor 1.04 in 106

Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.05

141 Elevator Lobby142 Fingerprint143 Fingerprint

Electronic modulating reheatTemp sensor 1.05 in 141 Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.06138 File Storage137 Storage

Electronic modulating reheatTemp sensor 1.06 in 138 Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.07108 Female Cells Electronic modulating reheat

Temp sensor 1.07 in 108Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.08

127,128 Corridors113 Monitor115 Quartermaster Station116 Liquor & Gun Storage110 Accused Video Interv.

Electronic modulating reheatTemp sensor 1.08 in 115

Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.09

135 Evidence136 Tele/Data

Electronic modulating reheatTemp sensor 1.09 in 135

Reuse VAV & connect to new BAS,Reuse stand alone AC system with temp control in 136(Option - connect to BAS)

Level 1, Basement VAV 1.10132 Evidence144 Evidence131 Evidence

Electronic modulating reheatTemp sensor 1.10 in 144 Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.11129 Storage126 Male Locker Room

Electronic modulating reheatTemp sensor 1.11 in 126

Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.12111 Male Cells Electronic modulating reheat

Temp sensor 1.12 in 111Reuse VAV & connect to new BAS

Level 1, Basement VAV 1.13 120 Corridor Temp sensor 1.13 in 120 Reuse VAV & connect to new BAS

Page 17: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

EXISTING BAS SCHEDULE

Floor Tag Serving Digital I/O Analog I/O Notes

Level 1, BasementBoiler Room

MainHydronic

LoopControl

Hydronic HeatingLevel 3 reheat &radiation coils,Penthouse (fieldconfirm)

Boiler B-1 High, Low FireBoiler B-2 High, Low FirePump P-2 (Main Loop) start/stopPump P-3 (Boiler B-1) start/stopPump P-4 (Boiler B-2) start/stopPump P-2,3,4 status

Pump P-2 (Main Loop) VFD speed controlPump P-2 (Main Loop) delta pressure(dP sensor located in penthouse, fieldconfirm)Main Loop Supply, Return temps

Remove & Dispose B-1,2,Reuse P-2,3,4 & connect to new BAS

Level 1, BasementBoiler Room

ModHydronic

LoopControl

Hydronic HeatingLevel 1 & 2 reheat &radiation coils (fieldconfirm)

Boiler B-1,2 AlarmsPump P-1 (Mod Loop) start/stopPump P-1 status

Pump P-1 (Mod Loop) VFD speed controlPump P-1 (Mod Loop) delta pressure(dP sensor located in ceiling of basementexercise room, field confirm)Mod Loop Supply, Return temps3-way mod valve

Remove & Dispose B-1,2,Reuse P-1 & connect to new BAS

NEW BAS SCHEDULE

Floor Tag Serving Digital I/O Analog I/O Notes

Penthouse

AHU-1,ACRE-1,

CU-1,H-1

Level 2 HVAC

Supply Fan AHU-1 start/stopReturn Fan ACRE-1 start/stopHumidifier H-1 enableCondensing Unit CU-1 enable

Supply Fan AHU-1 VFD speed controlReturn Fan ACRE-1 VFD speed controlSupply Fan AHU-1 VFD speed feedbackReturn Fan ACRE-1 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidity, CO2AHU-1 MA, OA & EA dampers

Occupied Mode: System to start & run according toschedule (24 hour occupied, adjustable).Static Control: supply fan VFD to maintain supplyduct pressure (adjustable). Return fan VFD to tracksupply & run at 90% supply fan speed (adjustable).Economizer Control: when OA below coolingsetpoint or above heating setpoint (adjustable),maintain cooling or heating mixed air temps(adjustable) using AHU MA, OA & EA dampers.IAQ Control: when CO2 above setpoint (adjustable),override ERV/Economizer damper settings(adjustable).Temp Control: to maintain target SA temp(adjustable). Cooling; enable CU-1 to operate usingits own self contained controls. Heating; enable HX-1system.Humidity Control: to maintain RA humidity setpoint(adjustable), enable H-1 to operate using its own selfcontained controls.

Penthouse

AHU-2,ACRE-2,

CU-2,H-2

Level 3 HVAC

Supply Fan AHU-2 start/stopReturn Fan ACRE-2 start/stopHumidifier H-2 enableCondensing Unit CU-2 enable

Supply Fan AHU-2 VFD speed controlReturn Fan ACRE-2 VFD speed controlSupply Fan AHU-2 VFD speed feedbackReturn Fan ACRE-2 VFD speed feedbackSupply Duct pressureOutdoor, Supply, Mixed Air tempsReturn Air temp, humidity, CO2AHU-2 MA, OA & EA dampers

To follow controls noted above.

Penthouse(ERV Option)

Add toAHU-1system;ERV-2

Level 2 HVAC

Add to AHU-1 system;ERV-2 enable

Add to AHU-1 system;ERV-2 EA & SA dampers(normally closed)

Add to AHU-1 system;ERV Control: when OA above cooling setpoint orbelow heating setpoint (adjustable), enable ERV tooperate using its own self contained controls.Maintain cooling or heating mixed air temps(adjustable) using ERV EA & SA dampers.

Penthouse(ERV Option)

Add toAHU-2system;ERV-3

Level 3 HVAC

Add to AHU-2 system;ERV-3 enable

Add to AHU-2 system;ERV-3 EA & SA dampers(normally closed)

Add to AHU-2 system;ERV Control: when OA above cooling setpoint orbelow heating setpoint (adjustable), enable ERV tooperate using its own self contained controls.Maintain cooling or heating mixed air temps(adjustable) using ERV EA & SA dampers.

PenthouseP-6P-7P-8

HX-1 HW pumpAHU-1 glycol pumpAHU-2 glycol pump

Pumps P-6,7,8 start/stop Pumps P-6,7,8 VFD speed controlPumps P-6,7,8 VFD speed feedbackHW, AHU-1, AHU-2 3-way mod valvesHW, AHU-1, AHU-2 mixed glycol tempsHX-1 HW off, HGR on, HGS off temps

Heating Temp Control: Adjust P-6 speed based on 1or 2 AHU call for heat, adjust HW 3-way mix valve tomaintain HW loop temp (adjustable). Adjust P-7,8speed based on offset from AHU SA temp setpoint,adjust AHU 3-way mix valve to maintain mixed glycolloop temp (adjustable).

PenthouseExisting

Fire AlarmShutdown

Fire Alarm Shutdown input toBAS

Monitor only, no control

Penthouse

ExistingGenerator

LoadShed

Non-essential loadsdo not operate whengenerator runs

New CRNP N.O. contact (closedin normal position) input to BAS.New CRNP N.O. contacts asrequired to connect newequipment (see ElectricalDrawings)

When Generator runs, BAS to modulateAHU-1,2 supply fan VFD to preset reducedspeed (adjustable).

Generator Load Shed of following non-essentialloads (see Electrical Drawings);Existing H-1,2 (connected already)Existing RTU-1 & ERV-1 (connected already)Existing Elevator (connected already)New CU-1,2 (replaces GC-1, C-1 & GP-1)New ERV-2,3New P-6,7,8 (note - no AHU heat, close OAdampers & run on hydronic reheat & radiation only)New P-9 (no secondary DHW heating)

NEW BAS SCHEDULE

Floor Tag Serving Digital I/O Analog I/O Notes

RoofRTU-1 &ERV-1

Level 1 HVAC

RTU-1 start/stopRTU-1 run statusERV-1 start/stopERV-1 run status

Return, Supply Air temps Occupied Mode: System to start & run according toschedule (24 hour occupied, adjustable).ERV-1 starts after RTU-1 run status confirmed.Temp Control: to maintain target SA temp(adjustable). RTU-1 controls SA temp and staticpressure based on its own self contained controls.RA setpoint is 22C (71.6F) (adjustable) andoperating range is 2.5C (4.5F). As RA goes from20.75 to 23.25C (69.4 to 73.9F), SA will go from 24to 12.5C (75.2 to 54.5F). When RA is at 22C (71.6F)setpoint, SA setpoint will be 18C (64.4F).

Roof(Option to add

stand alone A/Csystems to new

BAS);

ACC/CRU-1ACC/CRU-2ACC/CRU-3ACC/CRU-4

A/C Systems for;Comm. Room 307Comm. Room 307Server Room 224Data Room 136

ACC-1 start/stopACC-1 run statusACC-2 start/stopACC-2 run statusACC-3 start/stopACC-3 run statusACC-4 start/stopACC-4 run status

Temp & Humidity sensor in 307Temp sensor in 224Temp sensor in 136

Existing equipment not on existing BAS,Add new temp & humidity sensors in rooms shown,Add graphics, control, monitoring, alarming ofexisting stand alone A/C systems.

Level 3, Top Floor19 VAVs,

VAV3.01 toVAV3.19

Per Existing BASSchedule

Per Existing BAS Schedule

Per Existing BAS Schedule(Option for additional VAV controls toprovide improved temperature control inrooms served by VAV)

Per Existing VAV Control Schedule,(Option for additional VAV controls);Add new temp sensor 3.15A in room 305,Replace 3.17 pnuematic reheat valve with electronic,Add new temp sensor 3.18A in room 341

Level 2, GroundFloor

13 VAVs,VAV2.01 to

VAV2.13

Per Existing BASSchedule

Per Existing BAS Schedule

Per Existing BAS Schedule(Option for additional VAV controls toprovide improved temperature control inrooms served by VAV)

Per Existing VAV Control Schedule,(Option for additional VAV controls);Add new temp sensor 2.09A in room 242,Add new temp sensor 2.11A in room 238,Add new temp sensor 2.13A in room 231,Add new temp sensor 2.13B in room 233

Level 1, Basement13 VAVs,

VAV1.01 toVAV1.13

Per Existing BASSchedule

Per Existing BAS Schedule Per Existing BAS Schedule Per Existing VAV Control Schedule

Level 1, BasementBoiler Room

BoilerControl

Boiler B-1Pump P-3 (for B-1)Boiler B-2Pump P-4 (for B-2)

B-1,2 enableB-1,2 statusP-3,4 start/stop by boilersP-3,4 status

0-10vDC B-1,2 HWS setpointsB-1,2 HWS temps

Outdoor Air Reset: HWS 60 to 70C (140 to 160F) for0 to -20C (32 to -4F) OA (adjustable),Boiler Lead/Lag,Boiler Control: Enable lead boiler when OA tempfalls below setpoint (adjustable) & cycle/modulate tomaintain HWS setpoint. If lead boiler goes intoalarm, lag boiler will start & run until lead boilerreturns to normal state. Enable lag boiler on offsetfrom HWS setpoint (adjustable).

Level 1, BasementBoiler Room

P-2AMain Loop

Control

Hydronic HeatingLevel 3 reheat &radiation coils,Penthouse (fieldconfirm)

Pump P-2A(Main Loop) start/stopPump P-2A status

Pump P-2A (Main Loop) VFD spd controlPump P-2A (Main Loop) delta pressure(dP sensor located in penthouse, fieldconfirm)Main Loop Supply, Return temps

P-2A to run continuously when boiler controlenabled. VFD to modulate P-2A speed based on dPsensor.

Level 1, BasementBoiler Room

P-1AMod Loop

Control

Hydronic HeatingLevel 1 & 2 reheat &radiation coils (fieldconfirm)

Pump P-1A(Mod Loop) start/stopPump P-1A status

Pump P-1A (Mod Loop) VFD spd controlPump P-1A (Mod Loop) delta pressure(dP sensor located in ceiling of basementexercise room, field confirm)Mod Loop Supply, Return temps3-way mod valve

P-1A to run continuously when boiler controlenabled. VFD to modulate P-1A speed based on dPsensor. Target mod loop supply temp from 30 to 70C(86 to 160F) for 15 to-15C (59 to 5F) OA(adjustable).

Level 1, BasementBoiler Room

HWT-1P-9

Secondary DHWheating

P-9 start/stopP-9 statusDWH-1 alarm

HWT-1 tempP-9 enabled when boiler control enabled. P-9 to runon offset from DWH setpoint (adjustable) or whenDWH-1 goes into alarm.

Level 1, BasementBoiler Room(Option for

Hydronic StandbyPumps)

P-2BP-1B

(StandbyPumps)

Hydronic Heating

Pump P-2B(Main Loop) start/stopPump P-2B statusPump P-1B(Mod Loop) start/stopPump P-1B status

Pump P-2B (Main Loop) VFD spd controlPump P-1B (Mod Loop) VFD spd control

P-2B is standby to P-2A, P-1B is standby to P-1A.If pump A goes into alarm, pump B will start, run &modulate speed until pump A returns to normalstate. A & B pumps shall not run simultaneously andbe electrically & BAS interlocked.

EXISTING & NEW VAV CONTROL SCHEDULE

Normal OperationCooling Control: VAV to modulate between maximum & minimum flow rates to satisfy cooling demand. Increase flow for more cooling and decrease flow for less cooling. If VAV is at minimum flow androom temperature is still too cool, then VAV is to modulate to Reheat Air Flow (50% of maximum) and modulate reheat coil valve to satisfy the heating setpoint.Level 3 Heating Control: Rooms with radiation have 2 position on-off control valves. According to existing documentation, the valve actuator operation calls for a 5 minute delay on opening for heatingcall and 5 minute delay on closing for end of heating call. Radiation valve to open when control signal to reheat valve reaches 50% (adjustable) and close when control signal decreases to 10%(adjustable).Level 2 Heating Control: Rooms with radiation have modulating control valves. Radiation valves will modulate with the same control signal as the reheat valve.Level 1 Heating Control: No radiation heating, only reheat coils with modulating control valves.Temperature setpoints: Heating setpoint is room thermostat setpoint minus 0.5C (1F), cooling setpoint is room thermostat setpoint plus 0.5C (1F).

Unoccupied OperationWhen the associated air handling system is in unoccupied mode, the VAV will also be in unoccupied mode. Heating for maintaining room temp will be at unoccupied setpoint. During unoccupied VAVmode, pressing the override button on the thermostat will revert VAV control back to occupied mode for 1 hour (adjustable).

Morning Warmup OperationIf SA temp to the VAV increases to 24C (75F), the VAV damper will modulate between maximum & minimum flow rates. Increase flow for more heating and decrease flow for less heating. When SAtemp to VAV falls below 21C (70F), the VAV will return to normal operation (open for cooling, close for heating).

Fan Powered Box OperationLevel 1 Exercise Room, Level 2 EOC/Briefing Room & Public Meeting Room all have fan powered boxes. Fan will start & run continuously whenever the box is in occupied mode. All other sequencesare the same as VAV box sequences.

Page 18: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

GENERAL LEGEND & ABBREVIATIONS COMPONENT, VALVE & CONTROL LEGEND AIR HANDLING LEGEND EQUIPMENT LEGEND

Page 19: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

ACS-1

H-1

TO 2nd FLOOR

ACRE-1 TE-2 GE-1

ACRE-2

ACS-2

TO 3rd FLOOR

GP-1

H-2

C-1

GC-1

GT-1

UH-1

Page 20: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

P-7

H-1

TO 2nd FLOOR

ACRE-1 TE-2

ACRE-2

UH-1

TO 3rd FLOOR

H-2

GT-1

AHU-1

CU-1

AHU-2

CU-2

ERV-2

D-2

D-3L-2

W-2

ERV-2D-2

D-3L-2

D-1

D-1

W-1

HX-1P-6 PF-1 F-1 P-8

EWSS-1

L-1

Page 21: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

EXISTING HYDRONIC HEATING LOOPEXISTING DOMESTIC WATER HEATING LOOP

B-1

P-3

P-1

P-2

T-1P-4

EAST WALL

NORTH WALL

P-5

B-2

DWH-1HWT-1PF-1 F-1

Page 22: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

NEW HYDRONIC HEATING LOOPNEW DOMESTIC WATER HEATING LOOP

P-3

B-2

P-5

DWH-1HWT-1

P-9

T-2

B-1

P-10

EWSS-2

PF-1 F-1

P-1A

EAST WALL

NORTH WALL

P-1B

P-2A

P-2B

T-1

P-4

Page 23: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

E

D

65

E

D

65

BOILER ROOM - EXTG. LAYOUT

1

BOILER ROOM - NEW LAYOUT

2

Page 24: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 25: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 26: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

C

B

2 543

Page 27: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

120/208V 3Ø 4W

225A MAINS

RP-BR (NEW)

N

ELECTRICAL SPECIFICATIONS:

ELECTRICAL LEGEND

N.T.S.

TYPICAL VFD STARTER WIRING DIAGRAM

1

Page 28: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

208V 3Ø 3W

(C/W CUSTOM LUGS TO SUIT EXTG. FEEDER)

PP-PH (NEW)

REUSE EXTG. 2X(3#350MCM-3") FEEDER

208V 3Ø 3W

600A MAINS

PP-MCC (EXTG.)

400A MAINS

(EXTG. CHILLER REMOVED)

Page 29: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 30: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 31: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 32: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 33: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 34: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 35: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 36: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 37: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST
Page 38: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

NTS

A1.1

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.GENERAL NOTES AND CONDITIONS

WL

1 ISSUED FOR TENDER FEB 18 2014

GENERAL NOTES

1. GENERAL NOTES APPLY TO ALL ARCHITECTURALDRAWINGS.

2. CONTRACTOR SHALL CONFORM TO ALL INDUSTRYSTANDARDS FOR INSTALLATION, ACCORDING TO BESTPRACTICES.

3. THE ARCHITECT IS NOT RESPONSIBLE FOR THE ACCURACYOF THE INFORMATION CONCERNING THE SITE WHENFURNISHED BY OTHERS.

4. DRAWINGS PREPARED BY THE ARCHITECT ARE HISCOPYRIGHT PROPERTY AND SHALL BE RETURNED TO HIMON REQUEST. REPRODUCTION OF DRAWINGS ANDSPECIFICATIONS IN WHOLE OR IN PART IS FORBIDDENWITHOUT THE ARCHITECT'S WRITTEN PERMISSION.

5. CONTRACTOR SHALL CONFIRM EXISTING CONDITIONS.

6. CONTRACTOR SHALL REPORT ANY DISCREPANCIES IN THEDRAWINGS IMMEDIATELY TO THE ARCHITECT.

7. GENERAL CONTRACTOR TO COORDINATE WITH PLUMBER,ELECTRICIAN, ALL OTHER SUB-TRADES AND SUPPLIERS, TOENSURE THAT THERE IS ADEQUATE ROOM FOR NEWMECHANICAL AND ELECTRICAL SYSTEMS. GENERALCONTRACTOR TO COORDINATE LOCATION WITH ALLTRADES THE LOCATION OF FIXTURES AND EQUIPMENTBEFORE ROUGH-INS BEGIN.

8. PATCH AND MAKE GOOD ALL SURFACES AND FINISHESWHERE DEMOLITION OCCURS.

9. ENSURE THAT THE INTEGRITY OF ANY FIRE RATING IN ALLWALLS AND FLOOR ASSEMBLIES

10. CONTRACTOR SHALL PATCH AND MAKE GOOD ALLSURFACES AND FINISHES.

11. CONTRACTOR TO VERIFY ALL FINISHES AND FIXTURESWITH CLIENT BEFORE INSTALLATION.

12. NEW SUPPORT BLOCKING IN ALL WALLS WHEREINSTALLATION OF ALL MILLWORK, TOWEL DISPENSERS,SOAP DISPENSERS AND ANY OTHER WALL MOUNTEDACCESSORY OCCURS.

13. REFER TO DOCUMENTS PREPARED BY OTHERCONSULTANTS FOR THE ENGINEERING RELATED TO:STRUCTURAL MECHANICAL AND ELECTRICAL.

14. NEW PRODUCTS SHALL MATCH EXISTING ADJACENTPRODUCTS: (SIZE, COLOUR, AND FINISH OF EXISTINGMATERIALS)

15. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGSTO ARCHITECT FOR APPROVAL OF ALL ARCHITECTURALITEMS.

Page 39: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

EXISTING STRUCTURALCOLUMN

7'-2

"3'

-4"

6"1'

-1"1'

-41 2"

35'-6

"

3'-3"22'-112"5'-31

2"30'-8"

7'-4

1 2"8'

-6"

1'-8

1 2"35

'-6"

30'-8"

REMOVE EXISTING MECHANICAL LOUVREAND INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW

EXISTINGMECHANICAL LOUVRE

EXISTING H.M. DOORAND FRAME

ROOF TOPPENTHOUSE

P01

8'-6

"

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

3'-5

"3'

-11 2"

6'-1

11 2"2'

-7"

7'

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

REMOVE EXISTING MECHANICAL LOUVREAND INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

REMOVE EXISTING INSULATED CONCRETEWALL PANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

1'-4

1 2"

5'-018"4'-10"

CUT NEW OPENING IN EXISITINGCONCRETE INSULATED WALL PANEL. REFER

TO MECHANICAL DRAWINGS.

01A3.4

01A3.2

01

A3.1

01A3.3

7'

North

2a3

4

C BxCx Bz

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

3/16"=1'

A2.1

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.DEMO FLOOR PLAN

WL

1 ISSUED FOR TENDER FEB 18 2014

Page 40: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,

AND STRUCTURAL DRAWINGS.

FOR MECHANICAL ROOF CURBS, REPAIR /REPLACEMENT OF FLASHING AND ROOFREPAIR REFER TO ROOFING SPECIALIST'S

DRAWINGS AND NOTATION. PATCH AND MAKEGOOD ON ALL SURFACES AND FINISHES.

13'

12'-9

1 2"7'

7'

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,

AND STRUCTURAL DRAWINGS.

01A3.4

01A3.2

01A3.1

01A3.3

North

C Bz BxCx

2a3

4

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

3/16"=1'

A2.2

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.DEMO ROOF PLAN

WL

1 ISSUED FOR TENDER FEB 18 2014

Page 41: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

03A4.1

EXISTING STRUCTURALCOLUMN

7'-2

"3'

-4"

6"1'

-1"1'

-41 2"

35'-6

"

3'-3"22'-112"5'-31

2"30'-8"

7'-4

1 2"8'

-6"

1'-8

1 2"35

'-6"

5'-018"

NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALLPANEL SYSTEM ABOVE AND BELOW

EXISTINGMECHANICAL LOUVRE

NEW DOOR HARDWARE ON EXISTING H.M. DOOR AND FRAME (NEWHARDWARE TO MATCH EXISTING FOR POLICE STANDARDS)

01A10.2

ROOF TOPPENTHOUSE

P01

8'-6

"

NEW INSULATED CONCRETE WALL PANELSYSTEM

3'-5

"3'

-11 2"

6'-1

11 2"2'

-7"

7'

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

EXISTING INSULATED CONCRETE WALLPANEL SYSTEM

1'-4

1 2"

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALLPANEL SYSTEM ABOVE AND BELOW

7'

30'-8"4'-10"

PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL. NEW

SEALANT AROUND NEW PREFIN. METALMECHANICAL LOUVRE

02A3.4

02A3.2

02A3.1

02A3.3

02A4.1

01A4.1

03A4.1

02A4.1

01A4.1

02A4.1

02A4.1

North

C Bz BxCx

2a3

4

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

3/16"=1'

A2.3

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.NEW FLOOR PLAN

WL

1 ISSUED FOR TENDER FEB 18 2014

Page 42: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,AND STRUCTURAL DRAWINGS.

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,

AND STRUCTURAL DRAWINGS.

FOR MECHANICAL ROOF CURBS, REPAIR /REPLACEMENT OF FLASHING AND ROOFREPAIR REFER TO ROOFING SPECIALIST'S

DRAWINGS AND NOTATION. PATCH AND MAKEGOOD ON ALL SURFACES AND FINISHES.

13'

12'-9

1 2"7'

7'

NEW OPENING IN EXISTING ROOF. FOR EXACTLOCATIONS COORDINATE WITH MECHANICAL,

AND STRUCTURAL DRAWINGS.

02A3.4

02A3.2

02A3.1

02

A3.3

North

C Bz BxCx

2a3

4

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

3/16"=1'

A2.4

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.NEW ROOF PLAN

WL

1 ISSUED FOR TENDER FEB 18 2014

Page 43: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

4'-6

"5'

-6"

3'-0

14"

13'-0

14"

11"

6'-2

"

EXISTING H.M. DOOR AND FRAME

REMOVE EXISTING MECHANICALLOUVRE AND INSULATEDCONCRETE WALL PANEL SYSTEMABOVE AND BELOW

REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM

11"

REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM

PROTECT EXISTING UPSTAND AND ROOFING.PATCH AND MAKE GOOD ON ALL SURFACESAND FINISHES.

12'-1

14"

12'-1

14"

REMOVE EXISTING LIGHT CAREFULLY,AND REINSTALL LIGHT AFTERINSTALLATION OF NEW PANELS

6'-2

1 2"4'

2'-9

78"

13'-0

14"

11"

6'-2

" NEW DOOR HARDWARE ON EXISTING H.M.DOOR AND FRAME (NEW HARDWARE TOMATCH EXISTING FOR POLICE STANDARDS)

REINSTALL EXISTING LIGHT FIXTURE. NEWSEALANT AROUND.

NEW INSULATED CONCRETE WALL PANELSYSTEM

12'-1

14"

12'-1

14"

NEW CONTINUOUS SEALANT ATINTERSECTIONS OF EXISING AND NEW PANELS

NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW. NEW SEALANTAROUND NEW LOUVRE.

NEW INSULATEDCONCRETE WALLPANEL SYSTEM

FOR REPAIR / REPLACEMENT OF FLASHING ANDROOF REPAIR REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION. PATCH AND MAKE

GOOD ON ALL SURFACES AND FINISHES.

03A4.1

01A4.1

02A4.1

02A4.1

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

AS NOTED

A3.1

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.WEST ELEVATION DRAWINGS

WL

A3.101 DEMOLITION ELEVATION

SCALE 1 4" = 1'

A3.102 NEW CONSTRUCTION ELEVATION

SCALE 1 4" = 1'

1 ISSUED FOR TENDER FEB 18 2014

Page 44: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

11"

12'-1

14"

13'-0

14"

CUT NEW OPENING IN EXISITINGCONCRETE INSULATED WALLPANEL. REFER TO MECHANICALDRAWINGS.

2'-1

078"

6'-4

"

REFER TO MECH. AND ELEC. FORDEMOLITION NOTATION.

EXISTING RADIO TOWER

11"

12'-1

14"

13'-0

14"

PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL. NEWSEALANT AROUND NEW PREFIN. METALMECHANICAL LOUVRE

PATCH AND MAKE GOOD ON EXISTINGINSULATED CONCRETE WALL PANEL WHEREMECHANICAL / ELECTRICAL HAS BEENREMOVED. MATCH EXISTING COLOUR ANDFINISH.

2'-1

078"

6'-4

"

03A4.1

01A4.1

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

AS NOTED

A3.2

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.SOUTH ELEVATION DRAWINGS

WL

A3.201 DEMOLITION ELEVATION

SCALE 1 4" = 1'

A3.202 NEW CONSTRUCTION ELEVATION

SCALE 1 4" = 1'

1 ISSUED FOR TENDER FEB 18 2014

Page 45: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

4'-6

"5'

-6"

3'-0

14"

13'-0

14"

REMOVE EXISTING MECHANICALLOUVRE AND INSULATEDCONCRETE WALL PANEL SYSTEMABOVE AND BELOW

11"

REMOVE EXISTING INSULATEDCONCRETE WALL PANEL SYSTEM

PROTECT EXISTING UPSTAND ANDROOFING. PATCH AND MAKE GOODON ALL SURFACES AND FINISHES.

4'-6

"5'

-6"

3'-0

14"

13'-0

14"

11"

NEW CONTINUOUS SEALANT ATINTERSECTIONS OF EXISING AND NEW PANELS

NEW INSULATED CONCRETE WALL PANELSYSTEM

NEW PREFIN. METAL MECHANICAL LOUVREAND NEW INSULATED CONCRETE WALL PANELSYSTEM ABOVE AND BELOW. NEW SEALANTAROUND NEW LOUVRE.

FOR REPAIR / REPLACEMENT OF FLASHING ANDROOF REPAIR REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION. PATCH AND MAKE

GOOD ON ALL SURFACES AND FINISHES.

03A4.1

01A4.1

02A4.1

02A4.1

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

AS NOTED

A3.3

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.EAST ELEVATION DRAWINGS

WL

A3.301 DEMOLITION ELEVATION

SCALE 1 4" = 1'

A3.302 NEW CONSTRUCTION ELEVATION

SCALE 1 4" = 1'

1 ISSUED FOR TENDER FEB 18 2014

Page 46: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

7'3'

3'-0

14"

13'-0

14"

EXISTING MECHANICAL LOUVRE(TYPICAL)

EXISTING INSULATED CONCRETEPANEL WALL SYSTEM. (TYPICAL)

EXISTING PREFINISHED METALFLASHING (TYPICAL)

EXISTING ROOF UPSTAND SYSTEM(TYPICAL)

11"

7'3'

3'-0

14"

13'-0

14"

NEW SEALANT AROUND EXISTINGPREFIN. METAL MECH. LOUVRE

NEW MECHANICAL UNIT REFERTO MECHANICAL AND ELECTRICALDRAWINGS (TYPICAL)

11"

1 ISSUED FOR TENDER FEB 18 2014

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

AS NOTED

A3.4

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.NORTH ELEVATION DRAWINGS

WL

A3.401 DEMOLITION ELEVATION

SCALE 1 4" = 1'

A3.402 NEW CONSTRUCTION ELEVATION

SCALE 1 4" = 1'

Page 47: ATTACHMENT #2 HVAC RENOVATIONS TO PETERBOROUGH POLICE STATIONAssets/eTenders/Closed/2014/T-18... · HVAC RENOVATIONS TO PETERBOROUGH POLICE STATION SITE LOCATION DRAWING LIST

NEW SEALANT

NEW PREFINISHED METAL FLASHING

NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING

COLOUR, SIZE, AND FINISH)

NEW 312" STRUCTURAL STEEL STUDS

@ 12" O.C. MAX.

NEW 312" HORIZONTAL STEEL STUDS

@ 24" O.C. MAX.

PATCH AND MAKE GOOD ON EXISTING PREFINISHEDMETAL FLASHING (MATCH EXISTING COLOUR, SIZE,

AND FINISH) REFER TO ROOFING SPECIALIST'SDRAWINGS AND NOTATION

REMOVE EXISTING ROOFING 24" BACK FROM NEW

NEW PREFINISHED METAL FLASHING

NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING

COLOUR, SIZE, AND FINISH)

NEW 312" STRUCTURAL STEEL STUDS

@ 12" O.C. MAX.

NEW 312" HORIZONTAL STEEL STUDS

@ 24" O.C. MAX.

NEW 6 MIL POLY. VAPOUR BARRIER

NEW SEALANT

NEW PREFINISHED METAL FLASHING

NEW PREFINISHED METALMECHANICAL LOUVRE

NEW 312" STRUCTURAL STEEL STUDS

@ 12" O.C. MAX.

NEW 312" HORIZONTAL STEEL STUDS

@ 24" O.C. MAX.

NEW PREFINISHED METAL FLASHING

PATCH AND MAKE GOOD ON EXISTINGUPSTAND AND ROOFING

NEW INSULATED CONCRETE PANELWITH ROCK FINISH (MATCH EXISTING

COLOUR, SIZE, AND FINISH)

NEW 312" STRUCTURAL STEEL STUDS

@ 12" O.C. MAX.

NEW 312" HORIZONTAL STEEL STUDS

@ 24" O.C. MAX.

NEW 6 MIL POLY. VAPOUR BARRIER

1 ISSUED FOR TENDER FEB 18 2014

Lennis Trotter Architect

Oshawa, Ontario 905.576.6869REVISION

DATE PROJECT NO

SCALE

DRAWING NO

PROJECT NAME

DRAWING CLIENT

DRAWN BY

1334FEB 20 2014

AS NOTED

A4.1

PETERBOROUGH LAKEFIELD POLICEPENTHOUSE RENOVATIONS500 WATER ST.

PETERBOROUGH

P.L.P.S.DETAILS

WL

A4.101 SECTION DETAIL AT TOP OF NEW LOUVRE

SCALE 1" = 1'

A4.102 DETAIL AT EXISTING ROOF CURB

SCALE 1" = 1'

A4.103 SECTION DETAIL AT BOTTOM OF NEW LOUVRE

SCALE 1" = 1'