“ eni Iraq b.v. - Zubair Oil Field Development Project”
Work Package of Existing DGS Modification
Form No. QIR -121
Report No.:
BOLT TORQUE REPORT Sheet of
Reference : Piping Fabrication & Erection Procedure No. 00250600DBPC4066M - (Attach. 2)
SYSTEM TITLE or NO:_____________________
AREA / ISOMETRIC NUMBER : ___________________________ SHT NO :___________ DWG NO : ___________
JOINT REFERENCE/ LOCATION:______________________________ SPEC NO:________________________
FLANGE DETAILS (SIZE / RATING ) _____________________________________________________________
BOLT SIZE:___________________ NO OF BOLTS:________________BOLTING MATERIAL:____________________
REQUIRED TORQUE:_______________________________ NO OF STEPS _____________________________
WRENCH MANUFACTURER: ______________________________________________________________________
SERIAL NUMBER: ________________________ CALIBRATION DATE__________________________________
TIGHTENING SEQUENCE: REMARKS:
Construction QCI Company
Name
Sign
Date