2
Notice of Project Western University Facilities Management Client Services 519-661-3304 ([email protected]) Project Number: Project Name: Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other Shutdowns/Interruptions(Approximate Schedule): Electrical Power Domestic Water Steam Hot Water Heating Chilled Water Elevators Fire Alarms Roads / Lots ITS Other Issued By: Miniature Attached Date/Schedule: Contractor: Attached To Follow Special Conditions ( Noise, Odors, Asbestos, Etc.) Comments: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Date: Areas/Rooms Affected, Alternate Route/Service: Description/Reason for Project: Service to be interrupted: Building(s) Affected: Information Sheet Sent To Client #1 #3 #2 #4 #1 #2 #3 #4 Phone # Cell # Client Contact: Phone # Designer Consultant: Emergency Phone List: (to CCPS Only) Project Manager/ Co-ordinator: Signature/ Stamp: Cell # Note: Signature/ Stamp: Time: 9D7332 Catch Basin repairs on Kent Drive, east of UC Print Form Aug 15-16, 2016 Aar-Con Excavating inc. Adrian is supt. 2 isolated areas of sinkhole hazards to be repaired Removal of sunken, and broken asphalt, replace roadbase granular, parge extg CB's and connect to existing storm system, backfill same area, pave of long narrow area Southbound lane) Refer to attached map. Parking Lot spaces along east edge of Kent Drive at UC Hill 82711 +1 (519) 808-9512 n/a civil work under capital 82711 n/a no design req'd Craig Fellner 519-521-5586 7:00am - 5:30pm Kent Drive University College Submit by E-mail By Justin DeGurse ([email protected]) at 2:06 pm, Aug 12, 2016

Attached To Follow Dr. Sink Hole... · Aug 15-16, 2016 Aar-Con Excavating inc. Adrian is supt. 2 isolated areas of sinkhole hazards to be repaired Removal of sunken, and broken asphalt,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Attached To Follow Dr. Sink Hole... · Aug 15-16, 2016 Aar-Con Excavating inc. Adrian is supt. 2 isolated areas of sinkhole hazards to be repaired Removal of sunken, and broken asphalt,

Notice of Project Western University

Facilities Management Client Services 519-661-3304 ([email protected])

Project Number:

Project Name:

Asbestos Type 3 Type 2 Type 1 Contractor In House Team Other

Shutdowns/Interruptions(Approximate Schedule):Electrical Power Domestic Water Steam Hot Water Heating

Chilled Water

Elevators

Fire Alarms

Roads / Lots

ITS Other

Issued By:

Miniature Attached Date/Schedule:

Contractor:

Attached To Follow

Special Conditions ( Noise, Odors, Asbestos, Etc.)

Comments:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Date:

Areas/Rooms Affected, Alternate Route/Service:

Description/Reason for Project:

Service to be interrupted:

Building(s) Affected:

Information Sheet Sent To Client

#1

#3

#2

#4

#1 #2

#3 #4

Phone # Cell #

Client Contact: Phone #

Designer Consultant:

Emergency Phone List: (to CCPS Only)

Project Manager/ Co-ordinator:

Signature/ Stamp:

Cell #

Note:

Signature/ Stamp:

Time:

9D7332

Catch Basin repairs on Kent Drive, east of UC

Print Form

Aug 15-16, 2016

Aar-Con Excavating inc. Adrian is supt.

2 isolated areas of sinkhole hazards to be repaired

Removal of sunken, and broken asphalt, replace roadbase granular, parge extg CB's and connect to existing storm system, backfill same area, pave of long narrow area Southbound lane) Refer to attached map.

Parking Lot spaces along east edge of Kent Drive at UC Hill

82711 +1 (519) 808-9512

n/a civil work under capital 82711

n/a no design req'd

Craig Fellner

519-521-5586

7:00am - 5:30pm

Kent Drive University College

Submit by E-mail

By Justin DeGurse ([email protected]) at 2:06 pm, Aug 12, 2016

jdegurs3
Text Box
Aug 15-23, 2016
Page 2: Attached To Follow Dr. Sink Hole... · Aug 15-16, 2016 Aar-Con Excavating inc. Adrian is supt. 2 isolated areas of sinkhole hazards to be repaired Removal of sunken, and broken asphalt,

AreaofWork

We

will

try

to k

eep

a la

ne o

pen,

but

due

to

the

exte

nt o

f the

sin

khol

e, m

ay h

ave

to

clos

e it

off t

o tr

affic

. N

ot su

re u

ntil

area

is

expo

sed.

Th

e pl

an is

to k

eep

one

lane

ope

n.