1.PROJECT ABSTRACT

Page 2: ATM Project Report

2

1. PROJECT ABSTRACT

1.1. INTRODUCTION:

The project “ATM TRANSACTION” is implemented in Visual Basic 6.0. It is used by

all banks in their ATM machine (Automatic Teller Machine).In earlier years all the

transactions were to be done manually, still done but very rarely, as it is a difficult task. So

now banks use this to give their customers to have easy & faster transactions. Thus our this

project is a good task to have transactions easier, faster & for emergencies.

1.2. SCOPE:

It can be implemented in ATM machine by owner of bank or in charge of branch

It is easy to learn the task

1.3. OBJECTIVES:

Our main objective is to speed up the transactions done by customers. No manual

transactions needed generally. The second objective is to save the time which is very

important now-a-days.

Page 3: ATM Project Report

3

2.TOOLS / PLATFORM / LANGUAGES

Page 4: ATM Project Report

4

2. TOOLS / PLATFORM / LANGUAGES

2.1. TOOLS:

Processor :- Intel Pentium 4 or Later or Compatible

Hard Disk :- 10GB or more

RAM :- 256MB or more

Printer :- Any

Monitor :- SVGA Color Monitor (Touch Screen or Simple)

Pointing Device :- Touch Pad or Keys

2.2. PLATFORM:

Operating System :- Microsoft Windows XP or Later or Equivalent

2.3. LANGUAGES:

Front End :- Visual Basic 6.0

Back End :- Oracle 8i

Page 5: ATM Project Report

5

3.PROJECT PLANNING / SCHEDULING

Page 6: ATM Project Report

6

3. PROJECT PLANNING / SCHEDULING

Project Planning

Project Abstract

Project Design

Design Database

Use Case & Activity Diagram

Seq & Coll Diagram

State Chart & Activity Diagram

Recheck Availability

Create Toll in VB

0

2

4

6

8

10

12

14

16

18

20

lab1 lab2 lab3 lab4 lab5 lab6 lab7 lab8 lab9

Page 7: ATM Project Report

7

4.SYSTEM ANALYSIS

Page 8: ATM Project Report

8

4. SYSTEM ANALYSIS

4.1. STUDY OF CURRENT / EXISTING SYSTEM:

In the manual system, firstly the bank manager and its staff have to manage

information regarding the accounts and transaction of all the customers manually. Doing

this manual transaction was really tedious job. Secondly information regarding accounts

and transactions of customers were to be maintained. This process is time consuming and

it requires a great manual effort.

Disadvantages:

More time is consumed.

More hard work to maintain all records.

Bulk of paper is to be searched for a single search.

4.2. FEASIBILITY STUDY:

4.2.1.TECHNICAL FEASIBILITY:

The system is being developed in Visual Basic 6.0. It provides comprehensive

function to make it user friendly. The data entry and report generation is also made

easy. Backup and restore of the database facility are also provided. It also provides

easy retrieval of data. The machine configuration also supports this software.

4.2.2. SOCIAL FEASIBILITY:

As this system is user friendly and flexible some problems will also be solved

which employee may be facing when using existing system. So we can say that

system is socially feasible.

Page 9: ATM Project Report

9

4.2.3. ECONOMICAL FEASIBILITY:

The cost of converting from manual system to new automatic computerized

system is not probably more. For construction of the new system, the rooms and its

facilities are available so it does not require any extra resource, only the software

requirement is there.

4.2.4. OPERATION FEASIBILITY:

Since the system is being in user friendly way, the new customers within a few

time can master it.

4.3. DESIGN OF NEW PROPOSED SYSTEM (UML):

This system provides paperless maintenance. Initially a cashier or an clerk can be

appointed to do all the transaction and update and maintain records. In the new system the

customer himself can do all the transaction and the computerized system automatically

updates and maintains the records.

Advantages:

Less effort to complete transaction.

Less time required.

No need to maintain the bulk of papers.

Page 10: ATM Project Report

10

5.SYSTEM DESIGN

Page 11: ATM Project Report

11

5. SYSTEM DESIGN

5.1. DATA DICTONARY:

Table Name: customer

Column Name Data Type

cust_id varchar2

cust_name varchar2

Dob date

contact_no number

cust_add varchar2

a_c_no varchar2

a_c_type varchar2

Bal number

card_no number

card_pin number

b_branch_id varchar2

Table Name: bank

Column Name Data Type

b_branch_id varchar2

b_branch_name varchar2

b_branch_add varchar2

b_admin_id varchar2

Table Name: b_admin

Column Name Data Type

b_admin_id varchar2

b_admin_name varchar2

b_admin_pin number

b_admin_rights varchar2

Page 12: ATM Project Report

12

Table Name: atm

Column Name Data Type

a_branch_id varchar2

a_branch_name varchar2

a_branch_add varchar2

a_admin_id varchar2

available_cash number

b_branch_id varchar2

Table Name: a_atm

Column Name Data Type

a_admin_id varchar2

a_admin_name varchar2

a_admin_pin number

a_admin_rights varchar2

a_branch_id varchar2

5.2. DIAGRAM DESIGN (UML):

5.2.1.USE CASE DIAGRAM:

atm

branch_name branch_id available_cash

customer

card_no

cust_name type of a/c

pin_no

balance

savingcurrent

<<extend>>ATM Customer

Page 13: ATM Project Report

13

5.2.2.ACTIVITY DIAGRAM:

Page 14: ATM Project Report

14

5.2.3.SEQUENCE DIAGRAM:

user atm bank

1: card

2: req pin

3: enter pin

4: proccesing

7: option

5: verify

6: valid

8: transaction

9: transaction complete

10: collect reciept

Page 15: ATM Project Report

15

5.2.4.COLLABORATION DIAGRAM:

5.2.5.CLASS DIAGRAM:

user atm

bank

1: card3: enter pin

8: transaction

2: req pin4: proccesing

7: option9: transaction complete

10: collect reciept

5: verify6: valid

Page 16: ATM Project Report

16

5.2.6.STATE CHART DIAGRAM: