GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS
ATLAS RPC distribution racksChannel mapping after LS2 upgrade
GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS
New P&ID for future racks:
-Instead of High and Low flow line => One line with regulation valve. Goal: Smooth regulation
GAS group weekly meeting 04/03/2019 Kacper KapusniakEP/DT/FS
GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS
Rack 63:
-New manifold to be added
GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS
GAS group weekly meeting 08/07/2019 Kacper KapusniakEP/DT/FS
Summary:
-All channels will be displayed in SCADA. Unused/not connected will have indication.-2 channels will be moved inside the rack to empty space for dummy chambers.