ATLAS Endcap Muon System WBS 3.5. Frank Taylor MIT. M&O Request FY06 Toronto August 3, 2005. V1.1. U.S. Muon Schedule V7.03. Sequence: EIL4-13 EIL4-A&C BW-C SW-A SW-C BW-A. Status-I 30-July-05. MDT Chambers – EIL4+SW+BW Phase I Commissioning of all 240 chambers @ CERN complete - PowerPoint PPT Presentation
Citation preview
ATLAS Endcap Muon SystemWBS 3.5
Frank Taylor
MIT
M&O Request FY06
Toronto
August 3, 2005 V1.1
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20052
U.S. Muon Schedule V7.03
Seq
uenc
e: E
IL4-
13 E
IL4-
A&
C B
W-C
SW
-A S
W-C
BW
-A
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20053
Status-I 30-July-05
MDT Chambers – EIL4+SW+BW Phase I Commissioning of all 240 chambers @ CERN completecomplete All on-chamber electronics completecomplete Available personnel have largely moved to CERN
CSC Chambers – SW 14 of 32 passed Phase I Commissioning @ BNL All on-chamber electronics completecomplete Off-chamber RoD & Transition Modules in prototype
Will not be finished by CD4A but will be ready for installation
Alignment – EIL4+SW+BW+EO All in-plane components completecomplete All components for alignment bars completecomplete Expect EIL4/BW/SW parts complete by CD4A
Except – CSC on-chamber parts (not part of Appendix 3) EO parts will be completed before V7.03 need date
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20054
Status-II 30-July-05
Chamber installation tooling-Ready-Ready Chamber ‘Verticalizer’, ‘Grabber’ & ‘Wisconsin’ tool TIS certifiedTIS certified
BW Installation B180-Started-Started Last BT moved from B180 to Point 1 on 29-July-05
Competition for space reduced but share B180 with TGC & ECT BW-Large Sector tooling setup in B180
BW-Sector 9C verticalBW-Sector 9C vertical BW-Small Sector tooling delivered to CERN
Except A-frame that will be needed later Remaining BW sector parts delivery Aug. through Nov. from Russia
Project tracking difficult
EIL4 Installation B180-Started-Started Work area setup in B180 and is operational EIL4-13A installed on frame & integrated with TGCs in B180
SW Installation B191-To Start early 2006 after ECT Assembly SWA & SWC are at CERN
Were pre-assembled at Hatehof in Israel
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20055
M&O-Installation Locations & Phases
MDT Test StationBMC, UM, UW
CERN - Bld 184
CSC Test StationBNL - 832
Alignment SystemTest Station
CERN - Bld 180
CommissionBig Wheel [BW]
Sectors CERN - Bld 180, 185
Commission Small Wheel [SW]
CERN - Bld 191
Phase IICY 04 - 06
Phase ICY 04 - 05
Phase IIICY 05 - 07
ATLAS
UX15
Beam On - CY-07
Installation on Support Structures
Complete
Partially Complete
Started
B184 CERN
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20056
Installation Pictures
Chamber Handling Tooling Installation of 1st Alignment Bar in Sector 9C
BW-L Tooling & Sector 9C
EIL4 Work Area in B180 EIL4 A13 TGC+MDT
BW Sector 9C @ B180SW @ Hatehof
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20057
Plans for FY06 MDT Chambers
Production installation of EIL4 chambers (Operation 1) 16 chambers – 4 are special in Sectors 1 & 9 All 16 installed in UX15 by 15-March-06
Production installation of BW-L & BW-S chambers (Operations 2&3) 16 BW-C Sectors (5 MDT each) by 30-Jan-06 Continue BW-A Sectors finish by Dec-06
Set up SW area in B191 – start by 15-Jan-06 Production installation of EI MDTs on SWs (Operations 4&5)
All EI MDTs (64) installed by ~ Oct-06 (Start ASAP – dependent on ECTs)
CSC Chambers Ship all CSCs to CERN after Phase I finished @ BNL ~ Oct-05 Setup CSC test area in B184 ~ Nov-Dec-05
Integrate CSCs with support frames & alignment components Installation of CSCs in SWs (Operations 4’&5’)
Finish by Oct-06
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20058
US Muon Operations in B180
BW-S (O3) EIL4 (O1) BW-L (O2)Sm
all W
heel
in B
191
O(4
&5)
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 20059
3.5 Budget Profile-Baseline
Po
ssib
le c
all
on M
ana
ge
me
nt R
ese
rve
FY
06,7
,8 P
h ase
II &
III –
Inte
gr a
tion
&
Co
mm
issi
on
ing
in U
X15
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200510
3.5 Labor Plans-Baseline
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200511
Installation Baseline
Some carryover expected FY05->FY06 but unknown at this time
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200512
FY06 M&O Request Solicited M&O requirements from the 10 Muon Institutes
Replies from all 10 received
1st round of budget scrubbing of requests while trying to maintain essential technical staff support
Sum I+M&O = 2,278
Sum M&O = 1,895Comparision of M&O and Installation Baseline Plans vs. FY06 Institute Requests
Institute Major ActivityM&O
BaselineInstallation
Baseline
I+M&O Total
Baseline
I + M&O Request
PM Modification of Request M&O +
Installation
Comment
Sum 1,541 383 1,924 2,629 705 2,278 1,895 354
Arizona CSC Electronics Phase I, II Commissioning - - 56.0 56.0 46.0
Travel of Technicians reduced by 10k. 46.0
Boston
Phase 1.9 Commissioning, BW MDT Installation &
Commissioning, SW Installation & Commissioning, QA/QC 149.5 149.5 197.0 47.5 169.4
COLA for Senior Physicist put on Base. 19.9
Brandeis
Alignment Commissioning, BW Sector Assembly, Tooling, Service Installation, MDT
Chamber Installation 364.5 383.0 747.5 747.5 - 647.0
Budget request needs scrubbing. Reduce M&O
baseline by 100k and keep Installation the same. (100.5)
BrookhavenCSC Mechanical, CSC On-
chamber electronics, Phase I, II Commissioning 164.0 164.0 439.0 275.0 387.0
Hoffman & Junnarkar reduced to 1/3 FTE each. 223.0
HarvardMDT On-chamber Electronics,
System engineering MDT Commissioning Phase 1.9, II 255.0 255.0 256.0 1.0 189.0
Electronics request reduced by factor of 2. Physicists
COLA put on base. (66.0)
MIT MDT Commissioning Phase 1.9, II and PM - - 30.0 30.0 20.0
Support for Summer Students reduced. 20.0
Michigan
BW Service Installation, MDT Commissioning Phase 1.9, II
(Coordinator), On-chamber Electronics, Installation,
Database, Commissioning Software 356.5 356.5 402.0 45.5 392.0 Reduced Travel by 10k. 35.5
TuftsAlignment Commissioning, Database, Commissioning
Software 52.5 52.5 52.5 - 52.5 Preliminary budget set to
FY05 plan. -
UCI CSC Off-chamber Electronics, Phase II Commissioning 83.0 83.0 164.2 81.2 100.0
Work on only CSC Phase I & II at CERN. Phase III will be
FY07. 17.0
Washington
MDT Installation, EIL4 Mechanical, Electrical Phase
1.9, II Commissioning, Mechanical Engineering &
Structural Analysis 116.0 116.0 285.0 169.0 275.0 Reduced Senior Engineer by
10k. 159.0
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200513
M&O Resource Levels
Analysis of Jan-05 still holds:
Requirements for FY05, 06 & 07 estimated to be roughly same level
FY05 M&O Budget 1,887k
FY06 M&O Request after PM scrubbing 1,895k
Installation in FY06 budget baseline 383k
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200514
Management Reserve
Anticipate a call on MR ~ $354k in FY06 Scheduled work delayed but end-date fixed
BW and SW installations and commissioning will have
significant overlap
Expect roughly constant M&O resources needed FY05-FY07.
During FY06 work will focus on EIL4 & BW and later on SW
installation and commissioning in B180 & B191, respectively Installation and commissioning of EIL4-A13 and 1st BW-L sector
should provide a calibration of time & manpower needed
Priority for call for MR funding Essential technical & engineering staff @ CERN for
installation & commissioning
F. E. Taylor - ATLAS Muon SystemToronto 3-Aug-05, 200515
Summary
Many items completed on the CD4A list However significant effort in the US remains until the end of
FY05 that has impacted concentrated effort @ CERN
Delays BW Installation & Commissioning B180 occupancy, delivery of BW frames & tooling
Because Installation in UX15 is fixed, more work will have to be performed in parallel
EIL4, BW and SW installation work will overlap in CY06 5 ‘Operations’ simultaneously conducted Share manpower, share tooling, logistical overhead
M&O resources will have to support this compressed schedule