23
ATHI WATER SERVICES BOARD TENDER AWARD DETAILS TENDER IDENTIFICATION NUMBER AWSB/RDBWS/CS-01/2017 TENDER DESCRIPTION CONSULTANCY SERVICES FOR DESIGN REVIEW AND SUPERVISION OF WORKS FOR ‘DESIGN-AND-BUILD’ RUIRU II DAM WATER SUPPLY PROJECT TENDER SCOPE a. Review survey workks b. Review of Engineering Design prepared by the « Design-and- Build contractor c. Supervision of construction works to ensure works quality control and quality assurance d. Supervision of the implementation of ESMP e. Review and update of the resettlement action plan f. Management of works contract g. Reiview and update payment requesst and other related issues h. Review and verify completion activities and remedial works CONTRACT VALUE Euro 1,670,791.76 & KSHS. 118,325,578.95 inclusive of WHT but excluding VAT The amount of VAT is Euro 267,326.68 & KES 18,932,092.63 FULL PARTICULARS OF AWARDED BIDDER Company Name M/S TRACTABEL ENGINEERING S.A & GIBB AFRICA LTD JV Names of Partners GIBB AFRICA LTD List of Directors, Shareholders & Beneficial Owners Tractabel Engineering S.A. DANIEL DEVELAY MARC FRANCHIMONT BERNARD GILLIOT

ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor

ATHI WATER SERVICES BOARD

TENDER AWARD DETAILS

TENDER IDENTIFICATION NUMBER

AWSB/RDBWS/CS-01/2017

TENDER DESCRIPTION CONSULTANCY SERVICES FOR DESIGN REVIEW AND SUPERVISION OF WORKS FOR ‘DESIGN-AND-BUILD’ RUIRU II DAM WATER SUPPLY PROJECT

TENDER SCOPE a. Review survey workks b. Review of Engineering Design prepared by the « Design-and-

Build contractor c. Supervision of construction works to ensure works quality

control and quality assurance d. Supervision of the implementation of ESMP e. Review and update of the resettlement action plan f. Management of works contract g. Reiview and update payment requesst and other related issues h. Review and verify completion activities and remedial works

CONTRACT VALUE Euro 1,670,791.76 & KSHS. 118,325,578.95 inclusive of WHT but excluding VAT

The amount of VAT is Euro 267,326.68 & KES 18,932,092.63

FULL PARTICULARS OF AWARDED BIDDER

Company Name M/S TRACTABEL ENGINEERING S.A & GIBB AFRICA LTD JV

Names of Partners GIBB AFRICA LTD

List of Directors, Shareholders & Beneficial Owners

Tractabel Engineering S.A.

DANIEL DEVELAY

MARC FRANCHIMONT

BERNARD GILLIOT

Page 2: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor

Gibb Africa Ltd.

KASYOKA MALINDA

ELIZABETH NDINYA

Business Contacts Information

Tractabel Engineering S.A

Telephone : +33 (0)141850386/69 ;+33 (0)677470521

Email : [email protected],co/tractebel-engie .fr [email protected]

[email protected]

Gibb Africa Ltd.

Telephone : +254 0203245000/2251880/2250577

Email : [email protected]

Postal Address Tractabel Engineering S.A

5,rue du 19 mars 1962

9622 Gennevilliers CEDEX-France

Gibb Africa Ltd.

P.O BOX 30020 – 00100, NAIROBI KENYA

Physical Address Tractabel Engineering S.A

5,rue du 19 mars 1962

9622 Gennevilliers CEDEX-France

Gibb Africa Ltd.

1st Flr, Kaka House, Maua Close, off Parklands Rd,

Pin Number Tractabel Engineering S.A

Gibb Africa Ltd.

P0006006192C

Registration Details (Incorporation Number)

Tractabel Engineering S.A

Gibb Africa Ltd.

C.44849

Page 3: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor

Business Permit/License Number

EXEMPTED

Tax Compliance Status VALID

County of Operation NAIROBI, SOUTH AFRICA

Award Date 31st January, 2018

Contract Period 48 Months

Technical Capacity The technical proposal submitted by the firm met all the qualification criteria specificed in the request for expression of Interest documents including specific expirience of the firm relevant to this assignment, adequacy and quality of the proposed methodology and workplan ; experts qualification and competence for the assignment and participation by nationals among proposed key experts

Financial Capacity N/A

Current Market Price as per PPRA

N/A

Reasons of Award Based on the selection creteria as outlined in the Request for Proposal, M/s Tractabel Engineering S.A & Gibb Africa Ltd JV achieved the highest combined technical and financial scores

Names of Evaluation Committee

Paul Muchai

Eng. Emily Kilongi

Alphaxard Kitheko

Ann Gacheri

Names of Inspection & Acceptance Commitee

N/A

Variations/Addendums

N/A

SPECIFICATIONS, SCOPE & SCHEDULE OF WORKS

Page 4: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 5: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 6: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 7: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 8: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 9: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 10: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 11: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 12: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 13: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 14: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 15: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 16: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 17: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 18: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 19: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 20: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 21: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 22: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor
Page 23: ATHI WATER SERVICES BOARDawsboard.go.ke/wp-content/uploads/2018/07/CS-for... · a. Review survey workks : b. Review of Engineering Design prepared by the « Design-and-Build contractor