ASSIGNMENT ON PRINCIPLES AND PRACTICES OF MANAGEMENT (PGPM-11) MD IRSHAD ALAM (Registration No: 214-05-31-50011-2163) SUBMITTED TO SCHOOL OF DISTANCE EDUCATION NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND RESEARCH CENTRE 25/1 BALEWADI, N.I.A POST OFFICE PUNE – 411045.

Assignment(PGPM-11)- Principles and Practices of Management

Embed Size (px)

DESCRIPTION

SODE NICMARMANAGEMENT PRACTICES

Citation preview

ASSIGNMENTON

PRINCIPLES AND PRACTICES OF MANAGEMENT (PGPM-11)

MD IRSHAD ALAM(Registration No: 214-05-31-50011-2163)

SUBMITTED TO

SCHOOL OF DISTANCE EDUCATION

NATIONAL INSTITUTE OF CONSTRUCTIONMANAGEMENT AND RESEARCH CENTRE25/1 BALEWADI, N.I.A POST OFFICEPUNE 411045.

ASSIGNMENT TITLE

Your company has bagged a lucrative contract to construct a housing colony for an Industrial Group to be located in Western Maharashtra in a coastal belt. You as a Project Manager has been asked by the company to evolve Organisation Structure with following conditions.1. Organisation should be as lean and thin as possible with bare minimum of personnel on company roll upto Junior Engineer level.1. All supervisors to down below will be temporary for project duration only to be recruited locally from 100 km radius.Suggest and discuss an organisation structure denoting responsibility, authority, communication control for all facets of construction work and management functions as visualised by you.

Housing colony consists of 10 Bungalows for senior executives, 20 Apartments in five buildings, 100 dwellings for white collar workers and 300 dwellings for blue collared workers. Colony will have market and entertainment complex.

KEY:

1. Visualize & note all key functions to be carried out for the project.1. Break down Managerial (Technical and Administrative) functions up to final level.1. Evolve required flow of communication.1. Assign responsibility function to appointment.1. Co-relate authorities required to perform the tasks and delegate them.1. Think about desired control and form a structure for above.1. Assign suitable sub junior level workers for function.1. Discuss requirement of no. of personnel at each level (Why not less or More?)

STRUCTURE:Scope of workFunctionsInput / communication requirement and flowAuthority to carry out functionsRecommendationsBibliography/Readings

ABSTRACT

This paper proposes a structure for an organization for a residential project in their construction processes. This structure aims at integrating the knowledge that is found scattered among the several branches related to the construction system. This paper starts from a survey on the literature about the organization of knowledge, particularly about the system of facets classification, and includes the directives proposed by the ISO norms for the classification of information in the civil construction industry according to the concept of process.

This assignment is about management in an organization for a residential project. A housing colony generally comprises of blocks which is categorized based upon the grade or designation of the personnel working in the firm. As it is for industrial company, proposed in the assignment, the designation of the personnel varies from senior executives to blue collared workers.

INTRODUCTION

Management of materials and information flows are key strategic priorities for construction firms. Sound performance in these two areas can provide them with significant benefits and allow the adding of value for clients.

The introduction of supply chain management in construction is intended to integrate processes, manage interfaces between companies in projects, reduce uncertainties and weed out inefficiency as much as possible. The elimination of waste and inefficiency from the supply chain builds in value in the process. Similarly, Sir John Egan reaffirmed the aforementioned recommendations in his report title Rethinking Construction (Egan, 1998: 16). The report identified five key drivers of change, namely:

* Committed leadership* Focus on the customer* Integrated processes and teams* Quality driven agenda and * Commitment to people the present assignment paper is done by keeping in mind the above factors for attaining the best and profitable output.

SCOPE OF WORKThe project is about construction of a housing colony for an industrial group in Western Maharashtra in a coastal belt. There are three main aspects to be studied in the course of project namely man power, materials and expectance of the clients.

Considering the fact that the local labors can be engaged in the field of work due to the following facts a. No accommodation is must for local workers,b. Only travel arrangements can be made on demand as the people are around 100km radius from the work site and c. The number of labors can be altered in the work load. Apart from these as all the materials and are purchased from the local surroundings the availability of materials can be made on demand and there will be an assured supply of materials. Apart from the housing it is also proposed to build an entertainment complex and a market. Entertainment complex comprises of a theatre and a multi-purpose hall and a small park at the entrance. Considering on the economical basis the market can be also kept inside the complex as a shopping mall.

BREAKDOWN IN MANAGEMENTThe above chart is the outline for the breakdown for the management in the organization. The top most position in any project is the project manager. The orders are executed by the junior engineers through their senior engineer who is guided by the construction manager. The functions of the personnel are discussed briefly below

1. PROJECT MANAGER:* The project manager is a leader of the team. * The project manager will have clear idea about all the process that takes place in the project. * He should be influencing the team to follow in the achievement of a common goal. * He should be able to identify the delay if it is occurred and should be able to rectify it. He is answerable to the top level management of the firm and to the clients.1. PROJECT CONTROL MANAGER

* The function of a project control manager is to regularize the work flow in the project. * He forms a planning department under which all the essentials of the project are been maintained and recorded. * The project control manager being the head of the planning department has to keep up the above mentioned functions. He is assisted by:

SCHEDULERS: prepares the work flow for a project.DOCUMENT CONTROLLERS: maintains all the records of the project COST SPECIALISTS: analysis the day to day change in field of construction financially and run the project economically

1. DESIGN MANAGER:

* The design manager makes the plan and does the design of every single member of a structure that has to come in the project. * As for the residential project, he does prepare the layout of the entire colony with specification of the every single apartment and bungalow allocated as per the specification proposed by the clients. * He prepares the drawings which provide all the essentials for the structure. QC INSPECTOR: He takes care in examining the quality of the all the products from reinforcement, concrete to a completed building. SAFETY INSPECTORS: He assures the safe working condition prevails in the site to all the people working in the site. Thus he assures that the risk factors in the site are minimized and a safe working environment is provided.

1. CONSTRUCTION MANAGER

* He is the head of the execution department. * The main function of the execution department is to execute the orders received from the planning department. * The most active post in the organisation is the construction manager since he decides upon the plans proposed on assumed working conditions and executes them under the actual working conditions. * He has a team consisting of engineers and his sub ordinates for various works in the field.

Assigning responsibilityThe table below gives the outline for the entire assignment as a precise for the above all discussions:

TASKS THAT HAS TO BE PERFORMED| WHO PERFORMS THE TASK|

Measuring and laying-out site; calculating requirements; Cutting and aligning bricks; applying and finishing mortar Brick layer

Studying requirements; measuring site; setting forms; preparing grading and base Cement mason

Establishing methods, procedures, sources, and models for analyzing construction cost information; verifying weekly critical path balancing; comparing construction budget with variance calculations Construction accountant

Preparing residential closing work papers; completing monthly job closing routine; preparing financial statement data; preparing sales commissions, overhead, and marketing journal entriesConstruction Accounting Coordinator

Completing building permit requirements; maintaining sub-contractor relationships; assigning project numbers; noting phase completion datesConstruction Administrative Assistant

Establishing construction financial data methods, procedures, sources, and models; collecting, tracking, and calculating cost information; identifying and analyzing variances; maintaining job cost system

Construction Cost Analyst

Producing and improving architectural plans; reducing construction costs; resolving design and construction problems; resolving differences between designers and sales personnelConstruction Design Services Supervisor

Operating computer-aided design system; forwarding blueprints to requesting parties; analyzing design options; evaluating constructionConstruction Design Technician

Establishing and enforcing purchasing policies; identifying resources; negotiating quality, delivery, and price agreements and leases; maintaining ethical standards

Construction Director

Identifying suitable parcels and locations; negotiating purchases; planning land development; developing building sitesConstruction Division President

Collecting and studying reports, maps, drawings, blueprints, aerial photographs and tests on soil composition, terrain, hydrological characteristics, and related topographical and geologic data; preparing engineering design and documents; confirming specifications; inspecting construction site

Construction Engineer

Studying home plans; updating specifications; identifying and projecting costs for each elevation; costing changes, additions, and site adjustment requirementsConstruction Estimator

Studying blueprints; scheduling materials, equipment; preparing cost estimates; monitoring expensesConstruction Foreman

Assembling and disassembling scaffolding; checking schedules; determining materials requirements; locating, loading, unloading, and moving materials.Construction Laborer

Planning construction requirements; ; resolving land development issues; building quality homesConstruction Manager

Understanding and analyzing construction objectives; interviewing people who understand goals; studying position and product statements; diagnosing/analyzing needs and requirementsConstruction Operations Vice President

Analyzing materials, supplies, tools, and equipment requirements; requisitioning and approving purchase of materials, supplies, tools, and equipment; providing project estimates; monitoring project expenditures|Construction Planner

Construction Planner

clients regarding project objectives and requirements; Directing development of, and verifying, project drawings, specifications, details, and budgets; controlling expenses; guiding project operationsAdvising Construction Project Controller

Interviewing customers; following warranty guidelines; scheduling work with subcontractor; monitoring and evaluating subcontractor workConstruction Quality Assurance Coordinator

Recording surveys; tracking warranty claims; obtaining and investigating complaints; compiling and updating customer satisfaction informationConstruction Quality Manager

Providing administrative services; representing builder; identifying and correcting customer complaints; resolving warranty issuesConstruction Secretary

Identifying new acreage; obtaining and analyzing development bids; determining development profitability negotiating land purchase; obtaining utilitiesConstruction Services Vice President

Defining project purpose and scope; calculating resources required; establishing standards and protocols; allocating resourcesConstruction Supervisor|

Reading blueprints; estimating and ordering requirements; measuring and laying-out reference lines; measuring, cutting, fitting, and finishing dry-walls Dry-Wall Installer

Preparing bid documents and contracts; coordinating contract execution; maintaining contract records; maintaining materials and sup preparing material bids Engineering Construction Administrative

Completes construction projects by verifying estimates, project drawings, and specifications; establishing and disseminating schedules; awarding contracts; obtaining tools and equipmentEngineering Construction Project Manager

Engineering Construction Project Manager

Identifying suitable parcels and locations; negotiating purchases; planning land development; developing building sitesHome Construction manager

Constructs pipeline by studying demand estimates; assessing Sites and watercourse crossings; preparing specifications and logistics; completing impact studies Pipeline Construction Manager

Laying-out project; gathering materials; preparing roof; installing roofingRoofer

Developing staking sheets; completing and filing forms and sketches; requesting payment of permit and easement fees; defining staking requirements Staking Aide

Planning surveys; verifying construction location; defining lines and grades, typography, underground facilities, cut and fill; providing maps, calculations, documentation, and illustrations Surveyor

Training laborers on how to properly handle and dispose of hazardous materials according to procedures and policies set by personal corporation regulations and state laws. Safety Supervisor

Direct safety programs in an attempt to reduce any hazards or injuries possible during and after the sites construction Safety Director

Studying blueprints; calculating requirements; measuring and laying-out site; measuring, cutting, and attaching laths Tile Setter

INPUT/COMMUNICATION REQUIRETMENT AND FLOWAs discussed above the breakdown in an organisation can be categorized precisely under four departments namely,1. Planning & Infrastructure department,1. Finance department,1. Quality department and 1. Execution department.

The functions of all the above departments are explained elaborately below

PLANNING & INFRASTRUCTURE DEPARTMENT:

* The Planning team would work on the Layout, Town Planning and Connectivity. * The Infrastructure team would ensure that the basic infrastructure like Water and Electricity is made available to the units. * The intention to club these two divisions is based on logical interpretation of the basic tenets on which the two teams work. * A coordinative effort between these two divisions will ensure that that the product is ready for the execution team to deliver.

FINANCE DEPARTMENT:

* The team will work around the year to ensure that the required cash flows are maintained and also to ensure that the work doesnt get affected due to the inherent issues of managing the project. * Employees in the Manager level will ensure that all the required books are to do the book keeping and also execute the plans of the General Managers. * The General Managers are to ensure that the plans are made keeping in mind the vision and direction set by the Project Manager.

QUALITY DEPARTMENT:

* The Quality Team will have a structure as follows: Quality Control plays a very vital role in a project. Hence, it would be critical to have a Quality team member involved in every critical aspect of the project. * A team member would be involved in the Planning and Infrastructure, one team member in Architecture and one in Execution.* A team member of the cadre of an AGM would ensure that the Managers who look after the individual portfolios execute the plans according to the vision and direction of the Program Manager. EXECUTION DEPARTMENT:

* The primary thing that has to be realized is that execution is a very critical team for the success of the organization. * This team has to be closely monitored and should also be given enough flexibility to allow intelligent deviations from the plan and also should be flexible enough to incorporate the changing conditions in the environment.

In the field of construction there is no unidirectional flow of orders or communication it is a must that a for an efficient project there is a must that all should be knowing the happenings around them so as that the problems can be discussed and hurdles are overcome.

So as a result the client is pleased and at the same time the work progress is also maintained at the same ratio. As a result for the company time efficiency is gained which at the days end earns a lot of profit and fame for the concern

BREAKDOWN IN ORGANISATION:

The following are the number of people required White collared workers 100Blue collared workers 300

BLUE COLLARED WORKERSJob Title No. of workersBrick layers 30Cement Masons 30Construction Foreman 36Construction Laborer 100Construction Supervisor 15Dry-Wall Installer 2Pipeline/ Plumber 10Roofer 15Staking Aide 20Surveyor 2Safety Supervisor 15Tile Setter 15Electrician 10TOTAL 300

WHITE COLLARED WORKERS

Job title No. of workersConstruction accountant 3Construction Accounting Coordinator 3Construction Administrative Assistant 10Construction Cost Analyst 2Construction Design Services Supervisor 5Construction Design Technician 15Construction Director 1Construction Division President 1Construction Engineer 15Construction Estimator 5Construction Manager 3Construction Operations Vice President 1Construction Quality Assurance coordinator 3Construction Quality Manager 3Construction Secretary 1Construction Services Vice President 1Safety Director 3Chief Operating Officer 1Construction Project Manager 15Account officer 4Store Managers 5TOTAL 100

CONCLUSION

The task of organizing the information in the building field is difficult due to the nonexistence of a national classification system with a general consensus, nor is there a national norm for the classification and organization of this information. As a solution to this problem, the structure of the existing (hierarchical and facets) classifications was approached and the choice was made for the classification by facets. The structure proposed for the organization of the knowledge based on the Document, Processes, Elements and Basic Materials trees for a small building company has enabled the relation to be made among Materials, Services and Suppliers. A real example was used based on the quality documents obtained from one company. Later, other documents used by the company may be included. This will allow for the registration of experiences. The organized and integrated knowledge originated from a classification structure can work as a professional habilitation/updating tool, capable of integrating the knowledge of the area under consideration. Moreover, it can contribute to the strengthening of the technical history of the company and work as a channel to disseminate this knowledge to its collaborators.

RECOMMENDATIONSHaving stated that the non-integration of the construction supply chain hinders the creation and improvement of value for money in the construction process. Specifically the recommendations are anchored on collaboration and supply chain management. The recommendations include: * Ensuring the early involvement of key project team members that have expert knowledge so that an appropriate level of client satisfaction and value can be defined; * Establishing of subcontractor and supplier relationships by selecting teams based on value rather than lowest price; * Integrating pre-construction and construction activities and adopting common processes such as ICT; * Managing the project parameters of cost, schedule, quality, and H&S in unison; * Working together as a team to agree mutual goals and devise dispute resolution mechanisms; * Developing and monitoring continuous improvement programmers; * Developing and implementing sound risk management processes; * Dealing with risks and rewards equitably by using modern commercial arrangements such as collaborative contract forms, target cost and open book accounting; * Using non-adversarial forms of contract and ensuring that contractual relationships are appropriate for expected project objectives; * Using cost-plus and design and build forms on contract and deemphasizing the use of management contracting as well as traditional forms of contracting and * Mobilizing and developing people in order to ensure employee satisfaction through integrated teams.

BIBLIOGRAPHYHinks, J., Aouad, G., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. (1997) IT and The Design and Construction Process: A Conceptual Model of Co-Maturation, The international journal of construction IT, July

Construct IT report. (1995) Occasional Paper No. 1: A Process-Based Study of an IT Research Work Plan, University of Salford.Hughes, W. (1991) Modelling the Construction Process Using Plans of Work, Construction Project Modelling and Productivity - Proceedings of the International Conference CIB W65, Dubrovnik.Glaser, E.M. & Backer, T.E. (1973). A Look at Participant Observation, Evaluation, 1: 3: 46-49.

Banwell, H. (1964) Report of the Committee on the Placing and Management of Contracts for Building and Civil Engineering Works, HMSO.Love, P.E.D., Smith, J., Treloar, G. and Li, H. (2000a). Some empirical observations of service quality in construction. Engineering Construction and Architectural Management