12
ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN/ PGDIB/ PGDISMN/ PGDMMN/ PGDOMN/ PGDPMN/ PGDROMN/ PGDSCMN/ PGDTQMN SEM 1 SUBJECT CODE & NAME MB0050 RESEARCH METHODOLOGY BK ID B1700 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Q.No Questions Marks Total Marks 1 Research is a sequential method of enquiry, directed towards a clear implicit or explicit objective. Describe in detail the steps to be carried out in a typical research study. Meaning of Research Listing the steps Explanation of the steps in a research study 2 2 6 10 2 What are descriptive research designs? Explain the different kinds of descriptive research designs. Meaning of Descriptive Research designs Kinds of Descriptive research designs 5 5 10 3 The procedure of testing hypothesis requires a researcher to adopt several steps. Describe in brief all such steps. Meaning of hypothesis Steps in testing hypothesis 4 6 10

ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

  • Upload
    vunhi

  • View
    220

  • Download
    4

Embed Size (px)

Citation preview

Page 1: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

ASSIGNMENT

DRIVE FALL 2014

PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3

PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN/

PGDIB/ PGDISMN/ PGDMMN/ PGDOMN/ PGDPMN/

PGDROMN/ PGDSCMN/ PGDTQMN – SEM 1

SUBJECT CODE &

NAME MB0050

RESEARCH METHODOLOGY

BK ID B1700

CREDITS 4

MARKS 60

Note: Answer all questions. Kindly note that answers for 10 marks questions should be

approximately of 400 words. Each question is followed by evaluation scheme.

Q.No Questions Marks Total

Marks

1 Research is a sequential method of enquiry, directed towards a clear implicit or

explicit objective. Describe in detail the steps to be carried out in a typical research

study.

Meaning of Research

Listing the steps

Explanation of the steps in a research study

2

2

6

10

2 What are descriptive research designs? Explain the different kinds of descriptive

research designs.

Meaning of Descriptive Research designs

Kinds of Descriptive research designs

5

5

10

3 The procedure of testing hypothesis requires a researcher to adopt several steps.

Describe in brief all such steps.

Meaning of hypothesis

Steps in testing hypothesis

4

6

10

Page 2: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

4 a. Distinguish between:

i. Schedules and Questionnaires

ii. Open ended and closed ended questions

b. Explain the questionnaire design process.

a. Differences

b. Questionnaire design process

4

6

10

5 a. What is the analysis of variance? What are the assumptions of the technique?

Give a few examples where the techniques could be used.

b. The following data represents the number of units produced by four operators

during three different shifts:

Shifts Operator

A B C D

I 10 8 12 13

II 10 12 14 15

III 12 10 11 14

Perform a two-way analysis of variance and interpret the result.

a. Meaning, Assumptions and examples

b. Formulas, Calculation, Solution and Interpretation to the

problem

4

6

10

6 Explain the Structure of the Research Report. What are the guidelines for effective

report writing?

Explanation of the Structure of the Research Report

Guidelines for effective report writing

5

5

10

Page 3: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

ASSIGNMENT

DRIVE FALL 2014

PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3

PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN/

PGDIB/ PGDISMN/ PGDMMN/ PGDOMN/ PGDPMN/

PGDROMN/ PGDSCMN/ PGDTQMN – SEM 1

SUBJECT CODE & NAME

MB0051-Legal Aspects of Business

BK ID B1725

CREDIT & MARKS 4 Credits, 60 marks

Note – Answer all questions. Kindly note that answers for 10 marks questions should be

approximately of 400 words. Each question is followed by evaluation scheme.

Q.No Questions Marks Total Marks

1 “Discharge refers to the termination of contractual relationship between the parties”. Explain the statement along with different modes of discharging a contract.

Explanation of service positioning Explanation of modes

2 8

10

2 Explain the meaning of Power of Attorney, its types and clause related to registration.

Meaning Types Registration

2 2 6

10

3 Explain the procedure of registration of partnership firms.

Explanation

10 10

4 What are the circumstances under which breach of condition is treated as breach of warranty?

Explanation

10 10

Page 4: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

5 Explain the procedure for filing a complaint and admission of complaint in consumer protection act.

Filing a complaint Admission of complaint

5 5

10

6 Write short notes on: a) Shares and its classification b) Meetings and its classification

a) Meaning and classification b) Meaning and classification

5 5

10

Page 5: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

ASSIGNMENT

DRIVE FALL 2014

PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM 3) PGDPMN (SEM 1)

SUBJECT CODE & NAME PM 0010 – INTRODUCTION TO PROJECT MANAGEMENT

BK ID B1936

CREDIT & MARKS 4 CREDITS & 60 MARKS

Q.No Criteria Marks Total Marks

1 Describe the principles of project management.

A Brief description of the 8 principles of project management

10(1.25 marks each) 10

2 Define is project scope. Describe the elements of project scope

A Definition of project scope List the elements of project scope Describe each element of project scope

1.25

1.25

7.5 (1.25 marks for

each element)

10

3 Write short notes on:

Force field analysis

Product mix analysis

Financial feasibility of a project

Capital rationing

A Force field analysis

Product mix analysis

Financial feasibility of a project

Capital rationing

10 (2.5 marks each) 10

Page 6: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

4 What are the sources of differences, for which social costs and benefits of project are

estimated?

A Explain the rational of Social cost benefit analysis Discuss the sources of differences, for which social costs and benefits of project are estimated

2.5 7.5(1.25 marks for each source of difference)

10

5 Explain the corporate governance practices in infrastructure projects.

A Explain why corporate governance is required in infrastructure projects Explain the stages of corporate governance framework

1 9 (3 marks for each stage)

10

6 Write short notes on:

Expert judgement (a tool used in procurement planning)

Project audit

Statistical Quality Control (SQC)

Project termination by extinction

A Expert judgement (a tool used in

procurement planning)

Project audit

Statistical Quality Control (SQC)

Project termination by extinction

10 (2.5 marks each) 10

*A-Answer Note –Please provide keywords, short answer, specific terms, specific examples and marks break - up (wherever necessary) Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

***********

Page 7: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

ASSIGNMENT

DRIVE FALL 2014

PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM 3) PGDPMN (SEM 1)

SUBJECT CODE & NAME PM0011 – PROJECT PLANNING AND SCHEDULING

BK ID B1937

CREDIT AND MARKS 4 CREDITS AND 60 MARKS

Q.No Criteria Marks Total Marks

1 Write short note on:

Scope planning

Three point estimation tool used in project planning

Pure project management organisation

Negotiation strategies used in a project

A Scope planning

Three point estimation tool used in

project planning

Pure project management organisation

Negotiation strategies used in a project

10 (2.5 marks each)

10

2 Explain the need of project planning and scheduling in managing any project. Discuss the elements of a project plan.

A Explanation of the need of project planning and scheduling List and explain the elements important elements of a project plan

5 5

10

3 Write short notes on :

Milestone charts

Life cycle approach used by organisations to identify investment opportunities

Pareto analysis

Resource levelling

Page 8: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

A Milestone charts

Life cycle approach by organisations to

identify investment opportunities

Pareto analysis

Resource levelling

10 (2.5 marks each) 10

4 Explain the factors that affect market feasibility.

A Explain the factors and sub factors that affect market feasibility

10(5 marks for each factor)

10

5 What do you understand by cost of quality? Elaborate on various types of costs of quality associated with a project.

A Write the meaning of cost of quality Briefly explain each types of costs of quality associated with a project

1 9 (1. 5 marks for each cost of quality)

10

6 What is fast tracking? Describe the steps to be performed in fast tracking.

A Write the meaning of fast tracking Mention its importance Explain the steps performed in fast tracking

1

2

7

10

*A-Answer Note –Please provide keywords, short answer, specific terms, specific examples and marks break - up (wherever necessary) Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

***********

Page 9: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

ASSIGNMENT

DRIVE FALL 2014

PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM 3) PGDPMN (SEM 1)

SUBJECT CODE & NAME PM 0012 – PROJECT FINANCE AND BUDGETING

BK ID B1938

CREDIT AND MARKS 4 CREDITS AND 60 MARKS

Q.No Criteria Marks Total Marks

1 Write short notes on:

Importance of project budget

Project Cost Profile

Term loans for financing projects

Role of project sponsors

A Importance of project budget

Project Cost Profile

Term loans for financing projects

Role of project sponsors

10 (2.5 marks each) 10

2 Discuss the financing of power projects.

A Discuss about PPA (power purchase Agreement) Describe it basic features Mention the key risks and how these can be mitigated

2 4 4

10

3 Explain the different key project documents. A Description of key project documents. 10 (2 marks each) 10

4 Write short notes on:

Risk audit

Types of working capital

Factors affecting cash flows

Average rate of return method use to evaluate a investment on a project

A Risk audit

Types of working capital

Factors affecting cash flows

Average rate of return method use to

evaluate an investment on a project

10 (2.5 marks each) 10

Page 10: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

5 What are the problems associated with BOOT projects.

A Explanation of the main problems associated

with BOOT projects

Conclusion

9 (3 marks each) 1

10

6 Explain the different types of management contracts (a type of PPP ).

A List the types of management contracts Explain each type of management contract

1 9(3 marks each)

10

*A-Answer Note –Please provide keywords, short answer, specific terms, specific examples and marks break - up (wherever necessary) Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

***********

Page 11: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

Assignment

DRIVE FALL 2014

PROGRAM MBADS (SEM 3/SEM 5) MBAFLEX/ MBA (SEM 3) PGDPMN (SEM 1)

SUBJECT CODE & NAME PM 0013 – MANAGING HUMAN RESOURCES IN PROJECTS

BK ID B1939

CREDIT AND MARKS 4 CREDITS AND 60 MARKS

Q.No Criteria Marks Total Marks

1 Write short notes on:

Human Resource Cycle

Role of a project manager

Productivity measurement method of manpower estimation

Managing Conflicts in a project

A Financial resources

Need for human resources

management

Project team members

Challenges in developing a project team

10 (2.5 marks each) 10

2 What are the stages in a conflict process?

A Give a brief description of the stages in a conflict process

10(2 marks for each stage)

10

3 Write short notes on

Qualities of a project leader

Dealing with Poor Performers in a Project Team

Minority groups

Health issues of project team members

A Role of a project manager

Productivity measurement method

Importance of leadership in project

management

Goal setting theory

10 (2.5 marks each) 10

Page 12: ASSIGNMENT DRIVE FALL 2014 PROGRAM MBADS/ … MBA 3 G8 PROJECT.pdf · DRIVE FALL 2014 PROGRAM MBADS/ MBAFLEX/ MBAHCSN3/ MBA – SEM 3 PGDBMN/ PGDENMN/ PGDFMN/ PGDHRMN/ PGDHSMN

4 Explain the modern methods of performance management?

A List the six modern methods of performance management Explain the six modern methods of performance management

1 9 ( 1.5 mark for each method)

10

5 Explain various types of collective bargaining.

A Explanation of four types of collective bargaining

10 (2.5 marks each) 10

6 What is a Human Resource Information System(HRIS).

A Define HRIS

Very briefly Functions of HRIS

List any two advantages of HRIS

List any two disadvantages of HRIS

1.5

4.5 (1.5 marks for

each function)

2

2

10

*A-Answer Note –Please provide keywords, short answer, specific terms, specific examples and marks break - up (wherever necessary) Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

***********