11
ASME BPV II Materials – Conventional ASME Materials Qualification Presented by Jay Cameron Principal Engineer, HSB ASME BPV II Chair ASME SGM/VIII Member, former Officer © 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

ASME BPV 2021 Code Updates

  • Upload
    others

  • View
    40

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ASME BPV 2021 Code Updates

ASME BPV II Materials –Conventional ASME

Materials Qualification

Presented by Jay Cameron• Principal Engineer, HSB• ASME BPV II Chair• ASME SGM/VIII Member, former Officer

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

Page 2: ASME BPV 2021 Code Updates

AGENDA

1. How it’s started

2. Material specifications

3. Material properties

4. Code Cases

5. “Unconventional” materials

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 2

Page 3: ASME BPV 2021 Code Updates

How it’s started(General)1. Request from industry:

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 3

FOREWORD

Page 4: ASME BPV 2021 Code Updates

How it’s started(Specifics)1. Complete data set required:

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 4

ETC., ETC., ETC.

Page 5: ASME BPV 2021 Code Updates

Material specifications

1. ASTM [= Collins]

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 5

Page 6: ASME BPV 2021 Code Updates

Material specifications(cont.)1. Non-ASTM

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 6

Page 7: ASME BPV 2021 Code Updates

Material properties

1. TS, YS, time-independent allowables, physical properties

2. 100K-, 300K-, 500K-hr basis (III-5 = Wright); 10-hr basis properties

3. Creep-fatigue4. Creep buckling

5. Creep buckling

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 7

Page 8: ASME BPV 2021 Code Updates

Code Cases

1. “Try before you buy”

2. Unlimited publication schedule

3. Needs NRC approval

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 8

Page 9: ASME BPV 2021 Code Updates

“Unconventional” materials

1. PM [PM = Gandy, PM & AM = Mann]– SA-988, SA-989 and SB-834

PM specifications– CCs 2770 (I), 2840-1 (VIII)

2916 (I), 2930 (I)

2. NMM [= Hyam]– BPV X, RTP-1– Polymers: VIII-1 App 48

(acrylic); CCs 2411 (IV), 2725-1 (IV), 2795 (VIII), 2837 (VIII)

– Ceramics: VIII-1 Part UIG; CCs 2867-3 (VIII-1, SiC), 2949-1 (VIII-2, concrete)

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 9

Page 10: ASME BPV 2021 Code Updates

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 202110

Page 11: ASME BPV 2021 Code Updates

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

Thank you