Ashley Lyon CGSIC
May 7th 2006
European Satellite Services Provider “EGNOS Operations Status”
May 8th 2006EGNOS Operations StatusPage 2
ESSP in EGNOS
• A centralized management entity for EGNOS: ESSP
• ESSP has been created from a subset of the EOIG (EGNOS Operators and Infrastructure Group)
• ESSP has been founded to become theEGNOS OperatorEGNOS Safety of Life Service Provider, for example for Civil Aviation
May 8th 2006EGNOS Operations StatusPage 3
EGNOS Operations Consortium
MCC Operations
EGNOSOperations
Management
RIMS Operations
PACF Operations Training Services
Other OperationsServices
Support FacilityOperations
NLES Operations
Torrejon MCC
Langen MCC
Ciampino MCC
Swanwick MCC
AENA RIMSCanary Is., Malaga,
Palma, Santiago
CNESParis,
Hartebeeshoek,Kourou
DFSBerlin
ENAVCatania, Ciampino
TelespazioFucinoNLES
TelespazioScanzano
NLES
AENATorrejonNLES
ASQF Operations
SkyguideZurich
NATSSwanwick and
Glasgow
Logistics ServicesDFS
May 8th 2006EGNOS Operations StatusPage 4
Jan 2005 Jan 2007 Jan 2006
System Evolutions
System Development
System Operations System Initial Operations
EGNOS Timeline
May 8th 2006EGNOS Operations StatusPage 5
Jan 2005 Jan 2007
Open Service
Commercial Services
SoL Service
Jan 2006
System Evolutions
System Development
System Operations
System and Application Certification ( Safety Case)
System Initial Operations
EGNOS Services
May 8th 2006EGNOS Operations StatusPage 6
Jan 2005 Jan 2007 Jan 2006
System Initial Operations
Initial Operations
ORR ODR
Operationsperformance
OQR
Ramp- upStabilization
Op. QualificationESA Reqt
Δ ESA Reqt
Δ ESA Reqt
May 8th 2006EGNOS Operations StatusPage 7
Start of EGNOS operationsby the ESSP Operation Consortium
•Increase of staff and resources to fully support EGNOS operations
•Facilitate the transfer of knowledge and experience from ESA / Industry to Operator
•Test the operations processes and procedures
•Deliver remaining training packages to build up team capabilities
Initial Operations Ramp-up
May 8th 2006EGNOS Operations StatusPage 8
Reach nominal EGNOS operations performance (started on April 3rd
2006)
•Stabilise team resource profiles, to support EGNOS operations according to the operations performance requirements
•Run nominal maintenance procedures across the EGNOS system
•Complete operations processes and procedure testing
Initial Operations Stabilization
May 8th 2006EGNOS Operations StatusPage 9
Operational qualification of EGNOS system operations
•Demonstrate that EGNOS operations staff, plus procedures and documentation, can support EGNOS operations performances
•Provide evidence towards the EGNOS System Safety Case with nominal operations
•Concludes with the Operations Qualification Review (OQR) in early 2007
•Safety of Life service provision planned to follow this milestone
Initial Operations Qualification
May 8th 2006EGNOS Operations StatusPage 10
6 NLESNavigation Land Earth
Stations
EGNOS SitesGPS &
GLONASS
34 RIMSRanging &Integrity
Monitoring Stations
User Segment
4 MCCMission Control Centers
3 Satellites EGNOS
EWAN EGNOS Wide Area Network
2 Support Facilities
May 8th 2006EGNOS Operations StatusPage 11
EGNOS system handover
•Full handover of the EGNOS system did not take place at ORR
A subset of the EGNOS system was provided to EGNOS industry
1 CPF, 1 CCF, 3 RIMS (Paris, Toulouse, Lappeenranta), 2 NLES
EGNOS industry retained IOR-W (PRN 126)ESTB was continued using AOR-E (PRN 120)EGNOS was broadcasting on ARTEMIS (PRN 124) only
1 NLES only due to technical problem with other NLES Remaining subset of RIMS 3 CPFs with numerous stability problems
May 8th 2006EGNOS Operations StatusPage 12
Recent changes
•PRN 120 - AOR-EESTB operating continuously since 09/06/05Will be used for EGNOS SIS operations as from early July
2006
•PRN 124 – ARTEMISOperated by ESSP consortium since 26/07/2005Software version 0.4.9 currently being broadcast since
December 2005Swap with PRN 126 mid June 2006 for operations mid July
2006
•PRN 126 – IND-W Swap with PRN 126 mid June 2006 for industrial testing
mid July 2006 Limited transmissions over recent months with long
periods of inactivity
May 8th 2006EGNOS Operations StatusPage 13
System Releases
New release 2.0.2 as from mid June 2006
Another planned at the end of the year to solve CPF common mode failures
May 8th 2006EGNOS Operations StatusPage 14
SIS Availability
May 8th 2006EGNOS Operations StatusPage 15
Operational EGNOS
May 8th 2006EGNOS Operations StatusPage 16
EGNOS System Test Bed
May 8th 2006EGNOS Operations StatusPage 17
Operations User Support Website
•New ESSP website (www.essp.be) planned in a few weeks providing additional information to the users per market domain
•Link to the Operations User Support Web Site (already existing on current ESSP website):
General information on EGNOS operations. Projection of performances on a weekly basis (registered users).
Performance information at RIMS sites (registered users).
EGNOS Subsystem status (restricted). SIS-down alerts by e-mail (registered users)…
•Existence of a Helpdesk (already existing on current ESSP website)
May 8th 2006EGNOS Operations StatusPage 18
EGNOS Operations Website Services
May 8th 2006EGNOS Operations StatusPage 19
ESSPAvenue Louise 2401050 BrusselsBELGIUMTelephone: +32 (0)2 641 17 50Fax: +32 (0)2 641 17 59
[email protected] More about EGNOS:www.essp.be
www.esa.int/navigation