Upload
paulscardina
View
391
Download
0
Tags:
Embed Size (px)
Citation preview
Ash Creek House, 1959 gut rehab
LEED for Homes, Platinum
Whole-house
remodel
Space Efficiency
• Open Kitchen/Dining/Living• Master Suite on Main Level
• From 3 Bedrooms 2 Baths• To 5 Bedrooms 3 Baths• 2700 SF total
Energy Efficiency
• New Thermal Envelope• Advanced Mechanicals• Passive Technologies
Pre-existing conditions
Kitchen Before
Good Southern exposureLandlocked space“Fabulous” mid-century materials
Passive Solar Design
During Construction
Air-tight thermal envelopeEnergy efficient windowsPassive solar wallDay Lighting & Views
Recycled Content & Local Materials
Near CompletionKitchen Today!
Dining Before
Ladder not included…but we love the swag light!
Dining Today
Reclaimed and Refurbished Materials
Mid-century windows
Before
Polyiso Spray-in Foam with Advanced Framing
Tight Building Envelope
After
Thermal Comfort
Temperature: between 68 – 78 degreesRelative Humidity: between 30% - 70%
Water Conservation
Lavatory Faucets ≤ 2.0 GPM.Showers ≤ 2.0 GPM
Toilets ≤ 1.3 GPF
Indoor Environmental Quality
Low VOC materials – meet 3rd party standards
Durability
Engineered Quartz Countertop
Optimized Basement Space
New Daylight Basement Windows
Contaminant Control: Shoe Station
Active and Passive Solar Features
Passive SolarActive Solar PV system
Equipment Optimization
Ground Source Heat Pump: 300% efficiency