GUELPH | OWEN SOUND | LISTOWEL | KITCHENER | LONDON | HAMILTON | GTA
650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH ON N1K 1B8 P: 519-824-8150 WWW.GMBLUEPLAN.CA
Prepared By:
Armel Corporation
Paisley Road Sanitary Monitoring Report
GMBP File: 114133
REVISED JULY 2018
ARMEL CORPORATION
PAISLEY ROAD SANITARY Monitoring REPORT
GMBP FILE: 114133
REVISED JULY 2018
I
TABLE OF CONTENTS 1. INTRODUCTION ......................................................................................................................................................... 1
1.1 Background .......................................................................................................................................................... 1 1.2 Study Objective .................................................................................................................................................... 1
2. STUDY METHODOLOGY ........................................................................................................................................... 1 3. RESULTS .................................................................................................................................................................... 3 4. SANITARY SEWER CAPACITY AND THEORETICAL SURCHARGING ANALYSIS ............................................. 3 5. CONCLUSIONS .......................................................................................................................................................... 4
APPENDICES APPENDIX A: SANITARY FLOW MONITORING SUMMARY REPORT THOMPSON FLOW INVESTIGATIONS INC., AUGUST 19, 2016 APPENDIX B: CONCEPT PLAN FOR PAISLEY PARK DEVELOPMENT GSP GROUP LTD., MARCH 16, 2018 APPENDIX C: PAISLEY ROAD SITE CONCEPT PLAN GM BLUEPLAN ENGINEERING LTD., MARCH 2014 APPENDIX D: PAISLEY ROAD RECONSTRUCTION DESIGN BRIEF GM BLUEPLAN ENGINEERING LTD., NOVEMBER 7, 2014
PEOPLE | ENGINEERING | ENVIRONMENTS
PAGE 1 OF 4
1. INTRODUCTION This report presents the results of a sanitary sewer flow monitoring study undertaken in the City of Guelph to support the Paisley Park residential development. The monitoring program began on November 5th, 2015 and data collection ended on July 13, 2016.
1.1 Background The subject property is approximately 7.01 ha in area and is bound by the City limit to the west, Paisley Road to the north, Whitelaw Road to the east, and residential lands to the south.
Figure 1 shows the location of the Paisley Park lands, as well as the 0 Paisley lands.
Paisley Park – Appendix B – maximum of 800 units (approximately)
0 Paisley – Appendix C – 600 units (approximately)
Both developments are to be serviced from Paisley Road, which was recently reconstructed to accommodate this development.
1.2 Study Objective The objective of the sanitary sewer flow monitoring study was to determine actual sewage flow rates at several points downstream of the proposed developments, in order to determine whether any surcharging would result from the addition of flows from these developments.
2. STUDY METHODOLOGY Flow monitors were installed by Thompson Flow Investigation Inc. (TQI) at four monitoring locations as shown on Figure 2 and described in Table 1. Figure 2 shows the path of sanitary flows from Paisley Road south and east, ultimately discharging to the City of Guelph Wastewater Treatment Plant. Flow monitor locations G1, G2 and G3 were selected in consultation with City of Guelph staff as appropriate locations downstream of the proposed development at which to measure sanitary flows and to check for potential surcharging. As summarized in Table 1 and discussed in TQI’s report in Appendix A, a fourth monitor location (G4) was added due to concerns about poor hydraulics at location G2 that could cause erroneous measurements.
The flow monitors recorded the flow rate at 5-minute intervals.
PAISLEY ROAD SANITARY MONITORING REPORT
ARMEL CORPORATION
REVISED JULY 2018
GMBP FILE: 114133
ARMEL CORPORATION
PAISLEY ROAD SANITARY MONITORING REPORT
GMBP FILE: 114133
REVISED JULY 2018
PAGE 2 OF 4
Table 1: Monitoring Locations
Monitor Location Justification
G1 450mm inlet pipe of MH at Northwood and West Acres Crescent.
Downstream of proposed development
G2 525mm inlet pipe of MH along west edge of Imperial Road a short distance north of CNR
Downstream of proposed development (upstream of junction)
G3 525mm inlet pipe of MH along west edge of Imperial Road a short distance south of CNR crossing
Downstream of proposed development (downstream of junction)
G4 600mm inlet pipe of MH near centre of Imperial Road a short distance north of CNR crossing
Allow flow at G2 to be calculated if flow measurement is disrupted by poor hydraulics (upstream of junction; G2 + G4 = G3.)
Flow data were compared to the theoretical capacity of each downstream sanitary sewer, which was calculated from the pipe diameter and slope information shown in plan and profile drawings. The capacity of each sewer was then compared to the total theoretical peak flow at each location after theoretical peak flows from upstream development were added. These theoretical peak flows were calculated for the Paisley Park lands, as well as the 0 Paisley lands (same catchment). Areas of planned development are shown in Figure 1 and summarized in Table 2. A concept plan for 0 Paisley is included in Appendix C.
Table 2: Planned Development in Study Area
Name Drainage Area (ha)
Description Downstream Monitors
Paisley Park 5.85 Multi-family residential and Apartment development
G1, G2, G3
0 Paisley 5.2 Medium density apartments and wooded area
G1, G2, G3
Note: Sanitary drainage areas include half of adjacent road allowances Note: Wooded area was excluded from sanitary drainage area
Theoretical peak flows were calculated using the City of Guelph sanitary sewer design coefficients:
• 0.0010 cubic metres per second/ha for single family residential development,
• 0.0025 cubic metres per second/ha for multi-family residential development,
• 0.0017 cubic metres per second/ha for commercial and industrial development,
• 0.0060 cubic metres per second/ha for apartment developments (150 units per hectare), and
• 0.0070 cubic metres per second/ha for high density apartment (190 units per hectare) developments.
ARMEL CORPORATION
PAISLEY ROAD SANITARY MONITORING REPORT
GMBP FILE: 114133
REVISED JULY 2018
PAGE 3 OF 4
3. RESULTS Table 3 below summarizes the observed maximum, average, and minimum flow at each monitoring location. Detailed graphs of instantaneous and daily average flows are included in Appendix A.
Table 3: Sanitary Sewer Flow Monitoring Results
Monitor Peak Flow (L/s) Peak Flow Date Average Flow (L/s) Low Flow (L/s)
G1 14.76 January 3, 2016 4.67 0.22
G2 (calc) 25.20 April 7, 2016 9.08 0.02
G3 36.27 March 31, 2016 13.92 3.02
G4 17.21 March 31, 2016 4.88 0.46
As discussed in the report by TQI in Appendix A, hydraulics at G2 were poor and caused erroneous flow readings. Therefore, flow rates at G2 were estimated by subtracting the reported flow at G4 from the reported flow at G3. The three stations (G2, G3, and G4) are within about 20 m of each other and there are no additional sanitary inlets or outlets between the three monitoring locations.
4. SANITARY SEWER CAPACITY AND THEORETICAL SURCHARGING ANALYSIS Based on the City’s sanitary sewer design coefficients, the maximum theoretical peak flow rate generated from the development at Paisley Park and 0 Paisley were calculated as shown in Table 4. Paisley Park has been subdivided to show the maximum theoretical peak flows from the apartment complex and multi-family areas, using their respective sanitary coefficients.
Table 4: Maximum Theoretical Peak Flow Rates from Planned Development
Name Drainage Area (ha) Sanitary Coefficient (m3/s/ha) Peak Flow (L/s)
Paisley Park 2.58 0.0025 6.45
Paisley Park 3.27 0.006 19.62
0 Paisley 5.2 0.006 31.20
Total -- -- 57.27
The sanitary sewer capacities at monitoring locations G1, G2 and G3 are compared to the theoretical total peak flows at each location in Table 5 below. G4 is not downstream of the proposed development and has been excluded from the analysis.
Table 5: Existing Sanitary Sewer Capacity Analysis
Monitor Sewer Diameter (mm)
Slope (%)
Capacity (L/s) Maximum Observed Flow (L/s)
Total Theoretical Peak Flow (L/s)
G1 450 0.34 166 14.76 72.03
G2 525 1.32 494 25.20 82.47
G3 525 1.54 534 36.27 93.54 Note: Sewer capacity calculated using Manning’s equation assuming n=0.013 Note: Theoretical total peak flow is the sum of the observed peak flow and the theoretical peak flow from upstream planned development.
ARMEL CORPORATION
PAISLEY ROAD SANITARY MONITORING REPORT
GMBP FILE: 114133
REVISED JULY 2018
PAGE 4 OF 4
As shown, the total theoretical peak flow is considerably less than the sanitary sewer capacity at each location. Therefore, no surcharging is anticipated as a result of development at the Paisley Park Development.
5. CONCLUSIONS Based on the results of the sanitary sewer flow monitoring, as well as the sanitary sewer capacity and theoretical surcharging analysis, we offer the following conclusions:
• The measured peak flows between November 2015 and July 2016 were considerably less than the capacity of the sanitary sewers for all monitoring stations;
• There is sufficient capacity remaining in the sanitary sewers to accommodate the planned development in the study area. No surcharging is anticipated as a result of the planned development.
All of which is respectfully submitted,
Carolyn Chan, B. Eng., M.A.Sc.
Chris Sims, P. Eng.
FIL
E:W
:\G
ue
lp
h\1
14
-2
01
4\1
14
13
3\D
esig
n P
ha
se
\D
ra
win
gs\1
14
13
3 - F
IG
UR
ES
- 2
01
6-0
8-3
0.d
wg
L
AY
OU
T:F
ig
ure
1
- S
ite
L
oca
tio
n
LA
ST
S
AV
ED
B
Y:D
wa
te
rs, 8
/3
0/2
01
6 4
:2
6:4
0 P
M P
LO
TT
ED
B
Y:D
avid
W
ate
rs - G
M B
lu
eP
la
n 8
/3
0/2
01
6 4
:3
7:3
5 P
M
Figure No. 1
114133
FLOW MONITORING
CITY OF GUELPH
N.T.S.
AUGUST 2016
SITE LOCATION
MAP
PAISLEY
R
O
A
D
E
L
M
IR
A
R
O
A
D
WH
IT
ELA
W R
OA
D
FIFE ROAD
IM
PE
RIA
L R
D
I
M
P
E
R
I
A
L
R
O
A
D
S
T
E
P
H
A
N
I
E
D
R
ROCHELLE DR
WEST ACRES DR
C
N
R
R
A
IL
L
IN
E
ADDITIONAL
DEVELOPMENTS
"0 PAISLEY ROAD"
SITE
"WESTLAW WEST"
FIL
E:W
:\G
ue
lp
h\1
14
-2
01
4\1
14
13
3\D
esig
n P
ha
se
\D
ra
win
gs\1
14
13
3 - F
IG
UR
ES
- 2
01
6-0
9-3
0.d
wg
L
AY
OU
T:F
ig
ure
2
- 8
.5
x1
1
LA
ST
S
AV
ED
B
Y:D
wa
te
rs, 8
/3
0/2
01
6 4
:2
1:1
3 P
M P
LO
TT
ED
B
Y:D
avid
W
ate
rs - G
M B
lu
eP
la
n 8
/3
0/2
01
6 4
:2
2:5
1 P
M
Figure No. 2
114133
FLOW MONITORING
CITY OF GUELPH
N.T.S.
AUGUST 2016
LEGEND
PAISLEY ROAD
SANITARY FLOW
MONITORING LOCATIONS
SANITARY MONITORING LOCATION
G1
G4
G3
G2
APPENDIX A: SANITARY FLOW MONITORING SUMMARY REPORT
THOMPSON FLOW INVESTIGATIONS INC., AUGUST 19, 2016
2015-16 Flow Monitoring re Paisley Rd. Area in Guelph for GM BluePlan-documentation Page # 1
TQI - 4129 Varden Court, Mississauga, ON L5L 4A7 [email protected] Ph: 905-607-2728 Fax:905-607-9180
GM BluePlan Engineering Limited, August 20, 2016 650 Woodlawn Road West, Block C, Unit 2, Guelph, ON, N1K 1B8
Attention: Carolyn Chan, B.Eng., M.A.Sc. Project Designer
Re: Sanitary Sewer Flow Monitoring carried out for Paisley Rd. Area in Guelph
Scope of Work
We are writing to document the sanitary sewer flow monitoring carried out at requested
locations in the Paisley Road area in Guelph. We were authorized on October 23, 2015 to
carry out the work according to our proposal dated September 2, 2015. The intent was to
create 3 monitoring stations at specified locations, and operate them for 6 months with
twice monthly visits to retrieve data and check sensors.
Setup and Operation of Monitoring Stations
We have indicated the location of the monitoring stations on a figure provided by your firm
(Figure No. 1, GM BluePlan) which follows. The requested 3 stations (G-1 to G-3) were
located along the sewer line highlighted in black on this figure.
Station G1 was located in a 450mm sewer on West Acres Drive a short distance east of
Elmira Road.
Station G2 covered the 525mm sewer running along Fairmeadow Drive and then turning
south adjacent to Imperial Road where it joins a 600mm sewer running south on Imperial
Road just north of the CNR bridge.
Station G3 was located just south of the CNR bridge, downstream of the sewer junction.
When we first visited it we found that one of our Custom Compound Weirs (CCW) that was
installed for CH2M Hill over 10 years ago was still in place and in very good condition. We
decided to utilize this weir in the current monitoring program as it would provide more
accurate data than an A/V meter alone and would facilitate comparison to the earlier
monitoring. The inlet and outlet sewers to the G3 manhole are 525mm diameter.
We were concerned that the sewer hydraulics at station G2 (525mm inlet to this manhole)
were not ideal for accurate flow monitoring. The hydraulics at the next upstream manhole
2015-16 Flow Monitoring re Paisley Rd. Area in Guelph for GM BluePlan-documentation Page # 2
TQI - 4129 Varden Court, Mississauga, ON L5L 4A7 [email protected] Ph: 905-607-2728 Fax:905-607-9180
with a 90 degree bend were even worse. We thus decided to create station G4 (at our own
expense) on the 600mm Imperial Road sewer 1 manhole upstream of the junction. This
allowed us to determine the desired “G2” flows by subtracting flows at G4 from those at
G3.
ISCO model 2150 A/V meters were installed at all 4 locations on November 5, 2015 and
were operated until July 13, 2016 (8+ months). On the last service visit of July 13/16 all
monitors and the weir were removed.
2015-16 Flow Monitoring re Paisley Rd. Area in Guelph for GM BluePlan-documentation Page # 3
TQI - 4129 Varden Court, Mississauga, ON L5L 4A7 [email protected] Ph: 905-607-2728 Fax:905-607-9180
2015-16 Flow Monitoring re Paisley Rd. Area in Guelph for GM BluePlan-documentation Page # 4
TQI - 4129 Varden Court, Mississauga, ON L5L 4A7 [email protected] Ph: 905-607-2728 Fax:905-607-9180
Presentation of Data
The data was reduced to flow rates (5 minute time steps) and plotted in weekly form where
each plot covers a Monday through Sunday period. A complete set of weekly flow plots is
attached at the end of this document. The flows were also interval averaged to daily
average flows. A plot of daily average flows covering the entire monitoring period is also
attached. All data is at EST to avoid loss of data or gaps during shifts to/from daylight
savings time. EST is equal to local time during the winter bur 1 hour behind during the
summer.
The A/V meter at station G2 had erratic results as was suspected at installation. Thus we
used station G4 in conjunction with G3 to obtain flows for G2 as we provided for at
installation..
No rainfall data at the monitoring time step of 5 minutes was available.
A review of the plotted flows indicates that flows increase somewhat in the latter half of
March and most of April but are fairly consistent otherwise. Flows in the 600mm Imperial
Road sewer (G4) are similar to those in the 450mm sewer at G1.
.
Yours truly,
Thompson Flow Investigations Inc. (TQI)
Larry R. Thompson, M. A. Sc., P. Eng.,
Project Manager, TQI President
2015-16 Flow Monitoring re Paisley Rd. Area in Guelph for GM BluePlan-documentation Page # 5
TQI - 4129 Varden Court, Mississauga, ON L5L 4A7 [email protected] Ph: 905-607-2728 Fax:905-607-9180
APPENDIX B: CONCEPT PLAN FOR PAISLEY PARK DEVELOPMENT
GSP GROUP LTD., MARCH 16, 2018
APPENDIX C: PAISLEY ROAD SITE CONCEPT PLAN
GM BLUEPLAN ENGINEERING LTD., MARCH 2014
Tel. 519-748-1440 www.gamsby.com
GUELPH - OWEN SOUND - L ISTOWEL - KITCHENER - EXETER
APPENDIX D: PAISLEY ROAD RECONSTRUCTION DESIGN BRIEF