Upload
dinah-sutton
View
230
Download
7
Embed Size (px)
Citation preview
ARCHWIRESEQUENCE
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
DAMON SYSTEM
PHASE 1: INITIAL LIGHT ROUND WIRE
Never anything larger than an .014 or .013 CuNiTi.
Goal: to initiate alignment, leveling, bite opening, arch development, and to resolve 90% of the rotations. Duration: 10-20 weeksAppointment Intervals: 10 weeks
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
Phase 1: INITIAL LIGHT ROUND WIRE
.014 Damon CuNiTi (Upper/Lower) Main initial archwire – starts tooth movement, works on rotations, leveling, archform, prepares for next wire
.013 Damon CuNiTi (Upper/Lower) Use for severely crowded cases
.016 Damon CuNiTi (Upper/Lower) Use as a secondarchwire in severely crowded cases.
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
ALWAYS CHECK THE WIRES FOR PERMANENT DEFORMATIONS AT THE 10
WEEK APPOINTMENT!
ENGAGE ALL TEETH
NEVER START WITH AN ARCHWIRE LARGER
THAN .014 Cu NiTi
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
Goal: Resolve remaining rotations, begin torque control and anterior space consolidation, and continue/finish arch developmentAverage time: 20-30 weeksAppointment interval: 8-10 weeks for first wire, 4-6 weeks for second
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
.014 x .025 CuNiTi – Upper/LowerA great wire for initial rotation control and leveling
.018 x .025 CuNiTi – Upper/LowerA great transition wire for enhanced rotation control prior to stainless steel and sliding mechanics.
.016 x .025 CuNiTi – Upper/Lower
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE (case-specific alternatives)
.017 x .025 Reverse Curve Ni-Ti Normally used with 20°anterior torque for severe Class II Division II cases between .014 x .025 and .018 x .025 wires (If only intrusion
needed, use same size wire without 20° torque).
.019 x .025 Reverse Curve Ni-Ti Normally used with 20°anterior torque for severe Class II Division II cases between .014 x .025 and .018 x .025 wires (If only intrusion
needed, use same size wire without anterior torque).
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE (CLASS II/2)
.017 x .025 Reverse Curve Ni-Ti with 20°anterior (+) torque
.019 x .025 Reverse Curve Ni-Ti with 20°anterior (+) torque
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
ONLY IN U
PPER ARCH
ONLY IN U
PPER ARCH
PHASE 2: HIGH-TECH EDGEWISE (DEEP BITES)
.017 x .025 Reverse Curve Ni-Ti with 20°anterior (-) torque
.019 x .025 Reverse Curve Ni-Ti with 20°anterior (-) torque
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
ONLY IN LOWER A
RCH
ONLY IN LOWER A
RCH
G&H
PHASE 2: HIGH-TECH EDGEWISE (case-specific alternatives)
.017 x .025 NiTi
.019 x .025 NiTi
Used when torque desired in the anterior without the intrusive forces of the reverse curve or for uprighting lower incisors.
with 20° anterior torque
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
AVAILABLE
UPPER ARCH(+) TORQUE
LOWER ARCH(-) TORQUE
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
TAKE A PANOREX BEFORE TRANSITIONING BETWEEN LAST HIGH TECH EDGEWISE (CU NITI)
AND STAINLESS STEEL ARCHWIRE AND CHECK
BRACKET POSITIONING .
IMPORTANT!!!!
REBONDING APPOINTMENTREBONDING APPOINTMENT
ARCHWIRE SEQUENCE
PANOREX AND REBONDING APPOINTMENT
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
After workinglast rectangular Cu
NiTi
stainless steel
PHASE 3: MAJOR MECHANICS (working phase of treatment)
Goal: Finish torque control, posterior space closure, and make vertical, A.P. and bucco-lingual corrections. Elastics.Average time: 20 weeksAppointment interval: 6-8 weeks
PHASE 3: MAJOR MECHANICS (working phase of treatment)
Goal: Finish torque control, posterior space closure, and make vertical, A.P. and bucco-lingual corrections. Elastics.Average time: 20 weeksAppointment interval: 6-8 weeks
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
Phase 3: MAJOR MECHANICS
.019 x .025 SS – Upper & Lower (Pre-posted) Excellent archwire to maintain integrityof arch during AP correction and space closure. Great for vertical control.
.016 x .025 SS – Lower (Pre-posted)Used in lower arch where more play is desired. Nice finishing wire in lower archif all the torques are acceptable.
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 4: FINISHING
Goal: Make any remaining detailed archwire bends to complete the case. Elastics.Average time: 10-20 weeksAppointment interval: 4-6 weeks
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
PHASE 4: FINISHING
.019 x .025 SS Upper (pre-posted)
.016 x .025 SS Lower (pre-posted)Most cases finished with the working archwires.
If more than minor bends and torque are required to finish, use edgewise TMA:
.019 x .025 TMA Upper
.017 x .025 TMA Lower
Regular TMA – 3X friction SSHoney Dew TMA – 11/2 X friction SSPurple TMA – Same friction as SS
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
ARCHWIRE SEQUENCE
.014 CuNiTi
.016 x .025 CuNiTi
.019 x .025 S.S.
¿.019 x .025 TMA ?
INITIAL ARCHWIRES SEQUENCE
2.001
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
.014 CuNiTi
.014 x .025 CuNiTi
.018 x .025 CuNiTi
.019 x .025 S.S.
.019 x .025 TMA ?
REGULAR ARCHWIRE SEQUENCE
.017 x .025 NiTi Spee
.019 x .025 NiTi Spee
.017 x .025 N. S. T 20º
.019 x .025 N. S. T 20º
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
.013 CuNiTi
.016 CuNiTi
.016 x .025 CuNiTi
.019 x .025 S.S.
.019 x .025 TMA ?
GREAT CROWDING WIRE SEQUENCE
.014 x .025 CuNiTi
.018 x .025 CuNiTi
RAFAEL GARCIA ESPEJOCORDOBA (SPAIN)
EUROPEANDAMON MASTER
SUMMARY