    DEPARTMENT OF FASHION TECHNOLOGY

    Architectural Brief Of a

    Trouser ManufacturingUnit

    PLANT LAYOUT

    12/16/2014

    FACULTY INCHARGE

    Mohammad Umar

    DFT

    EFFORTS BY

    NEETEK KUMAR

    PRASHANT TYAGI

    PREYANSHU SOLANKI

    WATAN CHUGH

    DFT

    SEM VII

  • 8/9/2019 architectural brief - plant layout

    2/41

    PROJECT DESCRIPTION

    Proposed Industry : Apparel IndustryType of Industry : Manufacturing

    Nature of Business : Export

    Daily working hours : 8 hours (single shift)

    Total no. of Employee : (Approx)

    Sl. No. Products SAM Daily Production

    1. Formal Trouser 22.5 1000

    Site Location : Sec 37, Gurgaon, Haryana.

  • 8/9/2019 architectural brief - plant layout

    3/41

    SITE DETAILSGurgaonis a leading financialand industrial city of India, situated in

    the National Capital Regionnear the Indian capital New Delhiin the state

    of Haryana.

    Located 19.9 miles (32 km) south-west of New Delhi, Gurgaon has apopulation of 876,824. Witnessing rapid urbanization, Gurgaon has become

    the city with the third highest per capita incomein India.

    Accessibility

    Availability of Airways: 23 Km

    Availability of Railways: 9 Km

    Reasons for the Selection of the site

    Easy availability of laborers

    Skilled Labor

    Cheap Land

    Easy Transportation

    Closeness to buying offices

    Closeness to raw material resources

    LAND COST

    Total Area (400 * 100) : 40,000 sq. ft.

    Cost per sq. ft. : Rs. 12500

    Total cost : Rs. 50 Crore

    MINIMUM LABOUR COST

    Skilled Labour : Rs. 10,000/month

    Unskilled Labour : Rs. 7000/month

  • 8/9/2019 architectural brief - plant layout

    4/41

    PLANT LAYOUT

    The manufacturing plant is to be spread across an area of 40,000 sq. m. in Sec-37,

    Guurgaon, Haryana, India.

    Setbacks of width 4.5 m will run on all four sides.

    An electrical substation of capacity 11kV of area 500 sq. m, boilers andpneumatic compressor rooms occupy 250 and 170 sq. m. Respectively.

    The plant will open to two opposite gates onto main streets of 12 m

    width.

    The main front gate will open to Loading and unloading area.

    Floor Area Ratio (FAR) = 2.5

    STRUCTURAL DESIGN AND CONSTRUCTION Boundary wall minimum height of 2.4 m.

    Provision for underground water storage of 1,00,000 l capacity.

    Paved, bitumen roads of width 2 m circumventing the manufacturing unit.

    The dimensions of the main manufacturing unit will be - m X m X 12 m.

    Structural Shed to be braced steel framed structure.

    Masonry walls.

    Cemented Floor for manufacturing unit.

    Overhead, Pneumatic-powered conveyors for Unit Production System.

    Rain water harvesting pipes affixed outside external walls.

    Plant divided into two floors with false roofing.

    Manufacturing processes designed in straight line on the ground floor and

    non-involving departments demarcated on first floor.

    Three staircase of width 1.5m, 15 steps per flight .

    Emergency and escape routes 2 m wide.

    Wood fuel used for Boilers - Fire load density up to 50kg/m3.

    The interior finish materials shall not have a flame spreadability rating

    exceeding Class 1.

  • 8/9/2019 architectural brief - plant layout

    5/41

    THE PRODUCT

    Product to be manufactured is Formal Trouser.

    Unit Production system (UPS)

    Line layout Straight

    Production per day 1000 garments

    Type of fabrics required for production

    Shell - Wool, Linen, Viscose, Poly-Wool, Poly-Viscose, Cotton, Lycra,Canvas, Polyester, Silk, Rayon, Poly-Cotton etc.

    Lining - Knee Lining, Piping etc.

    Fusing - NR Fusing, Welt Fusing, Belt Fusing etc.

    Pocketing - Herringbone, Stripes, Solids etc.

    The production flow process for Formal Trousers

  • 8/9/2019 architectural brief - plant layout

    6/41

  • 8/9/2019 architectural brief - plant layout

    7/41

    DEPARTMENTS

    Administrative Block -

    1.

    General Manager

    2.

    Human Resource Department

    3. Factory Manager Cabin

    4. Production Manager Cabin

    5. PPC Department

    6. Marketing & Merchandising Department

    7. Accounts & Finance Department

    8. Conference Room

    Production Block -

    9. Sampling Department

    10. CAD Department

    11. Fabric Receipt Area

    12. Fabric Store

    13. Trim Store

    14.

    Spreading & Cutting Room

    15. Sewing

    16. Finishing & Packaging Section

    17. Ware House

    18.

    Quality Assurance Department

    19. Industrial Engineering Department

    20. Maintenance Department

    21.

    Training Department

  • 8/9/2019 architectural brief - plant layout

    8/41

    FACILITIES

    22. Main Entrance

    23.

    Security Room

    24.

    Parking25. Garden

    26.

    Reception Area

    Physical Plant -

    27. Boiler

    28. Generator

    29. Escalator (Lift)

    30.

    General Maintenance

    31. Store Room

    Personnel Block -

    32. Creche

    33.

    Canteen

    34. Water

    35. Safety Department

    36.

    Toilet

  • 8/9/2019 architectural brief - plant layout

    9/41

    DEPARTMENT DETAILS

    1. General Manager Cabin

    Manpower RequirementSl. No. Designation No. of Manpower

    1. General Manager 1

    2. Assistant General Manager 1

    2. Human Resource Department

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. HR Head 1

    2. Assistant HR 3

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Chair 4 1.5 x 1.5 9

    2. Table 4 5 x 3 60

    3. Cabinets For Storage 4 3 x 2 18

    4. Visitors Chair 5 +1

    (sofa)

    1.5 x 1.5 + 6

    x 3

    29.25

    Total Area 116.25

    Allowance (150%) 174.37

    Total Area including Allowance 290.6

    Area Allocation

    Sl.No.

    Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Chair 2 1.5 X 1.5 4.5

    2. Table 2 5 x 3 30

    3. Cabinets For Storage 2 3 x 2 12

    4. Visitors Chair 2 1.5 X 1.5 4.5

    Total Area 51

    Allowance (150%) 76.5

    Total Area including Allowance 127.5

  • 8/9/2019 architectural brief - plant layout

    10/41

    3.

    Factory Manager Cabin

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Factory Manager 1

    2. Assistant Factory Manager 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Chair 2 1.5 X 1.5 4.5

    2. Table 2 3 x 5 303. Visitors Chair 4 1.5 x 1.5 9

    4. Cabinets For Storage 2 3 x 2 12

    Total Area 55.5

    Allowance (150%) 83.25

    Total Area including Allowance 138.75

    4. Production Manager Cabin

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Production Manager 1

    2. Assistant Production Manager 2

    Area Allocation

    Sl. No. Particulars Quantit

    y

    Dimensions

    (Feet)

    Area

    (sq. ft.)1. Chair 3 1.5 x 1.5 6.75

    2. Table 3 3 x 5 45

    3. Visitors Chair 6 1.5 x 1.5 13.5

    4. Cabinets For Storage 3 3 x 2 18

    5. Hanger stand 1 10 x 3 30

    Total Area 113.25

    Allowance (150%) 169.85

    Total Area including Allowance 283.12

  • 8/9/2019 architectural brief - plant layout

    11/41

    5. PPC Department

    Manpower RequirementSl. No. Designation No. of Manpower

    1. PPC Manager 1

    2. Assistant PPC Manager 2

    3. Helper 1

    6. Marketing & Merchandising Department

    This department caters to the marketing and sourcing of the product

    and its components. The marketing and merchandising departments

    also requires a list of workstations and cabins for officers and

    managers. Following are the list of activities that are carried out in

    this department.

    Material Planning

    Initial Costing

    Purchase Orders

    Sample development

    Approval/Rejection

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)1. Chair 4 1.5 x 1.5 9

    2. Table 3 3 x 5 45

    3. Visitors Chair 6 1.5 x 1.5 13.5

    4. Cabinets For Storage 2 3 x 2 12

    5. Hanger stand 1 10 x 3 30

    Total Area 109.5

    Allowance (150%) 164.25

    Total Area including Allowance 273.75

  • 8/9/2019 architectural brief - plant layout

    12/41

    7.

    Accounts & Finance Department

    The Accounts & Finance Department caters to documentation

    regarding to the following documented activities.

    Purchase department

    Documentation

    Finance

    Accounts

    Shipment details and documentation

    Bank documents

    Letter of Credit

    Bills

    The purchase department is a sub department under the

    administration. This department is responsible for issue of purchase

    orders to buy fabrics and trims and also other requirement of the

    plant. The purchase department also requires space for keeping

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Marketing Head 1

    2. Junior Marketing Executives 43. Merchandiser 1

    4. Junior Merchandiser 4

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)

    1. Table 6 5 x 3 90

    2. Chair 10 1.5 x 1.5 22.5

    3. Cabinets for Storage 2 3 x 2 12

    4. Visitors Chair 10 1.5 x 1.5 22.5

    Total Area 147

    Allowance (150%) 220.5

    Total Area including Allowance 367.5

  • 8/9/2019 architectural brief - plant layout

    13/41

    records and workstations. Following are the activities that are

    carried out in this department.

    Placing Purchase Orders

    Raw material Procurement

    Affirmation of Purchase order by Supplier

    Evaluation of Supplier in terms of cost and quality

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Accounts Manager 1

    2. Assistant Account Manager 1

    3. Data Entry Operator 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Table 3 5 x 3 45

    2. Cabinets for Storage 2 3 x 2 12

    3. Chair 3 1.5 x 1.5 6.75

    4. Visitors Chair 6 1.5 x 1.5 13.5Total Area 77.25

    Allowance (150%) 115.88

    Total Area including Allowance 193.12

    8. Conference Room

    All the official meetings within company heads, buyers and

    contractors take place here.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

  • 8/9/2019 architectural brief - plant layout

    14/41

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Tables 1 28 x 7 196

    2. Chairs 30 1.5 x 1.5 67.53. Cabinets for Storage 2 3 x 2 12

    Total Area 275.5

    Allowance (150%) 413.25

    Total Area including Allowance 688.75

    9. Sampling Department

    This department serves the purpose of sample making before the

    actual production. The department requires a set of machinery to

    manufacture these samples. Following are the basic activities carried

    out in this department:-

    Sampling

    Patterns, sample approved

    Machineries required

    Cutting tables

    Sewing MachinesIron tables

    Inspection tables

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Pattern Master 1

    2. Sampling Department Manager 1

    3. Supervisor 1

    4. Cutting Master 1

    5. Sewing Operators 23

    6. Ironing Operators 1

  • 8/9/2019 architectural brief - plant layout

    15/41

    Area Allocation

    Sl. No. Particulars Quantity

    Dimensions(Feet)

    Area(sq. ft.)

    1. Pattern Store

    Racks

    3 2 x 4 24

    2. Fabric/SampleRacks

    3 2 x 4 24

    3. Cabinets forStorage

    1 3 x 2 6

    4. SNLS 10 3.5 x 2.5 87.5

    5. SNLS UBT 5 3.5 x 2.5 43.75

    SNCS 1 4 x 3 12

    6. Auto Serger 1 5 x 3 15

    7. Belt Loop Machine 1 3 x 3 9

    8 Tandem Needle 1 4 x 3 12

    9 Kaz Machine 1 5 x 3 5

    10 Button Attach

    Machine

    1 4 x 3 12

    Bartack Machine 1 4 x 3 12

    APW Machine 1 5 x 5 25

    6. Iron Tables 1 6 x 4 24

    7. Pattern Table 1 5 x 7 358. Table 1 3 x 5 15

    9. Operator Chair 25 1.5 x 1.5 56.25

    Total Area 417.5

    Allowance (150%) 626.25

    Total Area including Allowance 1043.75

    10. CAD Department

    The purpose of the CAD department is to generate pattern for the

    garment and thus produce the production marker for the same.

    Following are the activities and assets required in the department.

    Plotter

    Digitizer

    Marker making

    Marker Preparation

  • 8/9/2019 architectural brief - plant layout

    16/41

    Costing marker

    Bundle preparation report

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. CAD Executive 1

    2. Pattern Masters 1

    3. Junior Pattern Masters 1

    4. Plotter & Digitizer 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Table 2 3 x 2 24

    2. Plotter 1 6 x 3 18

    3. Digitizer 1 6 x 4 24

    4. CAD Machine 1 8 x 3 24

    5. Chair 4 1.5 x 1.5 9

    6. Cabinets for Storage 1 3 x 2 6

    Total Area 93

    Allowance (150%) 139.5Total Area including Allowance 232.5

    11. Fabric Receipt Area

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Temporary FabricStorage

    1 10 x 5 50

    Total Area 50

    Allowance (150%) 75Total Area including Allowance 125

  • 8/9/2019 architectural brief - plant layout

    17/41

    12.

    Fabric Store

    This department is required for the storage of trims and raw

    materials received. This department also keeps a record of trims

    received and issued to the production. Following are the activitiescarried out in this department:-

    Raw Material (fabric and trim receipt)

    Quality checking

    Issue material for production

    Packaging material storage

    Weighing machines

    Spring balance

    Area calculation for fabric store WIP

    Average Fabric Consumption - 1.5 m

    Per day requirement - 1000 x 1.5 = 1500m

    Per week requirement: 1500 x 7 = 10500m

    Now, assuming that 1 roll has 100m fabric. Then,

    Total rolls to be stored for 7 days= 105 rolls.

    Given, this rack (4 shelves) will accommodate 20 rolls at a time.

    Therefore, number of such racks required: 105/20 = 5.25 ~ 6

    racks.

    The extra three shelves will be used for storage of end bits and

    extra fabric after order completion.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Store Manager 1

    2. Assistant Manager 2

    3. Helpers 44. Fabric/Shade Inspectors 3

  • 8/9/2019 architectural brief - plant layout

    18/41

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Table 3 5 x 3 45

    2. Racks 6 9 x 5 2703. Fabric Inspection

    Machine

    3 9 x 8 216

    4. Inspection tables 4 6 x 3 72

    5. Working Table 3 8 x 6 144

    6. Chair 6 1.5 x 1.5 13.5

    7. Extra Shelves 3 6 x 3 18

    Total Area 535.5

    Allowance (150%) 803.25

    Total Area including Allowance 1338.75

    13. Trim Store

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Store Manager 1

    2. Helpers (Issuers) 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)

    1. Racks 6 8 x 6 48

    2. Working Table 1 5 x 3 15

    3. Chair 2 1.5 x 1.5 4.5

    Total Area 64.5Allowance (150%) 96.75

    Total Area including Allowance 161.25

  • 8/9/2019 architectural brief - plant layout

    19/41

    14.

    Spreading & Cutting Room

    The department serves the purpose of spreading of the fabric on long

    tables and cutting the pattern pieces out of it. The critical factor in

    deciding the area of the department is the length of the cutting table.The process of numbering and bundling is also carried out in this

    department. The department requires the storage space for the cut

    fabric rolls, cut components, bundles etc. Following are the

    requirements for this department.

    Spreading Tables

    Cutting tables

    Numbering tables

    Bundling tables

    Checking tables

    Cutters required

    Area calculation for cutting section and manpower -

    Daily production: 1000 garments

    Daily working hours: 8

    Let 1 lay consist of 70 plies with 4 way marker

    Thus, no. of garments = 70x4 = 280

    Spreading -

    Spreading time of 1 lay for 2 spreaders and 1 helper = 90 min

    So, SAM = 90/280= 0.321

    Now, total SAM req. per day= 1000x0.321

    = 321 min

    Thus, total no. of tables req.= 321/480 = 0.60

    = 1

    Manpower req. per lay (spreading) = 3 (2 operator + 1 helper)

  • 8/9/2019 architectural brief - plant layout

    20/41

    Cutting

    Cutting time for 4-way marker, 1 lay for 1 cutter = 120mins

    SAM = 90/280

    = 0.428

    Now, total SAM req. per day= 1000 x 0.4285

    = 429 mins

    Thus, total no. of tables req.= 429/480 = 0.89

    = 1

    Manpower required per lay (spreading) = 3 (2 spreaders + 1 cutter)

    Manpower required per lay (cutting) = 1

    Machine requirement = 2 straight knife (1 extra)

    Ticketing -

    Ticketing time per cut component = 1s

    Ticketing time per garment = (12 x 1) = 12 sec

    Time required per day = 1000x0.2 = 200mins

    Machine requirement = 200/480 = 0.416

    = 1

    Manpower requirement = 1 No. of tables required = 1

    Part Change

    It is found that 1 operator is sufficient for this operation.

    Fusing -

    It is found that 1 machine is capable of handling fusing required per day

    Assuming ( 2 operators + 2 helpers ) per m/c.

    WIP -

    Now, the cutting room should have the capacity to store inventory of three days.

    Inventory to be stored= 1000 x 3 = 3000

    A rack of (5 x 3) can store 1000 garment pieces.

    Hence 3 racks required to keep the inventory.

  • 8/9/2019 architectural brief - plant layout

    21/41

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Cutting Department Manager 1

    3. Cutting Master 1

    4. Cutting Operator 15. Spreaders + Helper 2 + 1

    6. Helper (Trolley) 2

    7. Numbering 1

    Fusing Manpower 4

    Part Change 1

    8. Bundling 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Tables 3 5 x 3 45

    2. Straight Knife 3 - -

    4. End Cutters 2 - -

    5. Cutting Tables 1 50 x 6 300

    6. Numbering &Bundling Tables

    2 20 x 6 240

    Fusing Machine 1 10 x 4 40Racks for WIP 3 5 x 3 45

    7. Chairs 1 1.5 x 1.5 2.25

    Total Area 672.25

    Allowance (150%) 1008.375

    Total Area including Allowance 1680.625

  • 8/9/2019 architectural brief - plant layout

    22/41

    15.

    Sewing

    The department serves the purpose of sewing the garment and thus

    carrying out the production. Following are the various activities that

    go in the sewing room:-

    Approval of operation breakdown

    Special machines and attachments approval

    Sewing department

    Line balancing

    No. of machines required

    Deciding or approval of manufacturing system

    Sewing

    Checking

    Area calculation and manpower requirement for sewing section

    Product Formal Trouser

    Daily production - 1000 pcs

    Efficiency 64 % (assumed)

    SAM: 22.5 mins

    Daily working hours - 8

    Total SAM needed per day = 1000x22.5 mins

    = 22500 mins

    Actual minutes req per day = 22500/0.64

    = 35156.25 mins

    Number of work stations/line= 74

  • 8/9/2019 architectural brief - plant layout

    23/41

    Actual mins/line = 74 x 8 x 60= 35520

    Thus, no. of lines required = 35156.25/35520 = 0.989 = 1

    PRODUCTION MANAGER OFFICE-

    Variable Quantity Dimensions Area (sq.ft)

    Table 1 5 x 3 15

    Chair 4 2 x 1.5 12

    Sample rack 1 7 x 2 14

    File cabinet 1 5 x 2 10

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Sewing Department Manager 1

    2. Supervisor 4

    3. Inspectors 3

    4. Sewing Operators 71

    5. Helper 5

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area

    1. SNLS UBT 30 3.5 x 2.5 262.5

    2. SNLS 9 3.5 x 2.5 78.753. 3TOL 10 4 x 3 120

    4. APW 2 5 x 5 50

    5. SNCS 6 4 x 3 72

    6. Tandem Needle CS 1 4 x 3 12

    7. 5TOL 1 4 x 3 12

    8. Zig - Zag 2 3.5 x 2.5 17.5

    9. Bartack Machine 4 4 x 3 48

    10. Button Attach

    Machine

    3 4 x 3 36

  • 8/9/2019 architectural brief - plant layout

    24/41

    16. Finishing & Packaging Section

    The finishing department is meant for ironing, folding and packing of

    the garment the department will require tables for checking as well

    as tables for folding and packaging. Following are the activities:-

    Ironing

    Tags attached Checking

    Folding and Packaging

    Area calculation for finishing department -

    Daily production= 1000 pcs/day

    SAM -

    No. of sec required for Inspection & Trimming = 40

    SAM = 40/60mins=0.66 min

    Total time required per day = 1000 x 40/60 = 667 mins

    Manpower requirement = 667/480 = 1.3(approx) ~2

    Assuming 2 persons per table,

    No. of tables required = 1

    No. of sec required for Thread sucking = 10

    11. Eyelet Machine 1 5 x 3 15

    12. Checker Table 6 5 x 4 120

    13. Matching Table 1 5 x 3 15

    14. Iron Tables 9 3 x 4 108

    15. Seam Burster 2 5 x 4 4016. Racks 6 5 x 4 120

    17. Trim Racks 2 6 x 4 48

    18. Side Table 1 67.5 x 1.5 101.25

    19. Operators Chair 74 1.5 x 1.5 166.5

    20. Office 1 - 51

    Total Area 1493.5

    Allowance (150 %) 2240.25

    Total Area including Allowance 3733.75

  • 8/9/2019 architectural brief - plant layout

    25/41

    SAM= 10/60 mins=0.166 min

    Total time required per day = 1000 x 10/60 = 166 mins

    Machine requirement = 166/480 = 0.34 ~ 1(approx)

    Manpower requirement =1

    No. of sec required for Stain removal = 60

    SAM = 60/60 = 1mins

    Taking average 1 stain per 10 trousers,

    Total time required per day = 100 x 1 = 100 mins

    Workstation requirement = 100/480 = 0.2~ 1(approx)

    Manpower requirement = 1

    No. of sec required for final Ironing = 90

    SAM= 90/60 mins

    Total time reqd per day = 1000 x 85/60 = 1500 mins

    Workstation requirement = 1500/480 = 3.125 ~ 4(approx)

    Manpower requirement = 4

    No. of sec required for Folding & Tagging = 60

    SAM = 60/60 = 1 min

    Total time required per day = 1000 x 1 = 1000 mins

    Manpower requirement = 1000/480 = 2

    Assuming 1 person per table,

    No. of tables required = 2

    No. of sec required for Final Packaging =60

    SAM = 60/60 =1 min

    Total time reqd per day = 1000 x 1 = 1000 mins

    Manpower requirement = 1000/480 = 2

    Assuming 2 persons per table,

    No. of tables required = 1

  • 8/9/2019 architectural brief - plant layout

    26/41

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Finishing Supervisor 1

    2. Checking 63. Ironing/Pressing 4

    4. Tag Attachment 2

    5. Folding 2

    6. Packing 3

    7. Helper 2

    8. Trimming 2

    9. Thread Sucking 1

    10. Stain Removal 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Table 1 5 x 3 15

    2. Ironing Tables 4 3 x 5 60

    3. Tag Attachment Machine 2 3 x 5 30

    4. Pressing 4 5 x 5 100

    5. Thread cutting tables 1 3 x 3 9

    6. Thread suction machine 1 4 x 3 12

    7. Stain removal table 1 4 x 3 128. Needle detection machine 1 5 x 3 15

    9. Trolley 2 4 x 3 24

    10. Inspection Tables 6 8 x 6 288

    11. Packing Tables 1 3 x 5 15

    12. Tag Attachment Table 2 5 x 3 30

    13. Folding Table 2 6 x 6 72

    Total Area 682

    Allowance (150%) 1023

    Total Area including Allowance 1705

  • 8/9/2019 architectural brief - plant layout

    27/41

    17.

    Ware House

    This department stores all the finished orders. Here the orders are

    stored till they are shipped. Also the finished goods of a consignment

    whose production is in process is also stored here. Following are thevarious processes:

    Cartons are brought in from finishing department

    Cartons are stored

    Cartons are moved to parking be shipped

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Warehouse Manager 1

    2. Helpers 2

    Area Allocation

    Sl. No. Particulars Quantity Dimension

    s(Feet)

    Area

    (sq. ft.)

    1. Working Table 2 4 x 3 24

    2. Trolley 2 4 x 3 24

    3. Table 1 3 x 5 15

    4. Chairs 3 1.5 x 1.5 6.75

    5. Cabinet for Storage 1 3 x 2 6

    Total Area 75.75

    Allowance (150%) 113.62Total Area including Allowance 189.37

  • 8/9/2019 architectural brief - plant layout

    28/41

    18.

    Quality Assurance Department

    The quality assurance department is meant for setting the quality

    standards for the product and then checking their sustainability in

    the production process. The department requires one qualitymanager and quality supervisors.

    Decision of Inspection points

    Solving quality problems

    Improving quality

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. QA Manager 1

    2. QA Supervisor 2

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)1. Table 3 3 x 5 45

    2. Chair 6 1.5 x 1.5 13.5

    3. Inspection Table 1 3 x 8 24

    4. Cabinets For Storage 2 3 x 2 12

    5. Hanger Stand 1 10 x 3 30

    Total Area 124.5

    Allowance (150%) 186.75

    Total Area including Allowance 311.25

  • 8/9/2019 architectural brief - plant layout

    29/41

    19.

    Industrial Engineering Department

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. IE Manager 1

    2. Assistant IE Manager 2

    3. Helper 2

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Chair 5 1.5 x 1.5 11.252. Table 3 3 x 5 45

    3. Cabinets For Storage 2 3 x 2 12

    4. Visitors Chair 3 1.5 x 1.5 6.75

    5. Hanger stand 1 10 x 3 30

    Total Area 105

    Allowance (150%) 157.5

    Total Area including Allowance 262.5

    20. Maintenance Department

    The department stores basic tools for the maintenance of the

    machines. It also requires space for the maintenance job. Following

    are the activities of the department.

    Tools and machinery storage for maintenance of sewing and

    finishing machines

    Tools and machinery storage for special machines

    Spare parts storage

    Building maintenance parts storage

    Machine maintenance

    UPS or power backup maintenance

    Air conditioning maintenance

    Record Keeping

    Electric supply decisions

  • 8/9/2019 architectural brief - plant layout

    30/41

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Maintenance Manager 1

    2. Assistant Maintenance Manager 1

    3. Helper 14. Mechanic 5

    5. Issuer 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Chair 5 1.5 x 1.5 11.25

    2. Work Table 3 3 x 4 36

    3. Cabinets For Storage 4 4 x 2 32

    4. Shelves for Storage 2 2 x 5 20

    Total Area 99.25

    Allowance (150%) 148.87

    Total Area including Allowance 248.12

    21. Training Department

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Training Incharge 1

    Area Allocation

    Sl. No. Particulars Quantity

    Dimensions(Feet)

    Area(sq. ft.)

    1. Sewing Machines 20 4 x 3 240

    2. Operator Chair 20 1.5 x 1.5 45

    3. Table 1 5 x 3 15

    4. Chair 1 1.5 x 1.5 2.25

    Total Area 302.25

    Allowance (150%) 453.37

    Total Area including Allowance 755.62

  • 8/9/2019 architectural brief - plant layout

    31/41

    Facility Details

    22. Main Entrance

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantit

    y

    Dimensions

    (Feet)

    Area

    (sq. ft.)1. NIL NIL NIL NIL

    Total Area NIL

    Allowance (150%) NIL

    Total Area including Allowance NIL

    23.

    Security Department

    This department comes under administration. Following are the

    various requirements:-

    Security cabins

    Parking

    Here all the vehicles of both operators and officials will be parked.

    Also parking is the place where the trucks and other vehicles for

    transport will be received. This will also be taken care by securitydepartment who will see to it from the entrance gate that rules are

    abided by people. Operators will be allowed to park cycles only.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Security Head 1

    2. Security Guards 8

  • 8/9/2019 architectural brief - plant layout

    32/41

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Table 2 5 x 3 30

    2. Stool 9 1 x 1 9

    3. Punching Machine 5 1 x 0.5 2.5

    4. Parking Area 1 83 x 10 830

    Total Area 871.5

    Allowance (150%) 1307.25

    Total Area including Allowance 2178.75

    24.

    Garden

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Gardener 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Garden 35 x 10 350

    Total Area 350

    Allowance -

    Total Area including Allowance 350

  • 8/9/2019 architectural brief - plant layout

    33/41

    25.

    Reception Area

    Reception is where all the people, buyers, contractors etc. will be

    received when they visit.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Receptionist 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)

    1. Table 1 5 x 3 152. Sofa 3 4 x 6 72

    3. Chairs 1 1.5 x 1.5 2.25

    Total Area 89.25

    Allowance (150%) 133.87

    Total Area including Allowance 223.12

    26. Boiler

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Boiler 40 x 10 400

    Total Area 400

    Allowance (150%) -

    Total Area including Allowance 400

  • 8/9/2019 architectural brief - plant layout

    34/41

    27.

    Generator

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantity

    Dimensions(Feet)

    Area(sq. ft.)

    1. Generator 2 15 x 5 150

    Total Area 150

    Allowance (150%) -Total Area including Allowance 150

    28. Escalator (Lift)

    Manpower Requirement

    Sl. No. Designation No. of Manpower1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)

    1. Lift (For 4 Floors) 1 13 x 8 416

    Total Area 416

    Allowance (150%) -Total Area including Allowance 416

  • 8/9/2019 architectural brief - plant layout

    35/41

    29.

    General Maintenance

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Housekeeping Incharge 1

    2. Housekeeping Staffs 12

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Housekeeping Stuffs 2 2 x 4 16

    2. Racks 4 1.5 x 5 30Total Area 46

    Allowance (150%) 69

    Total Area including Allowance 115

    30. Store Room

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Store Room Incharge 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area

    (sq. ft.)

    1. Racks 2 2 x 8 322. Idle Machine Area 25 2.5 x 3.5 218.75

    3. Other Stuffs - 8 x 5 40

    Total Area 290.75

    Allowance (150%) 436.12

    Total Area including Allowance 726.87

  • 8/9/2019 architectural brief - plant layout

    36/41

    31.

    Creche

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Creche Incharge 1

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Washroom 1 5 x 4 20

    2. Sleeping Area 1 20 x 11 220

    3. Playing Area 1 20 x 15 3004. Kitchen 1 6 x 4 24

    5. Racks/ Almirah 2 1.5 x 3 9

    Total Area 573

    Allowance (150%) 859.5

    Total Area including Allowance 1432.5

    32.

    Canteen

    Canteen is common for all but there will be different timings for

    operators and officials. Meals will only be offered to officials.

    Operators will be offered lunch, snacks and tea at subsidized cost.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Canteen Supervisor 1

    2. Cooks 4

    3. Helpers 10

  • 8/9/2019 architectural brief - plant layout

    37/41

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Tables 25 10 x 4 1000

    2. Chairs 250 1.5 x 1.5 562.53. Cooking Room 1 15 x 12 180

    Total Area 1742.5

    Allowance (150%) 2613.75

    Total Area including Allowance 4356.25

    33.

    Water

    As 1 person require 40 litres water/day for drinking and others

    (toilets). So, employees require 34000 litres of water/ day.

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    Area(sq. ft.)

    1. Water Purifier 2 3 x 3 18

    2. Taps 15 1 x 16 240

    Total Area 258

    Allowance (150%) 387Total Area including Allowance 645

  • 8/9/2019 architectural brief - plant layout

    38/41

    34.

    Safety Department

    The department caters to the maintenance of safety assets of the

    Organization.

    Installation and maintenance of fire extinguishers

    First aid Kit installation and Maintenance

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. Nurse 1

    2. Supervisor 2

    Area Allocation

    Sl. No. Particulars Quantity Dimensions(Feet)

    A60rea(sq. ft.)

    1. Bed 2 5 x 6 60

    2. Stretcher 1 3 x 7 21

    3. Chair 1 1.5 x 1.5 2.25

    Total Area 83.25

    Allowance (150%) 124.87Total Area including Allowance 208.12

    35.

    Toilet

    As per standard 50 Female = 1 Toilet

    As per standard 40 Males = 1 Toilet

    Manpower Requirement

    Sl. No. Designation No. of Manpower

    1. NIL NIL

  • 8/9/2019 architectural brief - plant layout

    39/41

    Area Allocation

    Sl. No. Particulars Quantity Dimensions

    (Feet)

    Area(sq.ft.)

    1. Ladies Washroom (For 4Floors)

    - 23 x11.5

    264.5

    2. Gents Washroom (For 4

    Floors)

    - 15 x

    11.5

    172.5

    Total Area 437

    Allowance (150%) -

    Total Area including Allowance 437

  • 8/9/2019 architectural brief - plant layout

    40/41

    VENTILATION & TEMPERATURE CONTROL

    Horizontal cooling tower power by terrace pump of pressure 900 l/min,fed by rainwater pond of capacity 20000 l

    Exhaust ventilation system in storage and finishing departments

    200 roof vents (1/100th of total area) having light weight metal frames

    and housing with hinged dampers, of 4x7 feet at every 20 inch distance.

    Depth from roof -- 3 m

    Machine rooms shall be ventilated. They shall be such that the motors and

    equipment as well as electric cables etc, are protected as far as possible

    from dust, harmful dusts and humidity. The ambient temperature in the

    machine room shall be maintained between 5C and 40C.

    Roof made of insulated sheet in U-shape with an opening in middle for hot

    air to pass by in the environment.

    WATER SUPPLY, DRAINAGE & SANITATION

    An underground water storage of capacity 1,00,000 l for fire safety andcooling system.

    Rainwater harvesting pond of capacity 20000 l attached with terracepump of pumping power 900 l/min

    Reservoirs and tanks for the reception and storage of water shall be

    constructed of reinforced concrete brick masonry, ferrocement precast,mild steel, stainless steel or plastic.

    Lead-based paint shall not be used in the tank. Lead-lined tanks shall not

    be used.

    Tank/water reservoir higher than 900 mm deep shall be provided with

    corrosion resistant catch rings, steps or ladders according to the depth to

    enable a person to reach the bottom of the tank.

    Tank/water reservoir shall be provided with an overflow pipe

    terminating above the ground/terrace level to act as a Warning Pipe toindicate overflow conditions. The size of the overflow pipe shall be

    adequate to accept the flow. Normally the overflow pipe size shall be onesize higher than the inlet pipe.

    Tank/water reservoir larger than 5000 l capacity shall be provided with

    vent pipes to prevent development pressure in the tank which might

    result in NO FLOW condition or inward collapse of the tank.

    Adequate number of manholes for access and repair. The manholes shall

    be made of corrosion resistant material (for example, cast iron, reinforced

    cement concrete, steel fibre reinforced concrete, galvanized steel, high

    density polyethylene, fibre glass reinforced plastic or such other materials

    acceptable to the Authority). Manholes shall be provided with locking

    arrangement to avoid misuse and tampering.

  • 8/9/2019 architectural brief - plant layout

    41/41

    FIRE & LIFE SAFETY

    Water and Foam Fire extinguishers for fires in ordinary combustiblessuch as wood, paper, cloth, trash, and plastics.

    Carbon Dioxide Fire extinguishers for fires in flammable liquids such asgasoline, petroleum oil and paint or fires involving energized electrical

    equipment .

    OTHER FACILITIES

    All departments are to be connected via Inter communication lines.Wiring to be done in a concealed manner through conduits.

    Parking space of area 750 sq. m. for operators and employees Crche for welfare of children of operators and employees

    Canteen spread over an area of 1000 sq. m., providing hygienic andhealthy food thrice a day.

    Medical room for accidents and unforeseen emergencies.

    Training centre for new operators and workers.

    OUTDOOR SIGNS & LANDSCAPING

    Open space to be planted with trees and flowering plants and rainwater fed

    pond.

    A board of dimensions 6 x 8 feet, displaying the companys name shall be

    fixed on the boundary wall facing the street.

    The logo of the company is to be fixed under the canopy of the roof,

    overlooking the front gate.