11
Architect’s Supplemental Instruction PROJECT: Diablo Valley College Underground Utilities Contra Costa Community College District ASI 010.3 ADDRESS: 321 Golf Club Road Pleasant Hill, CA 94523 DATE: May 6, 2020 TO: Robert Mohr, CM / CSI HMC #: 5036005 Construction Manager, LEED AP BD+C Critical Solutions, Inc. 1801 Oakland Blvd. Suite 300 Walnut Creek, CA 94596 DSA#: 01-117720 FILE# 7-C1 DESCRIPTION OF WORK TO BE PERFORMED: ITEM ASI-010r3: DESCRIPTION ASI 010r3 – REVISED PEK Electrical Systems Make-Ready & Temp Power (response to Owner’s comments) 1. This ASI will be submitted as CCD-B for Review & Approval by DSA/ SSS. 2. Plan layout is diagrammatic; adjustments for existing conditions to be confirmed with CM/ PM. 3. Work shown is required to maintain functionality of existing electrical and building management systems, which patch-thru several locations scheduled to be demolished prior to the PEK Complex project construction. REQUESTED BY: CM / Owner ACTION: ACT 1. Make the described change in the work at no change in the Contract Sum and no change in the Contract Time of Completion. ACT 2. X Make the described change in the work, with credit or cost for which will be determined in accordance with the General and Supplementary Conditions of the Contract. ACT 3. Promptly advise the Architect as to credit or cost proposed for the described change. This is not an authorization to proceed with the change. ATTACHMENTS: Sheets E0.01, E0.02, E1.00, E1.01, E1.02, E1.04, E1.05, E1.06, E1.07, E5.01, 30x42, dated 05/04/2020. cc: AOR; EEOR; IOR. File J:\Projects\5036 Contra Costa CCD\005-000 Art Complex\SITE UTILITES_117720\10 Construction\10 ASI\ASI 010.3- Revised layout & Temporary power/ASI 010r3 – REVISED PEK Electrical Systems Make-Ready & Temp Power

Architect’s Supplemental Instruction

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Architect’s Supplemental Instruction

Architect’s Supplemental InstructionPROJECT: Diablo Valley College Underground Utilities

Contra Costa Community College District ASI 010.3

ADDRESS: 321 Golf Club RoadPleasant Hill, CA 94523 DATE: May 6, 2020

TO: Robert Mohr, CM / CSI HMC #: 5036005Construction Manager, LEED AP BD+CCritical Solutions, Inc.1801 Oakland Blvd. Suite 300Walnut Creek, CA 94596

DSA#: 01-117720FILE# 7-C1

DESCRIPTION OF WORK TO BE PERFORMED:

ITEM ASI-010r3: DESCRIPTION

ASI 010r3 – REVISED PEK Electrical Systems Make-Ready & Temp Power (response to Owner’s comments)

1. This ASI will be submitted as CCD-B for Review & Approval by DSA/ SSS.2. Plan layout is diagrammatic; adjustments for existing conditions to be confirmed with

CM/ PM.3. Work shown is required to maintain functionality of existing electrical and building

management systems, which patch-thru several locations scheduled to be demolished prior to the PEK Complex project construction.

REQUESTED BY: CM / Owner

ACTION:

ACT 1.Make the described change in the work at no change in the Contract Sum and no change in the Contract Time of Completion.

ACT 2. XMake the described change in the work, with credit or cost for which will be determined in accordance with the General and Supplementary Conditions of the Contract.

ACT 3.Promptly advise the Architect as to credit or cost proposed for the described change. This is not an authorization to proceed with the change.

ATTACHMENTS: Sheets E0.01, E0.02, E1.00, E1.01, E1.02, E1.04, E1.05, E1.06, E1.07, E5.01, 30x42,

dated 05/04/2020.

cc: AOR; EEOR; IOR.

File J:\Projects\5036 Contra Costa CCD\005-000 Art Complex\SITE UTILITES_117720\10 Construction\10 ASI\ASI 010.3- Revised layout & Temporary power/ASI 010r3 – REVISED PEK Electrical Systems Make-Ready & Temp Power

Page 2: Architect’s Supplemental Instruction

M

M

M

K

AM

IQ

ELECTRICAL SYMBOLS AND LEGEND

RECEPTACLES / POWERFLOOR WALL CEILING

P

NOTE: ALL RECEPTACLE OUTLETS ON WALLS ARE MOUNTED AT 18" AFF, UON.

LETTER RATING

ABDFJKL

MNPRST

XZ

WP

125V, 1Ø, 30A, 2P, 3W125V, 1Ø, 50A, 2P, 3W 125/250V, 1Ø, 20A, 3P, 4W125/250V, 1Ø, 30A, 3P, 4W250V, 1Ø, 20A, 2P, 3W250V, 1Ø, 30A, 2P, 3W-

250V, 1Ø, 50A, 2P, 3W250V, 3Ø, 20A, 3P, 4W250V, 3Ø, 30A, 3P, 4W250V, 3Ø, 50A, 3P, 4W480V, 3Ø, 30A, 3P, 4W125V, 1Ø, 20A, 2P, 3W

125V, 1Ø, 20A, 2P, 3W480V, 3Ø, 20A, 3P, 4W

NEMA

5-30R5-50R14-20R 14-30R6-20R6-30R

-

6-50R15-20R15-30R15-50R

L16-30R 5-20R

5-20RL16-20R

WITH 5-30P PLUGWITH 5-50P PLUGWITH 14-20P PLUGWITH 14-30P PLUGWITH 6-20P PLUGWITH 6-30P PLUG'L' INDICATES ASSOCIATED RECEPTACLE IS LOCKING TYPE, PROVIDE MATCHING PLUG FOR EACH RECEPTACLEWITH 6-50P PLUGWITH 15-20P PLUGWITH 15-30P PLUGWITH 15-50P PLUGWITH L12-30P PLUGISOLATED GROUND WITH INTEGRAL TRANSIENT SUPPRESSER AND DEDICATED GREEN/YELLOW CONDUCTOR BACK TO GROUND BUS AT PANELDEDICATED CIRCUITWITH L16-20R PLUG

WEATHERPROOF RECEPTACLE WITH "IN-USE" COVER

SPECIAL RECEPTACLE DESCRIPTION SCHEDULENOTE: NUMBER OF WIRES INCLUDE GROUND

EXISTING / DEMOLITION

MULTI-OUTLET RACEWAY WITH PREWIRED RECEPTACLES MOUNTED 12" ON CENTER UNLESS OTHERWISE NOTED. NUMBER IN (X) PARENTHESIS INDICATES DISTANCE BETWEEN DEVICES. WHERE MULTIPLE CIRCUITS ARE INDICATED CIRCUITS ALTERNATE ALONG ENTIRE LENGTH OF RACEWAY

EXISTING EQUIPMENT / RACEWAYS TO REMAIN

EXISTING EQUIPMENT / RACEWAYS TO BE REMOVED

NEW EQUIPMENT / RACEWAYS

EXISTING TO REMAIN

EXISTING TO BE REMOVED

NEW EQUIPMENT, LIGHTING FIXTURE OR DEVICE

SINGLE LINE DIAGRAM

P P

X

X X

X

X

X

LIGHTING

SURFACE MOUNTED TROFFER

WALL CEILING

EXAMPLES:

NORMAL EMERGENCY

LUMINAIRE NOMENCLATURE:

"A" DENOTES FIXTURE TYPE"3" DENOTES CIRCUIT NUMBER"a" DENOTES SWITCH ZONE"z1" DENOTES DAYLIGHT ZONE"r1" DENOTES SITE RELAY ZONE

EXIT SIGN; SHADED PORTION INDICATES ILLUMINATED FACE. DIRECTIONAL ARROWS AS INDICATED ON PLANS. PROVIDE MASTER/SLAVE HIGH AND LOW LEVEL EXIT SIGNS WHEREVER AN EXIT SIGN IS INDICATED ON PLANS

EXIT

MULTIPLES

UNDERWATER

SWITCHING

MANUAL MOTOR STARTER WITH THERMAL OVERLOAD NUMBER OF POLES AS REQUIRED

1

E-6

1

P

1

A

E-6

GENERAL ELECTRICAL SYMBOLSRECESSED SURFACE

DISCONNECT SWITCH, 30 AMP MINIMUM UNLESS NOTED OTHERWISE

FREE STANDING SWITCHBOARD, MOTOR CONTROL CENTER OR DISTRIBUTION BOARD

A-1,3,5

RACEWAYS AND WIRINGFLOOR WALL CEILING

CONDUIT CONCEALED IN CEILING OR WALL SPACE

J

J

J

J

J

A. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING FIXTURE TYPE AND MOUNTING CONDITIONS REGARDLESS OF SYMBOL USED ON PLANS.

B. REFER TO FIXTURE SCHEDULE FOR FIXTURE DESCRIPTION, MOUNTING AND LAMP INFORMATION. SHADED FIXTURE SYMBOLS INDICATE FIXTURE IS CONNECTED TO THE LIFE SAFETY SYSTEM OR HAS SECONDARY POWER SOURCE.

RECESSED MOUNTED TROFFER

SUSPENDED OR PENDANT MOUNTED LUMINAIRE

NORMAL EMERGENCY

STRIP OR TRACK LIGHT

SURFACE MOUNTED DOWNLIGHT

RECESSED MOUNTED DOWNLIGHT

PENDANT MOUNTED DOWNLIGHT

DIRECTIONAL LUMINAIRE

SIMPLEX RECEPTACLES

JUNCTION BOX 4" SQUARE MINIMUM FOR WALL OR CEILING MOUNTED

DUPLEX RECEPTACLES

QUADRUPLEX RECEPTACLES

SPECIAL RECEPTACLES (DUPLEX & QUADRUPLEX), REFER TO SPECIAL RECEPTACLE SCHEDULE, THIS SHEET

GROUND FAULT CIRCUIT INTERRUPTING RECEPTACLES

ABOVE COUNTER RECEPTACLES. INSTALL ABOVE COUNTER OR DEFINED HEIGHT

HALF CONTROLLED DUPLEX

SWITCHED RECEPTACLES

CLOCK RECEPTACLES

JUNCTION BOX SIZE AS REQUIRED FOR NUMBER OF WIRES OR RACEWAYS

SYSTEM FURNITURE POWER FEED, REFER TO DETAIL FOR RACEWAY AND BOX REQUIREMENTS

POLE MOUNT FIXTURES (1, 2, 3, 4 HEADS)

WALL MOUNTED LUMINAIRE

FA

EEE

X33

+4'-6"

MH=4'-6"

P

P

P

M

X

ab

abc

L abc

X33

WALL CEILING

TRACK

LED

5

A3,a,z1

FIRE TREATED PLYWOOD BACKBOARD 3/4"X96" HIGH X LENGTH AS INDICATED

ELECTRICAL EQUIPMENT DESIGNATION DESIGNED "EQ01"

REFERENCE TO NOTE "1" ON SAME SHEET

LIGHTING FIXTURE DESIGNATIONFA = FIXTURE TYPE

MECHANICAL EQUIPMENT DESIGNATION "P-1" INDICATED

EQUIPMENT NAME OR NUMBER

MOUNTING HEIGHT FROM FINISHED FLOOR TO CENTERLINE OF OUTLET OR EQUIPMENT

MOUNTING HEIGHT FROM FINISHED FLOOR TO BOTTOM OF OUTLET OR EQUIPMENT

DETAIL REFERENCE NUMBER "1" ON DRAWING "E-6"

SECTION OR ELEVATION REFERENCE LETTER "A" ON DRAWING "E-6"

INDICATES HOMERUN WITH THREE CIRCUITS AND A SEPARATE NEUTRALS

CONDUIT RUN UNDERGROUND OR CONCEALED IN FLOOR SPACE

CONDUIT RISING UP FROM RUN

CONDUIT DROPPING DOWN FROM RUN

FUSED DISCONNECT SWITCH, 30 AMP MINIMUM UNLESS NOTED OTHERWISE

COMBINATION DISCONNECT SWITCH MOTOR STARTED

MOTOR, 5 HP INDICATED

TRANSFORMER

RELAY OR EQUIPMENT CABINET AS INDICATED ON PLAN

LIGHTING OR POWER PANEL BOARD

SWITCH, SUBSCRIPT INDICATES:X = NONE - SINGLE POLEX = 3 - THREE WAYX = A,B,C - OUTLET CONTROLLEDX = 2 - DOUBLE POLEX = KP - KEY OPERATED WITH PILOT LIGHT X = P - PILOT LIGHTX = R - MOMENTARY RELAY ON/OFF

2-SINGLE POLE SWITCHES, UNDER COMMON PLATE, +42" UON

3-SINGLE POLE SWITCHES, UNDER COMMON PLATE, +42" UON

LOW VOLTAGE LIGHTING CONTROL. NUMBER IN ELONGATED HEXAGON INDICATES CONTROL IDENTIFICATION. REFER TO SEQUENCE OF OPERATIONS AND LIGHTING CONTROL DETAILS FOR ADDITIONAL INFORMATION

DIMMER WITH INTEGRAL SWITCH, +42" UON. '600' INDICATES RATING IN WATTS

ROOM TYPE OCCUPANCY SENSOR, ARROW INDICATES DIRECTION OR ORIENTATION, SUBSCRIPT INDICATES SWITCH LEG OR CIRCUIT TO BE CONTROLLED

ROOM TYPE OCCUPANCY SENSOR, ARROW INDICATES DIRECTION OR ORIENTATION, SUBSCRIPT INDICATES SWITCH LEG OR CIRCUIT TO BE CONTROLLED

CORRIDOR TYPE OCCUPANCY SENSOR, ARROW INDICATES DIRECTION OR ORIENTATION, SUBSCRIPT INDICATES SWITCH LEG OR CIRCUIT TO BE CONTROLLED

PUSH-BUTTON STATION. +42" UON

PHOTOSENSOR - WALL MOUNT WITH DIRECTIONAL VIEW. ARROW INDICATES AIMING DIRECTION

PHOTOSENSOR - CEILING MOUNT WITH DIRECTIONAL VIEW. ARROW INDICATES AIMING DIRECTION

PHOTOSENSOR - CEILING MOUNT WITH 360 VIEW

LX

LOW VOLTAGE LIGHTING CONTROL SUBSCRIPT INDICATES:X = D - DIMMER SWITCHX = S - SENSOR SWITCHX = T - TIMER SWITCHX = M - LOW VOLTAGE MASTER CONTROL SWITCH

X

SENSOR TYPE SUBSCRIPT INDICATES:X = DT - DUAL TECHNOLOGYX = H - HALLWAYX = HB - HIGH BAYX = IR - PASSIVE INFRAREDX = US - ULTRASONIC

T

NOTES:

GROUNDING SYSTEMFLOOR WALL

GROUND PLATE, FLAT TAPPED SIDE TO BE FLUSH WITH FURNISHED SURFACE. CADWELD B164-2Q OR EQUIVALENT

G

TG

G

TG

GROUND BUS

TECHNICAL GROUND BUS

X

X

POKE THRU

HALF CONTROLLED QUADRUPLEX

(18)

G

EXOTHERMIC GROUND CONNECTION

GROUND WIRE

GROUND ROD

GROUND ROD TEST WELL

S

G

CIRCUIT BREAKER, 3 POLE UNLESS NOTED OTHERWISE

MOTOR STARTER WITH OVERCURRENT PROTECTION, 3POLE UNLESS NOTED OTHERWISE

MOTOR STARTER WITH FUSED AND DISCONNECT SWITCH, 3POLE UNLESS NOTED OTHERWISE

GROUND FAULT RELAY

SHUNT TRIP RELAY

DRAW-OUT CIRCUIT BREAKER

NON-FUSED DISCONNECT SWITCH, 30 AMP, 3P UNLESSNOTED OTHERWISE

FUSED DISCONNECT SWITCH, 3 POLE UNLESS NOTEDOTHERWISE

DEMAND TYPE KWH METER

DEMAND TYPE KWH METER WITH ENCLOSURE

PROVISION FOR UTILITY COMPANY KWH METER

KIRK-KEY INTERLOCK BETWEEN DEVICES

CURENT TRANSFORMER (CT)

AMMETER

ELECTRONIC METER

SEPARABLE CONNECTOR(S)

GROUND

TRANSFORMER , AS NOTED ON SINGLE LINE DISGRAM

TRANSFORMER , AS NOTED ON SINGLE LINE DISGRAM

1. 2016 CALIFORNIA BUILDING CODE (CBC), VOLUMES #1 AND #2 (PART 2, TITLE 24, CCR).

2. 2016 CALIFORNIA ELECTRICAL CODE (PART 3, TITLE 24, CCR.)

3. 2016 CALIFORNIA MECHANICAL CODE (CMC) (PART 4, TITLE 24, CCR).

4. 2016 CALIFORNIA PLUMBING CODE (CPC) (PART 5, TITLE 24, CCR).

5. 2016 CALIFORNIA ENERGY CODE (PART 6, TITLE 24, CCR).

6. 2016 CALIFORNIA FIRE CODE (CFC) (PART 9, TITLE 24, CCR).

7. 2016 CALIFORNIA GREEN CODE (PART 11, TITLE 24, CCR).

8. 2016 CALIFORNIA REFERENCED STANDARDS CODE (PART 12, TITLE 24, CCR).

9. 2016 NFPA 72 NATIONAL FIRE ALARM CODE (WITH CA AMENDMENTS).

10. 2016 NFPA 13 STANDARDS FOR FIRE SPRINKLER SYSTEMS (WITH CA AMENDMENTS).

11. 2016 ADA STANDARDS FOR ACCESSIBLE DESIGN.

12. 2016 NFPA 70E.

CALIFORNIA CODES AND STANDARDS

SHEET LIST - ELECTRICALNUMBER NAME

E0.01 ELECTRICAL LEGEND

E0.02 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

E1.00 DVC PEK - TEMPORARY BUILDING PHASE 0

E1.01 DVC PEK - TEMPORARY BUILDING PHASE 0 - DEMO PE OFFICES,

CONCESSION, BOILER ROOM AND T30

E1.02 DVC PEK - TEMPORARY BUILDING PHASE 1A & 1B - CONSTRUCT

BLDG A & BLDG B

E1.04 DVC PEK - TEMPORARY BUILDING PHASE 2A - DEMO WOMENS

LOCKER BUILDING

E1.05 DVC PEK - TEMPORARY BUILDING PHASE 2A & 2B - CONSTRUCT

BLDG C

E1.06 DVC PEK - TEMPORARY BUILDING PHASE 3 - DEMO MENS LOCKER

BUILDING

E1.07 DVC PEK - TEMPORARY BUILDING PHASE 3 - COMPLETE SITE

WORK

E5.01 DVC PEK - TEMPORARY ELECTRICAL SINGLE LINE DIAGRAMS

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

ELECTRICAL LEGEND

05/04/2020 D-4012

E0.01

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

Page 3: Architect’s Supplemental Instruction

RACEWAY APPLICATIONS MATRIX

RACEWAY APPLICATIONS

ENVIRONMENT RACEWAYSBOXES, ENCLOSURES, AND

CABINETS

DRY LOCATIONS,CONCEALED

RMC, IMC, EMT, FMC (12),LFMC (12), WW

SM, FS/FD; NEMA1

DRY LOCATIONS, EXPOSED,SUBJECT TO DAMAGE (11)

RMC, IMC SM, FS/FD; NEMA1

DRY LOCATIONS, EXPOSED,NOT SUBJECT TO DAMAGE

(11)

RMC, IMC, EMT, FMC (12),LFMC (12), WW

SM, FS/FD; NEMA1

WET LOCATIONS, SUBJECTTO DAMAGE (11)

RMC, IMC, EMT, FMC (12),LFMC (12), WW

FS/FD; NEMA 4, 4X

WET LOCATIONS, NOTSUBJECT TO DAMAGE

RMC (3), IMC (3), EMT (3),RNC (10), LFMC (12), WW (7)

FS/FD; NEMA 4, 4X

OUTDOOR LOCATIONS,EXPOSED TO RAIN, SLEET,WINDBLOWN DUST, AND

EXTERNAL ICING

RMC, IMC, RNC SCTE 77

OUTDOOR LOCATIONS,SUBMERGED

RMC (3), IMC (3), RNC NEMA 6, 6P

OUTDOOR LOCATIONS,EMBEDDED IN CONCRETE9

RMC, IMC, EMT (4), RNC FS/FD

UNDER CONCRETE SLAB RMC, IMC, EMT (4) N/A

UNDERGROUND, DIRECTBURIAL (9)

RMC (3), IMC (3), RNC SCTE 77

EMBEDDED BURIAL (9) RMC, IMC, EMT (4), RNC N/A

INDUSTRIAL LOCATION,GENERAL

RMC (3), IMC (3), EMT (3),LFMC (12)

NEMA 4X, 11

INDUSTRIAL LOCATION,SUBJECT TO CORROSION

RMC, IMC, LFMC, RNC (10) FS/FD; NEMA 13

HAZARDOUS CLASS I,DIVISION 1 (8)

RMC, IMC, FMC (9) NEMA 7, 8

HAZARDOUS CLASS I,DIVISION 2 (8)

RMC, IMC, LFMC (12), FMC(12), WW (5)

FS/FD; NEMA 1, 7, 8, 12

HAZARDOUS CLASS II,DIVISION 1 (8)

RMC, IMC, LFMC (12), WW (6) NEMA 9

HAZARDOUS CLASS II,DIVISION 2 (8)

RMC, IMC, LFMC (12), WW (6) FS/FD; NEMA 1, 9, 12

HAZARDOUS CLASS III (8) RMC, IMC, LFMC (12), WW (6) FS/FD; NEMA 12

LEGEND: NOTES:

EMT: ELECTRICAL METALLIC TUBINGENT: ELECTRICAL NONMETALLIC TUBINGFMC: FLEXIBLE METAL CONDUITFS/FD: CAST-METAL BOXIMC: INTERMEDIATE METAL CONDUITLFMC: LIQUIDTIGHT FLEXIBLE METAL CONDUITLFNC: LIQUIDTIGHT FLEXIBLE NONMETALLIC

CONDUITN/A: NOT APPLICABLENEMA: REFERS TO NEMA 250,

TYPE CLASSIFICATIONNM: NONMETALLIC BOXRMC: RIGID METAL CONDUITRNC: RIGID NONMETALLIC CONDUITSCTE 77: DESIGNED AND TESTED FORTIER 15

LOADING ACCORDING TO SCTE 77SPECIFICATION FOR UNDERGROUNDENCLOSURE INTEGRITY

SM: SHEET METAL BOXWW: WIREWAY

1. BUILDING FINISHES MUST PROVIDE A BARRIER WITH A 15-MINUTE FIRE RATING.

2. FOR BUILDINGS NOT MORE THAN THREE STORIES ABOVE GRADE.

3. CORROSION PROTECTION IS REQUIRED.4. WITH FITTINGS FOR PURPOSE.5. ENCLOSED AND GASKETED.6. DUST-TIGHT WIREWAY ONLY.7. RAINTIGHT WIREWAY ONLY.8. SUITABLE FOR HAZARDOUS LOCATION.9. ALUMINUM MATERIALS ARE NOT PERMITTED.10. SCHEDULE 80.11. "SUBJECT TO DAMAGE" DENOTES ENVIRONMENTS

WHERE EXPOSED RACEWAYS MAY BE IMPACTED BY TRAFFIC, BY CLEANING OR MAINTENANCE OPERATIONS, OR BY SIMILAR INFLUENCES.

12. USED FOR CONNECTION TO LIGHTING FIXTURES OR VIBRATING EQUIPMENT. MAXIMUM LENGTH 72”.

A, AMP AMPEREAC ALTERNATING CURRENTAF AMPERE FRAME, AMPERE FUSEAFC ABOVE FINISHED CEILINGAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAIC AMPERE INTERRUPTING CAPACITYANN ANNUNCIATORAS AMPERE SWITCHAT AMPERE TRIPATS AUTOMATIC TRANSFER SWITCHAWG AMERICAN WIRE GAUGE

BATT BATTERYBC BARE COPPERBCW BARE COPPER WIREBKBD BACKBOARDBKR BREAKERBLDG BUILDING

C CONDUITCATV CABLE TELEVISIONCB CIRCUIT BREAKERCEC CALIFORNIA ELECTRICAL CODECKT CIRCUITCLG CEILINGCO CONDUIT ONLYCOM COMMONCOMM COMMUNICATIONSCONN CONNECTCONT CONTINUECT CURRENT TRANSFORMERCU COPPER

(D) DEMOLISHDB DIRECT BURIEDDEF DUAL ELEMENT FUSEDIA DIAMETERDIM DIMENSIONDISC DISCONNECTDIST DISTRIBUTIONDN DOWNDP DISTRIBUTION PANELDPDT DOUBLE-POLE DOUBLE-THROWDWG DRAWING

(E) EXISTINGEGC EQUIPMENT GROUND CONDUCTORELEC ELECTRICALEM, EMER EMERGENCYEMT ELECTRICAL METALLIC TUBINGENCL ENCLOSUREEPO EMERGENCY POWER OFFEQUIP EQUIPMENT

(F) FUTUREF FUSE(D)FA FIRE ALARMFACP FIRE ALARM CONTROL PANELFATC FIRE ALARM TERMINAL CABINETFLA FULL LOAD AMPERESFLEX FLEXIBLEFLR FLOORFT FOOT, FEET

G, GND GROUNDGALV GALVANIZE(D)GEC GROUNDING ELECTRODE CONDUCTORGEN GENERATORGFI GROUND FAULT CIRCUIT INTERRUPTER

IDF INTERMEDIATE DISTRIBUTION FRAMEIMB MAX POWER CURRENTIN INCH, INCHESINV INVERTERISC SHORT CIRCUIT CURRENT

HID HIGH INTENSITY DISCHARGEHOA HAND-OFF-AUTOMATICHP HORSEPOWER, HEAT PUMPHPF HIGH POWER FACTORHPS HIGH PRESSURE SODIUMHV HIGH VOLTAGEHVAC HEATING, VENTILATING, AIR CONDITIONINGHZ HERTZ

IC INTERRUPTING CAPACITY IN AMPS RMSIG ISOLATED GROUNDISC SHORT CIRCUIT CURRENT

J, JB JUNCTION BOX

KAIC KILOAMPERE INTERRUPTING CAPACITYKA THOUSAND AMPERESKCMIL THOUSAND CIRCUILAR MILS

KV KILOVOLTKVA KILOVOLT-AMPEREKW KILOWATTKWH KILOWATT-HOURKVAR KILOVAR

LCL LONG CONTINUOUS LOADLF LINEAR FOOTLRA LOCKED ROTOR AMPLTG LIGHTINGLV LOW VOLTAGE

M MAGNETIC STARTER COILMAX MAXIMUMMC METAL CLAD CABLEMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMCM THOUSAND CIRCULAR MILSMDF MAIN DISTRIBUTION FRAMEMDP MAIN DISTRIBUTION PANELMFR MANUFACTURERMH METAL HALIDEMI MINERAL INSULATEDMIN MINIMUMMLO MAIN LUGS ONLYMTD MOUNTEDMTR MOTORMTS MANUAL TRANSFER SWITCH

(N) NEWN NEUTRALNB NEUTRAL BUSNEC NATIONAL ELECTRIC CODENF NON-FUSEDNIC NOT IN CONTRACTNO NORMALLY OPENNC NORMALLY CLOSEDNTS NOT TO SCALE

P POLE(S)PF POWER FACTORPH/Ø PHASEPNL PANELPRI PRIMARYPT POTENTIAL TRANSFORMERPV PHOTOVOLTAICPVC POLYVINYL CHLORIDEPWR POWER

QTY QUANTITY

(R) EXISTING TO BE RELOCATEDRECP RECEPTACLERGS RIGID GALVANIZED STEEL CONDUITRM, RMS ROOM, ROOMSRT RADIOTOUCH SYSTEM

SCA SHORT CIRCUIT AMPSSEC SECONDARYSFD SMOKE FIRE DAMPERSPKR SPEAKERSQ FT SQUARE FEETSUSP SUSPEND(ED)SW SWITCHSWBD SWITCHBOARDSWGR SWITCHGEAR

TC TIME CLOCKTEL TELEPHONETEMP TEMPORARYTTB TELECOMMUNICATIONS BACKBOARDTMH TELECOMMUNICATIONS MANHOLETRANSF TRANSFORMERTYP TYPICALTVSS TRANSIENT VOLTAGE SUPRESSION SYSTEM

UG UNDERGROUNDUON UNLESS OTHERWISE NOTEDUNO UNLESS NOTED OTHERWISEUPS UNINTERRUPTIBLE POWER SUPPLY

V VOLT, VOLTSVA VOLT-AMPERESVAV VARIABLE AIR VOLUMEVFD VARIABLE FREQUENCY DRIVEVMP VOLTAGE AT MAXIMUM POWERVOC VOLTAGE OPEN CIRCUIT

W WATT OR WIREWAP WIRELESS ACCESS POINTWP WEATHER PROOFWT WATERTIGHT

XFMR TRANSFORMER

A. DELEGATED DESIGN ELEMENTS ARE THE CONTRACTORS RESPONSIBILITY TO PROVIDE ENGINEERED DOCUMENTATION ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION.

B. REFER TO SPECIFICATION FOR DELEGATED DESIGN DOCUMENTATION AND SUBMISSION REQUIREMENTS.

C. ALL DELEGATED DESIGN ELEMENTS SHALL BE PREPARED UNDER THE DIRECTION OF AN ENGINEER LICENSED IN THE STATE OF CALIFORNIA.

D. DELEGATED DESIGN ELEMENTS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING, REFER TO CONSTRUCTION DOCUMENTS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND SUBMISSION REQUIREMENTS:

1. DESIGN SUPPORTS FOR MULTIPLE RACEWAY SYSTEMS CAPABLE OF SUPPORTING THE COMBINED WEIGHT OF ALL RACEWAYS AND SUPPORT COMPOUNDS.

2. DESIGN HOUSEKEEPING PADS AND SUPPORT OF EQUIPMENT ATTACHED TO PAD TO WITHSTAND SEISMIC FORCES.

3. DESIGN SUPPORTS FOR WALL MOUNTED ELECTRICAL EQUIPMENT.

4. DESIGN SUPPORTS FOR CEILING MOUNTED ELECTRICAL EQUIPMENT.

5. PROVIDE SHORT CIRCUIT STUDY USING ACTUAL EQUIPMENT FEEDER LENGTHS AND FEEDER SIZES.

6. PROVIDE ELECTRICAL COORDINATION STUDY USING ACTUAL EQUIPMENT PURCHASED FOR THIS PROJECT.

7. PROVIDE ARC FLASH STUDY USING ACTUAL EQUIPMENT, FEEDER LENGTHS AND SIZES.

E. INFORMATION COORDINATION DOCUMENTS REQUIRED TO DEMONSTRATE COORDINATION BETWEEN ELECTRICAL AND WORK OF OTHER TRADES.

1. 1/4" SCALE EQUIPMENT LAYOUT DRAWINGS FOR ALL ELECTRICAL SPACES. DRAWING SHALL INCLUDE THE FOLLOWING INFORMATION: FLOOR PLANS LOCATING ALL EQUIPMENT, HOUSEKEEPING PADS, NEC REQUIRED WORKING SPACE AND MANUFACTURERS RECOMMENDED WORKING AND OPERATION SPACE REQUIREMENTS.

2. ARCHITECTURAL, STRUCTURAL ELEMENTS AND WORK OF OTHER TRADES THAT ARE LOCATED WITHIN THE ELECTRICAL SPACES.

3. WALL ELEVATIONS OF ALL WALL THAT INCLUDE ELECTRICAL EQUIPMENT AND ATTACHMENT RECOMMENDATION FOR MOUNTING EQUIPMENT TO WALLS.

F. DESIGN FOOTINGS FOR POLE MOUNTED FIXTURES CONSIDERING FORCES IMPOSED ON THE POLE AND FIXTURES FROM WIND, OR SEISMIC FORCES.

A. GENERAL PROVISIONS:

1. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT A COMPLETE AND WORKABLE ELECTRICAL INSTALLATION BE PROVIDED FOR ALL THE EQUIPMENT DESCRIBED OR SHOWN AS BEING IN THIS CONTRACT. TOWARD THIS END, CONTRACTOR SHALL FURNISH ALL LABOR AND TOOLS NECESSARY, FURNISH AND INSTALL ALL APPARATUS, MATERIALS, AND EQUIPMENT IN A MANNER COMPLYING WITH ALL APPLICABLE CODES, INCLUDING ITEMS REQUIRED BUT NOT NECESSARILY SHOWN, SUCH AS LAMPS, COUPLINGS, HANGERS, BRACKETS, CLAMPS, BOXES, CONNECTORS, AND HARDWARE

2. ALL CONDUCTORS SHALL BE COPPER, TYPE "THWN/THNN" 90 DEGREE INSULATION. ALL LUGS SHALL BE 75 DEGREE MINIMUM. ALL CONDUIT SHALL BE EMT OR RIGID STEEL. USE OF FLEX IS NOT ALLOWED EXCEPT UP TO 6 FOOT FOR FINAL CONNECTION TO LIGHTING FIXTURES OR VIBRATING EQUIPMENT.

3. BEFORE SUBMITTING THE BID PROPOSAL, CONTRACTOR SHALL VISIT THE JOB SITE TO FULLY FAMILIARIZE HIMSELF WITH THE SITE CONDITIONS, REQUIREMENTS, INCLUDING ALL NECESSARY ADDITIONAL SCOPE OF WORK, WHETHER SHOWN ON DRAWING(S) OR NOT, BUT REQUIRED FOR PROVIDING A COMPLETE AND FUNCTIONING ELECTRICAL SYSTEM.

4. CONTRACTOR SHALL REFER TO MECHANICAL DRAWINGS AND WIRING DIAGRAMS FOR ITEMS AND DEVICES TO BE FURNISHED, INSTALLED AND/OR CONNECTED FOR A COMPLETE AND OPERABLE HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM. VERIFY EXACT LOCATION OF HVAC EQUIPMENT AND CONDUIT TERMINATION AT EQUIPMENT WITH MECHANICAL CONTRACTOR.

5. THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATE THE LOCATION OF OUTLETS AND EQUIPMENT THOUGH NOT NECESSARILY INDICATING THE ACTUAL ROUTES OF CONDUITS, THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS PROPER COORDINATION WITH THE WORK OF OTHER TRADES AND SPACE WILL PERMIT. SIMPLIFY INSTALLATION WHEREVER POSSIBLE BUT SUBJECT TO APPROVAL OF CAMPUS REPRESENTATIVE FOR VISUAL AND STRUCTURAL REASONS. IT IS NOT WITHIN THE SCOPE OF THE DRAWINGS TO SHOW ALL NECESSARY OFFSETS, BENDS, PULL BOXES AND OBSTRUCTIONS. THE DRAWINGS ARE NOT INTENDED TO BE SCALED AND THE CONTRACTOR SHALL REFER TO THE GENERAL CONSTRUCTION DRAWINGS FOR DIMENSIONS.

6. ALL PERMITS SHALL BE PROCURED FROM ALL LEGALLY CONSTITUTED AUTHORITIES, ARRANGE FOR ALL INSPECTION AND PAY ALL COSTS FOR FEES AND TESTS IN CONNECTION THEREWITH, COMPLY WITH CODES. PRESENT THE SIGNED CERTIFICATE OF FINAL INSPECTION TO THE CAMPUS REPRESENTATIVE PRIOR TO PRESENTING THE WORK FOR FINAL ACCEPTANCE.

7. CONTRACTOR SHALL ERECT AND MAINTAIN SUITABLE BARRIERS, PROTECTIVE DEVICES, LIGHTS AND WARNING SIGNS WHERE REQUIRED FOR THE PROTECTION OF THE PUBLIC AND EMPLOYEES ABOUT THE BUILDING.

8. CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL SERVICE FOR CONSTRUCTION POWER AND ILLUMINATION FOR ALL TRADES. ALL COSTS OF LABOR AND COST MATERIAL REQUIRED FOR THE TEMPORARY ELECTRICAL SERVICE SHALL BE INCLUDED IN THE ELECTRICAL CONTRACT.

9. ELECTRICAL ROOMS HAVING A TRANSFORMER(S) RATED 112.5KVA OR ABOVE SHALL BE PROVIDED WITH 1-HOUR FIRE-RATED ENCLOSURE.

10. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS FOR SUBMITTALS, ACCEPTABLE MATERIALS, COORDINATION REQUIREMENTS, TESTING, STARTUP, TRAINING AND PROJECT CLOSEOUT.

11. PROVIDE A CODE APPROVED DISCONNECT SWITCH OR BREAKER WITHIN SIGHT OF EVERY MOTOR. FOR LOCATION OF DISCONNECT SWITCH, COORDINATE WITH EQUIPMENT SUPPLIER TO DETERMINE THE BEST LOCATION ON SITE WHILE REMAINING ACCESSIBLE.

12. CONTRACTOR SHALL TEST ALL WIRING AND CONNECTIONS FOR CONTINUITY, GROUNDS, SHORT CIRCUITS, AND OTHER DEFECTS BEFORE ANY EQUIPMENT OR FIXTURES ARE CONNECTED THERETO. CABLES SHALL BE CHECKED FOR CONTINUITY, SHORTS, INSULATION RESISTANCE, AND PROPER PHASING.

13. PROVIDE PULL ROPE IN ALL EMPTY CONDUITS.

14. COORDINATE ROUTING OF RACEWAYS FEEDERS AND HOMERUNS IN COOPERATION WITH THE WORK OF OTHER TRADES.

15. EXPOSED RACEWAYS ON ROOF SHALL BE AMBIENT TEMPERATURE COMPENSATED PER NEC TABLE 310-15(B)(2)(C) BASED UPON DISTANCE RACEWAY IS MOUNTED ABOVE ROOF AND DESIGN TEMPERATURE OF ROOF.

16. NO MORE THAN THREE CIRCUITS PER HOME RUN. DO NOT COMBINE HOMERUNS WITHOUT PRIOR APPROVAL..

17. NO INTERMEDIATE SPLICING OF FEEDERS OR BRANCH CIRCUITS SHALL BE DONE WITHOUT PRIOR APPROVAL.

18. MINIMUM SIZE FOR EXTERIOR BELOW GRADE CONDUIT SHALL BE 1-1/4 INCH.

19. FOR 120V, 20 AMP CIRCUITS, WHERE CIRCUIT DISTANCE FROM PANELBOARD TO FARTHEST DEVICE EXCEEDS 75 FEET, PROVIDE #10 SIZE CONDUCTOR.

B. LIGHTING:

1. ALL LIGHTING FIXTURES SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS.

2. CONTRACTOR SHALL VERIFY THE TYPE OF CEILING, COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ORDERING FIXTURES. CONTRACTOR IS FULLY RESPONSIBLE FOR PROVIDING ALL FIXTURES. MOUNTING HARDWARE TO FIT CEILING CONDITIONS AT NO EXTRA COST TO THE COLLEGE.

3. REFER TO ARCHITECTURAL CEILING PLANS FOR EXACT DIMENSIONS, CEILING CONFIGURATION, LIGHTING PLACEMENT AND QUANTITIES.

4. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND MOUNTING HEIGHT OF WALL MOUNTED LIGHTING FIXTURES.

a. LIGHTING IN ELECTRICAL, MECHANICAL TELE/COM AND EQUIPMENT ROOMS ARE SHOWN FOR QUANTITY ONLY. ACTUAL FIXTURE LOCATIONS TO BE DETERMINED AFTER COORDINATING WITH WORK OF ALL OTHER TRADES. FIXTURES TO BE LOCATED SO THAT MAINTENANCE AND LIGHT OUTPUT ARE NOT OBSTRUCTED. FIXTURES ARE TO BE INSTALLED AFTER ALL OTHER WORK IS SUBSTANTIALLY COMPLETE.

C. POWER:

1. PROVIDE CONCRETE PADS (MINIMUM 4" HIGH OR AS INDICATED) FOR ALL FLOOR MOUNTED ELECTRICAL EQUIPMENT INSTALLED IN EQUIPMENT ROOMS AND IN AREAS SUSCEPTIBLE TO BEING WET OR HOSED DOWN. SUBMIT PAD DETAIL PLANS INCLUDING DIMENSIONS FOR APPROVAL.

2. THE LOCATION OF ALL OUTLETS SHALL BE COORDINATED WITH ARCHITECTURAL PLANS BY THE CONTRACTOR PRIOR TO INSTALLATION. MOUNTING HEIGHTS OF RECEPTACLES, SWITCHES, WIRING DEVICES AND DEDICATED EQUIPMENT OUTLETS SHALL BE COORDINATED WITH OTHER TRADES PRIOR TO INSTALLATION.

3. ALL DISCONNECT SWITCHES SHALL BE PAD-LOCKABLE IN THE "OFF" POSITION.

4. ALL FEEDER LENGTH SHOWN ON SINGLE LINE DIAGRAM ARE FOR VOLTAGE DROP CALCULATION ONLY. DO NOT USE FOR ANY OTHER PURPOSES.

5. VERIFY AND COORDINATE EXACT LOCATION, POWER REQUIREMENTS AND METHOD OF CONNECTION OF ALL MECHANICAL EQUIPMENT AND PERTINENT ITEMS AND DEVICES PRIOR TO INSTALLATION OF ELECTRICAL SYSTEM.

6. PROVIDE A MINIMUM OF 12" SEPARATION BETWEEN POWER AND COMMUNICATION CONDUITS, WHERE THEY ARE INSTALLED IN PARALLEL OR IN THE SAME TRENCH.

7. LABEL ALL RECEPTACLES, J-BOXES, DISCONNECT SWITCHES AND CONTROL DEVICES WITH THEIR SERVING CIRCUIT NUMBERS. LABELS SHALL BE PER THE SPECIFICATION.

8. PROVIDE A MINIMUM 24" HORIZONTAL SEPARATION THAT USUALLY APPLIES BETWEEN BOXES INSTALLED ON OPPOSITE SIDES OF THE WALL IN ORDER TO MAINTAIN THE FIRE-RESISTIVE RATING OF ASSEMBLIES WHERE PENETRATION OR OPENINGS ARE MADE.

D. GROUNDING:

1. THE EQUIPMENT GROUNDING CONDUCTOR SHALL RUN CONTINUOUS FROM PANEL TO LAST OUTLET. THIS WIRE SHALL BE PIGTAILED TO BOX AND DEVICE. ALL EQUIPMENT GROUNDING CONDUCTORS SHALL BE INSULATED GREEN CONDUCTORS.

2. GROUNDING OF CABLE TRAY SHALL BE PER NEC 392-7.

3. PROVIDE EQUIPMENT GROUNDING CONDUCTOR IN ALL LIGHTING AND POWER CONDUITS.

E. PENETRATIONS:

1. PENETRATIONS IN WALLS REQUIRING PROTECTED OPENINGS MUST BE FIRESTOPPED WITH AN APPROVED MATERIAL IN ACCORDANCE WITH CBC SECTION 709.6. SPACE BETWEEN PENETRATING MATERIALS (DESCRIBED BELOW) MUST BE DESIGNED TO PREVENT THE SPREAD OF HOT FLAME OR GASES.

2. COPPER OR FERROUS PIPES OR CONDUITS MAY PENETRATE THE WALLS OR PARTITIONS, PROVIDED THEY ARE FIRESTOPPED.

GENERAL ELECTRICAL NOTES DELEGATED DESIGN ELECTRICAL ABBREVIATIONS

1. ALL REPORTS, DRAWINGS, SPECIFICATIONS, COMPUTER FILES, FIELD DATA, NOTES AND OTHER DOCUMENTS AND INSTRUMENTS PREPARED BY THE CONSULTANT AS INSTRUMENTS OF SERVICE SHALL REMAIN THE PROPERTY OF THE CONSULTANT. THE CONSULTANT SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.

2. THE CLIENT ACKNOWLEDGES THE CONSULTANT'S CONSTRUCTION DOCUMENTS, INCLUDING ELECTRONIC FILES, AS INSTRUMENTS OF PROFESSIONAL SERVICE. NEVERTHELESS, THE FINAL CONSTRUCTION DOCUMENTS PREPARED UNDER THIS AGREEMENT SHALL BECOME THE PROPERTY OF THE CLIENT UPON COMPLETION OF THE SERVICES AND PAYMENT IN FULL OF ALL MONIES DUE TO THE CONSULTANT. THE CLIENT SHALL NOT REUSE OR MAKE ANY MODIFICATION TO THE CONSTRUCTION DOCUMENTS WITHOUT THE PRIOR WRITTEN UTHORIZATION OF THE CONSULTANT. THE CLIENT AGREES, TO THE FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY AND HOLD HARMLESS THE CONSULTANT, ITS OFFICERS, DIRECTORS, EMPLOYEES AND SUB-CONSULTANTS (COLLECTIVELY, CONSULTANT) AGAINST ANY DAMAGES, LIABILITIES OR COSTS, INCLUDING REASONABLE ATTORNEY'S FEES AND DEFENSE COSTS, ARISING FROM OR ALLEGEDLY ARISING FROM OR IN ANY WAY CONNECTED WITH THE UNAUTHORIZED REUSE OR MODIFICATION OF THE CONSTRUCTION DOCUMENTS BY THE CLIENT OR ANY PERSON OR ENTITY THAT ACQUIRES OR OBTAINS THE CONSTRUCTION DOCUMENTS FROM OR THROUGH THE CLIENT WITHOUT THE WRITTEN AUTHORIZATION OF THE CONSULTANT.

OWNERSHIP OF INSTRUMENTS OF SERVICES

MEP COMPONENT ANCHORAGE NOTE

ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA APPROVED CONSTRUCTION DOCUMENTS. WHERE NO DETAIL IS INDICATED, THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2013 CBC, SECTIONS 1616A.1.18 THROUGH 1616A.1.26 AND ASCE 7-10 CHAPTER 13, 26, AND 30.

1. ALL PERMANENT EQUIPMENT AND COMPONENTS.2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD WIRED) TO THE

BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS, OR WATER.3. MOVEABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER

THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS.

THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE, BUT THE ATTACHMENT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIETED DUCTWORK, PIPING, AND CONDUIT.

A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVE A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORTS THE COMPONENT.

B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR HUNG FROM A WALL.

FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD AND THE DSA DISTRICT STRUCTURAL ENGINEER. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH THE ABOVE REQUIREMENTS.

PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACINGPIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.5.6, 13.6.7, 13.6.8, AND 2013 CBC SECTIONS 1616A.1.23, 1616A.1.25, AND 1616A.1.26.

THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR IDENTIFIED DISTRUBITON SYSTEM ARE AS NOTED BELOW. WHEN BRACING AND ATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE (E.G. SMACNA OR OSHPD OPM), COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF AND DURING THE HANGING AND BRACING OF THE DISTRUBITON SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.

MECHANICAL PIPING (MP), MECHANICAL DUCTS(MD), AND PLUMBING PIPING (PP), ELECTRICAL DISTRUBTION SYSTEMS (E):

OPTION 1: DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC NOTES AND DETAILS.

OPTION 2: SHALL COMPLY WITH THE APPLICABLE OSHPD PRE-APPROVAL (OPM#) #OPM-0043-13.

OPTION 3: SHALL COMPLY WITH THE SMACNA SEISMIC RESTRAINT MANUAL, OSHPD EDITION (2009), INCLUDING ANY ADDENDA. FASTENERS AND OTHER ATTACHMENTS NOT SPECIFICALLY IDENTIFIED IN THE SMACNA SEISMIC RESTRAINT MANUAL, OSHPD EDITION, ARE DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC NOTES AND DETAILS. THE DETAILS SHALL ACCOUNT FOR THE APPLICABLE SEISMIC HAZARD LEVEL _____ AND CONNECTION LEVEL _____ FOR THE PROJECT AND CONDITIONS.

MP MD PP E

MP MD PP E

MP MD PP E

3. OPENINGS FOR STEEL ELECTRICAL OUTLET BOXES NOT EXCEEDING 16 SQUARE INCHES ARE PERMITTED PROVIDED OPENINGS DO NOT AGGREGATE MORE THAN 100 SQUARE INCHES OR 100 SQUARE FEET OF WALL OF PARTITIONS. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS MUST BE SEPARATED BY A HORIZONTAL DISTANCE OF 24 INCHES.

F. AESTHETIC CRITERIA NOTES:

1. WHERE BENDING MULTIPLE CONDUITS ALONG A COMMON PATH, FIELD BEND THE CONDUITS AROUND A COMMON CENTER POINT FOR ALL CONDUITS SO THAT THE SEPARATION BETWEEN CONDUITS REMAINS CONSTANT THROUGH ENTIRE LENGTH OF BEND.

2. CONDUIT FITTING SHALL BE ALIGNED AND PERPENDICULAR TO THE DIRECTION OF THE RACEWAYS. FITTINGS SHALL HAVE SET SCREWS LOCATED ON TOP OF RACEWAYS AND NOT VISIBLE FROM THE FLOOR.

3. ALL EXPOSED CONDUIT, RACEWAYS AND BOXES SHALL BE INSTALLED PARALLEL OR PERPENDICULAR TO ADJACENT BUILDING ELEMENTS AND FASTENED NEATLY AND CONSISTENTLY. IN PUBLIC AREAS, GROUP RACEWAYS IN MINIMUM GROUPS OF THREE RACEWAYS ON A COMMON SUPPORT SYSTEM.

4. MANUFACTURERS LABELS SHALL BE TURNED AWAY FROM PUBLIC VIEW. NO CONSTRUCTIONNOTATIONS SHALL BE VISIBLE IN AREAS EXPOSED TO PUBLIC VIEW.

5. ALL NEW DEVICES, OUTLETS, SWITCHES, CONTROLS, ECT. SHALL BE INSTALLED WITH CONCERN FOR ALIGNMENT WITH WORK OF OTHER TRADES. PROVIDE VERTICAL AND HORIZONTAL ALIGNMENT WITH EQUAL SPACING BETWEEN CENTER LINES. IF DOCUMENTS DO NOT INDICATE ALIGNMENT AND/OR SPACING CONSULT WITH ARCHITECT PRIOR ROUGH IN.

G. ACOUSTICAL NOTES:

1. ALL PENETRATIONS INTO SOUND RATED PARTITIONS OR FLOOR-CEILING ASSEMBLIES WILL BE SEALED, LINED OR INSULATED WITH APPROVED PERMANENT RESILIENT ACOUSTIC SEALANT AND FIRE CAULK (WHERE APPLIES).

2. ALL RIGID CONDUIT LOCATED IN SOUND ASSEMBLIES WILL BE ISOLATED FROM THE BUILDING CONSTRUCTION BY MEANS OF RESILIENT SLEEVES, MOUNTS OR MINIMUM 1/4" THICK APPROVED RESILIENT MATERIAL.

3. ELECTRICAL OUTLETS BOXES IN OPPOSITE FACES OF SEPARATION WALLS WILL BE SEPARATED HORIZONTALLY BY 24" AND NOTE THAT BACK AND SIDES OF BOXES WILL BE SEALED WITH 1/8" RESILIENT SEALANT AND BACKED BY MINIMUM OF 2" THICK MATERIAL FIBER INSULATION. (TV, TELEPHONE AND INTERCOM OUTLETS MUST BE INSTALLED IN BOXES ACCORDINGLY.

4. NO ELECTRICAL TRANSFORMER OR RELAYS SHALL BE INSTALLED ON OR IN SOUND RATED PARTITIONS.

H. COORDINATION

1. THERE IS NO ASSURANCE THAT THE LOCATION OF SUBSTRUCTURES SHOWN ON THIS DRAWING ARE ACCURATE, OR THAT ALL EXISTING SUBSTRUCTURES ARE SHOWN ON THIS DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL SUBSTRUCTURES WHETHER SHOWN OR NOT. ANY DAMAGE TO THE EXISTING SUBSTRUCTURES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

2. CONTRACTOR TO CLEAR PROJECT SITE AREA WITHIN THE CONFINES OF THE DEMOLITION LIMIT LINE CONTRACTOR SHALL DEMOLISH AND REMOVE FROM THE SITE ALL EXISTING UTILITIES, STRUCTURES, PLANTERS, TREES, AND ALL OTHER SITE FEATURES, UNLESS OTHERWISE NOTED ON THE PLAN.

3. COORDINATE WITH LANDSCAPE CONSULTANT FOR TREE LOCATIONS. DO NOT DISTURB ROOT BALL.

4. CONTRACTOR SHALL PROVIDE 1/4” SCALE DRAWING FOR ALL ELECTRICAL ROOMS, CLOSETS AND EQUIPMENT SPACES DEMONSTRATING THAT INSTALLATION HAS BEEN COORDINATED WITH WORK OF OTHER TRADES. USE ACTUAL DIMENSIONS FROM APPROVED EQUIPMENT SUBMITTALS TO COORDINATE LAYOUT AND INSTALLATION OF ELECTRICAL EQUIPMENT, DEVICES AND COMPONENTS WITH OTHER CONSTRUCTION INCLUDING HOUSEKEEPING PADS, CONDUIT, PIPING, EQUIPMENT, AND ADJACENT SURFACES. MAINTAIN MAXIMUM MOUNTING HEIGHTS FOR OPERABLE DEVICES AND REQUIRED WORKSPACE CLEARANCES AND REQUIRED CLEARANCES FOR EQUIPMENT ACCESS DOORS AND PANELS.

I. STRUCTURAL NOTES:

1. DO NOT EMBED CONDUITS OR SLEEVES IN STRUCTURAL CONCRETE, INCLUDING CONCRETE ON METAL DECK WITHOUT SPECIFIC ACCEPTANCE FROM ARCHITECT. LOCATE ELECTRICAL CONDUIT MINIMUM OF 3" APART AND WITHIN MIDDLE 1/3 OF MEMBER.

2. CONDUITS MUST BE SUPPORTED ON APPROVED CHAIRS AFFIXED TO THE SLAB FORMWORK, AND TIGHTLY SECURED TO ADJACENT REINFORCING STEEL WHERE FEASIBLE SO AS TO ASSURE NO MOVEMENT DURING CONCRETE PLACEMENT.

3. MULTIPLE LAYERS OF CONDUIT CROSSING EACH OTHER WITHIN THE 1/3" PLACEMENT ZONE IS ACCEPTABLE; HOWEVER, NO LESS THAN 3/4" VERTICAL CLEARANCE BETWEEN STACKED CONDUITS IS ALLOWED, AND NO MORE THAN THREE LAYERS OF CONDUIT WITHIN THE 1/3" PLACEMENT ZONE ARE ALLOWED AT ANY ONE LOCATION.

4. MULTIPLE CONDUITS PLACED SIDE-BY-SIDE MUST MAINTAIN AT LEAST 3 CONDUIT DIAMETER HORIZONTAL CLEARANCE, BASED ON THE LARGER OF ADJACENT CONDUITS.

5. CONDUIT "BANKS" CONSISTING OF 4 OR MORE CONDUITS MUST BE PLACED IN PLAN VIEW WITHIN THE MIDDLE THIRD OF THE DISTANCE BETWEEN COLUMNS OR BETWEEN COLUMNS AND ENDS/FACES OF WALLS. NO SINGLE "BANK" OF CONDUITS SHALL EXCEED 25 CONDUITS OR A TOTAL WIDTH OF 5 FEET, INCLUDING REQUIRED SPACING BETWEEN CONDUITS.

6. NO CONDUITS ARE ALLOWED TO CROSS OVER THE STUD RAILS/BETWEEN STUDS LOCATED AT COLUMNS AND CERTAIN WALL LOCATIONS. CONDUITS RUNNING ADJACENT TO STUD RAILS MUST HAVE AT LEAST 12" CLEARANCE BETWEEN STUDS AND CONDUIT.

7. JUNCTION BOXES ARE NOT ALLOWED IN THE ZONE AROUND COLUMNS OR ENDS OF WALLS WHERE STUD RAILS ARE LOCATED. THE OUTER PERIMETER OF THE ZONE OF EXCLUSION IS DEFINED BY CONNECTING THE ENDS OF ALL STUD RAILS BY A STRAIGHT LINE.

8. WHERE NO STUD RAILS ARE SHOWN NEAR COLUMNS OR ENDS OF WALLS, JUNCTION BOXES ARE NOT ALLOWED WITHIN 18" OF THE COLUMN FACE OR WITHIN A ZONE DEFINED BY A 36" DIAMETER CIRCLE CENTERED ON THE FACE OF THE WALL AT THE CENTER OF THE WALL.

9. JUNCTION BOXES MAY NOT BE PLACED CLOSER TO EACH OTHER THAN THE LARGEST PLAN DIMENSION OF THE BOX IN EITHER DIRECTION. NO MORE THAN TWO JUNCTION BOXES MAY BE PLACED ADJACENT TO EACH OTHER.

10. THE CONTRACTOR MUST SUBMIT FOR APPROVAL A DETAILED LAYOUT OF CONDUIT BANKS. THE LOCATIONS OF INDIVIDUAL CONDUIT RUNS OR RUNS OF UP TO THREE ADJACENT CONDUITS DO NOT NEED TO BE PRE-APPROVED, BUT MUST FOLLOW ALL APPLICABLE REQUIREMENTS SET FORTH IN THE DOCUMENTS.

11. NO CONCRETE FLOOR SLABS ARE ALLOWED TO BE POURED WITHOUT APPROVAL OF THE CONDUIT LAYOUT PLAN.

12. EXCEPTIONS TO THE ABOVE RULES WILL BE EVALUATED BY THE STRUCTURAL ON A CASE-BY-CASE BASIS.

J. DEMOLITION:

1. EXISTING CONDITIONS INDICATED ON DOCUMENTS ARE BASED UPON REVIEW OF AVAILABLE RECORD DOCUMENTS AND VISUAL FIELD SURVEY AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITIONS PRIOR TO COMMENCING WORK.

2. SURVEY EXISTING CONDITIONS, INVENTORY AND RECORD THE CONDITION OF ITEMS TO BE REMOVED AND REINSTALLED.

3. RECORD EXISTING CONDITION BY USE OF MEASURED DRAWINGS, PRECONSTRUCTION PHOTOGRAPHS, AND/OR VIDEO TAPES. RECORD CONDITION OF AREAS ADJACENT TO DEMOLITION IN ADDITION TO AREAS TO BE DEMOLISHED.

4. WHERE UTILITIES, FEEDERS, RACEWAYS PASS THROUGH AREAS OR WALLS TO BE DEMOLISHED, DETERMINE SOURCE, FUNCTION AND LOAD PRIOR TO DEMOLITION. IF THESE ARE SERVING AREAS OR LOADS THAT ARE TO REMAIN, PROVIDE PROVISIONS FOR RELOCATING PRIOR TO DEMOLITION.

5. AREAS OR LOADS THAT ARE TO REMAIN, PROVIDE PROVISIONS FOR RELOCATING PRIOR TO DEMOLITION. SOURCE OR FIRST UP STREAM DEVICE TO REMAIN IN SERVICE.

6. REMOVE ALL ABANDONED RACEWAY, CABLES AND EQUIPMENT FROM AREAS TO BE DEMOLISHED/REMODELED UNLESS NOTED OTHERWISE. DEMOLITION TO INCLUDE POWER, LIGHTING FIRE ALARM DEVICES AND RACEWAYS, COMMUNICATION DEVICES AND RACEWAYS, LOW VOLTAGE AND CONTROL SYSTEMS.

7. WHERE RACEWAYS ENTER OR EXIT SLABS OR PARTITIONS TO REMAIN, CUT RACEWAYS FLUSH WITH FINISH SURFACE, REMOVE CONDUCTORS AND PREPARE FOR REFINISH OF AREA.

8. VERIFY THAT ALL UTILITIES HAVE BEEN DISCONNECTED AND MADE SAFE PRIOR TO COMMENCING DEMOLITION.

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

05/04/2020 D-4012

E0.02

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

Page 4: Architect’s Supplemental Instruction

DN

ADA RAMP

6'CLF

6'CLF

GATE

GATE

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

WALL

WALL

WD

BRIDGEDOORS

BRICK

WALL

12"TREE

WALL

SEAT WALL

CONC

CONC

18"

TREE

16"

TREE

12"TREE

14"TREE

SHOT PUT

STOP

Asphalt

WALL

4' - 0"

(E)D.F.

RESTROOM MODULAR

WOMEN'S LOCKER

PE BUILDING

SWIMING POOL

GYMNASIUM

(E) LIGHT POLE AND PULLBOX

1

(E) SCORE BOARD 4

(E) ELECTRICAL ROOM

(E) LIGHT POLE2

(E) LIGHT POLE AND PULLBOX2

MEN'S LOCKER

(E) SCOREBOARD

PHYSICAL EDUCATION OFFICES

BOILER ROOM

T30

PE FIELD

VIKING FIELD

CONCESSION

0.1B

(E) LIGHT POLE AND PULLBOX

10.1A

0.4A

50.5A

0.2A

(E) LIGHT POLE1 0.1C

2

(E) ELECTRICAL MANHOLE AND SUMP PUMP

7

(E) TRACK AND FIELD SWITCH AND TRANSMITTER 60.6A0.2B

LAKE

(E) LIGHT POLE AND PULLBOX

2 0.2D

(E) LIGHT POLE2

(NO PHOTO)

(E) LIGHT POLE AND PULLBOX

3 0.3A

(E) LIGHT POLE AND PULLBOX

2 0.2C

(E) ELECTRICAL MANHOLE AND SUMP PUMP

8

(E) LIGHT POLE AND PULLBOX

3 0.3B

MUSIC BUILDING

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SL

SLSL

SL

SL

SLSL

SL

SL

SL

SL

SL

SL

SL

SL

MANHOLE

FIBEROPTIC SHACK

ELECTRICAL PANEL

9

(E) POOL TIMER

(E) POOL TIMER

SHUT PUT

10

11

(E) LIGHT POLE

117A 7A11 7A

(E) LIGHT POLE

(E) LIGHT POLE

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 0

05/04/2020 D-4012

E1.00

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

TEMPORARY BUILDING - PHASE 0 - EXISTING SITE LIGHTING POWER DEMOLITION OF CONCESSION,PHYSICAL EDUCATION ORRICE, BOILER ROOM AND T30

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36.

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

J. ALL SITE LIGHTING FIXTURE AND POLE THAT ARE SHOWN TO BE DEMOLISH SHALL BE SALVAGE AND RETURN TO DVC COLLEGE REPRESENTATIVE FOR REUSE. COORDINATE WITH DVC COLLEGE REPRESENTATIVE FOR LOCATION OF STORAGE AND FINAL RELOCATION.

(E) LIGHT POLE AND PULLBOX0.1B

(E) SCORE BOARD0.4A

(E) TRACK AND FIELD LIGHT SWITCH0.6A

(E) LIGHT POLE AND PULLBOX0.1A

(E) TRACK AND FIELD LIGHT SWITCH0.5A

(E) LIGHT POLE 0.1C (E) LIGHT POLE 0.2A

(E) LIGHT POLE AND PULLBOX0.2B

(E) LIGHT POLE AND PULLBOX0.3B

(E) LIGHT POLE AND PULLBOX0.3A

(E) LIGHT POLE AND PULLBOX0.2C

(E) LIGHT POLE AND PULLBOX0.2D

SHEET NOTES1. EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL TP AND TP1. CONTRACTOR

TO VERIFY EXISTING INSTALLATION FROM EXISTING CONCESSION STAND TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL LOCATED INSIDE THE FIBEROPTIC SHACK.

2. EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL A. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING PEO BUILDING TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL LOCATED INSIDE THE FIBEROPTIC SHACK.

3. EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL C. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING BOILER ROOM TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL LOCATED INSIDE THE FIBEROPTIC SHACK.

4. EXISTING SCOREBOARD LOCATED ON THE ROOF OF THE CONCESSION STAND SHALL BE REMOVED AND INSTALLED ON A STRUCTURE DETAILED BY CAMPUS REPRESENTATIVE. MOUNT EXISTING SCOREBOARD THE SAME HEIGHT AS EXISTING TO BE VISIBLE FROM THE TRACK AND FIELD. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM CONCESSION STAND ROOF AND DUPLICATE INSTALLATION TO THE NEW LOCATION AND SHALL BE POWERED FROM PANEL LOCATED INSIDE THE FIBEROPTIC SHACK.

5. EXISTING TRACK AND FIELD LIGHT SWITCH LOCATED IN THE ELECTRICAL ROOM OF THE CONCESSION STAND SHALL BE REMOVED AND SALVAGE. THE EXISTING TRACK AND FIELD LIGHT SWITCH SHALL BE RELOCATED. FINAL LOCATION BY ARCHITECT AND CAMPUS REFRESENTATIVE. CONTRCTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING CONCESSION STAND ELECTRICAL ROOM TO EXISTING TRACK AND FIELD. EXISTING TRACK AND FIELD LIGHT SWITCH HALL FUNCTION THE SAME AS EXISTING.

6. EXISTING TRACK AND FIELD LIGHT SWITCH AND TRANSMITTER LOCATED IN THE PE FACULTY BUILDING SHALL BE REMOVED AND SALVAGE. THE EXISTING TRACK AND FIELD LIGHT SWITCH BY RELOCATED BY ARCHITECT AND CAMPUS REFRESENTATIVE. CONTRCTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING PE FACULTY BUILDING TO EXISTING TRACK AND FIELD. EXISTING TRACK AND FIELD LIGHT SWITCH AND TRANSMITTER SHALL FUNCTION THE SAME AS EXISTING.

7. EXISTING ELECTRICAL MANHOLE WITH SUMP PUMP POWERED FROM EXISTING PANEL TP AND TP1. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING CONCESSION STAND TO EXISTING ELECTRICAL MANHOLE WITH SUMP PUMP. EXISTING MANHOLE SUMP PUMP SHALL BE DEMOLISH INCLUDING ALL ELECTRICAL CONDUITS AND CABLE ROUTED THROUGH THE MANHOLE. EXISTING MANGOLE AND DUCT BANK ARE LOCATED DIRECTLY BELOW BUILDING A FOOT PRINT AND WOULD NO LONGER BE ACCESSIBLE.

8. EXISTING ELECTRICAL MANHOLE WITH SUMP PUMP POWERED FROM EXISTING PANEL ML. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING MENS LOCKER ELECTRICAL ROOM TO EXISTING ELECTRICAL MANHOLE WITH SUMP PUMP. EXISTING MANHOLE SUMP PUMP SHALL BE POWERED FROM EXISTING LP1 AND EXISTING T-32.

9. REMOVE ALL EXISTING ELECTRICAL CONNECTION FROM SOURCE AND SHUT OFF POWER TO THE EXISTING PORTABLE, BEING USED AS FIELD STORAGE.

10. SITE LIGHTING SHALL BE POWERED TEMPORARILY FROM THE FIBER SHACK PANEL. PROVIDE ASTRONOMICAL TIME CLOCK IN THE FIBER SHACK FOR THE SITE LIGHTING. FINAL SITE LIGHTING POWER WILL BE FROM SWITCHBOARD MS1A. CONTRACTOR TO RELOCATE ASTRONOMICAL TIME CLOCK INSIDE SWITCHBOARD MS1A CLOSE TO PANEL INSIDE.WHEN SWITCHBOARD MS1A IS INSTALLED.

11. SITE LIGHTING IN THE ALLEY WAY BETWEEN THE POOL AND THE GYMNASIUM SHALL BE POWERED FROM THE FIBER SHACK PANEL. PROVIDE ASTRONOMICAL TIME CLOCK CONTROL. FINAL SITE LIGHTING POWER SHALL COME FROM SWITCHBOARD MS1A. REMOVE FEED FROM WOMENS LOCKER, AVOID UNDERGROUND PIPING ROUTED IN THE AREA.

#

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

(E) LIGHT POLE7A

Page 5: Architect’s Supplemental Instruction

DN

ADA RAMP

6'CLF

6'CLF

GATE

GATE

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

WALL

WALL

WD

BRIDGEDOORS

BRICK

WALL

12"TREE

WALL

SEAT WALL

CONC

CONC

18"

TREE

16"

TREE

12"TREE

14"TREE

SHOT PUT

STOP

WALL

FIBER SHACK

ELECTRICAL PANEL

MS1A

(E)T-30750KVA

(E)S3-1

(E)MV

A2

A1

MH2-8C

10

' -

0"

3' - 4"

11

' -

8"

1.1A

SWITCHBOARD MS1A PAD (6" ALL AROUND)

(E)MV

MH2-8A

FR

ON

T

FR

ON

TF

RO

NT

.

.

.

.

A1

MH2-8BTEMP DIST PANEL 600A

B1

A3

A2

A1

A1

.A3 B6

B6

(E) SOCCER FIELD

GOLF CAGE

(E)D.F.

RESTROOM MODULAR

WOMEN'S LOCKER

PE BUILDING

SWIMING POOL

GYMNASIUM

MEN'S LOCKER

(E) SCOREBOARD

PHYSICAL EDUCATION

OFFICES

BOILER ROOM

(E) T-30

PE FIELD

SOCCER

VIKING FIELDBASEBALL

CONCESSION

(E) ELECTRICAL MANHOLE AND SUMP PUMP

B2

CLASSROOM MODULAR

SHUT PUT

(E) POOL TIMER

(E) POOL TIMER

E1.01

2

B2

POLE

POLE B4

B4

EXISTING POLE AND CABLE ROUTING

(E) MECHANICAL ROOM

XFMR

225KVA XFMR

[OH]: #4/0 CU, STRANDS 19X, INSULATION THICKNESS 55 MILS, JACKET THICKNESS 45 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 2.18" (O.D.), 335 AMPS.

TWO SLACK LINES NO TENSION (MAINTAIN 14' AFG LOWEST POINT) TYP.

TWO SLACK LINES NO TENSION (MAINTAIN 14' AFG LOWEST POINT) TYP.

TWO SLACK LINES NO TENSION (MAINTAIN 14' AFG LOWEST POINT) TYP.

SLACK LINE NO TENSION (MAINTAIN 14' ABOVE FINISH GRADE LOWEST POINT)

SLACK LINE NO TENSION (MAINTAIN 5' ABOVE ROOF LOWEST POINT)

OH

OH OH

OH

[OH]: #2 CU, STRANDS 7X, INSULATION THICKNESS 45 MILS, JACKET THICKNESS 30 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 1.57" (O.D.), 158 AMPS.

OH

OH

OH

OH

OH

OH

OH

B8

B7

B3

B3

B3

B5

B5

B5

B5

B4

DOWN TO (E) PANEL MW

(E)

(E)

DOWN TO (E) PANEL A

ROUTE CONDUIT EXPOSED ON THE EXTERIOR OF GYMNASIUM

TO (E) PANEL B AND (E) PANEL BP CONDUITS ROUTED ON

THE GYMASIUM ROOF WITH SLIPPERS

DOWN TO (E) PANEL ML

CONDUITS ROUTED ON THE MENS LOCKER ROOF WITH SLIPPERS

SCAN FOR REBAR AND CORE THROUGH EXISTING GYM WALL (12" CONCRETE)

SCAN FOR REBAR AND CORE THROUGH EXISTING GYM WALL (12" CONCRETE)

POLE B4

POLE B4

POLE B4

POLE B4

POLE B4

POLE B4

POLE B4POLE

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 0 - DEMO PEOFFICES, CONCESSION, BOILER ROOM AND T30

05/04/2020 D-4012

E1.01

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

D. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

E. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

1/8" = 1'-0"2

ELEC_SITE PLAN ENLARGED VIEW 1" = 30'-0"

1

TEMPORARY BUILDING - SITE PLAN PHASE 0 - MENS LOCKER, WOMENS LOCKER, AND GYMNASIUMPOWER - DEMOLITION OF CONCESSION, PHYSICAL EDUCATION OFFICE, BOILER ROOM AND T30

SWITCHBOARD RELOCATING1.1A

TEMPORARY POWER SCOPE OF WORK DESCRIPTIONS

A. RANGER CONSTRUCTION ASI 10 SCOPE OF WORK.

B. TEMPORARY POWER CONSTRUCTION.

C. PHASE 1 WORK.

TEMPORARY POWER CONNECTION GENERAL NOTES

A1.

A2.

A3.

B1.

B2.

B3.

B4

B5.

B6.

B7.

B8.

EXISTING SWITCH S3-1 AND EXISTING TRANSFORMER T-30 ARE INSTALLED ON SEPARATE CONTRACT. THE SCOPE OF WORK UNDER PHASE 0, WILL PROVIDE SWITCHBOARD MS1A. PROVIDE 4 - 4" CONDUIT VIA EXISTING JOINT TRENCH AND SHALL PEEL OFF THE EXISTING JOINT TRENCH AND HEAD OFF TOWARD THE SWITCHBOARD MS1A.

PROVIDE CHIRSTY BOX T96V, 3' X 5' X 5' FOR MANHOLE MH2-8B AND MANHOLE MH2-8C. PROVIDE 9 - 4" CONDUITS, FOR ONE DUCT BANK, 3 - 2" CONDUITS AND 3 - 4" CONDUITS FOR SECOND DUCT BANK ROUTED TO MANHOLE MH2-8C.

PROVIDE MANHOLE MH2-8B ABOVE EXISTING 4-4" CONDUITS FROM EXISTING TRANSFORMER T-30 HEADING NORTH, INTERCEPT AND TERMINATE THE EXISTING 4-4" CONDUITS TO MANHOLE MH2-8B.

PROVIDE TEMPORARY DISTRIBUTION PANEL 600A, 480/277V, NEMA 3R. REFER TO SINGLE LINE DIAGRAM E5.01 FOR CONNECTIONS AND ADDITIONAL INFORMATION.

PROVIDE TEMPORARY 75 KVA, 480V-120/208V, 3 PHASE, 4 WIRE, NEMA 3R TRANSFORMER. TRANSFORMER SHALL FEED EXISTING PANEL ML LOCATED IN THE MEN'S LOCKER.

PROVIDE TEMPORARY 225 KVA, 480V-120/208V, 3 PHASE, 4 WIRE, NEMA 3R TRANSFORMER. TRANSFORMER SHALL FEED EXISTING PANEL BP, EXISTING PANEL A AND EXISTING PANEL B LOCATED IN THE GYMNASIUM, EXISTING PANEL MW LOCATED THE WOMEN'S LOCKER, MODULAR CLASSROOMS AND MODULAR RESTROOM.

PROVIDE 30 FEET WOODEN POLE TO MOUNT AERIAL CABLES MATCH EXISTING POLE LOCATED NEAR THE WOMEN'S LOCKER.

PROVIDE WEATHERPROOF JUCTION BOX TO TRANSITION FROM AERIAL CABLES TO BUILDING THHN/THWN CABLES.

PROVIDE MULTIPLE CABLES FOR CONNECTIONS FROM EXISTING TRANSFORMER T-30 TO INSTALLED SWITCHBOARD MS1A.

WHEN SWITCHBOARD MS1A IS INSTALLED, REMOVE TEMPORARY DISTRIBUTION PANEL MAIN 600A CIRCUIT BREAKERS CONNECTION FROM EXISTING TRANSFORMER T-30 AND CONNECT TO SWITCHBOARD MS1A. CONNECTION OF TEMPORARY DISTRIBUTION PANEL WITH 250A CIRCUIT BREAKER TO OVERHEAD AERIAL CABLES 3 # 4/0 SHALL POWER THE GYMASIUM, WOMENS LOCKER, CLASSROOM MODULAR AND RESTROOM MODULAR VIA 225 KVA TRANSFORMER.

WHEN SWITCHBOARD MS1A IS INSTALLED, REMOVE TEMPORARY DISTRIBUTION PANEL MAIN 600A CIRCUIT BREAKERS CONNECTION FROM EXISTING TRANSFORMER T-30 AND CONNECT TO SWITCHBOARD MS1A. CONNECTION OF TEMPORARY DISTRIBUTION PANEL WITH 150A CIRCUIT BREAKER TO OVERHEAD AERIAL CABLES 3 # 2 SHALL POWER THE MENS LOCKER VIA 75 KVA TRANSFORMER.

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

jgramling
Text Box
; INSTALL PER PG&E TEMPORARY STANDARDS.
jgramling
Text Box
B9
jgramling
Text Box
B9. PROVIDE WOODEN UTILITY POLE COMPLYING WITH PG&E TEMPORARY UTILITY POLE INSTALLATION REQUIREMENTS (30' HEIGHT NOT REQUIRED AT THESE LOCATIONS).
jgramling
Ellipse
jgramling
Text Box
B9
jgramling
Ellipse
jgramling
Text Box
B9
jgramling
Ellipse
Page 6: Architect’s Supplemental Instruction

DN

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

18"

TREE

16"

TREE

12"TREE

WALL

(E) SOCCER FIELD

GOLF CAGE

4' - 0"

(E)D.F.

RESTROOM MODULAR

WOMEN'S LOCKER

PE BUILDING

SWIMING POOLMEN'S LOCKER

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

PE FIELD

SOCCER

VIKING FIELDBASEBALL

(E) ELECTRICAL MANHOLE AND SUMP PUMP

BUILDING B

BUILDING ABUILDING A

MH

MH

CLASSROOM MODULAR

1

2

GYMNASIUM

(E) POOL TIMER

(E) POOL TIMER

E1.01

2

AERIAL CABLE

POLE

POLE

MH

MH

OH

OH

OH

OH

OH

GYMNASIUM

(E) SCOREBOARD

EXISTING POLE AND CABLE ROUTING

225KVA XFMR

SLACK LINE NO TENSION (MAINTAIN 14' ABOVE FINISH GRADE LOWEST POINT)

SLACK LINE NO TENSION (MAINTAIN 5' ABOVE ROOF LOWEST POINT)

OH

OH OH

OH

OH

3

DOWN TO (E) PANEL MW

(E)

(E)

DOWN TO (E) PANEL A

INTERCEPT (E) UNDERGROUND CONDUITS FOR (E) PANEL B AND (E) PANEL BP

TO (E) PANEL B AND (E) PANEL BP

CONDUITS ROUTED ON THE GYMASIUM ROOF WITH SLIPPERS

(E) MECHANICAL ROOM

DOWN TO (E) PANEL ML

CONDUITS ROUTED ON THE MENS LOCKER ROOF WITH SLIPPERS

43

55

6

MH

6

...

.

.

.

.

.

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 1A & 1B -CONSTRUCT BLDG A & BLDG B

05/04/2020 D-4012

E1.02

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

FINAL TEMPORARY BUILDING - SITE PLAN PHASE 1A & 1B - CONSTRUCT (BLDG A) & (BLDG B)

SHEET NOTES1. PROVIDE POWER CONNECTION TO DISTRIBUTION PANEL HDM1B LOCATED IN

ELECTRICAL ROOM BUILDING B. REFER TO DRAWING E5.01, EB3.01 SERIES AND E4.01 FOR BUILDING B CONNECTION. CONNECTION TO MAIN SWITCHBOARD MS1A LOCATED ON THE SITE.

2. PROVIDE POWER CONNECTION TO DISTRIBUTION PANEL HDM1A LOCATED IN ELECTRICAL ROOM BUILDING A. REFER TO DRAWING E5.01, EA3.01 SERIES AND E4.01 FOR BUILDING A CONNECTION. CONNECTION TO MAIN SWITCHBOARD MS1A LOCATED ON THE SITE.

3. PROVIDE 2-2" CONDUITS FROM PANEL G TO EXISTING PANEL B AND EXISTING PANEL BP IN THE GYMNASIU. INTERCEPT EXISTING UNDERGROUND CONDUITS FROM BOILER ROOM TO EXISTING PANEL B AND EXISTING PANEL BP. PLACE A PULL BOX ON TOP OF EXISTING CONDUITS FEEDING EXISTING PANEL B AND EXISTING PANEL BP.

4. PROVIDE POWER CONNECTION TO TRANSFORMER T1G AND PANEL G TO POWER EXISTING PANEL A, EXISTING PANEL B AND EXISTING PANEL BP IN GYMNASIUM. LOCATE TRANSFORMER T1G AND PANEL G IN GYMNASIUM OFFICE ROOM.

5. PROVIDE CHRISTY BOX T52V, 3' X 4' X 5' FOR MANHOLE PB2-8A.

6. PROVIDE CHRISTY BOX T43V, 3' X 3' X 5' FOR MANHOLE PB2-8B.

7. PROVIDE POWER CONNECTION FROM PANEL G LOCATED IN THE GYMNASIUM TO EXISTING PANEL MW IN THE ELECTRICAL ROOM AT THE WOMENS LOCKER. EXISTING PANEL MW IS A 225A, 208/120V, 3 PHASE, 4 WIRE. PROVIDE 225A, 3 POLE BREAKER IN PANEL G. PROVIDE FEEDER F4250. FEEDER F4250 WILL BE DEMOLISHED WHEN WOMENS LOCKER IS DEMOLISHED. FEEDER FROM SWITCHBOARD MS1A TO BUILDING C SHALL REUSE ROUTING SHOWN TO POWER WOMENS LOCKER.

#

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

J. SWITCHBOARD MS1A IS A LONG LEAD ITEM, PURCHASE BY THE CONTRACTOR (RANGER PIPELINES INC.) INSTALLED UNDER PHASE 0.

ASI-10r2

Response toOwner’s Comments

03.06.2020

Page 7: Architect’s Supplemental Instruction

DN

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

18"

TREE

16"

TREE

12"TREE

WALL

(E) SOCCER FIELD

GOLF CAGE

4' - 0"

(E)D.F.

RESTROOM MODULAR

WOMEN'S LOCKER

PE BUILDING

SWIMING POOLMEN'S LOCKER

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

PE FIELD

SOCCER

VIKING FIELDBASEBALL

22A

22A

2 2A

2 2A

(E) ELECTRICAL MANHOLE AND SUMP PUMP

BUILDING B

BUILDING ABUILDING A

MH

MH

CLASSROOM MODULAR

GYMNASIUM

(E) POOL TIMER

(E) POOL TIMER 4

4

3

E1.01

2

AERIAL CABLE

POLE

POLE

MH

MH

OH

OH

OH

OH

OH

(E) SCOREBOARD

EXISTING POLE AND CABLE ROUTING

225KVA XFMR

SLACK LINE NO TENSION (MAINTAIN 5' ABOVE ROOF LOWEST POINT)

OH

OH OH

OH

OH

DOWN TO (E) PANEL MW

(E)

(E)

DOWN TO (E) PANEL A

INTERCEPT (E) UNDERGROUND CONDUITS FOR (E) PANEL B AND (E) PANEL BP

TO (E) PANEL B AND (E) PANEL BP

CONDUITS ROUTED ON THE GYMASIUM ROOF WITH SLIPPERS

(E) MECHANICAL ROOM

DOWN TO (E) PANEL ML

CONDUITS ROUTED ON THE MENS LOCKER ROOF WITH SLIPPERS

1

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 2A - DEMOWOMENS LOCKER BUILDING

05/04/2020 D-4012

E1.04

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

FINAL TEMPORARY BUILDING - SITE PLAN PHASE 2A - DEMOLISH WOMEN LOCKER, GYMNASIUMREMODEL AND POOL REMODEL

SHEET NOTES1. EXISTING OVERHEAD FEED WOMENS LOCKER SHALL BE DEMOLISHED. EXISTING

OVERHEAD FEED FOR CLASSROOM MODULARS AND REST ROOM MODULAR SHALL BE REMAIN OPERATIONAL.

2. EXISTING MUSCO LIGHTING POWERED FROM EXISTING PANEL ML IN THE MEN'S LOCKER ROOM. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING MEN'S LOCKER ROOM TO EXISTING MUSCO LIGHTING. EXISTING MUSCO LIGHTING SHALL BE POWERED FROM EXISTING PANEL ML IN THE MENS LOCKER. LOCATED INSIDE MAIN ELECTRICAL ROOM IN MENS LOCKER.

3. EXISTING SCOREBOARD FOR SWIMING MOUNTED ON THE GYMNASIUM EXTERIOR WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION TO BOTH WOMEN'S LOCKER AND MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING SCOREBOARD, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON WOMEN'S LOCKER SHALL BE TRANSFER TO MEN'S LOCKER DURING DEMOLITION OF WOMEN'S LOCKER.

4. EXISTING TIMER FOR SWIMING MOUNTED ON MEN'S LOCKER WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION OF TIMER AT MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING TIMERS, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON MEN'S LOCKER SHALL BE TRANSFER, BOTH TIMERS TO BUILDING C DURING DEMOLITION OF MEN'S LOCKER. COORDINATE WITH ARCHITECT AND CAMPUS REPRESENTATIVE FOR LOCATION OF BOTH TIMERS ON BUILDING C EXTERIOR WALL.

#

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

J. SWITCHBOARD MS1A IS A LONG LEAD ITEM, PURCHASE BY THE CONTRACTOR (RANGER PIPELINES INC.) INSTALLED UNDER PHASE 0.

(E) MUSCO LIGHT AND POLE2A

2A

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

Page 8: Architect’s Supplemental Instruction

DN

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

18"

TREE

16"

TREE

12"TREE

WALL

(E) SOCCER FIELD

GOLF CAGE

4' - 0"

(E)D.F.

RESTROOM MODULAR

BUILDING C

PE BUILDING

SWIMING POOLMEN'S LOCKER

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

PE FIELD

SOCCER

VIKING FIELDBASEBALL

(E) ELECTRICAL MANHOLE AND SUMP PUMP

BUILDING B

BUILDING ABUILDING A

MH

MH

CLASSROOM MODULAR

2A

2A

2A

2A

2

2

2

2

3

GYMNASIUM

(E) SCOREBOARD

(E) POOL TIMER

(E) POOL TIMER 5

5

4

E1.01

2

AERIAL CABLE

POLE

POLE

MH

MH

1

(E) MECHANICAL ROOM

DOWN TO (E) PANEL ML

CONDUITS ROUTED ON THE MENS LOCKER ROOF WITH SLIPPERS

OH

OH

OH

OH

OH

3427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 2A & 2B -CONSTRUCT BLDG C

05/04/2020 D-4012

E1.05

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

FINAL TEMPORARY BUILDING - SITE PLAN PHASE 2A - CONSTRUCT (BLDG C)

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

J. SWITCHBOARD MS1A IS A LONG LEAD ITEM, PURCHASE BY THE CONTRACTOR (RANGER PIPELINES INC.) INSTALLED UNDER PHASE 0.

(E) MUSCO LIGHT AND POLE2A

SHEET NOTES1. RE-INSTALLED EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL ML.

CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING MENS LOCKER ROOM TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL L LOCATED INSIDE SWITCHBOARD MS1A.

2. EXISTING MUSCO LIGHTING POWERED FROM EXISTING PANEL MW. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING WOMENS LOCKER ROOM TO EXISTING MUSCO LIGHTING. EXISTING MUSCO LIGHTING SHALL BE POWERED FROM EXISTING MAIN SWITCHBOARD LOCATED INSIDE PE BUILDING.

3. PROVIDE POWER CONNECTION TO EXISTING PANEL B AND EXISTING PANEL BP LOCATED IN GYMNASIUM BUILDING FOR GYMNASIUM REMODEL. REFER TO DRAWING E5.01, EG3.01 SERIES AND EG2.01 FOR GYMNASIUM BUILDING CONNECTION.

4. EXISTING SCOREBOARD FOR SWIMING MOUNTED ON THE GYMNASIUM EXTERIOR WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION TO BOTH WOMEN'S LOCKER AND MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING SCOREBOARD, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON WOMEN'S LOCKER SHALL BE TRANSFER TO MEN'S LOCKER DURING DEMOLITION OF WOMEN'S LOCKER.

5. EXISTING TIMER FOR SWIMING MOUNTED ON BOTH MEN'S LOCKER AND WOMEN'S LOCKER WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION TO BOTH WOMEN'S LOCKER AND MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING TIMERS, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON WOMEN'S LOCKER SHALL BE TRANSFER TO MEN'S LOCKER DURING DEMOLITION OF WOMEN'S LOCKER.

6. EXISTING OVERHEAD FEED FOR CLASSROOM MODULARS AND RESTROOM MODULAR ARE DEMOLISHED. POWER FEED TO CLASSROOM MODULARS AND RESTROOM MODULAR WILL BE TRANSFERED TO BUILDING C VIA UNDERGROUND FEED. PANEL LD1C SHALL POWER CLASSROOM MODULARS AND RESTROOM MODULARS.

#

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

Page 9: Architect’s Supplemental Instruction

DN

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

18"

TREE

16"

TREE

12"TREE

WALL

(E) SOCCER FIELD

GOLF CAGE

4' - 0"

(E)D.F.

RESTROOM MODULAR

BUILDING C

CLASSROOM MODULAR

PE BUILDING

SWIMING POOLMEN'S LOCKER

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

PE FIELD

SOCCER

VIKING FIELDBASEBALL

(E) ELECTRICAL MANHOLE AND SUMP PUMP

BUILDING B

BUILDING ABUILDING A

MH

MH

2A

2A

2A

2A

2

2

2

2

GYMNASIUM

(E) SCOREBOARD

(E) POOL TIMER4

3

(E) POOL TIMER4

E1.01

2

AERIAL CABLE

POLE

POLE

MH

MH

OH

OH

OH

OH

OH

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 3 - DEMOMENS LOCKER BUILDING

05/04/2020 D-4012

E1.06

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

FINAL TEMPORARY BUILDING - SITE PLAN PHASE 3 - DEMO MENS LOCKER BUILDING

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

(E) MUSCO LIGHT AND POLE2A

SHEET NOTES1. EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL ML. CONTRACTOR TO

VERIFY EXISTING INSTALLATION FROM EXISTING MENS LOCKER ROOM TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL LOCATED INSIDE.

2. EXISTING MUSCO LIGHTING POWERED FROM EXISTING PANEL ML. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING MENS LOCKER ROOM TO EXISTING MUSCO LIGHTING. EXISTING MUSCO LIGHTING SHALL BE POWERED FROM PANEL LP1C LOCATED IN BUILDING C. REFER TO DRAWING EC3.01 SERIES, E5.01 AND E4.01 FOR ADDITIONAL INFORMATION.

3. EXISTING SCOREBOARD FOR SWIMING MOUNTED ON THE GYMNASIUM EXTERIOR WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION TO FROM MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING SCOREBOARD, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON MEN'S LOCKER SHALL BE TRANSFER TO BUILDING C DURING DEMOLITION OF MEN'S LOCKER.

4. EXISTING TIMER FOR SWIMING MOUNTED ON MEN'S LOCKER WALL SHALL BE KEPT OPERATIONAL DURING POOL RENOVATION. CONTRACTOR SHALL IDENTIFY POWER CONNECTION AND SIGNAL CONNECTION OF TIMER AT MEN'S LOCKER. CONFIRM INSTALLATION OF EXISTING TIMERS, FOR EXISTING SIGNAL AND POWER CONNECTION. CONNECTION ON MEN'S LOCKER SHALL BE TRANSFER, BOTH TIMERS TO BUILDING C DURING DEMOLITION OF MEN'S LOCKER. COORDINATE WITH ARCHITECT AND CAMPUS REPRESENTATIVE FOR LOCATION OF BOTH TIMERS ON BUILDING C EXTERIOR WALL.

#

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

Page 10: Architect’s Supplemental Instruction

DN

ASPHALT

AC GB

Asphalt

STOP SIGN

NO

PRKNG

SIGN

SPD LMT

SIGN

SIGN

STORAGE BINS

ON CONC

BIKE

RACK

Elec

Gene

rator

18"

TREE

16"

TREE

12"TREE

WALL

(E) SOCCER FIELD

GOLF CAGE

4' - 0"

(E)D.F.

RESTROOM MODULAR

BUILDING C

CLASSROOM MODULAR

PE BUILDING

SWIMING POOL

PE FIELD

SOCCER

VIKING FIELDBASEBALL

(E) ELECTRICAL MANHOLE AND SUMP PUMP

BUILDING B

BUILDING ABUILDING A

MH

MH

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

(E) MUSCO LIGHT POLE

2A

2A

2A

2

2

2

GYMNASIUM

(E) SCOREBOARD

(E) POOL TIMER

(E) POOL TIMER

(E) MUSCO LIGHT POLE 2A 2

E1.01

2

MH

MH

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

N

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY BUILDING PHASE 3 -COMPLETE SITE WORK

05/04/2020 D-4012

E1.07

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

1" = 30'-0"1

FINAL TEMPORARY BUILDING - SITE PLAN PHASE 3 - COMPLETE STIE WORK

GENERAL NOTESA. CAUTION: EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE KNOWN TO

EXIST ON THE PROJECT SITE. CONTRACTOR TO MAKE USE OF ALL CONSTRUCTION DOCUMENTS TO ASSIST IN LOCATING THE UNDERGROUND UTILITIES AND STRUCTURES. NO REPRESENTATION AS TO ACCURACY OR COMPLETENESS OF THE LOCATION OF THE UNDERGROUND UTILITIES OR STRUCTURES EXISTS. FIELD VERIFY EXISTING SITE CONDITIONS FOR TRENCHING REQUIREMENTS. ELECTRICAL ROUTING SHOWN ON ELECTRICAL SITE PLANIS DIAGRAMMATIC. REFER TO CIVIL DRAWINGS. REFER ALSO TO SINGLE LINE DIAGRAM FOR FEEDER QTY AND SIZES.

B. MEDIUM VOLTAGE EQPT AND CABLING SHOWN AS EXISTING WILL BE PROVIDED UNDER SEPARATE DSA PACKAGE "SITE UTILITIES".

C. 480V DUCT BANK SHALL BE PROVIDED WITH CONCRETE ENCASEMENT WHERE MINIMUM BURIAL DEPTH 24" WILL NOT BE MET.

D. CONTRACTOR TO EXERCISE PRECAUTIONARY MEANS INCLUDING HAND DIGGING OR VACUUM EXCAVATION TO PROTECT THE EXISTING UTILITIES AND STRUCTURES. WHERE EXACT LOCATIONS OF UTILITIES AND STRUCTURES CAN NOT BE DETERMINED HAND OR VACUUM EXCAVATION WILL BE REQUIRED.

E. INSTALLATION OF SERVICE CONDUITS, GROUNDING, ETC, SHALL BE VERIFIED AND COORDINATED WITH DVC PRIOR TO INSTALLATION. ALL WORK SHALL CONFORM WITH DVC RULES, REGULATIONS, AND STANDARDS. MINIMUM CONDUCTOR SIZE FOR SITE LIGHTING AND SITE RECEPTACLES SHALL BE #10 INCLUDING NEUTRAL CONDUCTOR.

F. PULL BOX MINIMUM DIMENSIONS 17" X 30" UON. CHRISTY BOX N36

G. PROVIDE ADDITIONAL (2) 4"C. SPARE WHERE 480V SITE ROUTING OCCURS. ALL 480V SITE UNDERGROUND ARE 4" MINIMUM U.O.N.

H. PROVISIONS SHALL BE MADE TO DISCONNECT EXISTING EQUIPMENT AND RECONNECT NEW EQUIPMENT WITH MINIMAL POWER DISRUPTION.

I. PROVIDE SEPARATE PULL BOXES FOR POWER AND COMMUNICATIONS CONDUIT ROUTING. LABEL IN-GRADE POWER PULL BOXES AS "ELECTRICAL." LABEL IN-GRADE COMMUNICATIONS PULL BOXES AS "SIGNAL."

(E) MUSCO LIGHT AND POLE2A

SHEET NOTES1. EXISTING SITE LIGHTING POWERED FROM EXISTING PANEL MW. CONTRACTOR TO

VERIFY EXISTING INSTALLATION FROM EXISTING WOMENS LOCKER ROOM TO EXISTING SITE LIGHTING. EXISTING SITE LIGHTING SHALL BE POWERED FROM PANEL L LOCATED INSIDE SWITCHBOARD MS1A.

2. EXISTING MUSCO LIGHTING POWERED FROM EXISTING PANEL MW. CONTRACTOR TO VERIFY EXISTING INSTALLATION FROM EXISTING WOMENS LOCKER ROOM TO EXISTING MUSCO LIGHTING. EXISTING MUSCO LIGHTING SHALL BE POWERED FROM EXISTING MAIN SWITCHBOARD LOCATED INSIDE PE BUILDING.

#

ASI-10r1

Response toOwner’s Comments

11.22.2019

ASI-10r2

Response toOwner’s Comments

03.06.2020

Page 11: Architect’s Supplemental Instruction

F41000

L~39',V~0.12%

#10 G

ELECTRICAL FEEDER TABLE

3 WIRE + GROUND 4 WIRE + GROUND

FEEDER

CODECONDUIT PHASE NEUTRAL

EQUIP.

GROUND

ISOLATED

GROUND

FEEDER

CODECONDUIT PHASE NEUTRAL

EQUIP.

GROUND

ISOLATED

GROUND

F320 (1)3/4 3#12 - 1#12 - F420 (1)3/4 3#12 1#12 1#12 -

F330 (1)3/4 3#10 - 1#10 - F430 (1)3/4 3#10 1#10 1#10 -

F340 (1)1 3#8 - 1#10 - F440 (1)1 3#8 1#8 1#10 -

F350 (1)1 3#6 - 1#8 - F450 (1)1 1/4 3#6 1#6 1#8 -

F370 (1)1 1/4 3#4 - 1#8 - F470 (1) 1 1/4 3#4 1#4 1#8 -

F390 (1) 1 1/4 3#2 - 1#8 - F490 (1) 1 1/2 3#2 1#2 1#8 -

F3125 (1) 1 1/2 3#1 - 1#6 - F4125 (1) 2 3#1 1#1 1#6 -

F3150 (1) 1 1/2 3#1/0 - 1#6 - F4150 (1)2 3#1/0 1#1/0 1#6 -

F3175 (1) 2 3#2/0 - 1#6 - F4175 (1)2 3#2/0 1#2/0 1#6 -

F3200 (1)2 3#3/0 - 1#6 - F4200 (1)2 1/2 3#3/0 1#3/0 1#6 -

F3225 (1)2 3#4/0 - 1#4 - F4225 (1)2 1/2 3#4/0 1#4/0 1#4 -

F3250 (1)2 1/2 3#250 - 1#4 - F4250 (1)3 3#250 1#250 1#4 -

F3300 (1)3 3#350 - 1#4 - F4300 (1)3 3#350 1#350 1#4 -

F3350 (1)4 3#500 - 1#2 - F4350 (1)4 3#500 1#500 1#2 -

F3400 (2)2 6#3/0 - 2#2 - F4400 (2)2 1/2 6#3/0 2#3/0 2#2 -

F3450 (2)2 1/2 6#4/0 - 2#1 - F4450 (2)2 1/2 6#4/0 2#4/0 2#1 -

F3500 (2)2 1/2 6#250 - 2#1 - F4500 (2)3 6#250 2#250 2#1 -

F3600 (2)3 6#350 - 2#1 - F4600 (2)3 6#350 2#350 2#1 -

F3700 (2)3 6#500 - 2#1/0 - F4700 (2)4 6#500 2#500 2#1/0 -

F3800 (3)3 9#350 - 3#1/0 - F4800 (3)3 9#350 3#350 3#1/0 -

F31000 (3)4 9#500 - 3#2/0 - F41000 (3)4 9#500 3#500 3#2/0 -

F31200 (4)3 12#350 - 4#3/0 - F41200 (4)3 12#350 4#350 4#3/0 -

F31500 (5)3 15#350 - 4#4/0 - F41500 (5)3 15#350 5#350 4#4/0 -

F31600 (5)3 15#500 - 5#4/0 - F41600 (5)3 1/2 15#500 5#500 5#4/0 -

F32000 (6)4 18#500 - 6#250 - F42000 (6)3 1/2 18#500 6#500 6#250 -

120V

SUMMARY OF MAXIMUM FEEDER AND BRANCH CIRCUIT LENGTHS

WIRE

(AWG)CIRCUIT

AMPS (A)

MAXIMUM FEEDER LENGTH (ft) MAXIMUM BRANCH CIRCUIT LENGTH (ft)

208V 240V 277V 480V 120V 208V 240V 277V 480V

14 12 39 67 78 90 156 58 101 117 135 233

12 16 46 80 93 107 185 69 120 139 160 278

10 24 48 83 96 111 192 72 125 144 166 288

8 32 57 99 115 132 229 86 149 172 199 344

6 40 73 127 146 169 293 110 190 220 253 439

4 52 89 154 178 206 356 134 232 267 309 535

2 72 103 178 206 237 412 154 267 309 356 617

0 96 123 212 245 283 490 184 319 368 424 735

00 108 137 238 274 317 549 206 357 412 475 823

0000 144 163 283 327 377 654 245 425 490 566 980

250 164 170 294 340 392 679 255 441 509 588 1019

300 184 181 314 362 418 725 272 471 543 627 1087

350 200 195 338 390 450 779 292 506 584 675 1169

500 248 224 388 448 517 896 336 582 572 776 1344

SUMMARY OF VOLT DROP LIMITS

CIRCUIT VOLTS(V)

2% VOLTAGE

DROP (V)

3% VOLTAGE

DROP (V)

TOTAL LOSS(V)

120 2.4 3.6 6.0

208 4.2 6.2 10.4

240 4.8 7.2 12.0

277 5.5 8.3 13.9

480 9.6 14.4 24.0

-

3P600A

-

M

LSIG

3P1000A

-

G

G G

DRIVENGROUND

ROD

GROUND LOOP

-

3P250A

-

-

3P400A

-

MAIN

BREAKER DISTRIBUTION

PULL

SECTION

-

3P300A

-

TO EXISTINGMANHOLE MH2-10

AIC = 25,730277/480V, 3P-4W1000A(E) MS1A

MEDIUM VOLTAGE SITE DISTRIBUTION

-

3P700A

-

3P1000A -(E)

(E)

T1L

-

3P100A

-

480V- 120/208V, 3P-4W45 KVA

SITE LIGHTING

NEMA 3R ENCLOSURE

-SPD

-

-

-

-

SPAC

E

N

G

PNL L100A

LCP-

AIC= xA4160KV- 277/480V, 3P-4W750 KVA(E) T-30

8

5

6

7

F42

25

--

F43

0

--

F41

00

--

F41

00

--

(E) PANEL MW LOCATED IN WOMEN'S

LOCKER ROOM

(E) PANEL LOCATED IN MODULAR

RESTROOM

(E) PANEL LOCATED IN MODULAR

CLASSROOM

(E) PANEL LOCATED IN MODULAR

CLASSROOM

(E) (OH) #2 CU, STRANDS 7X, INSULATION THICKNESS 45 MILS, JACKET THICKNESS 30 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 1.57" (O.D.), 158 AMPS

--

150A3

250A3

200A3

600A3

TEMPORARY DISTRIBUTION PANEL480-120/208V, 600A

F46

00

MH2-8B

9

TEMPORARY CONSTRUCTION POWER 480-120/208V,

F47

0

--

(E) PANEL BP LOCATED IN GYMNASIUM

F42

00

--

(E) PANEL B LOCATED IN GYMNASIUM

F42

00

--

(E) PANEL A LOCATED IN GYMNASIUM

70A3

200A3

200A3

PAD MTD XFMR480-120/208V,225 KVA

(E) PANEL ML LOCATED IN

MEN'S LOCKER ROOM

F42

00

POLE MTDXFMR

480-120/208V,75 KVA

(OH) #4/0 CU, STRANDS 19X, INSULATION THICKNESS 55 MILS, JACKET THICKNESS 45 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 2.18" (O.D.), 335 AMPS

(OH) #2 CU, STRANDS 7X, INSULATION THICKNESS 45 MILS, JACKET THICKNESS 30 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 1.57" (O.D.), 158 AMPS

(E) (OH) #2 CU, STRANDS 7X, INSULATION THICKNESS 45 MILS, JACKET THICKNESS 30 MILS, CU CLAD STEEL MESSENGER SIZE 0.375, APPROX 1.57" (O.D.), 158 AMPS

F42

50

11

10

11

11 12 12 12 12 12

1

1

1

2

1

PHASE 1 WIRING WORK

427 13th StreetOakland, CA 94612510.663.2070 TelephoneE-Mail: [email protected]

I N T E G R A L

If the sheet is not 30"x42", it is a reduced print. Scale Accordingly.

Please Recycle

5036004000

Keynotes:

File No.:

Facility:

ISSUE:

Project:

Sheet Title:

Date: Client Project No:

Sheet:

No. Issued Date No. Issued Date

T 510 250 8223 / www.hmcarchitects.com

1111 Broadway, Floor 3Oakland, CA 94607

ASI - 010r3

DVC UNDERGROUND UTILITIES

DVC PEK - TEMPORARY ELECTRICAL SINGLE LINEDIAGRAMS

05/04/2020 D-4012

E5.01

DIABLO VALLEY COLLEGECONTRA COSTA CCD321 GOLF CLUB RDPLEASANT HILL, CA 94523

J:\Projects\5036 Contra CostaCCD\004-000 DVC PEKComplex\06 BIM CAD\03 REVIT

SHEET NOTES:#

1. THE DESIGN IS BASED ON COPPER CONDUCTOR. THE USE OF EQUIVALENT ALUMINUM CONDUCTORS FOR TEMPORARY FEEDERS ARE ACCEPTABLE.

2. THE DESIGN IS BASED ON USING 225 KVA TRANSFORMER TO FEED THEFOLLOWING: (E) PANEL A, (E) PANEL B, (E) PANEL BP FOR THE GYMANSIUM, (E) PANEL MW FOR THE WOMENS LOCKER, BOTH (E) CLASSROOM MODULAR AND (E) RESTROOM MODULAR. THE USE OF ONE 150 KVA FOR THE (E) PANEL A, (E) PANEL B AND (E) PANEL BP AND 75 KVA FOR THE (E) PANEL MW, BOTH (E) CLASSROOM MODULAR AND (E) RESTROOM MODULAR IS ALSO ACCEPTABLE. GIVING THE BIDDERS FEXIBILITY IN BIDDING.

3. NOT USED.

4. NOT USED.

5. TRANSFORMER T1L AND PANEL L ARE LOCATED INSIDE SWITCHBOARD MS1A. PROVIDE AN ENCLOSURE SEPARATE FROM THE OTHER 480/277V BREAKERS.

6. RELOCATE ASTRONOMICAL TIME CLOCK (AC) FROM FIBER SHACK TO INSIDE THE SWITCHBOARD MS1A. SITE LIGHTING POWERED FROM FIBER SHACK WILL BE TRANSFERED TO PANEL L INSIDE THE SWITCHBOARD MS1A AND CONTROLLED BY THE RELOCATED ASTRONOMICAL TIME CLOCK (AC).

7. PROVIDE CONNECTION TO BOTH EXISTING SITE LIGHTING AND SECURITY LIGHTING IN THE SLOPE AREA, BY RANGER PIPELINES INC.

8. EXISTING SWITCHBOARD MS1A PROVIDED BY RANGER PIPELINES INC. SHALL PROVIDE POWER FOR (E) GYMNASIUM, BUILDING A, BUILDING B AND BUILDING C.

9. PROVIDE F4600 FEEDER FROM EXISTING TRANSFORMER T-30 FOR TEMPORARY DISTRIBUTION PANEL. TEMPORARY DISTRIBUTION PANEL SHALL FEED EXISTING MEN'S LOCKER, EXISTING WOMEN'S LOCKER, EXISTING GYMNASIUM, EXISTING MODULAR CLASSROOM, EXISTING MODULAR RESTROOM AND TEMPORARY COSTRUCTION POWER.

10. THE INSTALLATION OF EXISTING SWITCHBOARD MS1A. THE FEED TO TEMPORARY DISTRIBUTION PANEL WILL COME FROM EXISTING SWITCHBOARD MS1A (PHASE 1)

11. INSTALLATION AND ENERGIZING OF EXISTING SWITCHBOARD MS1A SHALL SHUTDOWN TEMPORARY DISTRIBUTION PANEL. THE POWER TO TEMPORARY DISTRIBUTION PANEL WILL BE TRANSFER TO EXISTING SWITCHBOARD MS1A. PROVIDE 600A, 3 POLE BREAKER IN EXISTING SWITCHBOARD MS1A TO FEED TEMPORARY DISTRIBUITION PANEL (PHASE 1).

12. CONNECTION FROM EXISTING SWITCHBOARD MS1A TO BUILDING A, BUILDING B, BUILDING C AND RECONNECTION TO EXISTING GYMNASIUM ARE NOT PART OF TEMPORARY POWER SCOPE. INSTEAD PART OF PEK PROJECT (PHASE 1).

GENERAL NOTES:CONDUIT AND FEEDER SIZES ARE MINIMUM. USE 1" CONDUIT MINIMUM FOR UNDERGROUND INSTALLATIONS.

DERATE WIRE SIZE PER CEC FOR NUMBER OF CURRENT CARRYING WIRES AND FOR AMBIENT TEMPERATURES OF 86F.

FEEDERS SHOWN ARE COPPER CONDUCTORS WITH THHN/THWN INSULATION TYPE RATED 75oC UNLESS NOTED OTHERWISE.

FEEDER LENGTH AND VOLTAGE DROP CALCULATIONS ARE FOR ESTIMATING VOLTAGE DROP AND SHORT CIRCUIT COORDINATION PURPOSE ONLY. CONTRACTOR SHALL USE ACTUAL FEEDER LENGTHS TO CALCULATE ACTUAL VOLTAGE DROP AND SHORT CIRCUIT VALUES.

THE SHORT CIRCUIT WITHSTAND/INTERRUPTING RATING OF SWITCHBOARDS, PANELS, CIRCUIT BREAKERS AND FUSES ARE BASED UPON ESTIMATED FEEDER LENGTHS AND GENERIC EQUIPMENT VALUES. ACTUAL SHORT CIRCUIT VALUES SHALL BE MINIMUM 10% ABOVE CONTRACTOR CALCULATED VALUES. NOTIFY ARCHITECT IF CALCULATED VALUES EXCEED INTERRUPTING CAPACITY AND MAKE RECOMMENDATIONS FOR CORRECTING DEFICIENCIES. DO NOT RELEASE ELECTRICAL EQUIPMENT FOR FABRICATION PRIOR TO RECEIPT OF APPROVED SHORT CIRCUIT STUDY.

THE CONTRACTOR SHALL PROVIDE AND INSTALL PERMANENTLY ATTACHED ARC FLASH HAZARD LABELS FOR ALL POWER DISTRIBUTION EQUIPMENT (CEC 110.16). LABELS SHALL BE PROFESSIONALLY PRINTED AND INCLUDE THE FOLLOWING INFORMATION:1. EXISTENCE OF ARCH FLASH HAZARD, FLASH PROTECTION BOUNDARY.2. INCIDENT ENERGY AT 18" EXPRESSED IN CAL/CM23. PPE CLOTHING REQUIRED. 4. VOLTAGE SHOCK HAZARD.5. LIMITED SHOCK APPROACH BOUNDARY.6. RESTRICTED SHOCK APPROACH BOUNDARY.7. PROHIBITED SHOCK APPROACH BOUNDARY.

PV CIRCUIT BREAKERS. BREAKER SHALL BE SUITABLE FOR BACKFEED. CIRCUIT BREAKER SHALL BE INSTALLED PER CEC AND MANUFACTURER'S SPECIFICATION AND INSTALLATION GUIDELINES.

PER CEC 240.87, PROVIDE ENERGY REDUCTION MAINTENANCE SWITCH AT EACH BREAKER RATED 1200A OR GREATER. ENERGY REDUCTION MAINTENANCE SWITCH SHALL HAVE LOCAL STATUS INDICATOR TO REDUCE INSTANTANEOUS PICKUP SETTING TO NO MORE THAN TWO TIMES THE SENSOR AMPERAGE

OUTDOOR DISTRIBUTION EQUIPMENT SHALL BE IN NEMA 3R ENCLOSURE.

PROVIDE (2) 2" EMPTY CONDUITS FROM EACH ELECTRICAL ROOM AND STUB-UP TO ROOF. CAP CONDUITS FOR FUTURE USE (PV). TYPICAL FOR EACH BUILDING.

SWITCHBOARD MS1A IS FURNISHED AND INSTALLED BY THE DEMOLITION CONTRACTOR (RANGER PIPELINES INC.) UNDER PHASE 0.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

ASI-10r2

Response toOwner’s Comments

03.06.2020