April 25, 2012 ODOT Planners Meeting

April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Embed Size (px)

Citation preview

Page 1: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

April 25, 2012

ODOT Planners

Meeting

Page 2: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

2

Purpose of Project

Improve mobility and safety for people and freight for local, regional, and through travel across the Willamette River in the Salem-Keizer metropolitan area while alleviating congestion on the Center Street and Marion Street Bridges and on the connecting highway and arterial street system. The following areas are of specific concern:Reducing congestion compared to current conditions at the existing bridgeheads to facilitate the flow of vehicles and freight through the downtown area and east-west freight movement through the Salem-Keizer metropolitan areaRemediating safety and operational deficiencies on the existing bridges and in the study area in locations where crash rates are higher than average

Page 3: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

3

Review of DEIS Alternatives

No Build Alternative 3 bridge crossing locations; 8 Build Alternatives Crossing locations:

1) Existing Bridges Crossing Location (2A & 2B)

2) Hope to Tryon Crossing Location (3)

3) Hope to Pine/Hickory Crossing Location (4A - 4E)

Page 4: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

4

DEIS Alternatives: Crossing Locations

Page 5: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

No Build Alternative

Alternative 1 (No Build): Examines how the transportation system will operate in the future without building another bridge.

Used as a baseline to compare and measure the other alternatives

5

Page 6: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

6

Existing Bridges Crossing Location

Alternative 2A (widen existing bridges): Adds two new lanes to the Marion Street Bridge (plus a connection to the future Marine Drive NW) and one new lane to the Center Street Bridge

Alternative 2B (north of existing bridges): New bridge between the Marion and Union Street Bike/Pedestrian bridges

Page 7: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

7

Alternative 2A (widen existing bridges)

Page 8: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

8

Alternative 2B (north of existing bridges)

Page 9: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

9

Hope to Tryon Crossing Location

Alternative 3 (Hope to Tryon): New bridge from Wallace Road NW and Hope Avenue NW to Tryon Avenue NE and the Salem Parkway NE, including connections to the Liberty/Commercial Street NE couplet

Page 10: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

10

Alternative 3 (Hope to Tryon)

Page 11: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

11

Hope to Pine/Hickory Crossing Location

Alternative 4A (Hope to Liberty via Pine/Hickory): New bridge from the Wallace Road NW and Hope Avenue NW to Pine/ Hickory Street NE and the Liberty/Commercial Street NE couplet

Page 12: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Alternative 4A: (Hope to Liberty via Pine/Hickory)

12

Page 13: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

13

Hope to Pine/Hickory Crossing Location

Alternative 4B (4A + 2A): New bridge (4A) plus widen existing bridges (2A)

Page 14: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Alternative 4B (4A + 2A)

14

Page 15: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

15

Hope to Pine/Hickory Crossing Location

Alternative 4C (4A + Direct Connections to Salem Parkway & OR 22): New bridge (4A), but Pine/Hickory Street NE extends to Broadway Street NE and has a direct connection to Salem Parkway NE with elevated and direct connection to OR 22 and Marine Drive NW

Page 16: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Alternative 4C (4A + Direct Connections to Salem Parkway &

OR 22)

16

Page 17: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

17

Hope to Pine/Hickory Crossing Location

Alternative 4D (4C with shortened Pine/Hickory couplet): Same as Alternative 4C but the bridge connection to Pine/ Hickory Street NE would touch down at Liberty Street NE (not Broadway Street NE)

Page 18: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Alternative 4B (4C with shortened Pine/Hickory

couplet)

18

Page 19: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

19

Hope to Pine/Hickory Crossing Location

Alternative 4E (4C minimizes impact to Wallace Marine Park): New bridge (4C) but with modified connection to OR 22 to minimize impacts to Wallace Marine Park

Page 20: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Alternative 4E (4C minimizes impact to Wallace Marine Park)

20

Page 21: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Cost Estimates (2015)

2A - $148 million 2B - $388 million 3 - $501 million 4A - $306 million 4B - $451 million 4C - $692 million 4D - $687 million 4E - $708 million

Page 22: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Next Steps

DEIS public hearings May 8 and 17 DEIS public comment period closes June 18 Identification of a locally preferred alternative Development of a finance strategy – to include

public opinion survey

Page 23: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Decision Process

Page 24: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Decision Process – Locally Preferred Alternative

Page 25: April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel

Decision Making Structure

25