View
214
Download
0
Tags:
Embed Size (px)
Citation preview
April 21, 2004April 21, 2004
Lewiston Porter Lewiston Porter StudiesStudies
• History of Schools SiteHistory of Schools Site– LOOW: TNTLOOW: TNT– Air Force: StorageAir Force: Storage– Radium StorageRadium Storage
• CleanupCleanup– CWM Hazardous WasteCWM Hazardous Waste– Modern LandfillModern Landfill
• Public Participation: UB Public Participation: UB ProjectProject– StakeholdersStakeholders– PlanningPlanning– SamplingSampling– GIS AnalysisGIS Analysis
April 21, 2004April 21, 2004
Public Public InputInput1.Stakeholders committee (jobs:
collect input, oversee deadlines, reporting and help review design and results).
2.Sampling points (any one with geographic knowledge about the area,history, etc., to supplement what the Roberts have put together).
3. Input on public knowledge and concerns: phone, mail, email, website
4.Website: www.acsu.buffalo.edu/~gardella/lewport