APPLICATION ON NOTIFICATION – Category 2 Applicant: Springwood Development Nominees Development Number: 490/E006/19 Nature of Development: Construction of a shopping centre comprising supermarket and six (6) specialty shops, two (2) standalone shops, associated car parking and signage Development Type: Merit Subject Land: Calton Road, GAWLER EAST - Lot 9010 CT 6205/146 (Proposed lot 2046 DA 490/D026/19) Development Plan: Gawler Development Plan Zone / Policy Area: Residential (Gawler East) Zone/ Mixed Use Centre Policy Area 3 Contact Officer: Hannah Connell Phone Number: 7109 7828 Consultation Start Date: 15 January 2020 Consultation Close Date: 5:00pm Monday, 3 February 2020 During the notification period, hard copies of the application documentation can be viewed at the Department of Planning, Transport and Infrastructure, Level 5, 50 Flinders St, Adelaide, during normal business hours. Application documentation may also be viewed during normal business hours at the local Council office (if identified on the public notice). Written representations must be received by the close date (indicated above) and can either be posted, hand-delivered or emailed to the State Commission Assessment Panel. Any representations received after the close date will not be considered. Postal Address: The Secretary State Commission Assessment Panel GPO Box 1815 ADELAIDE SA 5001 Street Address: Development Division Department of Planning, Transport and Infrastructure Level 5, 50 Flinders Street ADELAIDE Email Address: [email protected]

APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

APPLICATION ON NOTIFICATION – Category 2

Applicant: Springwood Development Nominees

Development Number: 490/E006/19

Nature of Development: Construction of a shopping centre comprising

supermarket and six (6) specialty shops, two (2)

standalone shops, associated car parking and signage

Development Type: Merit

Subject Land: Calton Road, GAWLER EAST - Lot 9010 CT 6205/146(Proposed lot 2046 DA 490/D026/19)

Development Plan: Gawler Development Plan

Zone / Policy Area: Residential (Gawler East) Zone/ Mixed Use Centre Policy

Area 3

Contact Officer: Hannah Connell

Phone Number: 7109 7828

Consultation Start Date: 15 January 2020

Consultation Close Date: 5:00pm Monday, 3 February 2020

During the notification period, hard copies of the application documentation

can be viewed at the Department of Planning, Transport and Infrastructure,

Level 5, 50 Flinders St, Adelaide, during normal business hours. Application

documentation may also be viewed during normal business hours at the local

Council office (if identified on the public notice).

Written representations must be received by the close date (indicated above) and can

either be posted, hand-delivered or emailed to the State Commission Assessment Panel.

Any representations received after the close date will not be considered.

Postal Address:

The Secretary

State Commission Assessment Panel

GPO Box 1815

ADELAIDE SA 5001

Street Address:

Development Division

Department of Planning, Transport and Infrastructure

Level 5, 50 Flinders Street

ADELAIDE

Email Address: [email protected]

Page 2: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

South Australian DEVELOPMENT ACT, 1993

REPRESENTATION ON APPLICATION – CATEGORY 2

Return Address: The Secretary, State Commission Assessment Panel, GPO Box 1815, Adelaide, SA 5001 /or Email: [email protected]

Applicant: Springwood Development Nominees

Development Number: 490/E005/19

Nature of Development: Construction of a Sales Centre (two storey) comprising Showroom, Office and Cafe with associated car park and signage.

Development Type: Merit

Zone / Policy Area: Residential (Gawler East) Zone/ Mixed Use Centre Policy Area 3

Subject Land: Calton Road GAWLER EAST – Lot 9010 CT 6205/146

(Proposed Lot 1006 in DA 490/D025/19)

Contact Officer: Hannah Connell

Phone Number: 7109 7828

Close Date: 5:00pm Monday, 3 February 2020

My Name: My phone number:

Primary method(s) of contact: Email:

Postal Address: Postcode:

You may be contacted via your nominated PRIMARY METHOD(s) OF CONTACT if you indicate below that you wish to be heard by the State Commission Assessment Panel in support of your submission.

My interests are: (please tick one)

owner of local property

occupier of local property

a representative of a company/other organisation affected by the proposal

a private citizen

The address of the property affected is:

Postcode

My interests are: (please tick one) I support the development

I support the development with some concerns

I oppose the development

The specific aspects of the application to which I make comment on are:

I: wish to be heard in support of my submission

(please tick one)

do not wish to be heard in support of my submission (Please tick one)

By: appearing personally

(please tick one)

being represented by the following person (Please tick one)

Signature:

Date:

Page 3: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,
Page 4: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Prepared for:

Springwood Communities

Date:

June 2019

SPRINGWOOD

SALES CENTRE

Planning Statement

Page 5: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741 – 001 | 14 June 2019 1

Proprietary Information Statement

The information contained in this document produced by Ekistics Planning and Design is solely for the use of the

Client as identified on the cover sheet for the purpose for which it has been prepared and Ekistics Planning and

Design undertakes no duty to or accepts any responsibility to any third party who may rely upon this document.

All rights reserved. No section or element of this document may be removed from this document, reproduced,

electronically stored or transmitted in any form without the written permission of Ekistics Planning and Design.

Document Control

Revision Description Author Date

V1 Draft Planning Statement KB 12 June 2019

V2 Final Planning Statement KB 14 June 2019

Approved by: Date: 14 June 2019

Page 6: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741 – 001 | 14 June 2019 2

Contents

1. EXECUTIVE SUMMARY 4

2. INTRODUCTION/BACKGROUND 4

3. THE SUBJECT SITE AND LOCALITY 8

3.1 THE SUBJECT LAND 8

3.2 THE SUBJECT SITE 9

3.3 THE LOCALITY AND SURROUNDING DEVELOPMENT 12

4. PROPOSED DEVELOPMENT 14

4.1 LAND USE, BUILT FORM, ACCESS AND SIGNAGE 14

4.2 STORMWATER MANAGEMENT 15

5. PROCEDURAL REQUIREMENTS 15

5.1 RELEVANT AUTHORITY 15

5.2 NATURE OF DEVELOPMENT 15

5.3 PUBLIC NOTIFICATION 16

5.4 AGENCY REFERRALS 16

6. DEVELOPMENT PLAN ASSESSMENT 16

6.1 OVERVIEW 16

6.2 LAND USE 17

6.3 DESIGN AND APPEARANCE 21

6.4 ACCESS AND PARKING 22

6.5 CRIME PREVENTION 25

6.6 STORMWATER AND FLOODING CONSIDERATIONS 27

6.7 SIGNAGE 27

6.8 LANDSCAPING 30

6.9 INTERFACE CONSIDERATIONS 30

7. CONCLUSION 31

Page 7: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741 – 001 | 14 June 2019 3

Appendices

Appendix 1. Land Tenure Plan and Certificate of Title 33

Appendix 2. Plan of Division 34

Appendix 3. Proposed plans and elevations Studio Nine 35

Appendix 4. Traffic and Parking Review CIRQA 36

Figures

Figure 2.1 Development Package 1 .............................................................................................................................. 5

Figure 2.2 Springwood Master Plan (Tract) ................................................................................................................. 6

Figure 2.3 Springwood Place and Community Masterplan (Tract) ............................................................................. 6

Figure 2.4 Springwood Village Centre Masterplan (Tract) .......................................................................................... 7

Figure 3.1 Land Tenure Plan .......................................................................................................................................... 8

Figure 3.2 Associated land division – subject site is Lot 1006 .................................................................................... 9

Figure 3.3 Associated land division (enlargement) – subject site is Lot 1006 ........................................................... 9

Figure 3.4 Subject site ................................................................................................................................................. 10

Figure 3.5 Site of the Sales Centre (looking south) .................................................................................................... 11

Figure 3.6 Site of the Sales Centre (looking east) ...................................................................................................... 11

Figure 3.7 Subject Site and Surrounds ........................................................................................................................ 13

Figure 3.8 Site of the proposed supermarket to the north-east of the Sales Centre ............................................... 13

Figure 3.9 Future residential areas of the Springwood development (looking south-west) ................................... 14

Figure 6.1 Zoning and Policy Areas ............................................................................................................................. 17

Figure 6.2 Gawler East Structure Plan ........................................................................................................................ 20

Figure 6.3 Extract from Table Ga/4 ............................................................................................................................ 28

Page 8: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 4

1. Executive Summary

Category Details

PROJECT Springwood Sales Centre

ADDRESS OF SITE Proposed Lot 1006 in DA 490/D025/19 – Calton Road, Gawler East

CERTIFICATE OF TITLE Volume 6205 Folio 146 (Parent title)

SITE AREA 2,604m2

FRONTAGE 50.82m to the Gawler East Link Road (under construction)

LOCAL GOVERNMENT Town of Gawler

RELEVANT AUTHORITY State Commission Assessment Panel

PRE-LODGEMENT PANEL MEETINGS 29 March 2019

DEVELOPMENT PLAN Gawler (CT) (consolidated 20 February 2018)

ZONING Residential (Gawler East) Zone

POLICY AREA/PRECINCT Mixed Use Centre Policy Area 3

EXISTING USE Vacant

PROPOSAL DESCRIPTION Springwood Sales Centre incorporating an office and café with associated

car parking, landscaping and signage

AGENCY REFERRALS N/A

PUBLIC NOTIFICATION Category 2

APPLICANT Springwood Nominees Pty Ltd

CONTACT PERSON Kieron Barnes – Ekistics Planning and Design – (08) 7231 0286

OUR REFERENCE 00741

2. Introduction/Background

Springwood is a 217.5 ha master planned community in Gawler East and Kalbeeba which, once completed, will

feature approximately 1,750 residential allotments. Approximately 350 of these allotments have already been

created (or are in the process of being created), while an additional 1,404 residential allotments will be created

via separate land division applications that have been lodged with the State Commission Assessment Panel. In

addition to the proposed residential allotments, eleven allotments will be created for commercial or educational

purposes. This includes proposed Lot 1,006 in DA 490/D025/19 on which a Sales Centre for the Springwood

development will be located.

By letter dated 15 November 2018, the State Coordinator General advised that the State Commission

Assessment Panel would be the relevant authority to assess all of the remaining portions of the Springwood

development. This 'call-in' by the State Coordinator General was conditional on the development proceeding

via a series of 'Development Packages' as follows.

· Development Package 1 comprising the following elements:

» Land division for all of the remaining portions of the Springwood development (including residential

areas, retail areas, community areas and school precinct);

» Retail area (supermarket, speciality shops and associated car parks); and

Page 9: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 5

» Sales Centre with retail component.

· Development Package 2 comprising the following elements:

» Retirement village;

» Childcare Centre; and

» Additional retail.

· Development Package 3 comprising the following elements:

» School precinct.

Figure 2.1 below broadly illustrates the area and scope of Development Package 1. In addition to the

application for a Sales Centre, four land division applications and a development application for a supermarket

with speciality shops have been lodged concurrently with SCAP.

Figure 2.1 Development Package 1

The Springwood development is proceeding in accordance with a Masterplan developed by Tract Consultants

and will include a 'village centre' together with a supermarket and other speciality retail stores, various

community uses and a school with large sporting grounds (see Figures 2.2, 2.3 and 2.4).

As a large master planned community, Springwood represents a significant economic investment and

development for the Gawler Region and the State. Importantly, Springwood will result in significant

employment generation and employment multipliers. It will also capitalise on significant embedded

Government investment in infrastructure including the new ‘Gawler East Link Road’ (GELR) which will pass

through the northern precinct of Springwood to service the proposed new Springwood Village Centre within

which the Sales Centre will be located.

Page 10: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 6

Figure 2.2 Springwood Master Plan (Tract)

Figure 2.3 Springwood Place and Community Masterplan (Tract)

Page 11: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 7

Figure 2.4 Springwood Village Centre Masterplan (Tract)

This planning statement provides information about the subject site and the proposed development while also

addressing the merits of the proposal against the relevant provisions of the Gawler (CT) Development Plan –

particularly the ‘Mixed Use Centre Policy Area 3’ of the ‘Residential (Gawler East) Zone’.

This planning statement has been informed by specialist advice which forms part of the application and is

appended as follows:

· Appendix 1: Land Tenure Plan and Certificate of Title

· Appendix 2: Plan of Division

· Appendix 3: Proposed plans and elevations Studio Nine

· Appendix 4: Traffic Impact Assessment CIRQA

Page 12: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 8

3. The Subject Site and Locality

3.1 The Subject Land

Currently, the subject land forms part of Allotment 9010, Deposited Plan 114845 in Certificate of Title Volume

6205 Folio 146 (refer to Appendix 1). Allotment 9010 forms part of a number of titles which are being

developed for the broader Springwood development (see Figure 3.1 below and Appendix 1).

Figure 3.1 Land Tenure Plan

There are a number of easements affecting the subject land including (but not limited to):

· A 275kV transmission line within a 100m wide ElectraNet easement that runs in a north-south

direction;

· A DN750 MSCL potable water main, known as the Barossa Trunk Main, is located within a 10.06m wide

easement running through the south-eastern corner of the land; and

· A 450mm diameter high pressure gas transmission pipeline, owned and operated by South East

Australia Gas Pty Ltd (SEA Gas), is located within a 15m wide easement that runs parallel to the Barossa

Trunk Main.

The easements listed above do not affect the site of the proposed Sales Centre. Similarly, the Land

Management Agreements that are noted on the title, do not affect the site of the proposed Sales Centre.

Page 13: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 9

3.2 The Subject Site

While the subject land currently forms part of Allotment 9010 in Deposited Plan 114845, the subject site

comprises proposed Allotment 1006 in Development Application 490/D025/19 see Figures 3.2 and 3.3.

Figure 3.2 Associated land division – subject site is Lot 1006

Figure 3.3 Associated land division (enlargement) – subject site is Lot 1006

Page 14: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 10

Proposed Lot 1006 has an area of 2,583m2, a primary frontage of 50.82m (excluding corner cut-offs) and

secondary frontages as follows:

· 35.06m (excluding corner cut-offs) to the west;

· 51.84m (excluding corner cut-offs) to the south; and

· 37.56m (excluding corner cut-offs) to the east.

The subject site, which previously formed part of the nearby quarry, is currently vacant. A significant amount of

fill has been placed in mounds around the site as a consequence of development of the earlier stages of

Springwood. Some vegetation in the form of small trees, shrubs and groundcovers is present on the site.

However, there are no Regulated or Significant Trees on the subject site. It is noted that some vegetation on

and near the site has recently been removed by the Department of Planning, Transport and Infrastructure

(DPTI) as part of the construction of the Gawler East Link Road.

The subject site will sit on a prominent corner at the junction of the Gawler East Link Road and the Springwood

north-south connector road. Given the site's prominence, the Sales Centre will be a key focal point for the

'village centre' along with the proposed supermarket and speciality shops which will be located on the opposite

side of the intersection.

Figure 3.4 Subject site

Page 15: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 11

Figure 3.5 Site of the Sales Centre (looking south)

Figure 3.6 Site of the Sales Centre (looking east)

Page 16: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 12

3.3 The Locality and Surrounding Development

The locality features a range of land uses including the former quarry and associated activities to the immediate

west and south of the site, residential development to the north and east and farmland further to the south.

Generally speaking, the locality comprises land south of Calton Road which forms part of the master planned

Springwood development. For this reason, the nature and character of the locality will be transformed over the

coming years to create a vibrant residential community supported by a range of facilities and services within a

proposed 'village centre'.

The former quarry, which forms a major element in the existing locality, was historically associated with the

excavation of sand. More specifically, excavated sand was processed on-site through a washing plant where silt

and clay were separated from the sand and deposited into a series of sedimentation and drying ponds. The

material was periodically excavated from the pond and stockpiled on-site or sold as a product. It is understood

that sand mining activities ceased operations in 2000.

Beyond the former quarry, the natural topography of the site comprises undulating hills which increase in

gradient towards the South Para River which runs roughly in an east-west direction through the central portion

of the Springwood development.

Major infrastructure within the locality includes:

· The Gawler East Link Road (under construction);

· An above-ground 750mm diameter Barossa Trunk Main;

· SEA Gas pipeline and associated ‘main line’ valve; and

· 275kV overhead electricity power lines within a 100 metre wide easement.

Beyond the Springwood development, low-density residential development is located on the northern side of

Calton Road and on the western side of Cheek Avenue. Further west is the Gawler Town Centre which features

a traditional 'high street' and contains the main shopping, administrative and cultural facilities for the Council

area. Figure 3.7 on the following page identifies the key features of the locality.

Page 17: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 13

Figure 3.7 Subject Site and Surrounds

Figure 3.8 Site of the proposed supermarket to the north-east of the Sales Centre

Page 18: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 14

Figure 3.9 Future residential areas of the Springwood development (looking south-west)

4. Proposed Development

4.1 Land Use, Built Form, Access and Signage

The development proposes the construction of a two-storey building to be positioned near the north-western

corner of the subject site (refer to architectural plans prepared by Studio Nine in Appendix 3).

The building will comprise the following key elements:

· A Sales Centre (132.55m2) at ground floor which will allow prospective residents to view a model of the

Springwood development (as well as other supporting material), while discussing the development

with sales staff;

· A café (79.4m2) at ground level with servery, back of house (9.47m2) and outdoor dining area which will

provide seats for approximately 40 customers;

· Amenities and a small storage area at ground floor to cater for customers of the sales centre and café;

· Offices with associated amenities (159.93m2) on the first floor which will be used for the administrative

functions associated with the Springwood development;

· A viewing deck (64m2) to enable prospective residents to view the Springwood development; and

· Signage (measuring 1.5m by 4.5m) on the northern and western elevations at the upper level which

will accommodate the Springwood logo.

Page 19: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 15

A car park providing 35 parking spaces, including a space for those with a disability, will be located at the rear of

the Sales Centre. A pedestrian link will be provided within the car park to enable prospective residents to walk

between the Sales Centre and the proposed display village to the south. It is anticipated that the display village

will accommodate approximately 30-35 display homes which will be constructed separately by a range of

building companies that have partnered with Springwood. Over time, these display homes will be sold as

private dwellings as the Springwood development progresses.

Access to the car park at the rear of the Sales Centre will be provided via the proposed north-south collector

road as well as from a proposed local road which will border the subject site to the east.

Appendix 4 contains a detailed assessment undertaken by CIRQA Traffic Consultants of the access and parking

arrangements for the Sales Centre. CIRQA's assessment confirms that the access points will be provided in

accordance with the relevant Australian Standards and there will be sufficient car parking spaces to

accommodate the various elements of the Sales Centre.

The proposed development also includes a substantial landscaped area to the east of the Sales Centre for the

use of prospective purchasers. It is intended that this area will remain in private ownership and won't form part

of the open space network for Springwood. Additional landscaping will be provided around the building and

within the car park including trees, bushes, shrubs and groundcovers.

A variety of building materials will be used including clear glazing, 'proprietary pre-finished lightweight cladding',

face brick and 'proprietary aluminium screen 'timber look' finish. The aluminium screen at the upper level will

be a key design feature that will provide additional visual presence for the building which reflects its prominent

location at a major intersection within the 'village centre'.

4.2 Stormwater Management

A site specific Stormwater Management Plan for the subject site will be provided by Wallbridge Gilbert Aztec

(WGA). This plan will complement and build upon the overall Stormwater Management Plan for the entire

Springwood development which has been submitted with the concurrent land division applications.

5. Procedural Requirements

5.1 Relevant Authority

By letter dated 15 November 2018 and pursuant to Schedule 10(20) of the Development Regulations 2009, the

State Coordinator General has assigned the State Commission Assessment Panel (SCAP) as the relevant Planning

Authority.

5.2 Nature of Development

The proposed development is perhaps best described as a 'Sales Centre incorporating an office and café with

associated car parking, landscaping and signage'.

Page 20: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 16

Pursuant to the Procedural Matters section of the Residential (Gawler East Zone), the application is neither a

‘Complying’ nor ‘Non-complying’ form of development. Therefore, this Development Application is to be

assessed as a ‘Consent use’ on its merits against the relevant provisions of the Gawler (CT) Development Plan.

5.3 Public Notification

Principle of Development Control (PDC) 38 of the Residential (Gawler East) Zone provides the following

guidance in relation to public notification:

PDC 38 Categories of public notification are prescribed in Schedule 9 of the Development Regulations 2008.

Further, all development listed within Principle of Development Control 1 of the Residential (Gawler

East) Zone, Mixed Use Policy Area 3 and/or Local Centre Policy Area 19 are designated category 2

(except where the development is classified as Category 1 or non-complying).

We note that Schedule 9 of the Development Regulations does not specifically assign a category of notification

for a Sales Centre (or an office/shop) in the Residential (Gawler East) Zone. Therefore, it is necessary to refer to

the lists of envisaged forms of development contained within PDC 1 of the Zone and PDC 1 of the Policy Area to

determine the correct category of notification. Both of these PDCs list an 'office' and a 'shop' as envisaged

forms of development. Given that the main land use elements of the Sales Centre are an 'office' and a 'shop',

the proposal constitutes a ‘Category 2’ form of development.

5.4 Agency Referrals

Pursuant to Schedule 8 of the Development Regulations, the proposed development does not trigger any

referrals to Government Agencies. However, given that SCAP is the relevant Authority, the proposal will be

referred to the Town of Gawler for comments.

6. Development Plan Assessment

6.1 Overview

The subject site is located within the Town of Gawler and, accordingly, the relevant Development Plan is the

Gawler (CT) Development Plan – consolidated 20 February 2018. More specifically, the subject site is located

within the ‘Residential (Gawler East) Zone’, and the ‘Mixed Use Centre Policy Area 3’ as identified in Figure 6.1 on

the following page.

The following section provides an assessment of the proposal against the Gawler (CT) Development Plan. For

convenience, this assessment has been grouped under a series of headings which reflect the key relevant

planning ‘themes’ from the Development Plan.

Page 21: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 17

Figure 6.1 Zoning and Policy Areas

6.2 Land Use

The Residential (Gawler East) Zone contemplates a wide range of land uses within broadly defined areas that

are illustrated at a 'high-level' on the Gawler East Structure Plan Map Ga/1 (Overlay 1) Enlargement G. The

Structure Plan identifies areas that will be developed for residential uses as well as other areas that are

intended to be developed as a 'Mixed Use Centre' and 'Neighbourhood Centres'. This desired mix of land uses is

expressed within Objective (Obj) 1 and the Desired Character of the Zone as well as Obj 1 and the Desired

Character of the Policy Area:

Zone

Obj 1 A predominately residential area comprising a range of low and medium-density dwellings, with

associated infrastructure, retail, commercial, recreational, educational and community development

in master-planned locations in accordance with Structure Plan Map Ga/1 (Overlay 1) Enlargement G.

Desired Character (extract)

---

Page 22: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 18

The zone will accommodate a diversity of housing forms. The Mixed Use Centre Policy Area 3 will comprise a

mix of residential development and a range of commercial, retail, educational, recreational and community

facilities. ---

Policy Area

Obj 1: A functional and diverse zone accommodating a mix of commercial, retail, recreation, community,

residential, office, consulting rooms and educational uses.

Desired Character (extract)

Mixed Use Centre Policy Area 3 will accommodate retail, commercial, community, education and formal

recreation facilities and clubrooms to service the local community.

---

Low impact, commercial business activities that provide employment opportunities for the local population

are envisaged. Such development will need to have particular regard to ensuring that minimal off-site

impacts occur with respect to noise, air, water and waste emissions, commercial traffic generation and

movement.

A retail facility, not exceeding 10 000 square metres in floor area, will comprise a supermarket and a range of

specialty shops to serve the weekly shopping needs of the community. Restaurants, cafes, hotels

(incorporating dining) and take away outlets are envisaged and will develop the centre as a destination point

and provide uses that extend the hours of the centres operation to promote surveillance and safety of the

adjacent recreation and education facilities.

---

In addition, specific guidance in relation to envisaged land uses is provided in PDC 1 of the Zone and PDC 1 of

the Policy Area. While a Sales Centre is not specifically listed in these PDCs, both an 'office' and a 'shop' are

listed as envisaged uses:

Zone

PDC 1 The following forms of development are envisaged in the zone:

---

Non-residential use that serves the local community, for example:

- child care facility

- health and welfare service

- open space

- primary and secondary school

- recreation area

Page 23: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 19

- shop, office or consulting room

---

Policy Area

PDC 1 The following forms of development are envisaged in the policy area:

---

Office

---

Shop

---

For the above reasons, the proposed Sales Centre (which comprises an office and a shop), is an appropriate land

use on the subject site. In terms of the strategic location of the proposed Sales Centre, Structure Plan Map Ga/1

(Overlay 1) Enlargement G (see Figure 6.2 on the following page) provides indicative, high-level direction for

development within the Springwood development. In particular, it provides indicative locations for a potential

Neighbourhood Centre (see Figure 6.2).

The proposed Sales Centre and other proposed development in the Springwood 'village centre' are located

reasonably close to the Neighbourhood Centre nominated on the Structure Plan and reflect the final alignment

of the Gawler East Link Road. For this reason and noting that the Springwood 'village centre' will be located in

the 'heart' of the Mixed Use Policy Area 3, the location of the Sales Centre is generally consistent with the

strategic direction provided by the Structure Plan.

Page 24: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 20

Figure 6.2 Gawler East Structure Plan

Page 25: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 21

6.3 Design and Appearance

The Development Plan contains a variety of provisions which seek to ensure that development is of a high

architectural standard, complements the character of the locality and minimises any visual impact on nearby

existing development. For example, the Desired Character of the Policy Area provides the following guidelines

in relation to the design and appearance of development.

Desired Character (extract)

---

In terms of urban design and built form, a ‘main street’ environment will be created, where buildings address

the street and car parks are primarily located to the rear. In order to minimise the overall extent of off street

parking shared car parking is encouraged, and the convenience, availability and function of on street parking

in mixed use environments will be recognised.

Gathering points for formal and informal community events will be established, either by means of a central

pedestrian plaza, a village green or series of nodes.

Commercial and mixed use buildings will be established close to the street frontage and incorporate verandas

and other protruding elements in order to create a pedestrian-friendly environment and outdoor dining

opportunities. These areas will be enhanced by large street trees, high quality paving, lighting and street

furniture. Building facades will be designed in a manner to create diversity of interest through the

appearance of an aggregation of smaller buildings.

The Desired Character of the Policy Area is reinforced by the following PDCs which seek to provide more specific

guidance in terms of the design and appearance of new buildings:

PDC 3 Development should be designed to ensure that:

(a) buildings are designed to address the street frontage with servicing areas located internal to the

centre and appropriately screened from public view;

(b) the establishment of shared car parking areas to the rear of buildings and on-street.

PDC 4 Public space established should be activated by uses around its edges.

PDC 5 Buildings should have a maximum of 5 storeys in height.

PDC 6 Development should not be undertaken unless it is consistent with the desired character for the policy

area.

The proposed Sales Centre directly responds to the design and appearance provisions in the following ways:

· It will assist to create a 'main street' environment through its siting close to the intersection of the

Gawler East Link Road and the proposed north-south collector road;

· The associated car park will be located to the rear of the building;

Page 26: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 22

· The car parking area will be shared with the associated display village to the south with the intention

that prospective purchasers will visit the Sales Centre first and then walk through the various homes

within the display village;

· The architecturally designed two-storey building will address the street frontages and will incorporate

"… protruding elements in order to create a pedestrian-friendly environment and outdoor dining

opportunities";

· The façade of the building and the materials used have been designed to reflect the high-profile

location of the subject site in the 'village centre' with additional visual interest created by the vertical

screening at the upper level;

· The building will assist to activate the street frontages by providing a main entry point near the

intersection, through the provision of outdoor dining along the Gawler East Link Road and through the

inclusion of high quality paving, street furniture and landscaping; and

· The proposed landscaped area to the east of the Sales Centre will further assist to provide an attractive

main street environment for the Springwood 'village centre' while also potentially providing a gathering

point for formal and informal community events.

6.4 Access and Parking

In order to address the relevant transportation and access provisions of the Development Plan, CIRQA Traffic

Consultants has been engaged to review the proposed development and provide a traffic impact assessment

(Appendix 4).

In terms of parking supply, the proposed development will provide a total of 35 onsite parking spaces at the rear

of the Sales Centre. In order to determine the likely parking demand of the Sales Centre, CIRQA has broken

down the various land use elements of the proposal and compared them against the relevant parking standards

expressed in PDC 32 of the Policy Area (see extract from CIRQA report below).

Given that 35 spaces will be provided, CIRQA considers that the proposal will provide sufficient parking to meet

the demands of the Sales Centre. In terms of the associated display village, CIRQA notes that additional parking

opportunities will be provided on the sites of the display homes as well as on the adjoining streets (noting that

this area will not be required for residential parking). For these reasons, CIRQA considers that an appropriate

level of parking will be provided to service the proposed development.

Page 27: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 23

In terms of the design of the car parks, the CIRQA report demonstrates that all spaces have been designed to

comply with AS/NZS 2890.1:2004 as summarised below:

· Parking spaces will have a length of 5.4 m;

· Regular spaces will have a width of 2.5 m;

· Aisles will be at least 5.8 m wide; and

· Spaces will be at least 300 mm clear of objects greater than 0.15m in height.

One of the spaces will be allocated for use by people with a disability. This space will be a minimum of 2.4m

wide with an adjacent 2.4m wide shared space, in accordance with the requirements of the Australian/New

Zealand Standard, Parking facilities Part 6: Off-street parking for people with disabilities (AS/NZS 2890.6:2009).

In terms of the proposed access to the subject site, CIRQA has confirmed that pedestrian sight line

requirements at the access points will be provided. Also, CIRQA advises that traffic movements associated with

the proposed Sales Centre will be easily accommodated in the surrounding road network which has been

specifically designed to accommodate the anticipated commercial development in the 'village centre'.

Based on CIRQA's assessment, the Sales Centre appropriately addresses the following key provisions of the

Development Plan in relation to transportation and access.

PDC 26 Provision for the movement of people and goods within business, centre, shopping or mixed

use zones or associated policy areas, should:

(a) not cause inconvenient and unsafe traffic and pedestrian movements;

(b) provide safe and convenient access for private cars, cyclists, pedestrians, service vehicles,

emergency vehicles and public utility vehicles;

(c) concentrate development for pedestrian convenience, and not extend unnecessarily along

road frontages; (increasing the depth of development is a more desirable alternative);

(d) separate pedestrian and vehicle movements within zones or areas, for pedestrian safety and

convenience.

(e) provide access points onto the arterial roads as shown on the relevant Structure Plans to:

minimize traffic hazards; queuing on the roads; right turn movements; and interference with

the function of intersections, junctions and traffic control devices.

(f) not cause congestion or detract from the safety of traffic on abutting roads, and minimize:

traffic hazards; queuing on public roads; and intrusion into adjacent residential areas.

(g) provide for service vehicles and the storage and removal of waste goods and materials.

(h) provide sufficient off-street parking to accommodate customer, employee and service

vehicles if there is insufficient public car parking in the locality.

Page 28: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 24

(i) consolidate and co-ordinate parking areas into convenient groups, rather than located

individually, and the access points minimized, and so located and designed that:

(i) vehicular movement between them does not require the use of public roads;

(ii) the number of access points is minimized; and

(iii) it is not necessary for vehicles to back onto public roads.

(j) locate, design and orientate car parks in such a way as to facilitate safe, direct and

convenient access of pedestrians between them and the facilities they serve, safe and

convenient traffic circulation, minimal conflict between customer and service vehicles, and

should include adequate provision for manoeuvring into and out of parking bays.

(k) provide on-site parking determined by:

(i) the amount, type and timing of movement generated by the use;

(ii) the design, location and configuration of parking spaces;

(iii) the ability of the site to accommodate the parking spaces;

(iv) the potential for shared use of parking spaces; and

(v) the effect on surrounding activities and uses.

(l) share use of car parking between developments to reduce the total extent of car parking

areas.

(m) provide for landscaping in order to screen, shade and enhance the appearance of car parking

areas.

(n) ensure that all sources of noise, including refrigeration and air conditioning equipment,

garbage collection and car parking, do not cause excessive or disturbing noise at

neighbouring properties.

PDC 340 Development should provide safe and convenient access for all anticipated modes of transport

including cycling, walking, public and community transport, and motor vehicles.

PDC 341 Development at intersections, pedestrian and cycle crossings, and crossovers to allotments should

maintain or enhance sightlines for motorists, cyclists and pedestrians to ensure safety for all road

users and pedestrians.

PDC 355 Development should be provided with safe and convenient access which:

(a) avoids unreasonable interference with the flow of traffic on adjoining roads;

(b) accommodates the type and volume of traffic likely to be generated by the development or

land use and minimises induced traffic through over-provision;

Page 29: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 25

(c) is sited and designed to minimise any adverse impacts on the occupants of and visitors to

neighbouring properties.

PDC 362 Development should be consistent with Australian Standard AS 2890 Parking facilities.

PDC 363 Vehicle parking areas should be sited and designed in a manner that will:

(a) facilitate safe and convenient pedestrian linkages to the development and areas of significant

activity or interest in the vicinity of the development;

(b) include safe pedestrian and bicycle linkages that complement the overall pedestrian and

cycling network;

(c) not inhibit safe and convenient traffic circulation;

(d) result in minimal conflict between customer and service vehicles;

(e) avoid the necessity to use public roads when moving from one part of a parking area to

another;

(f) minimise the number of vehicle access points to public roads;

(g) avoid the necessity for backing onto public roads;

(h) provide the opportunity for shared use of car parking and integration of car parking areas

with adjoining development to reduce the total extent of vehicle parking areas and the

requirement for access points;

(i) not dominate the character and appearance of a centre when viewed from public roads and

spaces;

(j) provide landscaping that will shade and enhance the appearance of the vehicle parking

areas.

PDC 367 Parking areas should be sealed or paved in order to minimise dust and mud nuisance.

PDC 368 To assist with stormwater detention and reduce heat loads in summer, vehicle parking areas

should include soft (living) landscaping.

PDC 369 Parking areas should be line-marked to indicate parking bays, movement aisles and direction of

traffic flow.

6.5 Crime Prevention

The Crime Prevention provisions in the Development Plan seek to ensure that new development prioritises

safety and security by incorporating design features which discourage crime and facilitates community

surveillance. The proposed development has responded to these provisions in the following ways:

Page 30: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 26

· Through the prominent siting of the building, at the intersection of two collector roads where clear

views into the site are available to traffic travelling along the Gawler East Link Road and the proposed

north-south collector road;

· By providing large windows which will overlook the adjoining streets and car park to maximise

opportunities for casual surveillance;

· By ensuring that landscaping selected for the development will be limited to low level plants to provide

unobstructed sightlines;

· By avoiding the construction of boundary fencing or other structures which may obstruct sightlines or

be used for concealment or entrapment spots; and

· By ensuring that the site will be illuminated in accordance with the relevant Australian Standards to

maximise opportunities for casual surveillance.

For the reasons outlined above, the development is closely aligned with the following relevant Crime Prevention

provisions of the Development Plan.

Obj 20: A safe, secure, crime resistant environment where land uses are integrated and designed to

facilitate community surveillance.

PDC 42 Development should be designed to maximise surveillance of public spaces through the

incorporation of clear lines of sight, appropriate lighting and the use of visible permeable barriers

wherever practicable.

PDC 43 Buildings should be designed to overlook public and communal streets and public open space to

allow casual surveillance.

PDC 44 Development should provide a robust environment that is resistant to vandalism and graffiti.

PDC 45 Development should provide lighting in frequently used public spaces including those:

(a) along dedicated cyclist and pedestrian pathways, laneways and access routes

(b) around public facilities such as toilets, telephones, bus stops, seating, litter bins, automatic

teller machines, taxi ranks and car parks.

PDC 46 Development, including car park facilities should incorporate signage and lighting that indicate the

entrances and pathways to, from and within sites.

PDC 47 Landscaping should be used to assist in discouraging crime by:

(a) screen planting areas susceptible to vandalism

(b) planting trees or ground covers, rather than shrubs, alongside footpaths

(c) planting vegetation other than ground covers a minimum distance of 2 metres from

footpaths to reduce concealment opportunities.

Page 31: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 27

PDC 48 Site planning, buildings, fences, landscaping and other features should clearly differentiate public,

communal and private areas.

PDC 49 Buildings should be designed to minimise and discourage access between roofs, balconies and

windows of adjoining dwellings.

PDC 51 Development should avoid pedestrian entrapment spots and movement predictors (eg routes or

paths that are predictable or unchangeable and offer no choice to pedestrians).

PDC 364 Vehicle parking areas should be designed to reduce opportunities for crime by:

(a) maximising the potential for passive surveillance by ensuring they can be overlooked from

nearby buildings and roads;

(b) incorporating walls and landscaping that do not obscure vehicles or provide potential hiding

places;

(c) being appropriately lit;

(d) having clearly visible walkways.

6.6 Stormwater and Flooding Considerations

A site specific Stormwater Management Plan for the subject site will be provided by Wallbridge Gilbert Aztec

(WGA). This plan will complement and build upon the overall Stormwater Management Plan for the entire

Springwood development which has been submitted with the concurrent land division applications. In

particular, the Stormwater Management Plan will address the relevant provisions of the Development Plan.

6.7 Signage

The proposed development includes signage at the upper level on the northern and western elevations which

reflect the intended use of the site as a Sales Centre. Additional directional signage will provided around the

site.

It is noted that the design, extent and size of the proposed signage does not visually dominate the building on

which they will be attached. Further, the proposed signage will:

· Complement the design of the building;

· Be contained within the boundaries of the site;

· Not affect existing street trees or obscure views to attractive landscaping;

· Not cause a distraction for drivers or obstruct their views of other vehicles; and

· Be limited to information relating to the proposed use of the land.

For the reasons outlined above, the nature, quantity and design of the proposed signage is closely aligned with

the following key ‘Advertisements’ provisions of the Development Plan including Table Ga/4 – Advertising and

Advertising Displays Definitions and Design Criteria:

Page 32: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 28

Figure 6.3 Extract from Table Ga/4

Obj 69: An urban environment and rural landscape not disfigured by advertisements.

Obj 70: Advertisements in retail, commercial and industrial urban areas, and centre zones, designed to

enhance the appearance of those areas.

Obj 71: Advertisements not hazardous to any person.

PDC 199 Advertising and advertising displays should, in addition to general provisions, conform with the

performance criteria in Table Ga/4.

PDC 200 The location, siting, size, shape and materials of construction, of advertisements should be:

(a) consistent with the desired character of areas or zones as described by their objectives;

(b) consistent with the predominant character of the urban or rural landscape; or

(c) in harmony with any building or site of historic significance or heritage value in the locality.

PDC 201 Advertisements should not detrimentally affect by way of their siting, size, shape, scale, glare,

reflection or colour the amenity of areas, zones, or localities, in which they are situated.

PDC 202 Advertisements should not impair the amenity of areas, zones, or localities, in which they are

situated by creating, or adding to, clutter, visual disorder and the untidiness of buildings and

spaces.

PDC 203 Advertisements should not obscure views of attractive landscapes or particular trees or groups of

trees.

Page 33: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 29

PDC 204 The scale of advertisements should be compatible with the buildings on which they are situated

and with nearby buildings and spaces.

PDC 207 Advertisements on buildings that have a single architectural theme but which contain a number of

tenancies, should be attached and displayed so as to be co-coordinated with that theme.

PDC 209 Advertisements should not create a hazard to persons travelling by any means.

PDC 210 Advertisements should not obscure a driver's view of other road vehicles, of rail vehicles at or

approaching level crossings, of pedestrians and of features of the road such as junctions, bends,

changes in width, traffic control devices and the like that are potentially hazardous.

PDC 211 Advertisements should not be so highly illuminated as to cause discomfort to an approaching

driver, or create difficulty in his perception of the road, or of persons or objects on it.

PDC 212 Advertisements should not be liable to interpretation by drivers as an official traffic sign, or convey

to drivers information that might be confused with instructions given by traffic signals or other

control devices, or impair the conspicuous nature of traffic signs or signals.

PDC 213 Advertisements should not detract drivers from the primary driving task at a location.

PDC 214 Advertisements or advertising displays should:

(a) convey in clear and concise language, symbols, print style, layout, and in a limited number of

colours, the owner/occupier and/or generic type of business, merchandise or services;

(b) be minimised in number to avoid proliferation of advertisements or advertising displays;

(c) be of a form, style, scale and size and in locations appropriate to the desired character and

future use of land or character of the locality or zone and to preserve reasonable exposure to

the public for all adjacent sites;

(d) not have an adverse impact on the amenity of adjacent land uses and areas from which they

are visible and without limiting the foregoing, no bunting, whirligigs or other like displays

should be displayed;

(e) conceal the supporting structure from view wherever possible;

(f) be completely contained within the boundaries of the subject property, and if road widening

is applicable, be within the proposed property boundary realignment;

(g) be unified in colour, style, placement and proportion to present a coordinated theme and

design for a site, centre or building; and

(h) be designed and located to avoid damage to, pruning or lopping of on-site landscaping or

street trees.

PDC 221 Advertisements or advertising displays should only identify premises or the nature of business,

goods or services conducted on the land or building.

Page 34: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 30

6.8 Landscaping

A conceptual landscaping plan has been prepared for the development and is included on the site plan

contained in Appendix 2.

The proposal includes landscaping around the perimeter of the site as well as within the car parking area. A

larger landscaped area will also be provided to the east of the Sales Centre fronting the Gawler East Link Road.

These landscaped areas will be planted with a range of species which complement the overall landscape theme

of the Springwood development. More specifically, the proposed landscaping will assist to create a sense of

place and a high-quality, coordinated development outcome.

Accordingly, the development satisfies PDC 25 of the Development Plan which seeks:

PDC 25 Development or redevelopment within business, centre, shopping or mixed use zone or associated

policy areas, should:

---

(i) be designed to be compatible with existing development through:

(i) a buffer between development in the zone and adjacent areas;

(ii) landscaping which complements adjacent development and enhances the visual

appearance and character of the zone;

(iii) pedestrian paths and spaces which are shaded, defined and protected from the wind;

and

(iv) service yards, loading areas and outdoor storage areas which are screened;

(v) foster human scale, define spaces, reinforce paths and edges, screen utility areas, and

generally enhance the visual amenity of the area.

6.9 Interface Considerations

The subject site is located within the Mixed Use Centre Policy Area 3 which clearly anticipates a neighbourhood

level centre in this area. Currently, the site and nearby land is vacant but will be developed over time to create

a master-planned community comprising residential development supported by a range of non-residential land

uses. On this basis, potential interface issues have been carefully considered during the preparation of the

Springwood masterplan and as part of the wider urban design of the whole project. In addition, by its nature,

the Sales Centre is unlikely to create any significant interface issues in terms of noise or light spillage. While the

building will be two-storeys in height, it will be located a significant distance from the proposed residential areas

to the south. For these reasons, potential issues relating to overshadowing and overlooking will be managed

appropriately. Therefore, the proposed development appropriately responds to the following relevant interface

provisions within the Development Plan:

Page 35: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 31

Zone

PDC 28 Development should be designed and sited to minimise negative impact on existing and potential

future land uses considered appropriate in the locality.

Council Wide

Obj 42: Development located and designed to minimise adverse impact and conflict between land uses.

Obj 43: Protect community health and amenity from adverse impacts of development.

PDC 107 Development should not detrimentally affect the amenity of the locality or cause unreasonable

interference through any of the following:

(a) the emission of effluent, odour, smoke, fumes, dust or other airborne pollutants;

(b) noise;

(c) vibration;

(d) electrical interference;

(e) light spill;

(f) glare;

(g) hours of operation;

(h) traffic impacts.

PDC 108 Development should be sited and designed to minimise negative impacts on existing and potential

future land uses desired in the locality.

7. Conclusion

This development application seeks approval to establish a Sales Centre incorporating an office and café with

associated car parking, signage and landscaping.

Having undertaken a comprehensive assessment of the application against the relevant provisions of the Gawler

(CT) Development Plan, we believe that the proposal represents orderly development which accords with the

relevant provisions of the Development Plan for the reasons summarised below:

· The main land use elements of the Sales Centre (office and shop) are envisaged forms of development

in the Residential (Gawler East) Zone and Mixed Use Policy Area 3;

· The general area of the subject site is indicatively identified as a Neighbourhood Centre within the

Gawler East Structure Plan Map Ga/1 (Overlay 1) Enlargement G as well as the Springwood Masterplan;

· The location and design of the proposed development will complement other proposed development

in the Springwood 'village centre' such as the supermarket on the opposite side of the Gawler East Link

Road;

Page 36: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

REF 00741-001 | 14 June 2019 32

· The Sales Centre has been designed to address both road frontages, and the building exhibits a high

degree of architectural merit achieved by using a variety of complementary colours, building materials

and articulation;

· A coordinated signage theme is proposed, with all signage designed in accordance with the relevant

provisions of the Development Plan;

· Large windows along the elevations of the Sales Centre will maximise opportunities for casual

surveillance across the site;

· The proposed development has been designed to accommodate safe and convenient movements for

vehicles, and the CIRQA report concludes that sufficient onsite parking will be provided to cater for the

anticipated parking demand;

· The additional traffic volumes to be generated by the development will not have a significant impact

on the road network;

· Stormwater will be managed appropriately in accordance with the overall stormwater management

plan for the Springwood development which has been submitted with the land division applications;

and

· The proposed landscaping will assist to create a sense of place and enhance the amenity of the locality.

Based on our assessment, the application is closely aligned within the relevant provisions of the Development

Plan and therefore warrants Development Plan Consent subject to reasonable and relevant conditions.

Page 37: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,
Page 38: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Appendix 1. Land Tenure Plan and Certificate of Title

Page 39: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

SurveyingConsultants

AlexanderSymonds

FOR CURRENT LAND TENURE & EASEMENTS

NOTE

THIS PLAN IS FOR INFORMATION PURPOSES ONLY

REFER TO DEPOSITED PLANS AND CERTIFICATES OF TITLE

500

419

418

420

421

425

426

427

428

429

430

DENHAM

STREET

403

401

402

414

415

416

417

431

432

434

408

433

435

101

102

104

105

PL

AC

E

JOHNSCHULTZ

COURT

SU

NN

YD

AL

E

AV

E

RO

AD

CALTON

ROAD

BA

LM

OR

AL

PUBLIC

RO

AD

CO

RK

R

OA

D

HD BAROSSA

SEC 345

CT 6163/873

32313029

2827262524

83

84

21

8180

23

51

52

79 78

82

22

CAMPBELL

CIRCUIT

128

127

126

125

124

123

122

136 137

132

130129

184

117 116

118

121

120

135

119

131

133

134

163164166167168169

185

186

187

188

189

190

191

162

161

160

192

170

159

158

157

SW

AN

PL

AC

E

IFO

ULD

STR

EET

TRELEAVEN

WAY

165

D

RIV

E

543

542

19

212

211

210

209

208

207

18

540

541115

17

20

197

545

193

544

L

ANE

HARTLEY W

ALK

BU

RFO

RD

RIGG

S

112

EASTON

LAND TENUREas of 20.11.2018

138139

152

151

149

148

100

99

98

TH

OR

NL

EY

C

OU

RT

TRELEAVEN

WAY

STR

EET

70

71

111

59

61

62

107

147

108

109

110

146106

145

CAMPBELL CIRCUIT

103

JA

ME

S

505

501

513

510

511

512

509

508

507

506

504503502

RO

SE

CO

UR

T

514

515

516

518

519

520

521

522

523

528529530531

HENWOOD

CO

UR

T

ED

SO

N C

T

SRINGWOOD TENURE PLAN(P)

LANE

Ele

ctric

al E

asem

et

DP 114845

CT 6205/146

Lot 9010

DP 114845

CT 6186/896

Lot 9011

FP 7765

CT 6118/249

Lot 2

FP 13468

CT 6184/173

Lot 1

FP 163062

CT 5697/87

Lot 94

DP 28814

CT 6162/334

Lot 4

DP 94700

CT 6148/558

Lot 7019

DP 119118

CT 6212/430

Lot 7030

443

444

445

446

451

450

449

452

552

453

551

440

442

441

412

499498

497

411

454

437

438

436

410

409

439

HARTLEY WALKM

ORRIS

PLACE

POO

LE

STREET

7024

RIG

GS

455

496495

456

457

458

461

462

460

459

494493492

490

489

488

487

485

484

483

491

486

482

480

481

HARTLEY W

ALKWIL

KIN

SO

N

CO

UR

T

Mc

DO

UG

AL

L

CO

UR

T

578

577

576

575

574

573

572

571

579

570

DP 89230STAGE 2A

DP 89229STAGE 1

DP 90323STAGE 1R

DP 90216

DP 90630STAGE 1A

DP 92704STAGE 2D

DP 90874STAGE 1B

DP 93494STAGE 2C

DP 93499STAGE 2C1

DP 94004STAGE 2B

DP 95328STAGE 3

DP 96322STAGE 7A

DP 111501STAGE 7B

DP 111869STAGE 7C

DP 111874STAGE 8A

DP 111875STAGE 8B

DP 114845STAGE 9

DP 119100

STAGE 9B1

DP 119108

STAGE 9B2

DP 119115

STAGE

9B3

RESERVE

PUBLIC

RO

AD

93

94

92

91

90

89

88

87

86

112

111

110109

108

107

106

105

104

103

102

101

100

99

98

97

96

95

RE

SE

RV

E

1

2

3

4

5

LU

XTO

N A

VE

NU

E

LUXTON A

VENUE

BOSLEY

WAY

BU

RF

OR

D S

TR

EE

T

1

DP 119118STAGE 1A

Page 40: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

The Registrar-General certifies that this Title Register Search displays the recordsmaintained in the Register Book and other notations at the time of searching.

Certificate of Title - Volume 6205 Folio 146

Parent Title(s) CT 6186/895

Creating Dealing(s) VE 12885392

Title Issued 26/03/2018 Edition 2 Edition Issued 06/07/2018

Estate Type

FEE SIMPLE

Registered Proprietor

FIVE AMES FARMING PTY. LTD. (ACN: 609 760 536)OF 63 GAWLER TERRACE GAWLER SOUTH SA 5118

Description of Land

ALLOTMENT 9010 DEPOSITED PLAN 114845IN THE AREA NAMED GAWLER EASTHUNDRED OF BAROSSA

Easements

SUBJECT TO EASEMENT(S) OVER THE LAND MARKED A ON D114845 TO THE MINISTER FORINFRASTRUCTURE (T 1374106)

SUBJECT TO EASEMENT(S) OVER THE LAND MARKED C ON D114845 TO TRANSMISSION LESSORCORPORATION OF 1 UNDIVIDED 2ND PART (SUBJECT TO LEASE 9061500) AND ELECTRANET PTY. LTD. OF 1UNDIVIDED 2ND PART (T 2370109)

SUBJECT TO EASEMENT(S) OVER THE LAND MARKED E ON D114845 TO ELECTRANET PTY. LTD. (TG 12371822)

SUBJECT TO EASEMENT(S) OVER THE LAND MARKED T ON D114845 (TG 9662213)

SUBJECT TO EASEMENT(S) OVER THE LAND MARKED U ON D114845 (TG 10297076)

SUBJECT TO SERVICE EASEMENT(S) OVER THE LAND MARKED H ON D114845 FOR DRAINAGE PURPOSES TOTHE COUNCIL FOR THE AREA (223LG RPA)

SUBJECT TO SERVICE EASEMENT(S) OVER THE LAND MARKED J ON F252234 FOR ELECTRICITY SUPPLYPURPOSES TO DISTRIBUTION LESSOR CORPORATION (SUBJECT TO LEASE 8890000) (223LG RPA)

SUBJECT TO SERVICE EASEMENT(S) OVER THE LAND MARKED K(T/F) ON F252234 FOR ELECTRICITY SUPPLYPURPOSES TO DISTRIBUTION LESSOR CORPORATION (SUBJECT TO LEASE 8890000) (223LG RPA)

Schedule of Dealings

Dealing Number Description

11764743 AGREEMENT UNDER DEVELOPMENT ACT 1993 PURSUANT TO SECTION 57A

12459905 AGREEMENT UNDER DEVELOPMENT ACT, 1993 PURSUANT TO SECTION 57(2)

12915311 MORTGAGE TO NATIONAL AUSTRALIA BANK LTD. (ACN: 004 044 937)

Product Register Search (CT 6205/146)

Date/Time 22/08/2018 09:41AM

Customer Reference a010816

Order ID 20180822001699

Cost $28.75

Land Services Page 1 of 2

Copyright Privacy Disclaimer: www.sailis.sa.gov.au/home/showCopyright www.sailis.sa.gov.au/home/showPrivacyStatement www.sailis.sa.gov.au/home/showDisclaimer

Page 41: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Notations

Dealings Affecting Title NIL

Priority Notices NIL

Notations on Plan NIL

Registrar-General's Notes NIL

Administrative Interests NIL

Product Register Search (CT 6205/146)

Date/Time 22/08/2018 09:41AM

Customer Reference a010816

Order ID 20180822001699

Cost $28.75

Land Services Page 2 of 2

Copyright Privacy Disclaimer: www.sailis.sa.gov.au/home/showCopyright www.sailis.sa.gov.au/home/showPrivacyStatement www.sailis.sa.gov.au/home/showDisclaimer

Page 42: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Appendix 2. Plan of Division

Page 43: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

14.00 W

IDE

14.00 WIDE

14.00 WIDE

8.00 WIDE

14.0

0 W

IDE

8.00 WIDE

14.0

0 W

IDE

14.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

12.5

0 W

IDE

20.0

0 W

IDE

12.5

0 W

IDE

20.0

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

16.00 W

IDE

14.00 WID

E

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

14

.00

WID

E

12.5

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

16.00 WIDE

14.00 WIDE

14.00 WIDE

14.0

0 W

IDE

12.5

0 W

IDE

12.50 WIDE

14.00 WIDE

12.50 WIDE

12.5

0 W

IDE

12.5

0 W

IDE

16.00 WIDE

14.00 WIDE

14.0

0 W

IDE

14.00 WIDE

14.00 WIDE

14

.00

WID

E

14

.00

WID

E

16

.00

WID

E

14.0

0 W

IDE

12.5

0 W

IDE

14.00 WIDE

14.00 WIDE

14.00 WIDE

14.00 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

12

.50

WID

E

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

20.00 WID

E 14.00 WID

E

14.00 WID

E

14.00 WID

E

12.50 WID

E

14.0

0 W

IDE

14.00 WIDE

12.50 WIDE

12

.50

WID

E

ORIGINAL SHEET SIZE A0

2041

2044

2045

2046

2048

2049

2047

6

7

36373839404142

5556

5758

6059

101

102

103

104

105

106

107

108

110

111

112

113

114

115

116

109

120

121

122123

124

125

126

127

128

129 130 131132133134135 136137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153154155156157158

159

160

161

162

163

164

165

166

167

168 169

170

171

172

173

174

175

176

177

178 179 180181

182

183

184

185

186

187

188189

190191

192

193

194

195

196

197

198

199

200

201

202

203

204205206207

208209210211212213214

215

216

219

220221 222 223 224 225 226 227 228 229

230

231

232

252

253

270

269

268

267266265264

263

262

261

260

259

258 257 256 255

254

251250249248247246

245244

243

242

241

240

239238 237 236 235

234233

306

305

304

303

302

301

300

299

298

297

296 295

281 280 279 278 277 276 275 274 273

272

271

294

293292291290289288287286285284

282

283

317

316

315

314

313

312

311

310

309

308

307

218

217

318319320321322

323 324 325 326 327 328

329

330

331

332

333334335336337338339

340

341

342

343

344345 346 347 348 349 350 351 352 353 354 355

356

357

358359360361362363364

365

366

367

368

369

370

371

372

373

374

375

376

377

378

379 380 381 382 383 384 385 386 387

388

389

391 390

392

393

394

395

396

397

398

399

400

401

402

403

404

405

406

407

408

409

410

411412413

414

415

416

417

418

419

420

421

422

423

424

425

426

427

428

429

430

431

432

433

434

435

436

437

438

439

440

441

442

443

444

445

446

447

448

449

450

451

452453

454

455

456

457

458

459460461

462

463

464

465

466

467

468

469

470

471472

473

474

475

476

477

478

479

480

481

482

483

484

485

486

487

488

489

490

491

492

493

494

495 496

507

506

505

504

503

502

501

500

499

498

497

508

509

510

511

512

513

514

515

516

517

518

519 520

521

522

523

524

525

526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

541

542

543

544

545

546

547

548

549

550

551

552

553

554

555

556

557

558

559

560

561

562

563

564

565

566

567

568

569

570

571

572

573

574

575

576

577

578

579

580

581

582

583

584

585

586

587

588

589590

591

592593

594595

596597

598

599

600

601

602

603

604

605

606

607

608

609

610

611

612

613

614

615

616

617

618

619

620

621

622

623

624

625

626

627

628

629

630

631

632

633

634

635

636

637

638

639

640

641

642

643

644

645

646

647

648

649

650

651

652

653

654

655

656

657

658

659

660

661

662

663

664

665

666

667

668669 670

671

672

673

674

675

676

677

678

679 680

681

682

683

684

685

686

687

688

689690

691

692

693

694

702

703

704

705

706

707

697

698

699

700

701

708

709

710

711

712

713

714

715

716

717

718

719

720

721

722

723

724

725

726

727

728

729

730

731

732

733

734

735

736

737

738

739

740

742

741

743

744

745

746

747

748

749

750

751

752

753

754

755

756

757

758

759

760

761

762

763

764

765

766

767

768

769

770

771

772

773

774

775776 777

782

783

784

785

786

787

788789

790 791

792 793

1012

1013

1014

1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

1026

1027

1028

1029

1030

1031

10321033

10341035

10361037

10381039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

1072

1073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1086

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100 11011102

11031104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1115

1116

11171118

1119

11201121

11221123

11241125

1126

11271128

1129

1130

1131

1132 1133 1134 1135 1136 1137 1138

1139 1140 1141

1149

1150

1151

1152

1153

1154

1155

1156

1157

1158

1159

1160

1161

1162

1163

1164

1165

1166

1167

1168

1170

1171

1172

1173

1174

1175

1176

1177

1178

1169

1179

1180

1181

1182

1183

11841185

11861187

1188

1189

1190

1191

1192

1193

1194

1195

Super Conventional (22+)

Traditional (17 - 19)Courtyard (14 - 17)

Conventional (20)

Villa (12.5)ViIla (10.5)Terrace

Other

1008

1007

1006

10051004

10031002

10011000

999

998

997

996

129

110444

47

18593164

8

Total 1180

Total 1172

979978

977976975

1009

1010

1011

119

118

117

No. of proposed allotments 1180

Total area 185.6ha

Area of Development 168.5ha

Reserve area 71.28ha

Length of new roads 19.8k

Contour interval 2m.

Datum AHD.

Vide Titles for disposition of easements.

Road pavements shown are indicative only.

**Not to be used for detailed engineering design.**

Dimensions and areas are subject to survey.

Regulated tree

Significant tree

Alexander & Symonds Pty Ltd

11 King William Street Kent Town,

South Australia 5067

PO Box 1000 Kent Town, SA 5071

ABN 93007 753 988

T (08) 8130 1666

F (08) 8362 0099

W www.alexander.com.au

E [email protected]

+ Property + Land Development +

+ Construction + Mining +

+ Spatial Information Management +

Surveying

AlexanderSymonds

Consultants

LICENSED SURVEYOR

Original Sheet Size A0© ALEXANDER & SYMONDS PTY. LTD.

REF:

DWG NO.:

REVISION:

Glenn Ian Hordacre

A010816-CG

A010816-CG PROP1 REV D

D

DEL 13.06.2019

1

2

3

4

5

89

1011

12

13

14

15

16

17

1819

20

21

22

2324

25

26

27

28

29

30

31

32

33

34

35

43

44

45

46

47

48

49

50

51

52

53

54

76

77

78

7980

8182

83

84

85

86

87

88

89

9091

92 93

94

9596

9798

99

100

778

779

780

781

794 795 796

797

798

799

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814815

816817

818819

820821

822

823

824

825

826

827

828829

830

831

832

833

834 835

836

837

838

839

840

841

842

843

844

845

846

847

848 849

850

851

852

853

854 855 856857

858 859860

861 862 863

864

865

866 867

868

869

870 871 872 873 874 875 876 877 878 879 880 881 882

883

884

885 886

887

888

889 890 891 892 893 894

895896

897898899

900

901

902

903

904

905

906

907

908

909

910

911

912913

914915

916

917918

919920

921

922

923

924

925

926

927

928

929

930

931

932

933934

935936

937938939940941942

943

944945

946

947948949950951952953954955956957958959

960

961962

963

964965966967

968969970

971972973

974

980981

982983

984985986

987988

989990

991992

993

994995

16.00 WIDE

D60894

SEC 345

VIDE

SHEET 1

VIDE

SHEET 3

VIDE

SHEET 2

JOHN SCHULTZ

RO

AD

BA

LM

OR

AL

ROAD

Dev No. 040/D010/17

CALTON ROAD

RO

AD

CH

EE

K

A

VE

NU

E

F163062

D60894

D81785

F11902

D11066

D95248

D11065

F218921

D16143

F163061

695

696

CouncilThe Barossa

Gawler

Town of

Gawler East

Kalbeeba

Development No. 490/D026/19

Town of Gawler

Development No. 960/D025/19

The Barossa Council

Proposed Plan of Division

Allotment 2 in F7765

Allotment 1 in F13468

Allotment 9010 & 9011 in D114845

Allotment 9201 in Dev No. 490/D010/17

Allotment 4 in D28814

Hundred of Barossain the area named

GAWLER EAST& KALBEEBA

CT 6186/896 CT 6205/146

CT 6118/249 CT 6162/334

CT 6184/173 PT CT 6212/430

9000

9001

9002

2050

ORIGINAL SHEET SIZE A0

SHEET 1 OF 4

Page 44: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

2.81

7.58

8.25

6.917.585.72021.99

20.26

24.93

50

.09

48

20

48

20

49

.21

22

52

.45

20

59

.19

24

12.5

313.0

3

4.11 25.06

16.0

312.5

3

28.0623.19

34.6

1

22.17

36.0

7

16.29 14 2.14 15.1517.93

35.3

3

36

36

33.07

4.38

15.2

111.4

3

13.0

6

21.078.4

36

14

36

37.17

17.0

312.1

6

37.15

20

16

7.71

36

36

36

36

36

36

36

36

18 16 16 18 18 18 18 22.37 5.39 13.17.6

9.27

7.88

8.4

16.1

5

8.6

2

19.0

6

33.3

7

4.5914.08

35.1

7

25.57

21

43.1

18

39.8

3

14.35

37.9

1

2.4924.15

14.114161614141616

14 16 16 14 14 16 16 14 14

10.726.7718181818161618

12.5

12.5

8.48

5.38

29.64

25

30

12.5

30

12.5

30

15

4.2410.08

21

8.61

10.5

21

10.5

10.5

21

10.5

10.5

10.5

8

4.2

4

18

11

21

10.510.5

21

31.96

65.

89

15.07

30

8.5

12.5

10.5

10.5

30

10.5

10.5

12.5

30

30

4.2

2

48.36

11.6

5

20.2

6

4.59

59.3

48.4

731.0

4

30.03

15.14

18.922.6728.64

8.51

142.8

85.06

4.0

3

34.0

1

8.4

1

8.85

27

4.24

4.24

32

32

32.2

1

32.2

1

75.8120

22.14

39.76

83.1

4

25.17

91.33

10

9.5

8

98.9

5

32.8

20

4.24

4.24

25.11

4.2

4

10.5

10.5

10.5

33

33

10.5

12.5

12.5

20.9

2

11.51

22.97

4.2

5

13.5

40

4.43 4.5

12.5

12.5

10.5

10.5

10.5

14.1

4.9

2

33

33

33

33

17.93

36.02

8.3

8

10.5

11.3

918.7

4

32.5

10.5 32.5

10.5

10.5

10.5

32.5

32.5

10.5

10.5

27

29.5

4.24

10.5

10.5

10.5

12.5

12.5

12.5

32.5

32.5

32.5

32.5

32.5

32.5

30

12

4.24

12

15

30

30

30

8 8 6 6 6 6 6 8

30

86666688

30

30

30

30

30

30

30

12.52

12.54

12.71

12.81

13.05

13.37

13.68

13.7

17.77

17.9

3

16.2112.5

12.512.5

12.512.5

47.7

4

39.7

4

40

12.512.5

12.5

40

43.3

6

404

0

32

12

4.24

29

15

12.5

32

12.5

22.4

3

24.17

9.33

7.1

4

12.512.5 12.5

32

32

9.71 10.5 12.512.5 10.5 10.5 12.5

32

32

32

32

32

32

30

8

27

4.24

58777785

4.24

27

8 8 7 7 7 7 8

30

30

30

30

30

30

30

30

15

15

12.5

12.5

12.5

10.7

64.

91

28.88

24.5

3

12.5

12.5

12.5

30

30

30

30

30

12.5

10.5

10.5

10.5

10.5

10.5

12.0

3

28.88

3.45

19.8

30

30

30

30

30

10.5

10.5

10.5

10.5

10.5

12.5

10.823.45

27.4

8

13.9711.18

11.0813.08

14

25.9

1

4.91

11.35

30.0

6

13.28

30.7

2

11.16

30.9

6

11.16

30.9

1

30

32

13

12.5

12.5

12.5

12.5

8.1

7

37.47

33.55

25.5

2

30

10.5

1

27.5

1

32

32

32

32

32

30

30

30

30

30

30

12.5

10.5

10.5

10.5

10.5

12.5

13

13

12.5

10.5

10.5

10.5

10.5

12.5

12.5

12.5

12.5

6

4.24

27

9 8 7 7 7 7 8 9

27

4.24

630

877778

30

30

30

30

30

30

10.8

4

10.8

1

11.1

8

38.9

35.52

24.6

5

12.5

12.5

10.5

4.2414.61

6.614.98

11.29

33.6

18.4

2

35.61 11.6

312.8

8

25.52

12.4

312.4

36.6

111.4

6

26.82

28.11

9.4

4

12.5

10.5

10.5

310.5

37.5

9

4.6

8

28.63

28.94.18

32

11.3

513.3

5

32.17

10.5

32.9

10.5

33.63

32

32

5.474.25

88

66

67

77

77

77

77

77

8.75

29

4.2

4

5.75

32

77

77

77

77

77

76

66

88

29

8.47

323

2323

2323

2323

2323

2323

2323

2323

2

9.36

32.37

24.45

20.48

18.66

73.7

8

17.82

19.2818.34

17.41

27.38

17.89

8.61

15.22

15.04

16.59

67.63

31.6

7

49.6

4

63.6

5

71.1

7

13.92 14.61 4.24

22.8

7

25.0

5

10.349.796.17

32.7

8

41.0

1

33.88

37.09

70.97

15.9

8

9.6

96.6

9

38.2

2

15.6

16.71

25.03

26.11

44.8

5

26

25

8.06

19.6

38.1

1

29.1

367.2

4

51

39.9

4.24

12.1

10.5

12.5

10.5

12.4

4.24

12.1

4.24

4.24

12.4

10.5

12.5

10.5

32

32

18.6713

4.23

29

32

16 10.21

32.2

632

32

16 14.44

32.2

6

16.4612.54

27

4.26 9.5 9.53 4.5

27.2

4

30

12.84 10.59 10.59 13.25

28.1

2

4.7

1

10.52

10.8

39.9

3

36.0

4

47.27

12.5

12.5

12

.510.5

10.5

10

.5

28.99 10.5

810.5

810.5

812.6

12.6

12.6

38.13

36.44

34.77

33.13

31.75

30.38

12.17

14

14

14.363.71

4.24

34.82

27.7

3

14.6

4

21.62

36.21

32

25.98

31.8

25.0

1

9.25

14

14.06

14.23

14.09

16.01

14

6.29

11.35

11.354.33

27.7

9

15.3

9

32

14

16

14

10.6

8

15.25

14

14

32.3

5

33.6

2

34.24

32.66

32

32

34.1

3

38.9

7

11.8

9

16

14

18

12.78

5.93

14

16

32

32

34

15.5

12.5

4.2

4

14

16

16

18

4.24

29

21

32

16

32

34

14.5

4.2

4

31

17.5

14

16

16

29

4.2

4

17

32

20

16

32

16

18

31

4.24

15

16

16

14

14

16

36

34

36

34

36

36

34

34

34

16

16

14

16

16

16

36

34

36

34

36

34

36

34

36

34

36

34

36

34

36

34

36

34

36

34

36

34

36

11.5

4.2

4

29

14.5

32

14

12.5

16

16

18

16

16

18

20

18

16

16

16

17

4.24

33

31

4.2

4

17

16

16

16

18

20

18

16

16

1816

16

1818

16

16

18

20

18

16

16

16

14

32

17

29

4.24

14

14

11.14

11.83

3.8

15.01

14.32 16.48

32

14

14

32

30

31.48

14.08

14

12.5

12.5

14

14

12.5

12.5

14

14

14.01

13.48

10.5411.54 9.71

17.744.13

18.79

3.9

2

28.4

8

8.09

28.2

5

12.5

31.5

1

12.5

30.2

4

29.55

30

9.33 25

26

14

14

14

12.5

12.5

14

14

12.5

12.5

14

14

14

14

12.5

12.5

14

14

12.5

12.5

14

14

14

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

30

24.4

9

32

18.8

5

25.19

4.3

18

16

32

16

18

32

52.8

5

10.3

39.55

20.9

6

17.77

17

29

4.24

14

32

16

32

16

13.52

30.7

8

13.82

9.48

14.01

31.1

7

14

14.02

32

14

14

14.47

14.07

22.01

1.37

30

14

30

14

29.5

5

15.0

1

33.6

5

12.3

9

12.5

14

12.5

12.5

14

14

14

14.69

35.11

14.67

30.73

14.02

12.5

12.5

30

30

30

14

30

12.5

30

27.5

1

21.2

32

11.2

6

4.2

8

16.59

13.36

14

14

14

15.09

14.184.22

14.7

4

14

1432

32

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

35

33

4.24

19

22

20.5

16

14

14

16

14

14

16

14

14

4.32

11.71

12.5

12.54

11.06

7.668.499.87

4.65

27.3

1

27.2

5

4

20.24 12.518.84

20.45

12.5

12.5

19.98

12.52

20.13

14.08

14.01

16

14

14

16

14

14

16

20.5

22

19

4.2

4

31

23.49

14

14

16

22

20.5

16

14

14

2.58

11.49

14

16

30.7

3

34.4

2

33.6

2

33.3

5

12.5

12.5

32.6

4

22

16

16.2

9

4.11 33.07

17

36

16

36.0

7

17.03 16.04 4.38

33.0

7

36.0

7

14.00 W

IDE

14.00 WIDE

14.00 WIDE

8.00 WIDE

14.0

0 W

IDE

8.00 WIDE

14.0

0 W

IDE

14.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

8.00 WIDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

12.5

0 W

IDE

20.0

0 W

IDE

12.5

0 W

IDE

8.3

8

10.12

6.77

22.2

21.59

16.16

16.42

16.58

16.33

18.17

18.02

44.7

3

17

46.4

3

20.43

48.5

8

18.38

51.1

4

23.18

53.8

7

25.56

55.2

8

25.35

54.7

5

21.47

51.2

9

22.58

43.3

2

13.3

7.44

8.03

20.0

0 W

IDE

14.00 WIDE

14.00 WIDE

12.50 WIDE

14.00 WIDE

14.00 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WID

E

14.00 WID

E

12.50 WID

E

14.0

0 W

IDE

6.49

7.1

7

67

76

66

6

7.22

4.2

8

5.81

6.01

6.01

6.01

6.01

7.01

7.02

6.02

24.2

6

85.09

9.5

316.2

78.01

33.6

65.03

19.3

12.4

18.0

620.1

713.9

4

7.0

57.

69

11.4

6

8.9

15.71

13.84

40.5

9

20

11.7

68.3

7

59.29

56.48

35.2

5

16.99

16

16

16

26.55

3.3

34.0

3

14.87

16

34

34

34

34

16

16

26.27

14.53

24.38

35.4

34

34

38.6

34.0

35.0

1

20.92

18

34

18

37.7

3

6.99

35.5

6

15

36.4

1

17.84

18

18

18

26.81

11.86

35.2

18.01

35.8

6

18

36.2

7

18

34.91

40.7

3

18

26.54

16.86

18.01

18.02

34.3

8

12.98

32

25.56

32

21.43

29.9

1

4.7

1

10.73

14

14

32

24.75

34.3

8

32

14

32

14

29.9

1

9.66

14

14

32

8.7

5.74.25

29

77

77

77

77

77

76

66

88

8.52

29

4.2

45.528

86

66

77

77

77

77

77

7

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

8.52

24.5

8

4.35

.49

27.7

2

66

6.01 6.01 6.02 6.03 6.036.04 4.734.63

10.9

6.9

111.5

2

9.68

31.3

3

6

30.6

6

29.9

8

6

29.4

1

6

28.9

3

6

28.5

2

6

28.1

7

6

27.9

3

6

12.554.3

310.1

4

10.7

1

4.8

5.08

28.4

8

7

7

7

7

7

7

7

70 7.414.28

.41

7.6

47.6

4

7.09

27.0

2

7.01

7

7

7

7

7

7

7.01

28.5

5

28.5

5

28.4

6

28.3

3

28.1

9

27.8

9

27.5

31.0

6

12.45

9.7

9

9.7

9

8.6

7

4.5

56.617

6.996.98

76.99

77

78.45

3.82

20.2

8.9

5

8.22

6.55

6.55

6.54

6.54

7.05

6.04

6.55

6.55

8.6

4

20.4

4.0

56.89

32

9.96

7.01 7.01 7.01 7.02 7.02 7.03 7.0414.01

3.59

30.7

2

8.15

32.1

1

6.576.57

6.576.56

6.556.55

6.55

32

32

32

32

32

32

40.3

2

39.7

7

8.89

4.26

14.00 WIDE

12.50 WIDE

12.5

0 W

IDE

2041

2044

2045

1.144 ha

2046

2048

2049

2500m²

2047

523m²

101

41.2

0

102

442m²

103

347m²

104

347m²

105

347m²

106

413m²

107

413m²

108

648m²

110

111

464m²112

113

341m²114

341m²115

341m²116

727m²

109

375m²120

375m²121

446m²122483m²123

341m²124

341m²125

341m²126

406m²127

406m²128

240

129 130

180

131132133134135 136137

1563m²

153

970m²

154

960m²

155

1065m²

156

1013m²

157

1333m²

158

159

628m²

268558m²

267

539m²

266

504m²

265

545m²

264

444m²263

351m²262

613m²

296

681m²

295

504m²

281

576m²

280

576m²

279

504m²

278

504m²

277

576m²

276

576m²

275

505m²

274

518m²

273

739m²

272

745m²

271

947m²

294

930m²

293734m²

292

648m²

291

648m²

290

648m²

289

648m²

288

576m²

287

576m²

286

648m²

285920m²

284

730m²

282

1039m²

283

649m²

317

576m²316512m²

549

512m²

550

668m²

551

518m²

552

553 576m²

559504m²

560576m²

561576m²

562

635m²

563

512m²

564

608m²

565

544m²

566

544m²

567

476m²

568

476m²

569

544m²

570

579m²

571

766m²

572

766m²

573

770m²

574

716m²

575

560m²

576

490m²

577490m²

578

560m²

579

490m²

580490m²

581

560m²

582

488m²

583475m²

584

544m²

585413m²

586

587

588

589590

591

592593

594595

596597

598

634m²

599

489m²

600

490m²

601

560m²

602

490m²

603

490m²

604

560m²

605

490m²

606

490m²

607

560m²

608

717m²

609

770m²

610

675m²

611

544m²

612

544m²

613

544m²

614

612m²

615

680m²

616

612m²

617

544m²

618

544m²

619

612m²

620

544m²

621448m²

460m²

627

576m²

628

576m²

629

648m²

630

576m²

631

576m²

632

648m²

633

720m²

634

648m²

635

576m²

636

576m²

637

576m²

638

716m²

639

431m²

640

531m²

641

420m²

642

420m²

643

420m²

644

375m²

645

375m²

646

420m²

647

420m²

648

375m²

649

375m²

650

420m²

651

420m²

652

540m²

653

448m²

654448m²

655

661m²

656 428m²

657 420m²

658 375m²

659 375m²

660 420m²

661 420m²

662 375m²

663 375m²

664 420m²

665 420m²

666 419m²

667

495m²

668525m²

669

524m²

670

1061m²

671

521m²

672 460m²

673 425m²

674375m²

675 375m²

676420m²

677375m²

678

599m²

679

525m²

680

448m²681

448m²682

523m²683

635m²

684

420m²

685

420m²

686

565m²

687

430m²

688

583m²

689

512m²

690

540m²

691

512m²692

576m²

693

703m²

694

941m²

725

601m²

726

448m²

727512m²

728

736m²

729

745m²

730

448m²

731

516m²

732

467m²

733

691m²

734

461m²

735

449m²

736

608m²

737

738

751m²

743

544m²

744544m²

745544m²

746

740m²

747

666m²

748

612m²

749

612m²

750

1059m²

751

673m²

752

640m²

753650m²

754654m²

755

723m²

756

2019m²

757

1810m²

758

1229m²

759

1158m²

760

1855m²

761

860m²

762

721m²

763

695m²

764

904m²

765

617m²

766448m²

767 448m²

768558m²

769

428m²

770

448m²

771

448m²

772

591m²

773

586m²

774

429m²

775

399m²

776

437m²

777

466m²782

445m²783

424m²784

341m²785

326m²786

312m²787

430m²

788

371m²

789

508m²

790

530m²

791

512m²

792

394m²

793

401m²

1012

218m

²

1013

218m

²

1014

217m

²

1015

217m

²

1016

217m

²

1017

217m

²

1018

216m

²

1019

299m

²

1020

322m

²

1021

215m

²

1022

214m

²

1023

213m

²

1024

213m

²

1025

220m

²

1026

204m

²

1027

211m

²

1028

211m

²

1029

316m

²

1030

248m²

1031

191m²

1032

194m²

1033

196m²

1034

198m²

1035

199m²

1036

200m²

1037

200m²

1038

199m²

1039

274m²

1040

305m

²

1041

186m

²

1042

182m

²

1043

178m

²

1044

175m

²

1045

172m

²

1046

170m

²

1047

168m

²

1048

167m

²

1049

231m

²

1050

274m

²

1051

224m

²

1052

224m

²

1053

224m

²

1054

224m

²

1055

224m

²

1056

224m

²

1057

224m

²

1058

224m

²

1059

224m

²

1060

224m

²

1061

224m

²

1062

192m

²

1063

192m

²

1064

192m

²

1065

256m

²

1066

256m

²

1067

268m

²

1068

266m

²

1069

256m

²

1070

256m

²

1071

192m

²

1072

192m

²

1073

192m

²

1074

224m

²

1075

224m

²

1076

224m

²

1077

224m

²

1078

224m

²

1079

224m

²

1080

224m

²

1081

224m

²

1082

224m

²

1083

224m

²

1084

224m

²

1085

275m

²

1086

381m²

1087

400m²

1088

336m²

1089

349m²

1090

342m²

1091

380m²

1092

449m²

1093

365m²

1094

409m²

1095

438m²

1096

341m²1097

325m²1098

300m²1099

937m²

11001071m²

1101

1366m²

1102

1859m²

11032023m²

1104

1040m²

11051131m²

1106

2220m²

1107

1359m²

1108

1047m²

1109

1363m²

1110

1022m²

1111

1043m²

1112

1137m²

1113

1147m²

1114

1147m²

1115

1041m²

1116

860m²

1117

913m²

1118

798m²

1119

538m²

1120

529m²

1121

511m²

1122

580m²

1123

539m²

1124

486m²

1125

421m²

1126

350m²

1127350m²

1128

469m²

1129

400m²1130

476m²1131

311m²

1132

336m²

1133

400m²

1134

400m²

1135

336m²

1136

336m²

1137

400m²

1138

499m²

1139

500m²

1140

500m²

1141

236m

²1149

240m

²1150

210m

²1151

210m

²1152

210m

²1153

210m

²1154

240m

²1155

236m

²1156

265m

²1157

240m

²1158

210m

²1159

210m

²1160

210m

²1161

210m

²1162

240m

²1163

266m

²1164

416m²1165

400m²1166

400m²1167

400m²1168

583m²

1170

547m²

1171

375m²1172

315m²1173

315m²1174

315m²1175

315m²1176

375m²1177

390m²1178

400m²1169

451m²1179

375m²1180

375m²1181

375m²1182

570m²

1183

395m²

1184

325m²

1185

324m²

1186

380m²

1187

394m²

1188

518m²1189

315m²1190

315m²1191

315m²1192

315m²1193

315m²1194

376m²1195

375m²

1008

375m²

1007

458m²

1006

263m²

1005220m²

1004221m²

1003221m²

1002221m²

1001227m²

1000

540m²

999

375m²

998315m²

997315m²

996

12.5

4.2

4

13.7

2 12.5

30

10.5

10.51

10.52

10.54

8.7610.5

10.510.5

10.5

375m²

297m²

979

301m²

978

307m²

977

316m²

976975

30.5

1

29.6

4

28.9

5

28.4

5

1009

12.5

30

10.44

10.5

30

10.4521.91

10.5

315m²

517m²

1010

1011

32

.46

21.2

8

15.89

1897m²

36

48.8

3

40.63

57.9

3

37.15

26.3

4.03

21.05

31.5

2

14.54

15.01

32

15

10.5

32

10.5

10.5

12.5

17.9

4.2

4

17

13.3

7 15

32

10.5

32

12.5

33.43

26.9

2

12.1

7

12.5

34.55

8

18.5

7

34.19

24.7

4

9.61

10.7

6.9

24.6

31.49

5.4

3.5

8

352m²

483m²

30

10.5

10.5

10.5

315m²

315m²

315m²

15.56

3.3

5

28.8

8

8.13

119

118

117

7

32

7

6667

32

7 6 6 6

32

7 6 6 6 7

32

76667

32

10.5

8.5

8.5

8.5

8.5

10.5

10.5

8.5

8.5

8.5

11.3

832

12.9

612.5

8.5

8.5

10.5

10.5

8.5

8.5

8.5

8.5

10.5

32

17151512.512.510.5

12

32

15

10.5

10.5

15

10

29

13

15 10.5 12.5 12.5

20.7

32

24.415

15 10.5 12.5 12.5 12.5 12.5 15 15 15 1815 18

15.4

15.1

12.5 12.512.515 15 1810.5

12.5 12.5 1510.5

15

13.5

32

13.5

32

32

29

4.24

12

12.5

32

12.5

12.5

32

12.5

10.5

10.5

15

32

12

4.2429

12.5

32

12.5

12.5

32

12.5

10.5

13.5

32

13.5

10.5

32

18.4

7

44.39

18.6

2

18

42.02

18.1

6

15

40.04

15.1

3

15

15.1

2

375m²

76

375m²

77

768m²

78

525m²

79

525m²

80

672m²

81510m²

82375m²

83375m²

84375m²

85611m²

86

622m²

87

571m²88

403m²

89

420m²

90

517m²

91

613m²

92735m²

93

94

9596

9798

99

100

30

12.5

12.5

30

12.5

12.5

5.46

12.4

8

12.48

3.57

35

12.5

15

15

4.4911.0611.06

31.1

2

13.2

35

15

35

15

21.47

30

12.5

12.5

30

12.5

12.5

30

12.5

12.5

12.58

16.12

31.34

11.65

30

12.5

11.8

6

13.4

12.3

35 9.4

3

20.4

1

3.319.48

9.77

15.1

10.5 1

9.9

3

18.38

25.1

5

20.09

15.08

31.0

1

16.74

15 15.0412.92

38.7

8

24.48

88.06

16.74

38.1

9

40.9

5

579m²

478m²

336m²

336m²

400m²

629m²

586m²

628m²

517m²376m²

375m²

449m²

490m²

374m²

531m²

546m²

482m²475m²

379m²491m²

30.9

5

5.28

14.26

30

12.5

30.5

6

13.457.26

30

3.13 12.9523.34

29.7

9

13.97 12.5

30

13.73

29.9

6

12.68

30

12.5

30.5

8

12.52

12.83

849m²

778

782m²

779

618m²780

587m²781

461m²

794

375m²

795

315m²

796

530m²797

499m²798

467m²799

436m²800

404m²801

368m²

802

588m²

803

447m²

804

337m²

805

338m²

806

338m²

807

600m²

808

360m²809

286m²810

343m²811

345m²812

389m²813

370m²

814195

815225

816

222

817188

818

186

819184

820

183

821

274m²

822

399m²823

360m²824

352m²825

289m²826

358m²827

494m²

828450m²

829

347m²

830

340m²

831

334m²

832

394m²

833

450m²

834

446m²

835

446m²836

450m²837

450m²838

450m²839

450m²840

450m²841

450m²842

446m²843

476m²844

400m²845

400m²846

336m²847

432m²848 432m²849

336m²850

400m²851

400m²852

476m²853336m²

854

400m²

855

400m²

856

480m²

857

480m²

858

480m²

859

576m²

860

400m²

861

400m²

862

400m²

863

400m²864

336m²865

479m²866479m²

867

336m²868

400m²869

480m²

870

576m²

871

480m²

872

336m²

873

336m²

874

400m²

875

400m²

876

400m²

877

400m²

878

480m²

879

480m²

880

480m²

881

576m²

882

336m²883

336m²884

476m²885 475m²886

336m²887

336m²888

336m²

889

400m²

890

400m²

891

480m²

892

480m²

893

603m²

894

245

895896

897898

222

899

364m²900

272m²901

272m²902

272m²903

336m²904

336m²905

272m²906

272m²907

272m²908

272m²909

336m²910

911

912913

914915

916

917918

192

919

224

920

336m²921

272m²922

272m²923

272m²924

272m²925

336m²926

336m²927

272m²928

272m²929

400m²930

415m²931

227

932

198

933

202

934

206

935

241

936

722m²

937

480m²

938

400m²

939

400m²

940

336m²

941

480m²

942

480m²943

412m²944412m²945

480m²946576m²

947

480m²

948

480m²

949

480m²

950

400m²

951

400m²

952

400m²

953

400m²

954

336m²

955

336m²

956

480m²

957

576m²

958

480m²

959

336m²960

488m²961488m²962

336m²963400m²

964

400m²

965

400m²

966

576m²

967

480m²

968

480m²

969

480m²

970

400m²

971

400m²

972

336m²

973

974224m²

980

224m²

981

982983

984

224m²

985224m²

986

987988

989

154

990

294m²

991992

993

154

994

224

995

4795m²

1625m²

4000m²

1.007 ha

9.836.56

6.27.9

8

4.086.6

7

9.4

19.3

2

5.27

71.38

4.44

32.7

5

39.8

7

25

15.4

8

76.41

20.8

713.0

87.9

9

10.4

7

5.82

9.35

50.87

478m²545m²

28.1

4

12.89

30.6

8

9.36

18.02

29.9

2

18

m² m² m²m²

154 154

154m²

154m²

154m²

154m²

154m² 154

28

8 5.5 5.5 5.5 5.25 7.655.5 5.5

5.5 5.58

85.5 5.5

5.58

8

28

282

8282

8282

8

282

8282

828

28

28

28

28

88

5.55.5

5.58

85.5

5.55.5

5.58.1

5.55.55.58

36

36

36

36

36

36.2

7

29.9

4

22.3

3

9.55

7.98

27.0

3

m²m²

m²m²

m²m²

29.9

29.9

13.6

2

12.5

12.5

10.5

10.5

3

4.5

2

23.46

23.46

4.42

10.5

510.5

412.5

5

12.5

5

13.5

5

27.72

29.15

27.51

28.47

27.3

27.7827.12

27.2

13.5

110.5

12.5

112.5

113.5

115.7

911.1

4

4.0

6

12.17

15

16.663.95

33.2

7

14.9315.14

15.76

31.9

1

33.9

4

23.33

22.5

15

15

15

21.4

6

22.72

18.3

115

15

15

22.522.88

15.0

1

22.522.43

22.522.61

24.93

15

3.7

4

11.3

15.0

1

15

30

12 4.24

27

1517.65

27.2

9

3.94 18.85

30

15

12

4.242720.81

4.53

12.1

5

25.91 30

15.1

5

3028.01

15.1

515.1

515.1

515.1

5

36.42

10.512.513.42

27.2

9

3.94 14.62

30

12.5

30

10.5

30

15

30

15

30

30

15

27 4.24

12

15

3034.32

15

3032.21

15

3030.11

15

15

15

15

15

15

15

15

1512.512.510.53

23

2

32

32

32

32

32

32

29

15.1

32

10.5

12.5

10.5

15.4

29

32

32

32

32

32

32

12.512.512.5181515

32

32

32

32

32

32

32

32

32

32

32

32

32

29

32

32

32

29

32

32

15 10.5 12.5 12.5 12.5 12.5 15 15 15 1818 10.515

32

323

23

2

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

1815151512.512.512.512.510.510.515181529

15

32

12

10.5

32

10.5

10.5

15

13

29

10

15

10.5

32

32

32

32

32

15

10.5

10.5

10.5 12.5 12.5 15 15

12.512.510.515

32

32

32

32

32

32

32

32

32

m² m² m² m² m²

76667

32

7.04 6.03 6.03 6.03

4.04

4.01

32.4

4

34.6

9

32.7

5

33.4

34.0

4

32

32

32

32

32

32

32

32

32

32

10.5

8.5

8.5

8.5

8.5

10.5

10.5

8.5

8.5

12.5

12.9

6

32

32

32

32

m² m²192

m²192

m²224

192224

m² m²192m²

192m²

224

32

32

32

32

11.3

88.5

8.5

8.5

10.5

10.5

8.5

8.5

8.5

8.5

10.5

32

32

32

32

32

32

32

32

32

32

32

35.4

4

76667

29

4.46

4.04

6.03 6.03 6.03 7.04

34.6

9

34.0

4

33.4

32.7

5

m²198 202 206m² m² m² m²

41.6

9

42.7

4

9.71 10.5 12.512.5 10.5 10.5

25.2

3

30.8

5

36.4

2

41.1

6

44.9

2

401m²

m²240

m² 240

m²180

m²180

m²180

m²180

2.309 ha

1400m²

16.00 WIDE

9000

2.047 ha

9001

9002

1.521 ha

12.02 ha

35.8

21.99

31.1

4

12.6

2

10.31

5.46.01

8.7611.18

39.6

540.1

2050

44.53

44.24

50.29

10.7

8

43.5

4

19.07

2450m²

34.1

9

39.2

9

11.0

8

50.3

7

56.3

5

ORIGINAL SHEET SIZE A0ORIGINAL SHEET SIZE A0

Dimensions and areas are subject to survey.

Alexander & Symonds Pty Ltd

11 King William Street Kent Town,

South Australia 5067

PO Box 1000 Kent Town, SA 5071

ABN 93007 753 988

T (08) 8130 1666

F (08) 8362 0099

W www.alexander.com.au

E [email protected]

+ Property + Land Development +

+ Construction + Mining +

+ Spatial Information Management +

Surveying

AlexanderSymonds

Consultants

LICENSED SURVEYOR

Original Sheet Size A0© ALEXANDER & SYMONDS PTY. LTD.

REF:

DWG NO.:

REVISION:

Glenn Ian Hordacre

A010816-CG

A010816-CG PROP1 REV D

D

DEL 13.06.2019

SHEET 2 OF 4

No. of proposed allotments 1180

Total area 185.6ha

Area of Development 168.5ha

Reserve area 71.28ha

Length of new roads 19.8k

Contour interval 2m.

Datum AHD.

Vide Titles for disposition of easements.

Road pavements shown are indicative only.

**Not to be used for detailed engineering design.**

Dimensions and areas are subject to survey.

Development No. 490/D026/19

Town of Gawler

Development No. 960/D025/19

The Barossa Council

Proposed Plan of Division

Allotment 2 in F7765

Allotment 1 in F13468

Allotment 9010 & 9011 in D114845

Allotment 9201 in Dev No. 490/D010/17

Allotment 4 in D28814

Hundred of Barossain the area named

GAWLER EAST& KALBEEBA

CT 6186/896 CT 6205/146

CT 6118/249 CT 6162/334

CT 6184/173 PT CT 6212/430

Regulated tree

Significant tree

Page 45: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

40.73

16.6

7

19

33

4.24

16

36

35.7

1

19

34

19

4.2

4

5.41

12.512.512.512.5

32

22.9

59.1

9

12.5

14

14.0

3

13.0

7

4.6

1

23.68

29.01

29.93

12.5

312.5

313.0

3

4.11 25.06

16.0

312.5

312.5

3

28.06

28.06

28.06

17.02

36.6

4

16.42

34

23.19

14.28

34.6

1

22.17

6.737.7712.811414

36.0

7

16.29 14 2.14 15.1517.93

35.3

3

36

36

33.07

4.38

15.2

1

14

36

17.0

312.1

6

37.15

20

16

7.71

36

8.6

2

19.0

6

33.3

7

4.5914.08

35.1

7

25.57

21

18

14.35

37

.91

2.4924.15

14.114161614141616

14 16 16 14 14 16 16 14 14

10.726.7718181818161618

18.64

35

.92

17.96

31.9

7

3.53

15.72

35.9

5

15.73

15.71

15.22

4.83

30.4

17.745.65

9.64

34.8

4

37.06

6.27

23.4

12

28

21.5

6

16

28.57

33.1

8

14

24.4

25.4

9

7.43

30.08

12.2

7

28

16

26.42

16.1

4

14.5

8

26.6

4

15.4

217.9

4

1.2

4

13.08

17

25

4.24

14

8.6

55.5

6

14.74

33

.4

17.74

30

.4

3.58

18.97

15.4

35.6518.94

17.82

15.5

35.4

3

35.6

5

14.74

17.73

15.94

5.0

9

32

.65

13.2

32

28.9

1

16

14

34.82

27.7

31

6

32

14

32

26.2

2

14

32

14

30

36.48

4.1

712.1

8

14.6

4

21.62

36.21

14.9

1

32

25.98

31.8

25.0

1

9.25

14

14.06

14.23

14.09

16.01

14

15.3

9

32

14

16

14

10.6

8

15.25

14

14

32.3

5

33.6

2

34.24

32.66

32

32

34.1

3

38.9

7

11.8

9

16

14

18

12.78

5.93

14

16

32

32

36

20

33

4.24

17

16

14

12.5

16

16

14

4.2

4

33

17

36

25

16 25.02

16

32

16

15

4.24

29

14

14

22

4.2

4

34

14

14

16

16

12.5

14

16

36

36

36

36

34

34

34

34

32

18

16

18

14

14

12.5

12.5

22

16

25

13

4.24

12.5

12.5

14

15

22

4.2

4

12

14

12.5

12.5

25

25

25

34

36

14

12.5

12.5

15.5

36

34

15.5

12.5

12.5

14

15.25

12.5

12.5

14

36

34

36

34

36

34

32

17

29

4.2

4

14

16

16

18

4.24

29

21

32

16

16

32

14.5

36

34

14.5

4.2

4

31

33

4.24

17.5

16

14

16

16

29

4.2

4

17

32

20

16

32

16

18

16

16

14

14

16

36

34

36

34

36

36

34

34

34

16

16

14

16

16

16

29

4.24

12

32

15

34

36

34

36

34

36

34

36

34

36

34

36

34

36

34

34

14

12.5

14

11.5

4.2

4

29

14.5

32

14

12.5

14

32

32

16

16

18

16

16

16

16

18

20

18

16

16

18

16

16

16

16

1818

16

16

18

20

18

14

32

17

29

4.24

14

14

11.14

11.83

3.8

15.01

14.32 16.48

32

14

14

32

30

31.48

14.08

14

12.5

12.5

14

14

14

14

12.5

30

30

30

30

30

35

35

35

33

4.24

19

22

20.5

16 19

4.2

4

31

22

22

40

32.4

7

11.46

12.75

12.5

14

12

4.24

29

29

4.2

4

12

14

14

14

16.4

8

5.53

9.93

9.67

10

16

36.2

2

13.42

32

34.4

8

5.68

32.29

15.5

7.7314

32

14

14

15

32

32

32

32

17.4

7.74.95

15.2

5

28.5

16.8

6

16

16

15.7

5

4.95

11.9513.59

23.8

1

28.5

16

28.5

16

36.1

1

36.5

6

14

16

14

14

12

4.24

4.2

4

12

14

14

16

14

14

14

9.05

9.87

10.26

15.03

29

29

32

32

32

32

32

32

32

32

32

32

32

32

8.61

14

14

14

16

14

14

15

28

67.2

8

20

18.32

16.92

14

24.0

4

16

20.9

616

16

18

16

16

16.2

9

4.11 33.07

17

36

16

16

18

16

16

3.7

314.2

816

10.6

67.4

8

36.54

36.67

36.77

36

36

36

36

3619.0417.03

36.0

7

17.03 16.04 4.38

33.0

7

36.0

7

36.07

14

36

16.2

9

12.5

12.5

14

12.5

14.0

112.5

12.5

5

35.53

7.9

910.3

9

35.4

12.5

35.18

14

35.79

4.0

511.3

7

36

14

12.5

12.5

36

36

20.48

14141416

38.4

3

36.7

9

5.59 9.19 18 16 16 19.41

4.01

35.2

2

18.36

38

16

38

16

38

18

38

29.53

16.32

16 14 14 14 19.41

32.61

15.0

917.1

29.61

4.01

14.1

15.0

9

32.61

32

18.41

29.1

8

4.461212.512.51412.512.5141612.512.514

18

18

25

25

25

18

18

18

21

4.24

22

4.2

4

32

14 14 12.5 12.5 14 19.41

16

32

14

32

12.5

32

12.5

32

14

32

14

14 12.5 12.5 16 14 12.5 12.5 14 12.5 12.5

32

32

32

32

32

32

32

32

32

54.1

3

24.17

37.9

1

39.1

3

33.04

25

16.03

32

16

14

32

32

32

32

32

32

12

4.24

29

15

12.5

12.5

14

14

14

14

14

14

12.5

12.5

58.29

45.5

8

16.69

70.3

6

20

37.2

1

21.68

22

25.3

5

4.55 7.78 14.33

74.25

65.63

7.5

7.0

7

9.95

53.0

5

57

3.52

7.5

19.9

5

38.2

53.5

5

14.5

24.0824.02

70.1

24.32

22.62

7.7

8

67.2

1

37.2

829.3

24.

57

18.52

32.2

5

21.53

19.11

33.8

3.34

15.38

20.09

21.42

21.96

9.737.87

12.22 5.87 18.5 4.24

24.0

5

22.42

18.77

18.49

9.53

10.85

20.03

20.03

33.9

4

36.7

6

39.3

3

37.2

3 33.4

28.0

65.3

25.32

39.9

1

24.5

30.02

46.6

10.4

16.68

28.43

46.5

5

26.92

44.3

3

27.82

25.93

41.8

9

11.28

15.58

22.333.99

25.63

40.5

4

21

37.0

6

4.3318

20.07

40.9

3

9.14 11.01

29.78

4.1

30.0

8

6.9

9 20.15 32.01

17.8

7

32

18.7

3

32

32

32

32

32

32

18

18

16

18

16

16

18

33.16

26.7

116

16

18

16

18

18

11.3

2

8.2

9

27.69

24.6

1

29.29

18.1

6

30.06

18

16.1

4

32.22

16

16.1

4

34.37

16

16.1

4

36.53

16

18.1

6

38.95

18

18.1

6

42.88

29.2

6

40

29.05

37.3

5

4.5

1

20.74

22

32.88

3.64

38.4

5

25

22

40

26.74

40.9

2

20.19

37

4.23

5.77

13.12

12.24

38.71

14.1134.3

11.3

8

32 13.1

17.9

8.3

4

12.5

4

10.2

6

12.7

4

40

18

18

18

20

18

18

18

4.3

37.07

23.3

8

40

40

40

40

40

32

20

24.344.88

3.95

20.7

520

18

16

16

16

16

32

32

32

32

32

18

18

20

18

18

16

16

16

16

18

20

36

15.97

18.713.85

16

16

16

16

16

16

16

16

22

22

4.24 33

3632

29 4.24

20

16

16

16

14

14

14

16

16

14

5.3

15.96

18.18

3236

36

36

36

36

36

36

36

36

22 25

22

22

16

16

16

16

16

16

16

16

15.3

5

23.2

1

33.3

5

11.6

1

32

32

32

32

32

32

32

32

32

23

20

28.5

17

25.5

4.24 14 16 16 14.5 4.24

25.5

17.51616

28.5

28.5

14

14

14

14

14

14

16

12.5

32 34.5

16

16

16

16

14

14

14

16

17.5

4.2424.377.14

11.17

10.02

10.632.83

32

20.9

34.5

32

32

32

32

32

32

32

32

32

12.5

27.6

9 17.9

16

34.5

34.5

34.5

34.5

34.5

34.5

34.5

12.5

16

12.5

14

14

14

14

14

14

14

14

14

16

16

16

16

28.01

17

31

14

4.24

16

16

31

31

14

17

28 4.2414

18.5161616141414149.1410.28

10.28

3.73

35.5

5

18.5

32

32

32

32

32

32

32

32

14

4.2

4

32.5

5

17

4.8514 14 14 14 16 16 16

32

32

15161612.5141422.9312.07

35.6

6

4.72 10.5910.14

14.05 14 12.5 16 16 15

38.2

7

33.2

8

32

32

32

32

32

17.1

8

43.2

36.1

8

27.0

1

4.24

23.88

12.66

44.72

22.4

3

15.02

15.02

17.3

6

21.71

20.38

33.22

32.9

1

41.3

5

18.73

15

7.07

10

19.61

12.76

10.2111.868.78

7.07

16

16

14

14

14

15

36

4.2

4

12

14

14

14

16

16

39

39

39

39

39

39

44.3

6 39

20

23

23

39

20

20.0

0 W

IDE

14.0

0 W

IDE

12.5

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

16.00 WIDE

14.00 WIDE

14.00 WIDE

14.0

0 W

IDE

12.5

0 W

IDE

14.00 WIDE

12.50 WIDE

12.5

0 W

IDE

12.5

0 W

IDE

16.00 WIDE

14.00 WIDE

14.0

0 W

IDE

14.00 WIDE

14.00 WIDE

14.0

0 W

IDE

14.0

0 W

IDE

16.0

0 W

IDE

14.0

0 W

IDE

12.5

0 W

IDE

14.00 WIDE

14.00 WIDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

12.5

0 W

IDE

14.0

0 W

IDE

20.00 WID

E 14.00 WID

E

14.00 WID

E

11.38 ha

159

440m²160

161

162

201

202

203

204205206207

208209210211212213214

215

646m²

216

219

220221 222 223 224 225 226 227 228 229

230

231

232

252

253

270

701m²

269

628m²

268558m²

267

539m²

266

504m²

265

545m²

264

444m²263

351m²262

351m²261

260

259

258 257 256 255

254

251250249248247246

245244

243

242

241

240

239238 237 236 235

234233

306

305

552m²

304

440m²

303

496m²

302

502m²

301

504m²

300

450m²299

450m²298

545m²297

613m²

296

681m²

295

504m²

281

576m²

280

576m²

279

504m²

278

504m²

277

576m²

276

576m²

275

505m²

274

518m²

273

739m²

272

745m²

271

947m²

730m²

282

1039m²

283

649m²

317

576m²316

576m²315

648m²314

576m²313

576m²312

708m²

311

589m²310

766m²

309

308

307

679m²

218

943m²

217

770m²

318

608m²

319

608m²

320

684m²

321

1113m²

322

323 324 325 326 327 328

329

330

550m²

331

489m²

332567m²

333

448m²

334

400m²

335

400m²

336

448m²

337

448m²

338339

521m²

340

450m²

341

450m²

342

343

344

448m²

345

400m²

346

400m²

347

512m²

348

448m²

349

400m²

350

400m²

351

448m²

352

400m²

353

400m²

354

530m²

355

522m²356

434m²357479m²

358

512m²

359

512m²

360

400m²

361

448m²

362

454m²

363

574m²

364928m²

365

581m²

366

546m²

367

546m²

368

546m²

369

624m²

370

624m²

371

780m²

372

897m²

373

1347m²

374

2501m²

375

1199m²

376

1750m²

377

600m²

378

659m²

379

448m²

380

448m²

381

448m²

382

448m²

383

512m²

384

512m²

385

512m²

386

592m²

387

496m²388

523m²389

456m²

391

494m²

390

552m²392

552m²393

552m²394

552m²395

483m²396

483m²397

483m²398

552m²399

704m²

400

721m²

401

448m²402

448m²403

448m²404

448m²405

448m²406

448m²407

400m²408

512m²409

400m²410

456m²

411

480m²

412731m²

413

640m²

414

512m²415

512m²416

512m²417

448m²418

448m²419

448m²420

512m²421

512m²422

448m²423

786m²

424

773m²

425

576m²426

576m²427

576m²428

576m²429

576m²430

576m²431

576m²432

576m²433

792m²

434

792m²

435

896m²

436

1213m²

437

715m²

438

512m²

439

512m²

440

576m²

441

512m²

442

576m²

443

576m²

444

589m²

445

669m²

446 597m²

447606m²

448

634m²

449

688m²

450

621m²

451 643m²

452645m²

453

830m²

454

1104m²

455

1166m²

456

1143m²

457

1064m²

458

1028m²

459

845m²

460810m²

4611059m²

462

615m²

463

519m²

464

498m²

465

533m²

466

567m²

467

679m²

468

956m²

469

880m²

470

1051m²

471

692m²

472

640m²

473

576m²

474

512m²

475

512m²

476

512m²

477

512m²

478

657m²

479

1015m²

480

899m²

481

1062m²

482

720m²

483

720m²

484

800m²

485

720m²

486

720m²

487

874m²

488

1909m²

489

820m²

490715m²

491

1384m²

492

1777m²

493

1955m²

494

1511m²

495

1659m²

4961224m²

1354m²

1208m²

507

1194m²

506

726m²

505

516m²

504

448m²

503448m²

502448m²

501448m²

500400m²

499400m²

498476m²

497

476m²

508

448m²

509

448m²

510

512m²

511

448m²

512

448m²

513

448m²

514

633m²

515

517m²

516

456m²

517

456m²

518

578m²

519861m²

520

448m²

521512m²

522448m²

523448m²

524475m²

525

710m²

526

576m²

527

504m²

528

450m²

529

576m²

530

576m²

531

608m²

532

512m²

533

572m²

534

476m²

535

476m²

536

425m²

537

470m²

538

400m²

539

446m²

540

396m²

541313m²

542313m²

543504m²

544450m²

545450m²

546550m²

547

540m²

548

512m²

549

512m²

550

668m²

551

518m²

552

425m²

553

425m²

554

476m²

555

350m²

556

371m²

557

614m²

558

576m²

559504m²

560576m²

561576m²

562

635m²

563

512m²

564

608m²

544m²

566

544m²

567

476m²

568

476m²

569

544m²

570

579m²

571

766m²

572

766m²

573

717m²

609

770m²

610

544m²

612m²

615

680m²

616

612m²

617

544m²

618

544m²

619

612m²

620

544m²

621

544m²

622

476m²

623

448m²

624

400m²

625

448m²

626

460m²

627

576m²

628

576m²

629

648m²

630

576m²

631

576m²

632

648m²

633

420m²

375m²

649

375m²

650

420m²

651

420m²

652

540m²

653

448m²

654448m²

655

661m²

656 428m²

657 420m²

476m²

702

448m²

703

448m²

704

448m²

705

598m²

706

884m²

707

557m²

697602m²

698401m²

699 448m²

700476m²

701

634m²

708503m²

709

734m²

710

440m²

711

601m²

712

382m²

713

471m²

714

709m²

715

392m²

716

457m²

717

500m²

718571m²

719

563m²

720482m²

721

668m²

722

448m²

723

751m²

724

941m²

725

601m²

726

448m²

727512m²

728

736m²

729

745m²

448m²

731

516m²

732

467m²

733

691m²

734

461m²

735

449m²

736

608m²

737

668m²

738

512m²

739

674m²

740

570m²

742

602m²

741

14

32

.46

21.2

8

15.89

1897m²

36

15151515

14.2314.83

15.07 12.5 12.5 15 12.5 12.5 15 15 3.22 11.79

24.26

39

10

26.631.43

15.44

11.19

36.9

9

36.9

9

15

14.1

8

4.1

6

20.24

13.17

22.0

2

15

35.17

32.74

4.08

18

19.5

3

22.9

4

18

36.79

4.56

38.84

19.0

1

4.42

21.5

39.15

21.4

4

28.5

3

32.87

21.3

7

31.01

22.5

3

20.08

32.6

2

39.9

4

23.6

39

15

15

39

15

15

39

15

15

39

12.5

39

12.5

39

10.5

39

15

39

12.5

39

12.5

12.5 12.5 15 10.5 12.5 12.5 15

34.5

4

35

35

35

35

35

35

35

34.8

4

37.0

5

34.1

9

35.475.14

13.2

34

19.4

9.14

21.92

20.8

853m²

746m²

736m²541m² 437m²

438m² 525m² 437m² 438m² 525m² 525m² 523m² 775m² 920m²

827m²

805m²

753m²585m²585m²585m²488m²487m²409m²585m²488m²488m²

700m²

662m²

529m²

675m²

820m²

20.9

620.0

5

13.6

312.8

7

5.86

27.78

4.09

15.8

1

14.1

7

37.9

9

15.3

1512.512.512.512.510.75

27.14.54

19.1

3

11.2

30.68

14.7

4

30.55

12.5

16.4

9

30.37

6.2

77.7

8

16.4

8

30.36

14

15.9

7

4.11 27.06 9

.97

6.0

4

26.3

1

16.81

36

12.5

22.75

37.0

2

29.915

22.9

8

36.64

20

18.3

35.22

37.6923.25

24.2

8

21.2

2

37

15

37

37

37

37

37

12.5 12.5 12.5 12.5 15

14

14.14

14

36

14

14

36

14

12.5

36

12.5

12.5

12.5

486m²

418m²

462m²

464m²

521m²

538m²

450m² 450m² 504m²

36.0

3

514m²

881m²

975m²

822m²

750m²

806m²555m²555m²462m²463m²463m²463m²

625m²

504m²

16.43

13.79

4.0

9

32.37

12.59

11.85

37.79

12.512.515

37.5

8

17.38

37.5

37.5

37.5

15.8815

34.4

11.67

6.2 9.3312.5 12.5

242

17.5

4

25.06

4.38

14.5

415.0

3

15.0

3 986m²

828m²549m²469m²469m²607m²

486m²

421m²

24.8

322

4.2

4

22.0

8

15.25

10.73

7.84

9.52

10.29

26.8

1118m²

622m²

783m²

36

36

36

36

36

36

.27

15.57

36

18.1

2

20.48

15.1

2

4.4617.48

18.1

2

18.1

2

36

36

36

36

21.985.49

19.92

1333m²

577m² 504m² 504m² 504m²

630m²

364m²

369m²

32.1

8

51.05

55.0

3

11.74

31.9

6

14

14

32

14

11

4.2

4

29

32448m²

695

444m²

696

ORIGINAL SHEET SIZE A0ORIGINAL SHEET SIZE A0

Dimensions and areas are subject to survey.

Alexander & Symonds Pty Ltd

11 King William Street Kent Town,

South Australia 5067

PO Box 1000 Kent Town, SA 5071

ABN 93007 753 988

T (08) 8130 1666

F (08) 8362 0099

W www.alexander.com.au

E [email protected]

+ Property + Land Development +

+ Construction + Mining +

+ Spatial Information Management +

Surveying

AlexanderSymonds

Consultants

LICENSED SURVEYOR

Original Sheet Size A0© ALEXANDER & SYMONDS PTY. LTD.

REF:

DWG NO.:

REVISION:

Glenn Ian Hordacre

A010816-CG

A010816-CG PROP1 REV D

C

DEL 12.06.2019

SHEET 3 OF 4

No. of proposed allotments 1180

Total area 185.6ha

Area of Development 168.5ha

Reserve area 71.28ha

Length of new roads 19.8k

Contour interval 2m.

Datum AHD.

Vide Titles for disposition of easements.

Road pavements shown are indicative only.

**Not to be used for detailed engineering design.**

Dimensions and areas are subject to survey.

Development No. 490/D026/19

Town of Gawler

Development No. 960/D025/19

The Barossa Council

Proposed Plan of Division

Allotment 2 in F7765

Allotment 1 in F13468

Allotment 9010 & 9011 in D114845

Allotment 9201 in Dev No. 490/D010/17

Allotment 4 in D28814

Hundred of Barossain the area named

GAWLER EAST& KALBEEBA

CT 6186/896 CT 6205/146

CT 6118/249 CT 6162/334

CT 6184/173 PT CT 6212/430

Regulated tree

Significant tree

Page 46: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

40.73

16.6

7

19

33

4.24

16

36

35.7

1

19

34

19

4.2

4

5.41

12.512.512.512.5

14.61

41.54

14.9

1

9.7

718.1

3

21.7

5

61.15 4.23

18

58.59

54.12

50.1

6

48.6

431.98

15

7.07

46.29

22.51

24

1.5

20

22

15.5

7.0

7

1.5

13.5

7.077

7

7.0

7

35.0

9

36.83

23.46

23.46

21.33

69.57

62.16

54.02

40.87

63

40

22

22

24.6

34.42

24.8

9

22.2

6

22.2

6

20.3

2

52.58

45.05

41.64

38.23

8.2

7

7.58

4.77

2.81

7.58

8.25

6.917.585.72021.99

20.26

24.93

32

22.9

50.0

9

39.61

48

20

48

20

49.2

1

22

52.4

5

20

59.1

9

24

32

3.4

210.8

8

13

16

14

14

12.5

12.5

14

14.0

3

13.0

7

4.6

1

23.68 15.7

9

29.01

14

29.93

14

30 12.5

30 12.5

30

14

30

14

30

16

30 14

30

14

12.5

30

12.5

12.5

30

12.5

14

30

14

12.5

30

12.5

12.5

30.01

12.5

14

31.24

16.24

15

34.2

7

15.06

22.274.02

8.0

6

18.2

5

32.8

9

8.0

1

10.1

3

17.74

14

14

14.7930.27

30.27

12.5

30

16.5

1

12.7

7

30

16.7

8

12.5

14

12.5

12.5

14.1

8.2

1

25 6.9910.2

6

30

30

30

30

12.5

12.5

14

12.5 12.5

12.5

12.5

14

14

30

14

30

14

30

30

30

3012.5

12.5

12.5

32

12.512.5

6.0

614.2

5

8.8

5

4.27 11.88 12.5

32

7.277.27

7.27

7.276.2

6

9.11

12.5

312.5

313.0

3

4.11 25.06

16.0

312.5

312.5

3

28.06

28.06

28.06

17.02

36.6

4

16.42

34

23.19

14.28

34.6

1

22.17

6.737.7712.811414

36.0

7

16.29 14 2.14 15.1517.93

35.3

3

36

36

33.07

4.38

15.2

111.4

3

13.0

6

21.078.4

36

14

36

37.17

17.0

312.1

6

37.15

20

16

7.71

36

36

36

36

36

36

36

36

18 16 16 18 18 18 18 22.37 5.39 13.17.6

9.27

7.88

8.4

16.1

5

8.6

2

19.0

6

33.3

7

4.5914.08

35.1

7

25.57

21

43.1

18

39.8

3

14.35

37.9

1

2.4924.15

14.114161614141616

14 16 16 14 14 16 16 14 14

10.726.7718181818161618

29

4.2

4

12.5

4.24

12

15

32

12.5

36

36

13

43.3

3

4.8814.03

1414

14.0116.04

16 2.8 11.49 14.35 14.35 14.35

34.2

5

33.1

1

35.1

7

38.3

3

41.1

5

38.2

6

12.5

12.5

8.48

5.38

29.64

25

30

15

4.2410.08

21

8.61

10.5

21

10.5

10.5

21

10.5

10.5

10.5

8

4.2

4

18

11

21

10.510.5

21

31.968.52

0.2

6

4.59

59.3

18.922.6728.64

8.51142.8

34.0

1

8.4

1

8.85

25.11

4.2

4

10.5

10.5

10.5

33

33

10.5

12.5

12.5

20.9

2

11.51

22.97

4.2

5

13.5

40

4.43 4.5

12.5

12.5

10.5

10.5

10.5

14.1

4.9

2

33

33

33

33

17.93

36.02

8.3

8

10.5

11.3

918.7

4

32.5

10.5 32.5

10.5

10.5

10.5

32.5

32.5

10.5

10.5

27

29.5

4.24

10.5

10.5

10.5

12.5

12.5

12.5

32.5

32.5

32.5

32.5

32.5

32.5

30

12

4.24

12

15

30

30

30

8 8 6 6 6 6 6 8

30

86666688

30

30

30

30

30

30

30

24.0

4

16

20.9

616

16

18

16

16

16.2

9

4.11 33.07

17

36

16

16

18

16

16

3.7

314.2

816

10.6

67.4

8

36.54

36.67

36.77

36

36

36

36

3619.0417.03

36.0

7

17.03 16.04 4.38

33.0

7

36.0

7

36.07

14

36

16.2

9

12.5

12.5

14

12.5

14.0

112.5

12.5

5

35.53

7.9

910.3

9

35.4

12.5

35.18

14

35.79

4.0

511.3

7

36

14

12.5

12.5

36

36

14.00 W

IDE

13.614.24

39.6

1

25.06

4.7

9

13.5

9

13.5

9

26.39

20.4

7

12.5

0 W

IDE

20.0

0 W

IDE

12.5

0 W

IDE

14.00 WIDE

27.58

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

16.00 W

IDE

14.00 WID

E

14.0

0 W

IDE

14.0

0 W

IDE

14.0

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

10.3

28.2

7

6.0

56.8

4

5

12.5

0 W

IDE

14.00 WIDE

14.0

0 W

IDE

16.00 WIDE

14.00 WIDE

14.00 WIDE

14.0

0 W

IDE

12.5

0 W

IDE

12.50 WIDE

14.00 WIDE

8.89

4.26

1.144 ha

2046

2500m²

2047

476m²

6

400m²

7

1224m²

36

591m²

37

559m²

38

514m²

39

474m²

40538m²

4142

5556

57 58 829m²

6059

523m²

101

41.2

0

102

442m²

103

347m²

104

347m²

105

347m²

106

413m²

107

413m²

108

648m²

110

111

464m²112

113

341m²114

341m²115

341m²116

727m²

109

375m²120

375m²121

446m²122483m²123

341m²124

341m²125

341m²126

406m²127

406m²128

240

129 130

180

131132133134135 136137

1317m²

138

1278m²

139

1079m²

140

895m²

141

142

143

1183m²

144

145

146

147

894m²

148

879m²

149

954m²

150

1419m²

151

152

1563m²

153

970m²

154

960m²

155

1065m²

156

1013m²

157

1333m²

158

159

440m²160

414m²161

420m²162

375m²163

375m²164

420m²165

420m²166

480m²167

168 169

420m²

170

375m²

171

375m²

172

420m²

173

375m²

174

375m²

175

426m²

176

505m²

177 622m²

178

458m²

179

400m²

180

799m²

181

420m²182

420m²183

375m²184

375m²185

375m²186

443m²187

188189

190191

435m²192

375m²193

420m²194

375m²195

375m²196

502m²

197

1279m²

198

1019m²

199

1245m²

200

201

202

203

204205206207

208209210211212213214

215

646m²

216

219

220221 222 223 224 225 226 227 228 229

230

231

232

252

253

270

701m²

269

628m²

268558m²

267

539m²

266

504m²

265

545m²

264

444m²263

351m²262

351m²261

260

259

258 257 256 255

254

251250249248247246

245244

243

242

241

240

239238 237 236 235

234233

306

305

552m²

304

440m²

303

496m²

302

502m²

301

504m²

300

450m²299

450m²298

545m²297

613m²

296

681m²

295

504m²

281

576m²

280

576m²

279

504m²

278

504m²

277

576m²

276

576m²

275

505m²

274

518m²

273

739m²

272

745m²

271

947m²

294

930m²

293734m²

292

648m²

291

648m²

290

648m²

289

648m²

288

576m²

287

576m²

286

648m²

285920m²

284

730m²

282

1039m²

283

649m²

317

576m²316

576m²315

648m²314

576m²313

576m²312

708m²

311

589m²310

766m²

309

308

307

679m²

218

943m²

217

375m²

458m²

1006

263m²

1005220m²

1004221m²

1003221m²

1002221m²

1001227m²

1000

12.5

4.2

4

13.7

2 12.5

30

10.5

10.51

10.52

10.54

8.7610.5

10.510.5

10.5

375m²

297m²

979

301m²

978

307m²

977

316m²

976975

30.5

1

29.6

4

28.9

5

28.4

5

1009

12.5

30

10.44

10.5

30

10.4521.91

10.5

315m²

517m²

1010

1011

29

29

4.2

4

15.5

15

15

12.5

1532

12.5

15

15

12.5

12.5

15

15

15

18

15

15

12.5

12.5

15

15

12.5

32

32

32

32

32

32

32

32

32

32

32

32

41.6

4

18

18

36

36

40.9

6

40.6

7

40.5

2

35.92

48.85

47.78

31.6

4

29.9

5

25

25

72.15

60.5

27.58

32.15

40

59

97.88

6.18

29.04

29.23

44.49

26.5

56.38

26.5

58.62

26.5

26.5

43.25

28.2

4

14.3

7

12.9

6

6.05

59

40

59

73.4

6.01

26.7

1

13.7

6

13.4

5

26.5

26.5

26.58

26.5

33.14

26.5

26.5

35.67

59

40

53

33.79

37.11

12

30

15

12.5

10.5

10.5

8

7

7

8

10.5

15

30

15 30

30

30

30

30

30

30

30

10.5

8

7

7

8

10.5

10.5

12.5

27

4.2

4

44.1

1

4.48

32.5

41.0

6

17.95

18.42

3.8

5

38.1

5

1515

1510.889.7

29.18

19.2

15.04

14.8812.5 15.05 15.04

15.29

35.3

34.2

5

35.4

636.9

5

41.5

2

21.33

16.3

7

12.5

4

17.09

23.72

12.31

18.05

40

1328m²

1102m²

47

4.2

4

21

50

44.25

1669m²

1195m²

2526m²

14.45

15.5

35.8

32.4

6

21.2

8

15.89

1897m²

558m² 581m²596m²

631m²

36.8

8

4

14.35

16.7817.613.46

7.14

1116m²

8.3

9

7.1

19.81

17.9

7

31.4

5

29.024.93

30.6

7

25.59

5.65

35.2

7

36

15151515

14.2314.83

15.07 12.5 12.5 15 12.5 12.5 15 15 3.22 11.79

24.26

39

10

26.631.43

15.44

11.19

36.9

9

36.9

9

48.8

3

40.63

57.9

3

37.15

26.3

4.03

21.05

31.5

2

14.54

15.01

32

15

10.5

32

10.5

10.5

12.5

17.9

4.2

4

17

13.3

7 15

32

10.5

32

12.5

15

14.1

8

4.1

6

20.24

13.17

22.0

2

15

35.17

32.74

4.08

18

19.5

3

22.9

4

18

36.79

4.56

38.84

19

.01

4.42

21.5

39.15

21.4

4

28.5

3

32.87

21.3

7

31.01

22.5

3

20.08

32.6

2

39.9

4

23.6

39

15

15

39

15

15

39

15

15

39

12.5

39

12.5

39

10.5

39

15

39

12.5

39

12.5

12.5 12.5 15 10.5 12.5 12.5 15

34

.54

35

35

35

35

35

35

35

34.8

4

37.0

5

34.1

9

35.475.14

13.2

34

19.4

9.14

21.92

20.8

853m²

746m²

736m²541m² 437m²

438m² 525m² 437m² 438m² 525m² 525m² 523m² 775m² 920m²

827m²

805m²

753m²585m²585m²585m²488m²487m²409m²585m²488m²488m²

700m²

662m²

529m²

675m²

820m²

20.9

620.0

5

13.6

312.8

7

5.86

27.78

4.09

15.8

1

14.1

7

37.9

9

15.3

1512.512.512.512.510.75

27.14.54

19.1

3

11.2

30.68

14.7

4

30.55

12.5

16.4

9

30.37

6.2

77.7

8

16.4

8

30.36

14

15.9

7

4.11 27.06 9

.97

6.0

4

26.3

1

16.81

36

12.5

22.75

37.0

2

29.915

22.9

8

36.64

20

18.3

35.22

37.6923.25

24.2

8

21.2

2

37

15

37

37

37

37

37

12.5 12.5 12.5 12.5 15

14

14.14

14

36

14

14

36

14

12.5

36

12.5

12.5

12.5

486m²

418m²

462m²

464m²

521m²

538m²

450m² 450m² 504m²

36.0

3

514m²

881m²

975m²

822m²

750m²

806m²555m²555m²462m²463m²463m²463m²

625m²

504m²

16.43

13.79

4.0

9

32.37

12.59

11.85

37.79

12.512.515

37.5

8

17.38

37.5

37.5

37.5

15.8815

34.4

11.67

6.2 9.3312.5 12.5

242

17.5

4

25.06

4.38

14.5

415.0

3

15.0

3 986m²

828m²549m²469m²469m²607m²

486m²

421m²

445m²

375m²

315m²

315m²

240m²

210m²

210m²

240m²

315m²

450m²

834m²890m²

789m²

837m²601m²

520m²519m²

551m²

923m²

878m²

2560m²

2562m²

934m²

1057m²

1267m²

1512m²

2710m²

1342m²

1015m²

2703m²

1658m²

1367m²

1487m²

1154m²

1113m²

647m²

647m²

649m²

400m²

480m²

480m²

400m²

400m²

480m²

480m²

572m²

588m²

480m²

480m²

400m²

480m²

33.43

26.9

2

12.1

7

12.5

34.55

8

18.5

7

34.19

24.7

4

9.61

10.7

6.9

24.6

31.49

5.4

3.5

8

352m²

483m²

30

10.5

10.5

10.5

315m²

315m²

315m²

15.56

3.3

5

28.8

8

8.13

119

118

117

7

32

76

1

2

18

21.1

7

18

18

22.5

2

3

4

5

89

1011

12

13

14

15

16

17

1819

20

21

22

2324

25

26

27

28

29

30

31

32

33

34

35

43

44

45

46

47

48

49

50

51

52

53

54

375m²

76

375m²

77

768m²

78

525m²

79

525m²

80

672m²

81510m²

82375m²

83375m²

84375m²

85611m²

86

622m²

87

571m²88

403m²

89

420m²

90

517m²

91

613m²

92735m²

93

94

9596

9798

99

100

30

12.5

12.5

30

12.5

12.5

5.46

12.4

8

12.48

3.57

35

12.5

15

15

4.4911.0611.06

31.1

2

13.2

35

15

35

15

21.47

30

12.5

12.5

30

12.5

12.5

30

12.5

12.5

12.58

16.12

31.34

11.65

30

12.5

11.8

6

13.4

12.3

35 9.4

3

20.4

1

3.319.48

9.77

15.1

10.5 1

9.9

3

18.38

25.1

5

20.09

15.08

31.0

1

16.74

15 15.0412.92

38.7

8

24.48

88.06

16.74

38.1

9

40.9

5

579m²

478m²

336m²

336m²

400m²

629m²

586m²

628m²

336m²

272m²

272m²

272m²

272m²

336m²

911

912

974224m²

980

224m²

981

982983

984

224m²

985224m²

986

987988

989

154

990

294m²

991992

993

154

994

224

995

4.44

478m²545m²

28.1

4

12.89

30.6

8

9.36

18.02

29.9

2

18

m² m² m²m²

154 154

154m²

154m²

154m²

154m²

154m² 154

28

8 5.5 5.5 5.5 5.25 7.655.5 5.5 5.5

5.58

85.5 5.5 5.5

88

28

282

8282

828

282

8282

8282

8

28

28

28

28

88

5.55.5

5.58

85.5

5.55.5

5.58.1

5.55.55.58

35.6

2

38.0

8

39.4

9

772m² 624m²

14.0

5

36

36

36

36

36

36.2

7

224

32

10.5

10.5

8.5

8.5

8.5

8.5

10.5

32

32

401m²

m²240

m² 240

m²180

m²180

m²180

m²180

6.01

SEC 345

9000

2.047 ha

9001

9002

1.521 ha

12.02 ha

ORIGINAL SHEET SIZE A0ORIGINAL SHEET SIZE A0

Dimensions and areas are subject to survey.

Alexander & Symonds Pty Ltd

11 King William Street Kent Town,

South Australia 5067

PO Box 1000 Kent Town, SA 5071

ABN 93007 753 988

T (08) 8130 1666

F (08) 8362 0099

W www.alexander.com.au

E [email protected]

+ Property + Land Development +

+ Construction + Mining +

+ Spatial Information Management +

Surveying

AlexanderSymonds

Consultants

LICENSED SURVEYOR

Original Sheet Size A0© ALEXANDER & SYMONDS PTY. LTD.

REF:

DWG NO.:

REVISION:

Glenn Ian Hordacre

A010816-CG

A010816-CG PROP1 REV D

C

DEL 12.09.2016

SHEET 4 OF 4

No. of proposed allotments 1180

Total area 185.6ha

Area of Development 168.5ha

Reserve area 71.28ha

Length of new roads 19.8k

Contour interval 2m.

Datum AHD.

Vide Titles for disposition of easements.

Road pavements shown are indicative only.

**Not to be used for detailed engineering design.**

Dimensions and areas are subject to survey.

Development No. 490/D026/19

Town of Gawler

Development No. 960/D025/19

The Barossa Council

Proposed Plan of Division

Allotment 2 in F7765

Allotment 1 in F13468

Allotment 9010 & 9011 in D114845

Allotment 9201 in Dev No. 490/D010/17

Allotment 4 in D28814

Hundred of Barossain the area named

GAWLER EAST& KALBEEBA

CT 6186/896 CT 6205/146

CT 6118/249 CT 6162/334

CT 6184/173 PT CT 6212/430

Regulated tree

Significant tree

Page 47: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Appendix 3. Proposed plans and elevations

Brown Falconer

Page 48: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:43 AM

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

3 A

M

SPRINGWOOD TOWN CENTRE

COVER SHEET & LOCATION PLAN

2016040

ARCADIAN PROPERTY

JSM

2569 DA01

16/05/2019

SPRINGWOOD TOWN CENTREPLANNING APPLICATION PACKAGE

DA01 COVER SHEET & LOCATION PLAN 1

DA02 SITE PLAN 1

DA03 ELEVATIONS 1

DA04 SITE SECTIONS 1

DA06 3D IMAGES 1

DA05 LANDSCAPING PLAN 1

LOCALITY PLAN

3D VIEW STREET VIEW TO NORTH WEST

TOWN CENTRE

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

LODGEMENT ISSUE 14 JUNE 2019

Page 49: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

1

DA04

1

DA04

2

DA04

2

DA04

3

DA04

3

DA04

4

DA04

4

DA04

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BOUNDARY

BOUNDARY

RE

FU

SE

PLAZA

GAWLER EAST LINK ROAD

RO

AD

WA

Y N

AM

E

ROADWAY NAME

SHOP [A]RL: 122.00

SHOP [B]RL: 123.00

MAIN SHOPPING CENTRERL: 123.00

SAPN OVER HEAD POWER LINE EASEMENT

192

AC

CE

SS

RA

MP

ACCESS POINT

TR

OL

LE

Y

TROLLEY

TROLLEY

TROLLEY

TR

OL

LE

Y

TR

OL

LE

YT

RO

LL

EY

TR

OL

LE

Y

TROLLEY

1

17

18 29 30 40

41

46

4753

54

59

6064

65

79

80

96

97 101

102

112

113

124125

136

137

147

148 160 161 169

204192

191 179 178 170

205217

SUPERMARKET

STORELOADING

DOCK

RETAIL F

ENTRY

AMENITIES

FU

TU

RE

S

UP

ER

MA

RK

ET

E

XP

AN

SIO

N

400m

2

RETAIL E

RETAIL D

RETAIL C

RETAIL B

RETAIL A

CAR PARKING 217 SPACES

BOUNDARY

REFUSE

BO

UN

DA

RY

BOUNDARY

ACCESS POINT

SAPN TRANSFORMER

5500 7000 11000 7000 5500

2700

7000

1100

070

0011

000

7000

5500

2700

FOYER

64995

6800

041

650

2350027000 22758

1702

440

24

1456

652

500

5800

714

018

10005

PY

LO

N S

IGN

8

m H

IGH

PYLON SIGN 6m HIGH

SIGNAGE ON BUILDING

VEHICLE PATH

VEHICLE PATH

VE

HIC

LE

PA

TH

VE

HIC

LE

PA

TH

DELIVERY VEHICLE PATH

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:44 AM

As indicated

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

4 A

M

SPRINGWOOD TOWN CENTRE

SITE PLAN

2016040

ARCADIAN PROPERTY

JSM

2569 DA02

16/05/2019

SITE SUMMARY

SITE AREA 27,980m2

SUPERMARKET 2,600m2

RETAIL (A-F) 780m2

SHOP A 325m2

SHOP B 355m2

TOTAL BUILDING AREA 4,060m2

CARPARKING SPACES 217

1 : 400

SITE PLAN

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 50: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

ROADWAY CARPARK

EXISTING GROUND LINE

PC01 TC01PC01

BALUSTRADE TO LOADING DOCK

FEATURE STEEL FRAMES BEYOND

TRANSFORMER

LOADING DOCK

PC01

SIGNAGE

CARPARK

EXISTING GROUND LINE

BR01

BR01 BR01

BR01BR01 BR01 BR01 BR01FC02 PC01

PC01

BR02

FC01 PC01

TRANSFORMER

PC01

FT1

CANOPY

TC01

FEATURE CANOPY BR01FEATURE STEEL FRAMES

BUILDING A BEYOND

AW01

SIGNAGESIGNAGE PYLON

ROADWAYCARPARK

EXISTING GROUND LINE

FEATURE STEEL FRAMES BEYOND

BR02FC01

TC01PC01

FEATURE CANOPY

TC01PC01FC01

PC01BR02BR01TC01PC01

FEATURE CANOPY

FC01

AW01 AW01 AW01 AW01 AW01

SIGNAGE

ROADWAY

CARPARK

EXISTING GROUND LINE

CANOPY

MAIN BUILDING BEYOND

PC01PC01

CANOPY

PC01 PC01?

?

SIGNAGE

CARPARKROADWAY

BR02TC01

PC01

PC01PC01

LOADING DOCK

BEYOND

FC01

FEATURE CANOPY

BUILDING B BEYOND

PC01

FT01

EXISTING GROUND LINE

ROADWAY

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:46 AM

1 : 200

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

6 A

M

SPRINGWOOD TOWN CENTRE

ELEVATIONS

2016040

ARCADIAN PROPERTY

JSM

2569 DA03

16/05/2019

1 : 200

North - Supermarket

1 : 200

East - Street Elevation

1 : 200

South - Supermarket

1 : 200

South - Street Elevation

1 : 200

West

MATERIAL LEGEND

PC

01P

AIN

TE

D

CO

NC

RE

TE

PA

NE

L

BR

01F

AC

E B

RIC

KW

OR

K(W

ALL

ELE

ME

NT

)

FE

AT

UR

E S

TO

NE

F

AC

ING

ELE

ME

NT

TC

01LI

GH

T W

EIG

HT

T

IMB

ER

CLA

DD

ING

AW01 POWDER COATED ALUMINIUM DOOR/WINDOWFC01 PAINTED FIBRE CEMENT FACADE

FC02 PAINTED FIBRE CEMENT FACADE

BR

02F

AC

E B

RIC

KW

OR

K(F

EA

TU

RE

PIE

R

ELE

ME

NT

)

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 51: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

ROADWAY

CARPARK

EXISTING GROUND LINE

ROADWAYLOADING

DOCK BEYOND

SIGNAGE

ROADWAY

CARPARK

EXISTING GROUND LINE

ROADWAY

FOYER ENTRYSUPERMARKETLOADING DOCK

ROADWAY CARPARK

EXISTING GROUND LINE

ROADWAY

RETAILSUPERMARKETSTORERETAIL

CARPARK

EXISTING GROUND LINE

ROADWAY

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:48 AM

1 : 200

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

8 A

M

SPRINGWOOD TOWN CENTRE

SITE SECTIONS

2016040

ARCADIAN PROPERTY

JSM

2569 DA04

16/05/2019

1 : 200

DA - Section 1

1 : 200

DA - Section 2

1 : 200

DA - Section 3

1 : 200

DA - Section 4

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 52: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BOUNDARY

BOUNDARY

RE

FU

SE

PLAZA

GAWLER EAST LINK ROAD

RO

AD

WA

Y N

AM

E

ROADWAY NAME

SHOP [A]

SHOP [B]

SAPN OVER HEAD POWER LINE EASEMENT

192

AC

CE

SS

RA

MP

ACCESS POINT

TR

OL

LE

Y

TROLLEY

TROLLEY

TROLLEY

TR

OL

LE

Y

TR

OL

LE

YT

RO

LL

EY

TR

OL

LE

Y

TROLLEY

1

17

18 29 30 40

41

46

4753

54

59

6064

65

79

80

96

97 101

102

112

113

124125

136

137

147

148 160 161 169

204192

191 179 178 170

205217

SUPERMARKET

STORELOADING

DOCK

RETAIL F

ENTRY

AMENITIES

FU

TU

RE

S

UP

ER

MA

RK

ET

E

XP

AN

SIO

N

400m

2

RETAIL E

RETAIL D

RETAIL C

RETAIL B

RETAIL A

CAR PARKING

BOUNDARY

REFUSE

BO

UN

DA

RY

BOUNDARY

ACCESS POINT

SAPN TRANSFORMER

FOYER

T1

T1T1

T1

T1

T1

T1

T1 T1 T1 T1 T1 T1

T1

T1

T1

T1

T1

T1

T1

T1T1

T1

T1

T2T2

T2

T2

T2

T2

T2

T2

PS

AC

AC

AC

AC

AC

AC

AC

NS

NS

NS

NSNS NS

NS NS

NS NS

NS NS

NS

LLLL LL

DD

NS

NS

DD

LL

LL

LL

PS

LL

LL

ASC

LC

AC

LC

ASC

LC

AC

ASC

ASC

LC

AC

LC

ASC

LC

AC

DD

PS

PS

PS

PSPS

PS

PS

PS

PS

PS PS PS PS

AC ACAC

AC

AC

ACAC

AC

LANDSCAPE LEGEND

NEW LANDSCAPING WITHIN MULCHED BEDSAREAS WITHIN

PROPOSED SITE ONLY

> ALL LANDSCAPING TO BE IRRIGATED> MULCH TO BE INSTALLED TO ALL GARDEN BEDS

PLANT SCHEDULE

SEDGES / GRASSES

AGAPANTHUS SMALL CULTIVARS ASC 2 per m²DISTICHLIS DISTICHOPHYLLA DD 2 per m²LOMANDRA CULTIVARS LC 2 per m²NANDINA SPP NS 2 per m²POA SPP PS 2 per m²

GROUND COVERS

ASPERULA CONFERTA AC 2 per m²LEPTOSPERMUM LANIGERUM LL 2 per m²

NOTES

ALL TUBE STOCK

Agapanthus Cultivars

TREE SCHEDULET1 CALLERY PEART2 JAPANESE ELM

Asperula Conferta

Distichlis Distichophylla

Lomandra Cultivars

Poa SPP

Leptospermum Lanigerum

Nandina SPP

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:49 AM

As indicated

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

9 A

M

SPRINGWOOD TOWN CENTRE

LANDSCAPING PLAN

2016040

ARCADIAN PROPERTY

Author

2569 DA05

06/07/19

1 : 400

LANDSCAPING PLAN

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 53: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:49 AM

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

9 A

M

SPRINGWOOD TOWN CENTRE

3D IMAGES

2016040

ARCADIAN PROPERTY

JSM

2569 DA06

16/05/2019

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 54: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

Appendix 4. Traffic and Parking Review

CIRQA

Page 55: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

SPRINGWOOD SHOPPING CENTRE

GAWLER EAST

TRAFFIC AND PARKING REPORT

Page 56: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Disclaimer and Document Control

DISCLAIMER

The information and data contained within this document are the property of CIRQA Pty Ltd and

copyright. This document and the information contained therein is for the use of the authorised

Client noted below. The document may not be used, copied, reproduced or modified in whole or

in part for any purpose other than for which it was supplied by CIRQA Pty Ltd. CIRQA Pty Ltd

accepts no responsibility or liability to any other party who may use or rely upon this document

or the information contained therein.

DOCUMENT CONTROL

Report title: Springwood Shopping Centre, Gawler East – Traffic and Parking report

Project number: 19140

Client: Arcadian Property

Client contact: Warwick Mittiga

Version Date Details/status Prepared by Approved by

Draft 5 Jun 19 For review BNW BNW

V1 12 Jun 19 For submission BNW BNW

CIRQA Pty Ltd

ABN 12 681 029 983

PO Box 144, Glenside SA 5065

150 Halifax Street, Adelaide SA 5000

(08) 7078 1801

www.cirqa.com.au

Page 57: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 1 of 6

1. INTRODUCTION

CIRQA has been engaged to provide design and assessment advice for the

Springwood Shopping Centre at Gawler East. Specifically, CIRQA has been

engaged to provide advice in respect to traffic and parking aspects of the

proposal.

This report provides a review of the subject site, the proposed development (and

its associated operation), its access and parking provisions and the associated

traffic impact on the adjacent road network. The traffic and parking assessments

have been based upon plans prepared by Brown Falconer (drawing no. 2569-

DA01 to DA05, dated 16 May 2019, refer Appendix A).

2. BACKGROUND

2.1 SUBJECT SITE

The subject site is located adjacent the north-western corner of the Gawler East

Link Road and a new north-south collector road at Gawler East. The site (Lot

2046) forms part of the Village Centre of the broader Springwood development

(approximately 2 km east of the township of Gawler). The site will be bound by

the Gawler East Link Road to the south, a new north-south collector road to the

east, a local road to the north and a reserve/easement to the west.

The City of Gawler’s Development Plan identifies that the site is located within

the Residential Zone (Gawler East) Zone and the Mixed Use Centre Policy Area.

2.2 ADJACENT ROAD NETWORK

The Gawler East Link Road is a proposed major link road which will provide access

to/from Main North Road without the need to travel through the centre of the

Gawler township. In the vicinity of the subject site, the road will generally comprise

a single traffic lane and bicycle lane in each direction separated by a raised

central median (with opportunities for sheltered right turn lanes where required).

Footpaths will be provided on both sides of the Gawler East Link Road. Prevoius

traffic forecasts (by others) indicate volumes on the Gawler East Link Road will

ultimately be in the order of 12,500 vehicles per day (vpd).

Adjacent the site, the Gawler East Link Road will intersect with the new

north-south collector road. The intersection will be controlled with traffic signals

(including pedestrian crossing facilities on all legs). Additional right turn lanes will

be provided on all approaches. The design of the intersection has been based on

detailed analysis prepared as part of the Gawler East Link Road planning and

design inputs (by others). It is understood that a 50 km/h speed limit will apply on

Gawler East Link Road.

Page 58: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 2 of 6

The north-south collector road will also comprise a single traffic lane and a bicycle

lane in each direction separated by a raised central median (or right turn lanes

where required). Footpaths will be provided on both sides of the north-south road.

A 50 km/h speed limit will apply on the north-south collector road. Previous

forecasting for the broader development has indicated ultimate volumes in the

order of 6,500 vpd will be experienced on the north-south collector road.

Figure 1 illustrates the location of the subject site and adjacent road network.

Figure 1 – Location of the subject site and adjacent road network

(Source: after Tract, 2019)

2.3 WALKING AND CYCLING

The site will be highly accessible for residents of the surrounding area by walking

and cycling. Footpaths will be provided on both sides of all bounding roads and

on-road cycling facilities will be provided on the Gawler East Link Road and

north-south collector road (including ‘bicycle boxes’ at the signalised intersection

approaches).

2.4 PUBLIC TRANSPORT

It is understood that public transport (bus) services will operate along the Gawler

East Link Road with bus stops in close proximity to the subject site.

Page 59: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 3 of 6

3. PROPOSED DEVELOPMENT

3.1 LAND USE AND YIELD

The proposed development comprises the construction of a new shopping centre

on the subject site. Specifically, the shopping centre will comprise a 2,600 m² floor

area supermarket and a total of 1,460 m² floor area of specialty tenancies

(totalling 4,060 m² of floor area).

3.2 ACCESS AND PARKING DESIGN

The site will be serviced by a 217-space parking area (inclusive of 4 spaces

reserved exclusively for use by people with disabilities). A further 20 bicycle

parking spaces are also proposed. The parking area will comply with the

requirements of Australian/New Zealand Standard, Parking Facilities Part 1: Off-

street car parking (AS/NZS 2890.1:2004) and Australian/New Zealand Standard,

Parking Facilities Part 6: Off-street parking for people with disabilities (AS/NZS

2890.6:2009) in that:

regular parking spaces will be 2.7 m wide and 5.4 m long (or 4.8 m long with

0.6 m overhang);

disabled parking spaces will be at least 2.4 m wide and 5.4 m long (with an

adjacent shared space of the same dimension);

the parking aisles will exceed 6.6 m in width;

0.3 m clearance will be provided to all objects greater than 0.15 m in height;

and

pedestrian sightlines will be provided at the site’s property boundary.

Vehicle access to the site will be provided via the following locations:

a two-way access point on the Gawler East Link Road (which will

accommodate left-in, left-out, right-in and right-out movements);

a two-way access point on the north-south collector road (which will

accommodate left-in, left-out, right-in and right-out movements); and

a two-way access point on the local road to the north which will primarily

provide access for commercial vehicle movements, albeit customers will also

be able to utilise the access point.

All vehicles will be able to enter and exit the site in a forward direction.

Page 60: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 4 of 6

3.3 SERVICING AND DELIVERIES

Commercial vehicle access will primarily be accommodated via the loading area

located at the rear (north) of the shopping centre. This will include a recessed

dock for the supermarket tenant. Figure 2 illustrates the turn path of a Semi-

Trailer entering and exiting the dock.

Figure 2 - Semi-Trailer access movements at the loading dock

In addition, other minor service and delivery movements will be undertaken via

the car park (particularly for the individual tenancies fronting the Gawler East Link

Road. Such movements would be undertaken via medium rigid vehicles or smaller

and would typically be undertaken outside of peak trading periods (particularly

refuse collection which would occur outside of trading hours).

4. PARKING ASSESSMENT

4.1 CAR PARKING

The Development Plan identifies a rate of 5.5 spaces per 100 m² floor area for

shop (retail use) within the Mixed Use Centre Policy Area 3 of the Residential

(Gawler East) Zone). On this basis, there is a theoretical requirement for 224

Parking spaces associated with the proposal. The provision of 217 spaces

therefore results in a theoretical shortfall of 7 spaces.

Page 61: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 5 of 6

However, recent surveys of shopping centres indicate peak parking demands are

more commonly in the range of 3.0 to 5.0 spaces per 100 m² floor area. These

rates equate to peak demands in the order of 122 to 203 spaces. Such demands

would be accommodated by the proposed level of parking provisions.

In comparison, the Aurecon “Parking Spaces for Urban Places” (parking provision)

study recommended a rate of 6 spaces per 100 m² for shops within a retail centre

with a potential discount of up to 25% (depending on a variety of factors). A

discount of 15% is considered appropriate for application to the proposal. On this

basis, there would be a requirement for 207 parking spaces. The proposed

provision would meet such a requirement.

On the basis of the above, it is considered that the proposed level of parking will

more than adequately accommodate peak demands.

4.2 BICYCLE PARKING

The Development Plan does not identify rates for the provision of bicycle parking.

However, the following rates are typically applied for bicycle parking provision for

shops:

one bicycle parking space for every 300 m² of gross leasable floor area for

employees, plus

one visitor space for every 600 m² of gross leasable floor area for shoppers.

On the basis of the above, the provision of 20 bicycle spaces (10 bicycle rails) is

considered sufficient.

5. TRAFFIC ASSESSMENT

5.1 TRAFFIC GENERATION AND DISTRIBUTION

Previous traffic impact assessments have been undertaken as part of the

broader Springwood land division project. This has included consideration of the

traffic generation of development within the town centre including the shopping

centre site.

Previous planning and design inputs (by others) have also considered the

appropriateness of the proposed access arrangements for the shopping centre.

Adequate design provisions have been made to accommodate the proposed

turning movements at all access points.

The broader land division layout (including adjacent signalised intersection) has

been designed to accommodate future traffic flows, including traffic generation

Page 62: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Page 6 of 6

associated with the subject site. As such, the traffic movements associated with

the proposed use will be easily accommodated in the surrounding road network.

Notwithstanding the above, a high level assessment of conditions at the two

primary access points has been undertaken utilising SIDRA intersection analysis.

The assessment has been based on the traffic generation and distribution

detailed in the GTA “Springwood Land Division – Transport Impact Assessment”

report (2019). The worst-case pm weekday peak has been modelled based on the

traffic generation rates for retail uses (as identified in the GTA report) and

forecast future movements on the adjacent road network.

Detailed output of the SIDRA modelling is provided in Appendix B. The SIDRA

analysis confirms that the proposed access arrangements will have sufficient

capacity to accommodate the forecast traffic movements associated with the

proposed development (as well as other movements on the adjacent roads).

6. SUMMARY

The proposal comprises the development of a shopping centre within the

Springwood land development. Specifically, the shopping centre will include a

supermarket as well as specialty tenancies.

The site will be well serviced by active (walking and cycling) facilities and public

transport services which will minimise reliance on private motor vehicles. Access

to the parking areas will be provided via the Gawler East Link Road, a new

north-south collector road and a local road (adjacent the site’s northern

boundary).

The development will be serviced by parking areas containing 217 vehicle parking

spaces (in total). A total of 20 bicycle spaces will also be provided. The proposed

level of parking will result in a small shortfall against the requirements of Council’s

Development Plan. However, based on more recent surveys for shopping centres,

it is considered that more than adequate parking will be provided as part of the

development.

Traffic impacts associated with the proposal have been assessed as part of the

broader land division application and planning for the Gawler East Link Road. The

proposed access arrangements and associated traffic impacts will be in line with

the previous assessments. Additional SIDRA modelling of the primary access

points indicates that the forecast movements will be adequately accommodated.

Page 63: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Appendix A

APPENDIX A BROWN FALCONER’S PLANS DATED MAY 2019

Page 64: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

1

DA04

1

DA04

2

DA04

2

DA04

3

DA04

3

DA04

4

DA04

4

DA04

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BOUNDARY

BOUNDARY

RE

FU

SE

PLAZA

GAWLER EAST LINK ROAD

RO

AD

WA

Y N

AM

E

ROADWAY NAME

SHOP [A]RL: 122.00

SHOP [B]RL: 123.00

MAIN SHOPPING CENTRERL: 123.00

SAPN OVER HEAD POWER LINE EASEMENT

192

AC

CE

SS

RA

MP

ACCESS POINT

TR

OL

LE

Y

TROLLEY

TROLLEY

TROLLEY

TR

OL

LE

Y

TR

OL

LE

YT

RO

LL

EY

TR

OL

LE

Y

TROLLEY

1

17

18 29 30 40

41

46

4753

54

59

6064

65

79

80

96

97 101

102

112

113

124125

136

137

147

148 160 161 169

204192

191 179 178 170

205217

SUPERMARKET

STORELOADING

DOCK

RETAIL F

ENTRY

AMENITIES

FU

TU

RE

S

UP

ER

MA

RK

ET

E

XP

AN

SIO

N

400m

2

RETAIL E

RETAIL D

RETAIL C

RETAIL B

RETAIL A

CAR PARKING 217 SPACES

BOUNDARY

REFUSE

BO

UN

DA

RY

BOUNDARY

ACCESS POINT

SAPN TRANSFORMER

5500 7000 11000 7000 5500

2700

7000

1100

070

0011

000

7000

5500

2700

FOYER

64995

6800

041

650

2350027000 22758

1702

440

24

1456

652

500

5800

714

018

10005

PY

LO

N S

IGN

8

m H

IGH

PYLON SIGN 6m HIGH

SIGNAGE ON BUILDING

VEHICLE PATH

VEHICLE PATH

VE

HIC

LE

PA

TH

VE

HIC

LE

PA

TH

DELIVERY VEHICLE PATH

DA ISSUEISSUED FOR DEVELOPMENT APPROVAL

Scale

Date

Job No.

Rev:Dwg No.

Drawn

A1 SHEET

28 Chesser Street, Adelaide, South Australia 5000

Telephone : 08 8203 5800 Facsimile : 08 8223 2440 ABN 65 007 846 586 brownfalconer.com.au

14/06/2019 11:30:44 AM

As indicated

1

C:\

Use

rs\w

kam

pes

\Do

cum

ents

\201

6040

DA

_wka

mp

es.r

vt14

/06/

2019

11:

30:4

4 A

M

SPRINGWOOD TOWN CENTRE

SITE PLAN

2016040

ARCADIAN PROPERTY

JSM

2569 DA02

16/05/2019

SITE SUMMARY

SITE AREA 27,980m2

SUPERMARKET 2,600m2

RETAIL (A-F) 780m2

SHOP A 325m2

SHOP B 355m2

TOTAL BUILDING AREA 4,060m2

CARPARKING SPACES 217

1 : 400

SITE PLAN

Rev. Amendment Date

1 LODGEMENT ISSUE 14/6/19

Page 65: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

CIRQA\\Projects\19140 Springwood Shopping Centre Gawler East 12Jun19 V1 Appendix A

APPENDIX B SIDRA OUTPUT

Page 66: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

MOVEMENT SUMMARY

Site: 101 [North-South Link Rd - Future PM Peak ]

New SiteGiveway / Yield (Two-Way)

Movement Performance - Vehicles

Demand Flows 95% Back of QueueMovID

ODMov

Deg.Satn

AverageDelay

Level ofService

Prop. Queued

Effective Stop Rate

AverageSpeed Total HV Vehicles Distance

veh/h % v/c sec veh m per veh km/hSouth: North-South Link Rd (S)

1 L2 84 5.0 0.153 5.6 LOS A 0.0 0.0 0.00 0.18 56.6

2 T1 200 5.0 0.153 0.0 LOS A 0.0 0.0 0.00 0.18 58.4

Approach 284 5.0 0.153 1.7 NA 0.0 0.0 0.00 0.18 57.8

North: North-South Link Rd (N)

8 T1 379 5.0 0.201 0.0 LOS A 0.0 0.0 0.00 0.00 60.0

9 R2 53 5.0 0.040 6.5 LOS A 0.2 1.3 0.38 0.60 51.9

Approach 432 5.0 0.201 0.8 NA 0.2 1.3 0.05 0.07 58.8

West: Shopping Centre Access

10 L2 53 5.0 0.084 6.3 LOS A 0.3 2.3 0.37 0.62 51.7

12 R2 21 5.0 0.084 11.6 LOS B 0.3 2.3 0.37 0.62 51.2

Approach 74 5.0 0.084 7.8 LOS A 0.3 2.3 0.37 0.62 51.6

All Vehicles 789 5.0 0.201 1.8 NA 0.3 2.3 0.06 0.16 57.7

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).

Vehicle movement LOS values are based on average delay per movement.

Minor Road Approach LOS values are based on average delay for all vehicle movements.

NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.

SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).

HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

SIDRA INTERSECTION 7.0 | Copyright © 2000-2017 Akcelik and Associates Pty Ltd | sidrasolutions.comOrganisation: CIRQA PTY LTD | Processed: Wednesday, June 12, 2019 1:39:53 PMProject: P:\2019\19140 Springwood Shopping Centre\SIDRA\19140_12JUN19.sip7

Page 67: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

MOVEMENT SUMMARY

Site: 101 [Gawler East Link Rd - Future PM Peak]

New SiteGiveway / Yield (Two-Way)

Movement Performance - Vehicles

Demand Flows 95% Back of QueueMovID

ODMov

Deg.Satn

AverageDelay

Level ofService

Prop. Queued

Effective Stop Rate

AverageSpeed Total HV Vehicles Distance

veh/h % v/c sec veh m per veh km/hEast: Gawler East Link Rd (E)

8 T1 426 5.0 0.226 0.0 LOS A 0.0 0.0 0.00 0.00 60.0

9 R2 63 5.0 0.145 12.9 LOS B 0.5 3.7 0.72 0.89 47.8

Approach 489 5.0 0.226 1.7 NA 0.5 3.7 0.09 0.11 58.0

North: Shopping Centre Access

10 L2 84 5.0 0.399 15.6 LOS C 1.5 11.2 0.83 1.00 43.0

12 R2 21 5.0 0.399 48.9 LOS E 1.5 11.2 0.83 1.00 42.8

Approach 105 5.0 0.399 22.3 LOS C 1.5 11.2 0.83 1.00 42.9

West: Gawler East Link Rd (W)

1 L2 84 5.0 0.047 5.6 LOS A 0.0 0.0 0.00 0.58 53.4

2 T1 784 5.0 0.415 0.1 LOS A 0.0 0.0 0.00 0.00 59.9

Approach 868 5.0 0.415 0.6 NA 0.0 0.0 0.00 0.06 59.2

All Vehicles 1463 5.0 0.415 2.5 NA 1.5 11.2 0.09 0.14 57.2

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).

Vehicle movement LOS values are based on average delay per movement.

Minor Road Approach LOS values are based on average delay for all vehicle movements.

NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.

SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).

HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.

SIDRA INTERSECTION 7.0 | Copyright © 2000-2017 Akcelik and Associates Pty Ltd | sidrasolutions.comOrganisation: CIRQA PTY LTD | Processed: Wednesday, June 12, 2019 1:39:53 PMProject: P:\2019\19140 Springwood Shopping Centre\SIDRA\19140_12JUN19.sip7

Page 68: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

INTERSECTION SUMMARY

Site: 101 [North-South Link Rd - Future PM Peak ]

New SiteGiveway / Yield (Two-Way)

Intersection Performance - Hourly Values

Performance Measure Vehicles Persons

Travel Speed (Average) 57.7 km/h 57.7 km/hTravel Distance (Total) 798.2 veh-km/h 957.8 pers-km/hTravel Time (Total) 13.8 veh-h/h 16.6 pers-h/h

Demand Flows (Total) 789 veh/h 947 pers/hPercent Heavy Vehicles (Demand) 5.0 %Degree of Saturation 0.201Practical Spare Capacity 388.4 %Effective Intersection Capacity 3935 veh/h

Control Delay (Total) 0.39 veh-h/h 0.47 pers-h/hControl Delay (Average) 1.8 sec 1.8 secControl Delay (Worst Lane) 7.8 secControl Delay (Worst Movement) 11.6 sec 11.6 secGeometric Delay (Average) 1.5 secStop-Line Delay (Average) 0.3 secIdling Time (Average) 0.1 sec

Intersection Level of Service (LOS) NA

95% Back of Queue - Vehicles (Worst Lane) 0.3 veh95% Back of Queue - Distance (Worst Lane) 2.3 mQueue Storage Ratio (Worst Lane) 0.00Total Effective Stops 127 veh/h 153 pers/hEffective Stop Rate 0.16 per veh 0.16 per persProportion Queued 0.06 0.06Performance Index 15.0 15.0

Cost (Total) 324.08 $/h 324.08 $/hFuel Consumption (Total) 61.4 L/hCarbon Dioxide (Total) 146.5 kg/hHydrocarbons (Total) 0.011 kg/hCarbon Monoxide (Total) 0.168 kg/hNOx (Total) 0.264 kg/h

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).

NA: Intersection LOS for Vehicles is Not Applicable for two-way sign control since the average intersection delay is not a good LOS measure due to zero delays associated with major road movements.

SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Intersection Performance - Annual Values

Performance Measure Vehicles Persons

Demand Flows (Total) 378,947 veh/y 454,737 pers/yDelay 187 veh-h/y 224 pers-h/yEffective Stops 61,010 veh/y 73,212 pers/yTravel Distance 383,125 veh-km/y 459,750 pers-km/yTravel Time 6,637 veh-h/y 7,964 pers-h/y

Cost 155,559 $/y 155,559 $/yFuel Consumption 29,495 L/yCarbon Dioxide 70,322 kg/yHydrocarbons 5 kg/yCarbon Monoxide 81 kg/yNOx 127 kg/y

Page 69: APPLICATION ON NOTIFICATION Category 2 · 2020. 1. 15. · During the notification period, hard copies of the application documentation can be viewed at the Department of Planning,

INTERSECTION SUMMARY

Site: 101 [Gawler East Link Rd - Future PM Peak]

New SiteGiveway / Yield (Two-Way)

Intersection Performance - Hourly Values

Performance Measure Vehicles Persons

Travel Speed (Average) 57.2 km/h 57.2 km/hTravel Distance (Total) 1478.8 veh-km/h 1774.6 pers-km/hTravel Time (Total) 25.8 veh-h/h 31.0 pers-h/h

Demand Flows (Total) 1463 veh/h 1756 pers/hPercent Heavy Vehicles (Demand) 5.0 %Degree of Saturation 0.415Practical Spare Capacity 100.5 %Effective Intersection Capacity 3524 veh/h

Control Delay (Total) 1.02 veh-h/h 1.23 pers-h/hControl Delay (Average) 2.5 sec 2.5 secControl Delay (Worst Lane) 22.3 secControl Delay (Worst Movement) 48.9 sec 48.9 secGeometric Delay (Average) 1.0 secStop-Line Delay (Average) 1.6 secIdling Time (Average) 1.1 sec

Intersection Level of Service (LOS) NA

95% Back of Queue - Vehicles (Worst Lane) 1.5 veh95% Back of Queue - Distance (Worst Lane) 11.2 mQueue Storage Ratio (Worst Lane) 0.01Total Effective Stops 210 veh/h 252 pers/hEffective Stop Rate 0.14 per veh 0.14 per persProportion Queued 0.09 0.09Performance Index 29.7 29.7

Cost (Total) 592.22 $/h 592.22 $/hFuel Consumption (Total) 110.2 L/hCarbon Dioxide (Total) 262.8 kg/hHydrocarbons (Total) 0.019 kg/hCarbon Monoxide (Total) 0.303 kg/hNOx (Total) 0.457 kg/h

Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).

NA: Intersection LOS for Vehicles is Not Applicable for two-way sign control since the average intersection delay is not a good LOS measure due to zero delays associated with major road movements.

SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.

Intersection Performance - Annual Values

Performance Measure Vehicles Persons

Demand Flows (Total) 702,316 veh/y 842,779 pers/yDelay 492 veh-h/y 590 pers-h/yEffective Stops 100,849 veh/y 121,019 pers/yTravel Distance 709,844 veh-km/y 851,813 pers-km/yTravel Time 12,401 veh-h/y 14,882 pers-h/y

Cost 284,266 $/y 284,266 $/yFuel Consumption 52,886 L/yCarbon Dioxide 126,125 kg/yHydrocarbons 9 kg/yCarbon Monoxide 146 kg/yNOx 219 kg/y