58
Appendix B: Planning Process Documentation CONTENTS: 1. Local Planning Committee Invite List 2. Meeting Agendas 3. Meeting Sign-in Sheets 4. Meeting Notes 5. Meeting Presentations 6. Subject Matter Expert Surveys 7. Public Survey Results 8. Prioritization Worksheets 9. Public Comments on Plan

Appendix B: Planning Process Documentation

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix B: Planning Process Documentation

Appendix B: PlanningProcess Documentation

CONTENTS:

1. Local Planning Committee Invite List2. Meeting Agendas3. Meeting Sign-in Sheets4. Meeting Notes5. Meeting Presentations6. Subject Matter Expert Surveys7. Public Survey Results8. Prioritization Worksheets9. Public Comments on Plan

Page 2: Appendix B: Planning Process Documentation
Page 3: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Arroyo Cindey Colorado Springs Utilites [email protected] Assigned Group: Terrorism

Barrentine Jim Pikes Peak Community College [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Blanchard TobiColorado Springs Office ofEmergency Management

[email protected]

Boley Mark El Paso County Sheriff's Office [email protected]

Brady Mike Federal Express [email protected]

Brenner GordonColorado Springs Office ofEmergency Management

[email protected] Group: Flood

Broomfield Sally American Red Cross [email protected]

Burgard Tim Harrison School District 2 [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Carrier Will AECOM [email protected] Assigned Group: Wildfire

Chamberlain Rich AECOM [email protected] Assigned Group: Severe Weather/Geologic Hazards

Corsaro Cindy Memorial - UC Health [email protected]

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Page 4: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Curtis KeithPikes Peak Regional BuildingDepartment

[email protected]

Dunn Ray Fort Carson [email protected]

Easton Travis Public Works - Engineering [email protected] Assigned Group: Flood

Edmondson DavidColorado Springs PoliceDepartment

[email protected] Assigned Group: Terrorism

Eller PaulColorado Division of EmergencyManagement and HomelandSecurity - Mitigation and

[email protected]

Evans Bart El Paso County [email protected]

Farkas CoreyColorado Springs Public Works -Streets

[email protected] Assigned Group: Severe Weather/Geologic Hazards

Force Jeff Memorial Hospital - UC Health [email protected]

Frank Lawrence AECOM [email protected] Assigned Group: Terrorism

French Brigitte Penrose St Francis [email protected]

Gavelda PatriciaColorado Division of EmergencyManagement and HomelandSecurity - Mitigation and

[email protected]

Gonzales TomEl Paso County Public Health -Environmental Health Division

[email protected]

Gorsich-Bracken

Nancy South Central Region VOAD [email protected]

Page 5: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Grady Brian Academy School District 20 [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Griffin-Strickland

Deb Colorado Springs Utilites [email protected]

Hannon James USAA [email protected]

Hastings James School District 11 [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Hein JayColorado Springs Parks andRecreation

[email protected] Assigned Group: Wildfire

Howard BartColorado Springs Office ofEmergency Management

[email protected] Group: Terrorism

Hughlett Ken Colorado Springs Utilites [email protected] Assigned Group: Flood

Husted DavidColorado Springs PoliceDepartment

[email protected] Assigned Group: Terrorism

Inzer Lonnie El Paso County OEM [email protected]

Jenkins Jimmy [email protected]

Kelley Brian Public Works [email protected] Assigned Group: Flood

Page 6: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Korwes Christopher Peterson AFB [email protected]

Lacey BrettColorado Springs Fire Marshal'sOffice

[email protected] Assigned Group: Wildfire

Magnuson Tom National Weather Service [email protected] Assigned Group: Severe Weather/Geologic Hazards

Martinez OscarUnited States Forestry Service -Pike and San Isabel NationalForest

[email protected] Assigned Group: Wildfire

Mitros TimPublic Works - Engineering/Fountain Creek Watershed FloodControl and Greenway District

[email protected]

Morin Natalie Cheyenne School District 12 [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Mouton Andre United States Air Force Academy [email protected]

Pirri Kimberly AECOM [email protected] Assigned Group: Flood

Poage David American Red Cross [email protected]

Quitana KennyColorado Department ofTransportation

[email protected] Assigned Group: Flood

Roux RussSouth Central Health CareCoalition

[email protected]

Page 7: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Sasaki Caroline El Paso County OEM [email protected]

Scalfri DavidColorado Springs Public Works -Streets

[email protected] Assigned Group: Severe Weather/Geologic Hazards

Sevey Anthony Fort Carson OEM [email protected]

Smith RC El Paso County OEM [email protected]

Stanton David American Red Cross [email protected]

Stoecklein TimUniversity of Colorado atColorado Springs

[email protected] Group: Severe Weather/Geologic Hazards

Sylvester AmyColorado Springs Fire Marshal'sOffice

[email protected] Assigned Group: Wildfire

Teferiller Ryan Planning - Land Use Review [email protected]

Vigil Steve Information Technology - GIS [email protected]

Vitwar David Colorado Springs Fire Department [email protected] Group: Wildfire

Waldrip ErikCheyenne Mountain Air ForceStation

[email protected]

Walker Jeremy Colorado Technical University [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Page 8: Appendix B: Planning Process Documentation

Last Name First Name Organization Email address Signature

Local Planning Committee - Colorado Springs Hazard Mitigation PlanRevision - July 29, 2015

Waters BretColorado Springs Office ofEmergency Management

[email protected]

Watson David School District 49 [email protected] Group: Terrorism OR Severe Weather/GeologicHazards

Will DennisColorado Springs Parks andRecreation

[email protected] Assigned Group: Wildfire

Wysocki Peter Planning - Land Use Review [email protected]

Page 9: Appendix B: Planning Process Documentation

Page 1 of 4

City of Colorado SpringsPre-Disaster Mitigation Plan RevisionPre-Kickoff Meeting Conference Call

April 16, 201510:00 am to 12:00 pm MDT

AGENDA

1. Introductions: roles and responsibilities

2. Any contractual business

3. Plan Revision schedule and process

4. Plan Revision participantsa. Local Planning Committee (have jurisdictional authority in COS)b. Initial identification of key stakeholders

5. PDMP data needs for identified hazards including human-causeda. GIS Data Needsb. Hazus Data Needs – Matrix Flood Inundation Study, Latest

DEM

6. Other Plans of note that need to be reviewed

7. Kickoff meeting date, invitations and materials discussion

8. Public Outreach Strategy Framework

9. Next Steps

Page 10: Appendix B: Planning Process Documentation

Page 2 of 4

Local Planning Committee (Local Jurisdictional Authority)

� Office of Emergency Management� Fire Department� Police Department� Planning and Development� City Engineering/Stormwater� Colorado Springs Utilities� El Paso County Office of Emergency Management (include here or as Stakeholder?)� Pikes Peak Regional Building Department� Pikes Peak Metropolitan Medical Response System

Stakeholders

� Downtown Business Partnership� Peterson Air Force Base� US Air Force Academy� Cheyenne Mountain Air Force Station� USAA� Federal Express� Fountain Creek Watershed Flood Control and Greenway District� Pikes Peak Community College� University of Colorado at Colorado Springs� Colorado State departments (DHSEM and CDOT)� Other El Paso County departments?� Non-profits?� State and National Parks?� Other Regional agencies?

Plans

� Updated comprehensive plan� Capital Improvement budget/plan� 2011 Colorado Springs Community Wildfire Protection Plan� Recovery plans� 2012 Colorado Springs Emergency Preparedness and Safety Guide� 2007 Emergency Operations Plan� Local by-laws, building codes, and zoning ordinances� Shook’s Run Drainage Basin Planning Study

Page 11: Appendix B: Planning Process Documentation

Page 3 of 4

GIS Data

Data Source Notes (scale, vintage, etc.)Aerial & ElevationAerial Photography City, CSUDigital Elevation Model CSUBoundariesCounty Boundary CityMunicipal Boundaries CityDistricts City, CSU, El Paso CountyZoning CityLand Use CityFuture Land Use CityZip Codes CityInventoryParcels CSUAssessor's Data CSUBuilding Footprints CSUStreet Trees CitySnow Routes CityNatural FeaturesStreams, Lakes (Hydrography) StormwaterCritical FacilitiesRoads CityPolice Stations CityFire Stations CitySchools CityHospitals CityAirports CityBridges CityDams CityWater Facilities CityWastewater Facilities CityCommunications Facilities CityEOCs CityGovernment Buildings City/CSULevees City/CSUPowerplants or Substations CityHazards DataFlood Hazard Zones CityEarthquake Data City/USGS

Page 12: Appendix B: Planning Process Documentation

Page 4 of 4

Data Source Notes (scale, vintage, etc.)Wildfire (Burn Areas) City/CSUWildland Urban Interface Areas CityRockfallLandslideSubsidenceHazmat Facilities City

Page 13: Appendix B: Planning Process Documentation

City of Colorado SpringsPre-Disaster Mitigation Plan Revision

GIS Data Needs – May 21, 2015

Page 1 of 1

Data Source Notes (scale, vintage, etc.)Aerial & ElevationAerial Photography City, CSUDigital Elevation Model CSUBoundariesCounty Boundary CityMunicipal Boundaries CityDistricts City, CSU, El Paso CountyZoning CityLand Use CityFuture Land Use CityZip Codes CityInventoryParcels El Paso CountyAssessor's Data El Paso CountyBuilding Footprints El Paso CountyStreet Trees El Paso CountySnow Routes El Paso CountyNatural FeaturesStreams, Lakes (Hydrography) StormwaterCritical FacilitiesRoads CityPolice Stations CityFire Stations CitySchools CityHospitals CityAirports CityBridges CityDams City/CSUWater Facilities City/CSUWastewater Facilities City/CSUCommunications Facilities CityEOCs CityGovernment Buildings City/CSULevees City/CSUPowerplants or Substations CSUHazards DataFlood Hazard Zones PPRBDEarthquake Data City/USGSWildfire (Burn Areas) City/CSUWildland Urban Interface Areas CityRockfall CSGSLandslide CSGSSubsidenceHazmat Facilities City

Page 14: Appendix B: Planning Process Documentation

City of Colorado SpringsPre-Disaster Mitigation Plan (PDMP) Revision

Kickoff Meeting

May 12, 20151:00 pm to 3:00 pm MDT

AGENDA

1. Welcome and Remarks – Bart Howard, Office of EmergencyManagement (OEM)

2. General Introductions

3. Introduction of AECOM Team – Kim Pirri, AECOM

4. Purpose and overview of mitigation planning and Colorado SpringsPDMP – Lawrence Frank, AECOM

5. Purpose and roles of the Local Planning Committee and Stakeholders –Lawrence Frank

6. Baseline Survey

7. Local Mitigation Planning Process – Lawrence Franka. Themes/Conceptsb. List of Hazardsc. Data Collectiond. Plans to Reviewe. Past Goals and Actions

8. Detailed Survey and Discussion

9. Plan Revision schedule – Lawrence Frank and OEM� Chart out next two meetings

10. Public Outreach Strategy Framework – Lawrence Frank

11. Next Steps

Page 15: Appendix B: Planning Process Documentation

Pre-DisasterMitigation PlanKickoff Meeting

Page 16: Appendix B: Planning Process Documentation

Agenda

– OEM Welcome and Remarks• General Introductions• Introduction of AECOM Team

– Purpose and overview of mitigation planning and COSPDMP

– Purpose and roles of the Local Planning Committee andStakeholders• Baseline Survey

– Local Mitigation Planning Process• Detailed Survey and Discussion

– Plan Revision schedule including next two meetings– Public Outreach Strategy Framework

• Next Steps

Page 17: Appendix B: Planning Process Documentation

Purpose and Overviewof Mitigation Planningand COS PDMP

Page 18: Appendix B: Planning Process Documentation

Emergency Management Cycle

MITIGATIONMITIGATION

RESPONSERESPONSE

RECOVERYRECOVERYDISASTERDISASTER

PREPARATIONPREPARATION

Page 19: Appendix B: Planning Process Documentation

Mitigation is…

Sustained action taken to reduce oreliminate long-term risk to human lifeand property from natural and humancaused hazards

Photo Credit: Colorado Springs OEM

Photo Credit: Colorado Springs OEM

Page 20: Appendix B: Planning Process Documentation

Mitigation is…

Partnerships to combineefforts to reduce the risk ofhazards in the community.

Page 21: Appendix B: Planning Process Documentation

Increasing Disaster Costs

Decade – Cost in BillionsllionsDecade – Cost in BilDecade – Cost in Billions

2000-2013 – $2,500002000-2013 – $2,52000-2013 – $2,500

1990s – $778.331990s – $778.31990s – $778.3

1980s – $262.91980s – $262.91980s – $262 91980s $262.91980s – $262.9

1970s – $161.771970s – $161.71970s – $161.7

1960s – $93.31960s – $93.31960s – $93.3

1950s – $53.61950s – $53.61950s – $53.6

Worldwide Economic Losses from Natural Disasters

$2.5 Trillion!*

*from a U.N. estimate

Page 22: Appendix B: Planning Process Documentation

Increasing Disaster Costs

Year Peril Insured Loss Insured Lossin 2014 Dollars

July 20, 2009 Hail and wind –Denver Metro $767.6 M $844.9 M

July 1990 Hail-Colorado $625 M $1.1 Billion

June 2012Wildfire -Colorado Springs(Waldo Canyon)

$453.7 M $466.7 M

June 2013 Wildfire - BlackForest, Colorado $420.5 M $426.3 M

Most Costly Non-Flood Catastrophesin the Rocky Mountain Region

Source: Rocky Mountain Insurance Information Association

Page 23: Appendix B: Planning Process Documentation

Disaster Mitigation Act of 2000

– Encourages and facilitates Local/State planning

– Requires a hazard mitigation plan to maintain eligibility forFEMA mitigation funds

– Enables effective risk reduction

– Creates public forum for hazard mitigation

Page 24: Appendix B: Planning Process Documentation

Benefits of Mitigation Planning

– Identifies community policies/actions for risk reduction

– Communicates priorities to state and federal officials

– Builds partnerships and efficiencies

– Helps institutionalize mitigation

– Helps creates disaster resilient communities by preparingnow to reduce impact of future disasters

Page 25: Appendix B: Planning Process Documentation

Benefits of Mitigation Planning

– Can help achieve multiple community objectives

– Eligibility and/or preparation for Grant Programs…• Hazard Mitigation• Pre-Disaster Mitigation• Flood Mitigation Assistance• HUD Recovery (CDBG-DR) programs• Others

– Synergies – How can we do more?

Page 26: Appendix B: Planning Process Documentation

Examples of Mitigation Project Categories

– Preventive

– Property Protection

– Public Education and Awareness

– Natural Resource Protection

– Emergency Services Protection

– Structural Projects

Photo Credit: Colorado Springs OEM

Page 27: Appendix B: Planning Process Documentation

Colorado Springs PDMP – 2015 Plan Revision

– Chapter 1 Introduction

– Chapter 2 Community Profile

– Chapter 3 Planning Process

– Chapter 4 Risk Assessment

– Chapter 5 Mitigation Strategy

– Chapter 6 Plan Maintenance

– Appendices

Page 28: Appendix B: Planning Process Documentation

Colorado Springs PDMP – 2015 Plan Revision

– How Mitigation Planning isdistinct from other on-goingefforts

– Challenges• Cross-disciplinary (requires multiple

partners to succeed)• Scarce resources• Competes with other worthy issues• Disaster amnesia

Page 29: Appendix B: Planning Process Documentation

Purpose and Roles of theLocal Planning Committee andStakeholders

Page 30: Appendix B: Planning Process Documentation

Who is what?

–Local Planning Committee• Municipal Agencies – You have the jurisdictional authority

to implement mitigation• Input is significant!

–Stakeholders• Community representatives – A broader audience

affected by the implemented mitigation• A force-multiplier on the LPC, with grass-roots knowledge

and leadership• Input is significant!

Page 31: Appendix B: Planning Process Documentation

Local Planning CommitteeRole and Responsibilities

– Provide data and institutional knowledge

– Communicate plan goals and progress withagency/department

– Review risk assessment and critique vulnerability analysis

– Update the mitigation strategy and prioritize mitigationactions

– Help promote mitigation and resiliency within community

– Review and provide comments on draft plan

– For actions within your jurisdiction, help implement them

Page 32: Appendix B: Planning Process Documentation

StakeholdersRole and Responsibilities

– Provide data and institutional knowledge

– Communicate and promote plan goals and progress withconstituency

– Review risk assessment and critique vulnerability analysis

– Update the mitigation strategy and prioritize mitigationactions

– Help promote mitigation and resiliency within community

– Review and provide comments on draft plan

Page 33: Appendix B: Planning Process Documentation

Baseline Survey(10 minutes)

Page 34: Appendix B: Planning Process Documentation

Local MitigationPlanning Process

Page 35: Appendix B: Planning Process Documentation

Planning ProcessEstablish a

PlanningProcess

Establish aPlanningProcess

HazardIdentification,Analysis, and

RiskAssessment

HazardIdentification,Analysis, and

RiskAssessment

CapabilityAssessmentCapability

Assessment

MitigationStrategy –Alternative

Measures andImplementation

MitigationStrategy –Alternative

Measures andImplementation

Plan Monitoringand EvaluationPlan Monitoringand Evaluation

Keep the PlanCurrent

Update It.

Keep the PlanCurrent

Update It.

Page 36: Appendix B: Planning Process Documentation

Desired Outcomes

– FEMA compliant plan• Accrue CRS points• Receive EMAP mitigation credit

– Build on momentum from recovery

– Enhance working relationships

– Clear sense of priority

– Risk and potential actions communicated to community,including public and elected officials

– Make it compelling and interesting to the public

Page 37: Appendix B: Planning Process Documentation

Planning Themes

– Public-private partnerships

– Make floodplains an amenity –nature trail with flood buffer(natural function of the floodplain)

– Proactive long term approachesand enhanced readiness posture(can react to events better)

– Engage the whole community(public, business, non-profit,military)

CommunityResilienceCommunityResilience

ExistingPlanningExistingPlanning

Page 38: Appendix B: Planning Process Documentation

CommunityResilience

ExistingPlanning

HazardMitigation

Planning Themes

– Integrate mitigation into other localplanning mechanisms

– To the extent possible, make mitigationa consideration in day-to-day communitybusiness and when making capital investments

– Opportunities to piggyback a mitigation project ontoanother infrastructure project (e.g., road reconstructionplus drainage system upgrade)

– Get as many uses out of your capital, your land, and yourinfrastructure as possible

Page 39: Appendix B: Planning Process Documentation

Planning Themes

– Combined talent, authority,energy, experience andcapability as a committee to dowhat would not be possible witheveryone on their own

– Address immediate risks whilealso laying groundwork toapproach on-going, long-termrisk

– Leverage funding opportunities

Page 40: Appendix B: Planning Process Documentation

Planning Themes - Integration

– Integration into local planningmechanisms• Consider natural hazards information (past

events, impacts and vulnerabilities)• Identify hazard prone areas• Identify inconsistencies, gaps, and

recommendations• Add into plans like comprehensive plan and

capital improvement budgeting process

– Integration between departments• Involve key community officials with authority to

execute policies and programs• Collaborate across departments to share

knowledge and build relationships forsuccessful implementation

Photos Credit: FEMA Region III

Page 41: Appendix B: Planning Process Documentation

Risk Assessment

Risk: Intersection ofHazard, Vulnerability and

Capability

RISKRISK

VulnerabilityVulnerability

HazardHazard

CapabilityCapability

Photo Credit: NASA

Page 42: Appendix B: Planning Process Documentation

Identifying the Hazards2010 PDMP Update included:– Dam and Levee Failure– Drought– Earthquake– Flood– Hail– Landslide– Lightning– Severe Winter Storm– Tornado– Wildfire– Windstorm– Human-caused hazards

2015 PDMP Revision:– Updates all those hazards

– Flood after Fire– More detail on:

• Human-caused hazards• Terrorism

Page 43: Appendix B: Planning Process Documentation

Hazard Profile in the Risk Assessment

– Hazard Description– Geographic Location / Spatial Extent

• Using best available data, depict and describe areas at risk• Focus on increased risk from flooding post-wildfire

– Previous Occurrences– Probability and Extent of Future Occurrences– Magnitude / Severity

• Determine what is at risk – especially critical facilities and criticalinfrastructure

– Vulnerability Assessment– Damage Estimates (for certain hazards, using Hazus)

Page 44: Appendix B: Planning Process Documentation

Data Sources for Hazard Analysis

– Local GIS data

– National Oceanic and Atmospheric Administration (NOAA)

– National Weather Service (NWS)

– SHELDUS – Spatial Hazard Event and Loss Database

– NCDC – National Climatic Data Center

– Western Regional Climate Center

– Others specific to hazard

Page 45: Appendix B: Planning Process Documentation
Page 46: Appendix B: Planning Process Documentation

How Hazus fits into the Planning Process…

Page 47: Appendix B: Planning Process Documentation

Example HazusOutput…

Flood Model

Estimated Losses

Page 48: Appendix B: Planning Process Documentation

Plans to Review

– Approved City Comprehensive Plan– Capital Improvement budget/plan– 2011 Community Wildfire Protection Plan– Recovery plan (being revised)– 2012 Colorado Springs Emergency Preparedness and

Safety Guide– 2014 Emergency Operations Plan– Local by-laws, building codes, and zoning ordinances– Shook’s Run Drainage Basin Planning Study– Colorado State Mitigation Plan– Colorado Resiliency Framework– ARE THERE MORE TO CONSIDER???

Page 49: Appendix B: Planning Process Documentation

Past Mitigation Goal, Objectives, and Actions

–Reduce or eliminate the exposure to propertydamage, injury or loss of life, and damage to thenatural environment caused by natural hazards.

• Identify and initiate improvements to public safety,response, and recovery programs to reduce risk andvulnerability.

• Follow through with and leverage existing organizations,programs, and procedures to implement the PDMProgram.

Page 50: Appendix B: Planning Process Documentation

Past Mitigation Goal, Objectives, and Actions

• Build upon existing public outreach efforts to reduce riskand vulnerability to natural hazards.

• Leverage external financial assistance and otherresources to strengthen the City's disaster resiliency.

• Continue to improve the regulatory review process fordevelopment and construction in the vicinity of knownnatural hazard areas.

• Continue to assess ongoing disaster preparednessprograms that maintain or improve City preparedness.

Page 51: Appendix B: Planning Process Documentation

Results of Baseline Surveyand Detailed Survey(20 minutes)

Page 52: Appendix B: Planning Process Documentation

Plan Revision Schedule

– Two more meetings for LPC and Stakeholders• Risk Assessment Meeting• Mitigation Strategy Meeting

Page 53: Appendix B: Planning Process Documentation

Public Outreach StrategyFramework

Page 54: Appendix B: Planning Process Documentation

Who to Involve

– Considering a few more stakeholders:

• Downtown Business Partnership

• Non-profits

• Environmental Groups

• US Forest Service

– General public

Page 55: Appendix B: Planning Process Documentation

How to Involve Them

– Already have organized wildland fire preparedness drillsand flash flood preparedness meetings

– Survey– Information available at the “Community Emergency

Preparedness Night” at the May 31st Sky Sox game– Public Meetings– Stakeholders promote preparedness and resiliency among

constituencies– Post notifications and draft plan on OEM website (and

others)– Other preferred and successful outreach modes

• Social media

Page 56: Appendix B: Planning Process Documentation

Next Steps

Action Items for LPC:

– Confirm dates for next two meetings

– Review 2010 actions

– Known hazard events from 2010-2015

– Recent/New Mitigation actions completed by yourorganization

• Projects triggered by recent fires (recovery, HUD, HMGP)

• Post-fire flood recovery

Page 57: Appendix B: Planning Process Documentation

Next Steps

Action Items for Stakeholders:

– Confirm dates for next two meetings

– Promote your participation in the planning process withinyour agency

– Recent/New Mitigation actions completed by yourorganization

• Projects triggered by recent fires (recovery, HUD, HMGP)

• Post-fire flood recovery

Page 58: Appendix B: Planning Process Documentation

Questions???