16
Appendix A Conceptual Engineering Drawings Environmental Assessment May 2015 Tempe Streetcar

Appendix A Conceptual Engineering Drawings

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Appendix A

Conceptual Engineering Drawings

Environmental Assessment May 2015 Tempe Streetcar

This page is intentionally left blank.

Environmental Assessment May 2015 Tempe Streetcar

2

0

SCALE IN FEET

200 400

2

4

3

5

6

7

8

9 10 1311 12

R

I

O

S

A

L

A

D

O

P

A

R

K

W

A

Y

MARINA HEIGHTS /

RIO SALADO PARKWAY

PA

CK

AR

D D

RIV

E

CONCEPT LAYOUT

SIG

NA

L

PE

DE

ST

RIA

N

SIG

NA

L

PE

DE

ST

RIA

N

TPSS

RS/P

OPTION 2

9.2

6

10

11

6.5

4.7

17

4.7

6.5

11

10

6

4.6

1

0

.

3

6

1

0

1

1

6

.

5

1

3

.

5

6

.

5

1

0

1

1

1

0

6

5

.

7

DATE: 09 FEBRUARY 2015

2

4

3

5

6

7

8

9 10 1311 12

SCALE IN FEET

0 200

HAYDEN FERRY /

RIO SALADO PARKWAY

CONCEPT LAYOUT

TPSS

RS/P

OPTION 1

SIG

NA

L

PE

DE

ST

RIA

N

1

4

6

1

0

1

1

6

.

5

4

.

7

1

7

4

.

7

7

.

5

1

1

1

0

6

1

2

.

5

DATE: 09 FEBRUARY 2015

RIO SALADO PARKWAY

2

3

4

5

6

7

8

9 10 11 12 13

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

EXISTING LRT TRACKS

DATE: 09 FEBRUARY 2015

MIL

L A

VE

NU

E

TEMPE BEACH PARK /

RIO SALADO PKWY

AS

H A

VE

NU

E

TPSS

RS/A

RIO

SA

LA

DO

PA

RK

W

AY

SIG

NA

L

PE

DE

ST

RIA

N

2

3

4

5

6

7

8

9 10 11 12 13

4TH STREET

3RD ST / MILL AVE

MILL AVE / 3RD ST

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

TPSS

3/M

1151 s.f. R-O-W

7

8

9

EXISTING LRT TRACKS

DATE: 09 FEBRUARY 2015

AS

H A

VE

NU

E

TPSS

3/A

3RD ST / ASH AVE

3RD STREET

MIL

L A

VE

NU

E

UNIVERSITY DRIVE

MIL

L A

VE

NU

E

AS

H A

VE

NU

E

2

3

4

5

6

7

8

9 10 11 12 13

7TH STREET

UNIVERSITY DR / ASH AVE

9TH ST / MILL AVE

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

U/M

DATE: 09 FEBRUARY 2015

DATE: 09 FEBRUARY 2015

PEDESTRIAN SIGNAL

TPSS

NO LEFT TURN

10

TH

S

TR

EE

T

11

TH

S

TR

EE

T

MILL AVENUE

2

3

4

5

6

7

8

9 10 11 12 13

9T

H S

TR

EE

T

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

DATE: 09 FEBRUARY 2015

11

TH

S

T / M

IL

L A

VE

2

3

4

5

6

7

8

9 10 11 12 13

APACHE BOULEVARD

MIL

L A

VE

NU

E

FO

RE

ST

A

VE

NU

E

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

TPSS

13/M

DATE: 09 FEBRUARY 2015

8' Parking Lane

5' Bike Lane

10' Thru Lane

10' Thru Lane

12' Thru Lane

12' Thru Lane

5' Bike Lane

8' Parking Lane

2

3

4

5

6

7

8

9 10 11 12 13

M

C

A

L

L

I

S

T

E

R

A

V

E

N

U

E

COLLEGE AVE /

APACHE BLVD

NO

RM

AL

A

VE

NU

E

SCALE IN FEET

0 200 400

CONCEPT LAYOUT

CO

LL

EG

E A

VE

NU

E

DATE: 09 FEBRUARY 2015

APACHE BOULEVARD

This page intentionally left blank.