Appendix A - Alternatives
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
Alt 3-1
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
L E G E N D
Proposed Pavement
Proposed Multi-Use Trail
Existing Pavement
Pavement to be Removed
Greenspace / Park Land
Lower Gorge Area
Native Plantings / Landscape Restoration Areas
Section LocationA
September 2012
TOP OF GORGE
TOP OF GORGE
EDGE OF WATER
EDGE OF WATER
2nd ST.
RAINBOW BLVD.
1st ST.
NIAGARA ST.
MAIN ST.
FERRY AVE.
3rd ST.
2nd ST.
3rd ST.
WHIRLPOOL ST.
PINE AVE.
CEDAR AVE.
SPRUCE AVE.
ELMW
OOD AVE.
RAIN
BOW B
RIDG
E
ORCHARD PKWY.
PIERCE AVE.
DISCOVERYCENTER
RAINBOW BRIDGEPLAZA
ASHLAND AVE.
CHILTON AVE.
AQUARIUMOF
NIAGARA
384
104
62
HISTORIC
NIAGARA
RESERVATION
STATE PARK
R o b e r t M o s e s P a r k w a y ( R M P )
R e a l i g n e d P a r k w a y t o C r e a t e
a C a m p u s S e t t i n g f o r t h e
D i s c o v e r y C e n t e r a n d A q u a r i u m
P r o p o s e d A q u a r i u m
I m p r o v e m e n t s b y o t h e r s
R e c o n s t r u c t e d O v e r l o o k P a r k i n g
A n d W h i r l p o o l S t r e e t
N a t i v e P l a n t i n g s /
L a n d s c a p e R e s t o r a t i o n
A r e a s
3A 3B
North0 100 200 400
Feet
• Remove the roadway segment between the Discovery Center and the Aquarium and replace it with an “S” curve to Third Street at Pine Avenue.
• Remove the pedestrian overpass between Aquarium and Discovery Center; connect the facilities with a landscape of broad walks and native plants; accent with interpretive features.
• Design the multimodal trail to service both facilities.
MAIN ST. TO CEDAR AVE.3A
Alt 3-2
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
L E G E N D
Proposed Pavement
Proposed Multi-Use Trail
Existing Pavement
Pavement to be Removed
Greenspace / Park Land
Lower Gorge Area
Native Plantings / Landscape Restoration Areas
Section LocationA
September 2012
TOP OF GORGE
EDGE OF WATER
TOP OF GORGE
EDGE OF WATERPA
RK ROAD
WILLOW
AVE. 8th ST.
MAIN ST.
MAIN ST.
LINWOOD AVE.
DIVISION AVE.
LINCOLN PL.SOUTH AVE.
CLEVELAND AVE.
NIAGARA AVE.
ONTARIO AVE.
DEPOT AVE.NORTH AVE.
WHIRLPOOL ST.
WHIRLPOOL BRIDGE
BELLEVUE AVE.
GILLETT CT.
WHIRLPOOL ST.
CHESTNUT AVE.
FINDLAY DR.
LEWISTON RD.
CHASM AVE.
McKOON MONTEAGLE ST.
MACKLEM AVE.
CLIFTON ST.
SEYMOUR AVE.
COLLEGE AVE.
VAN RENSSELAER AVE.
BATHAVE.
MICHIGAN
104
104
104
31
DEVEAUX WOODS STATE PARK
WHIRLPOOL
STATE PARKA c c e s s t o W h i r l p o o l S t a t e P a r k
a l o n g t h e N o r t h b o u n d L a n e s o f
t h e R o b e r t M o s e s P a r k w a y
N a t i v e P l a n t i n g s /
L a n d s c a p e R e s t o r a t i o n
A r e a s
N a t i v e P l a n t i n g s /
L a n d s c a p e R e s t o r a t i o n
A r e a s
3A
3B 3CNorth
0 100 200 400Feet
• Redesign Whirlpool Street from Cedar Avenue to Findlay Drive. Curve Whirlpool Street to the lower level (where the 2-way RMP is now) and bring the road into the Orchard Parkway Overlook.
• Loop Orchard Parkway with Pierce Avenue; connect the neighborhood to the Overlook and multimodal trail with pedestrian crossings.
• Connect city sidewalks to the multimodal trail with numerous safe pedestrian and bicycle crossings.
• Remove the Whirlpool Bridge Overpass.
• Provide gorge trail and overlook parking near Whirlpool Bridge.
• Expand native meadow and shrub plantings in mowed lawn areas.
• Design a new entry feature to the gorge area parks at Findlay Drive.
CEDAR AVE. TO FINDL AY DR.3B
Alt 3-3
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
L E G E N D
Proposed Pavement
Proposed Multi-Use Trail
Existing Pavement
Pavement to be Removed
Greenspace / Park Land
Lower Gorge Area
Native Plantings / Landscape Restoration Areas
Section LocationA
September 2012
TOP OF GORGE
TOP OF GORGE
EDGE OF WATER
EDGE OF WATER
TOP OF GORGE
TOP OF GOR
TOW
N O
F LEWISTO
N
CITY
OF N
IAG
AR
A FA
LLS
LEWISTON RD.
LEWISTON RD.
VANDERBILT AVE.
CARROLL ST.
CLIFF ST.CLIFF ST.
MAPLE AVE.
WASHINGTON AVE.
MORLEY AVE.
JAMES AVE.
ORMOND AVE.
HARRISON AVE.
MCKINLEY AVE.
PARK ROAD
RANKINE AVE.
BARTON ST.
PARK ROAD
MAPLE AVE.
MCKOON AVE.
WOODLAND PL.
GARRETT AVE.
NORWOOD AVE.
WYO
MIN
G AV
E.
RANKINE AVE.
LAFAYETTE AVE. PENN ST.
GARFIELD AVE.
POWER AUTHORITY SERVICE RD.
ROOSEVELT AVE.
HYDE PARK BLVD.
UNIVERSITY DR.
PARK ROAD
THOR
NDAL
E AVE
.
RIVERVIEW AVE.
NIAGARA UNIVERSITY
LAFAYETTE AVE.104
104
61
MAPLE AVEELEMENTARY
SCHOOL
POW
ER A
UTHO
RITY S
ERVICE RD
DEVIL'S HOLESTATE PARK
1 3 ’ W i d e M u l t i - U s e T r a i l
A l o n g E x i s t i n g R o b e r t M o s e s
P a r k w a y
V e h i c l e a n d P e d e s t r i a n
A c c e s s i n t o
N e i g h b o r h o o d s W h e r e v e r
F e a s i b l e .
N o r t h P a r k i n g a n d P e d e s t r i a n
B r i d g e R e m o v e d a n d R e p l a n t e d
w i t h N a t i v e V e g e t a t i o n
N a t i v e P l a n t i n g s /
L a n d s c a p e R e s t o r a t i o n
A r e a s
3B
3C 3D
North0 100 200 400
Feet
• Retain the existing 2-lane park road and multimodal trail.
• Connect neighborhood streets to the park road.
• Design a minor entry feature at Whirlpool State Park.
• Establish safe pedestrian route/crossings from the Deveaux neighborhood to the multimodal trail.
• Design a standard roadway intersection including stop signs and directional signs at Devil’s Hole.
• Remove ramp lanes and simplify the layout of the gorge side parking lot. Remove the Lewiston Road parking lot and pedestrian overpass. Restore with soil and native plantings.
• Remove chain link fences, jersey barriers, and guide rails wherever not required.
FINDL AY DR. TO DEVIL’S HOLE3C
Alt 3-4
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
L E G E N D
Proposed Pavement
Proposed Multi-Use Trail
Existing Pavement
Pavement to be Removed
Greenspace / Park Land
Lower Gorge Area
Native Plantings / Landscape Restoration Areas
Section LocationA
September 2012
RGE
TOP OF GORGE
EDGE O
F WATER
EDGE
OF W
ATER
TO
LEWISTON RD.
OLD LEWISTON RD.
RIVERDALE AVE.
SPRING ST.
GEORGE ST.
IRVING DR.
NYPA POWER PROJECT
LEWISTON RD.
PAVED TRAIL
RIVERDALE CEMETERY
PARK
ROAD
BARTON DR.
HEWITT PKWY.
KENNETH AVE.
FORT GRAY DR.
MEADOW
BROOK DR.
LEWISTON - QUEENSTON BRIDGE
FORT GRAY DR.
PAVE
D TRAIL
UNPAVED TRAIL
LEWISTON - QUEENSTONBRIDGE INSPECTION
PLAZA
NIAGARA FALLSCOUNTRY CLUB
NIAGARA FALLSCOUNTRY CLUB
FAIRWAY DR.
OUR LADY OF PEACENURSING CARE
POWER VISTA
104
104
MOUTAIN RD
UPPER
R e m o v e R a i l b e d T r a i l a n d
R e s t o r e w i t h N a t i v e P l a n t i n g s
C o n n e c t M u l t i - U s e T r a i l w i t h
E x i s t i n g R a i l b e d P a t h W h i c h
P r o v i d e s P e d e s t r i a n A c c e s s
i n t o t h e N e i g h b o r h o o d
N e w M u l t i - U s e T r a i l
E n s c a r p m e n t O v e r l o o k
3C
N a t i v e P l a n t i n g s /
L a n d s c a p e R e s t o r a t i o n A r e a s
3D 3E
North0 100 200 400
Feet
DEVIL’S HOLE TO LEWISTON-QUEENSTON BRIDGE
• Continue the 2-way park road and multimodal trail from Devil’s Hole to Center Street on existing pavement.
• Convert the northbound lanes to 2-way traffi c.
• Convert southbound lanes to a multi-modal trail. Repave, stripe and sign as required.
• Remove chain link fences, jersey barriers, and guide rails wherever not required.
3D
Alt 3-5
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
L E G E N D
Proposed Pavement
Proposed Multi-Use Trail
Existing Pavement
Pavement to be Removed
Greenspace / Park Land
Lower Gorge Area
Native Plantings / Landscape Restoration Areas
Section LocationA
September 2012
OP OF GORGE
EDGE OF WATER
TOW
N O
F LEWISTO
NV
ILLAG
E OF LEW
ISTON
VILLAGE OF LEWISTON
TOWN OF LEWISTON
LEWISTON RD.
MILITARY RD.
HOMESTEAD
MOUNTAIN VIEW DR.
NIAGARA FALLSCOUNTRY CLUB
ARTPARK
SENECA ST.
ARTPARK ACCESS RD.
PARK ROAD
CREEK RD. EXTENSIONLEWISTON RD.
CREEK RD. EXTENSION
S. 8th ST.
TUSCARORA ST.
PARK ROAD
MOUNTAIN VIEW DR.
ARTPARK
ROBERT MOSES PKWY.
ROBERT MOSES PKWY.
CENTER ST.
PORTAGE R
D.
CAYUGA ST.
S. 9TH ST.
WALKER DR.
CREEK RD. EXTENSION
CAYUGA DR.
WALKER DR.
104
104
265
T r a n s i t i o n t h e T w o - W a y R o b e r t
M o s e s P a r k w a y B a c k t o t h e
E x i s t i n g 4 - L a n e D i v i d e d
H i g h w a y N o r t h o f C e n t e r S t r e e t .
N e w E n s c a r p m e n t
O v e r l o o k w i t h
P a r k i n g
N a t i v e P l a n t i n g s /
L a n d s c a p e
R e s t o r a t i o n A r e a s
M a i n t a i n v e h i c l e a c c e s s f r o m
A r t P a r k t o t h e R o b e r t M o s e s
P a r k w a y
North0 100 200 400
Feet
LEWISTON-QUEENSTON BRIDGE TO CENTER ST.
• Continue the 2-way park road and multimodal trail to Center Street on existing pavement.
• Design an Escarpment Overlook to include the multimodal trail and car parking. Terrace the seating area above the parked cars for an unobstructed view.
• Establish safe, lighted and paved pedestrian route/crossing(s) from the Gorgeview neighborhood to the multimodal trail.
• Remove chain link fences, jersey barriers, and guide rails wherever not required.
• Connect the rail bed trail from Niagara University to the multimodal trail. Remove the Gorgeview portion of railway bed trail. Restore with soil and native plantings.
• Maintain vehicle exit lanes as constructed in 2011 from Art Park to the park road as egress for departing event patrons; active only during Art Park events
• At Center Street, transition the 2-way park road into the four-lane RMP.
3E3E
Alt 3-6
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
September 2012
VariesTo the Gorge
13’ Width Varies WidthVaries
5’26’Pavement Width
ProposedMultimodal
Trail
Re-establishwith Native Plantings
Street TreesReconstructedWhirlpool Street
Rec
onst
ruct
edS
idew
alk Existing
Residential / Commerical
Property
Section 3A
VariesTo the Gorge
13’Wide5’ 24’
Pavement WidthWidth Varies WidthVaries
WidthVaries
21’Pavement Width
Proposed Multimodal
Trail
ProposedPark Road
(Utilize Existing Northbound Lanes)
Re-establishwith Native Plantings
Re-establishwith Native Plantings
Re-establishwith Native Plantings
ExistingRankine Parkway
ExistingResidenceProperty
Exi
stin
gG
orge
Tra
il
Section 3B
Alt 3-7
Robert Moses Parkway Reconfi guration
Appendix A | Alternative 3
OFF
ICE
OF
PAR
KS
• R
ECREATION • HISTORIC P
RE
SE
RVATIO
N NEW YORK STATE
September 2012
VariesTo the Gorge
13’Wide Width Varies 24’
Pavement Width Width Varies WidthVaries
24’Pavement Width
Proposed Multimodal
Trail
ProposedPark Road
(Utilize Existing Northbound Lanes)
Re-establishwith Native Plantings
Re-establishwith Native Plantings
Re-establishwith Native Plantings
ExistingFort Gray
Drive Exi
stin
gR
esid
ence
Pro
pert
y
Section 3C