The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 5
A 5 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management for the Kathmandu Valley
Japan International Cooperation Agency
Figure A 5-1 Kathmandu Metropolitan City
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 5
A 5 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management for the Kathmandu Valley
Japan International Cooperation Agency
Figure A 5-2 Lalitpur Sub-Metropolitan City
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 5
A 5 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management for the Kathmandu Valley
Japan International Cooperation Agency
Figure A 5-3 Bhaktapur Municipality
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 5
A 5 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management for the Kathmandu Valley
Japan International Cooperation Agency
Figure A 5-4 Madhyapur Thimi Municipality
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 5
A 5 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management for the Kathmandu Valley
Japan International Cooperation Agency
Figure A 5-5 Kirtipur Municipality
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 7
A 7 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
APPENDIX 7 TRAINING NEEDS ANALYSIS (TNA)
1. Background
Within the Action Plans formulated by the five target municipalities (KMC, LSMC, BKM, MTM, KRM) and the Solid Waste Management Resource Mobilization Center (SWMRMC), it is envisaged that a Human Resource Development Program would be incorporated. In view of the limited availability of human resources at the municipality level, such planning in human resources, such as with financial planning, would be necessary in order to ensure long-term viability and applicability of the Action Plans.
Planning in Human Resource Development is all the more critical when taking into consideration the inflexible procedures and processes involved in executing any organizational changes or recruitment of new staff at the municipality level. Addressing Human Resource needs by increasing the size of municipality staff usually is not an option for the municipalities. The remaining solution would be to enhance the capacities of individual staff involved in Solid Waste Management Administration as much as possible, mainly through training and other staff development activities.
To frame the premises of the municipal human resource needs, training needs analysis (TNA) was applied as the main tool for identifying core areas for capacity building, and developing Human Resource Management strategies. The TNA is a necessary first step to identify feasible and sustainable means to enhance municipal service delivery.
2. Training Needs Analysis (TNA)
2.1 Objectives
TNA exercise was conducted between February 10-March 12, 2004 with the following objectives:
a. To identify priority areas for human resource development of each municipality and SWMRMC
b. To assess the training needs of personnel involved in Solid Waste Management c. To establish a framework for future human resource development of respective
organizations
2.2 Target Group
Target group included the Counterpart Staff and Task Force (T/F) members of five municipalities and SWMRMC who are expected to be directly responsible for the drafting and the implementation of respective Action Plans. Some additional target personnel who were identified as key personnel in SWM administration were also included in the TNA Process.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 7
A 7 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
2.3 Analytical Framework and Methodology
Figure A.7-1 Analysis Framework of TNA
The above analytical model was applied for the TNA exercise utilizing the following three tools:
2.3.1 TNA Workshop (One Day Session each at five municipalities + SWMRMC)
• Listing and assessment of required skills and knowledge to implement SWM tasks • Analysis and prioritization of strategic areas for capacity building in respective
organizations • Specification and listing of required human resources to address the strategic areas for
capacity building (in terms of quality and quantity. For quality, necessary operational knowledge and skills and minimum qualifications)
• Identification of a list of personnel, which by targeting training programs, the organization will gain maximum leverage in enhancing SWM service delivery.
2.3.2 Personal Profiling and Subjective Training Needs Identification
Subsequent to the workshop, a questionnaire aimed to profile key personnel in SWM was distributed including the following items: • Designation and main duties and/or tasks • Educational attainment and past training experience • Self-assessment of generic professional competence • Subjective training needs in meeting operational goals and fulfilling responsibilities
Compare & Contrast
Compare & Contrast
B. Confirm what other knowledge is necessary.B. Confirm what other
knowledge is necessary.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
Workshop Outputs
Gaps and NeedsGaps and NeedsRequired Skills & Knowledge
Required Skills & Knowledge
Existing Skills & Knowledge
Existing Skills & Knowledge
D. Confirm existing knowledge and capacities.
D. Confirm existing knowledge and capacities.
C. Inquire what has been conducted.
C. Inquire what has been conducted.
Questionnaire and interviews
ANALYSIS
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
Human Resource Development Program
E. Confirm what is not known and what could be conducted.
E. Confirm what is not known and what could be conducted.
STRATEGIZE
Compare & Contrast
Compare & ContrastCompare &
ContrastCompare &
Contrast
B. Confirm what other knowledge is necessary.B. Confirm what other
knowledge is necessary.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
Workshop Outputs
B. Confirm what other knowledge is necessary.B. Confirm what other
knowledge is necessary.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
A. Confirm what is needed to implement Action Plans and Pilot Projects.
Workshop Outputs
Gaps and NeedsGaps and NeedsRequired Skills & Knowledge
Required Skills & Knowledge
Existing Skills & Knowledge
Existing Skills & Knowledge
Gaps and NeedsGaps and NeedsRequired Skills & Knowledge
Required Skills & Knowledge
Existing Skills & Knowledge
Existing Skills & Knowledge
D. Confirm existing knowledge and capacities.
D. Confirm existing knowledge and capacities.
C. Inquire what has been conducted.
C. Inquire what has been conducted.
Questionnaire and interviews
ANALYSIS
D. Confirm existing knowledge and capacities.
D. Confirm existing knowledge and capacities.
C. Inquire what has been conducted.
C. Inquire what has been conducted.
Questionnaire and interviews
ANALYSISANALYSIS
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
Human Resource Development Program
E. Confirm what is not known and what could be conducted.
E. Confirm what is not known and what could be conducted.
STRATEGIZE
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
F. Confirm necessary inputs and training contents that would “fill
gaps” and “address needs”
Human Resource Development Program
E. Confirm what is not known and what could be conducted.
E. Confirm what is not known and what could be conducted.
STRATEGIZESTRATEGIZE
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 7
A 7 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
2.3.3 Structured Interviews to Assess Existing Knowledge and Experiences for SWM Task Implementation
To determine existing skills and experience of staff, individual structured interviews were conducted among target personnel of TNA, focusing on, but not limited to, required skills and knowledge identified by the JICA Study Team. This process highlighted objective areas for training needs. Upon collection of data through the personal profiles and interview results, identification of gaps in required skills and knowledge was conducted. Preliminary findings as well as priority training areas Human Resource Development were consulted with the municipalities.
3. TNA Preliminary Results
3.1 Workshop Results
Despite the diversity in the workshop participants held at each of the five municipalities and at SWMRMC, consistency existed in results where it was identified that Strategic Planning and Operational Management was the high priority Human Resource Development area. Other common priority areas identified included Human Resource Development, Financial Management, SWM Technical Issues, and Community Mobilization/ Public Education.
3.2 Subjective Training Needs
After the workshop, task force members and other additional key personnel identified during the workshop were requested to respond to questionnaires regarding their personal background information (educational /professional/ training history) and subjective assessment of training needs. The tabulated results for individual level training needs are as follows:
Table A.7-1 Tabulated Individual Training Needs
Rank KMC LSMC BKM MTM KRM SWMRMC
1 SWM Technical Training
Conflict Management
Community Development
SWM Technical Training
SWM Technical Training
Strategic Planning & Management
2 Office Management
Organization Management
SWM Technical Training
CBO Mobilization
Human Resource Development
Financial Management
3 Documentation & Writing Skills
Human Resource Development
Communi- cation Skills
Proposal and Report Writing
Office Management
Computer Skills & Data Analysis
Source: JICA Study Team
3.3 Gaps in Skills and Knowledge in Five Municipalities
As the final step of the TNA exercise, structured interviews were conducted among 36 Municipality T/F Members and five SWMRMC staff to objectively assess the existing skills and knowledge regarding SWM. The questions were divided into 14 core areas for SWM,
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 7
A 7 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
and the gaps that exist between the levels of required skills and knowledge and existing skills and knowledge were quantified.
Figure A.7-2 Existing Gaps in Skills and Knowledge
Source: JICA Study Team
Similarly as shown in the Figure 2.3, a high number of respondents with no experience were recorded in the area of EIA, Waste Collection, and Composting and Recycling.
0
5
10
15
20
25
30
35
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 50 51 52 53 54 55 56 57 58 59 60 61 62
Planning Policy Waste Collection Landfill Composting &
Recycling
EIA Monitor
ing and
Data
Analysis
Community
Mobilization
Private Sector
Partnerships
Financial
Mangement
HRD Coordination Report
ing
Computer
Skills
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
No. of Persons without any Experience in Municipality Task Force Mean Score for 5 Municipalities
Figure A.7-3 Number of Task Force Members with No experience in SWM Areas and Mean Score of Five Municipalities
Source: JICA Study Team
1.00
0.92
1.06
0.54
0.85
0.81
0.99
1.251.16
1.16
1.49
1.38
1.41
1.81
0.00
0.50
1.00
1.50
2.00Planning
Policy
Waste Collection
Landfill
Composting & Recycling
EIA
Monitoring and Data Analysis
Community Mobilization
Public Private Partnerships
Financial Management
HRD
Coordination
Reporting
Computer Skills Highest Gaps for the five municipalities were recorded in the area of: 1. EIA 2. Waste Collection 3. Composting and Recycling
(Score 2.00 signifies the highest level of gap)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 7
A 7 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
3.4 Preliminary TNA Results for SWMRMC
For SWMRMC, participants in general scored higher than from the municipalities in most SWM areas. Nevertheless gaps in skills and knowledge were recorded for the following areas:
Figure A.7-4 Existing Gaps in Skills and Knowledge
Source: JICA Study Team
(Score 2.00 signifies the highest level of gap)
Highest Gaps for SWMRMCwere recorded in the area of :1. EIA 2. Waste Collection 3. Composting and
Recycling 0.05
0.74
0.53
1.25
0.88
1.35
0.13
0.47
0
0.36
-0.2
0.15
0.4
0.87
-0.5
0
0.5
1
1.5Planning
Policy
Waste Collection &
Transportation
Landfill
Composting &
Recycling
EIA
Monitoring and
Data Analysis
Community
Mobilization
Public Private
Partnerships
Financial
Management
HRD
Coordination
Reporting
Computer Skills
A 8 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
AP
PE
ND
IX 8
(1)
PR
OJE
CT
DE
SIG
N M
AT
RIX
(PD
M2)
Pr
ojec
t nam
e: Im
prov
emen
t of C
olle
ctio
n an
d Tr
ansp
orta
tion
Dur
atio
n: J
uly,
200
4 to
Jun
e, 2
005
Proj
ect a
reas
: KM
C, L
SMC
, BK
M, M
TM
, KR
M
Targ
et g
roup
s: S
taff
of t
he fi
ve M
unic
ipal
ities
and
SW
MR
MC
D
ate:
Mar
ch 2
1, 2
005
Nar
rati
ve S
umm
ary
Obj
ecti
ve V
erif
iabl
e In
dica
tors
M
eans
of V
erif
icat
ion
Impo
rtan
t Ass
umpt
ions
【
Ove
rall
Goa
l】
• SW
M s
ervi
ce o
f res
pect
ive
mun
icip
aliti
es is
im
prov
ed th
roug
h ca
paci
ty d
evel
opm
ent (
solid
w
aste
man
agem
ent r
atio
is in
crea
se)
1. T
he c
onso
lidat
ed w
aste
man
agem
ent
ratio
of
the
five
mun
icip
aliti
es r
each
es 9
3% (
or 7
18 t
on/d
ay)
by th
e en
d of
201
5 fr
om th
e cu
rren
t lev
el o
f 76
%
(or 3
31 to
n/da
y).
1 C
onso
lidat
ed w
aste
man
agem
ent
ratio
and
qua
ntity
of t
he fi
ve
mun
icip
aliti
es
• Po
litic
al s
tabi
lity
• N
o dr
astic
cha
nge
in th
e av
aila
bilit
y of
fina
ncia
l re
sour
ces.
•
Dec
entr
aliz
atio
n of
SW
M
resp
onsi
bilit
ies
is n
ot
reve
rsed
by
HM
G/N
.
【P
roje
ct P
urpo
se】
•
Cap
abili
ties
of re
leva
nt s
taff
of t
he fi
ve
mun
icip
aliti
es a
nd S
WM
RM
C re
gard
ing
was
te
colle
ctio
n an
d tr
ansp
orta
tion
are
stre
ngth
ened
.
• B
y th
e en
d of
Jun
e 20
05, t
he a
mou
nt o
f tr
ansp
orte
d w
aste
to th
e de
sign
ated
land
fill
site
(s)
is in
crea
sed.
1. P
ilot P
roje
ct re
port
2.
Dai
ly re
cord
of c
olle
cted
was
te
quan
tity
or v
olum
e 3.
Dai
ly re
cord
of t
rans
port
ed a
nd
disp
osed
of w
aste
qua
ntity
or
volu
me
• B
udge
t allo
catio
n is
en
sure
d to
impl
emen
t was
te
data
man
agem
ent b
ased
on
Act
ion
Plan
on
SWM
.
【O
utpu
ts】
1.
B
asic
kno
wle
dge
and
expe
rien
ce a
bout
ef
fici
ent p
rim
ary
colle
ctio
n w
ith m
easu
res
such
as
sour
ce-s
epar
ated
col
lect
ion
are
obta
ined
am
ong
the
rele
vant
off
icia
ls in
m
unic
ipal
ities
. 2.
Pr
actic
al g
uide
line
for p
ublic
pri
vate
pa
rtne
rshi
p fo
r SW
M is
pre
pare
d.
3.
Bas
ic k
now
ledg
e an
d ex
peri
ence
rega
rdin
g tr
ansf
er s
tatio
n ar
e ob
tain
ed
1-1.
By
the
end
of th
e Pi
lot P
roje
ct, s
epar
ated
co
llect
ion
is im
plem
ente
d at
500
hou
seho
lds
at
the
spec
ifie
d ar
eas
in B
KM
1-
2. B
y th
e en
d of
the
Pilo
t Pro
ject
, hou
seho
lds
at
the
spec
ifie
d ar
eas
in M
TM
rece
ive
colle
ctio
n se
rvic
e 2.
B
y th
e en
d of
the
Pilo
t Pro
ject
, a s
et o
f co
ntra
ct/a
gree
men
t for
ms
is p
repa
red
as
guid
elin
e 3.
B
y th
e en
d of
the
Pilo
t Pro
ject
, Tek
u T
/S is
im
prov
ed a
nd te
ntat
ive
tran
sfer
hau
l pra
ctic
es
are
star
ted
1-1.
Pilo
t Pro
ject
repo
rt
1-2.
Pilo
t Pro
ject
repo
rt
2.
Pilo
t Pro
ject
repo
rt
3.
Proj
ect d
ocum
ent/r
epor
t (i
nclu
ding
as
built
doc
umen
t of
Teku
T/S
)
• E
ach
mun
icip
ality
tr
ansp
orts
co
llect
ed w
aste
to
the
desi
gnat
ed fi
nal
disp
osal
site
A 8 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
• Tr
aine
d st
aff c
ontin
ue
wor
king
in m
unic
ipal
ities
an
d SW
MR
MC
【A
ctiv
itie
s】
1.
Prac
tices
of S
olid
Was
te C
olle
ctio
n at
Mod
el
Are
as
1-1.
Pra
ctic
e of
sou
rce-
sepa
rate
d co
llect
ion
in
BK
M
1-2.
Pra
ctic
e of
col
lect
ion
and
tran
spor
tatio
n in
M
TM
2.
Tr
aini
ng fo
r Pub
lic P
riva
te P
artn
ersh
ip (P
PP)
for S
olid
Was
te M
anag
emen
t 2-
1. R
evie
w o
f the
exi
stin
g PP
P ac
tiviti
es
2-2.
Stu
dy o
f an
appr
opri
ate
cont
ract
/agr
eem
ent
form
s be
twee
n m
unic
ipal
ity a
nd p
riva
te
sect
ors
2-3.
Pre
para
tion
of h
andb
ook
for P
ublic
Pri
vate
Pa
rtne
rshi
p 3.
Tr
aini
ng/P
ract
ice
of T
rans
fer S
tatio
n (T
eku
T/S
) 3-
1. T
rain
ing
for p
lann
ing
of T
/S
3-2.
Tra
inin
g fo
r des
igni
ng T
/S
3-3.
Tra
inin
g fo
r con
stru
ctio
n an
d su
perv
isio
n of
im
prov
emen
t of T
/S
3-4.
Pra
ctic
e of
ope
ratio
n of
T/S
【In
puts】
Ja
pan
(1)
Pers
onne
l •
Mem
bers
of t
he J
ICA
Stu
dy T
eam
-
Col
lect
ion
and
Tran
spor
tatio
n -
Publ
ic In
volv
emen
t/ So
cial
Con
side
ratio
n -
Org
aniz
atio
nal a
nd In
stitu
tion
Stre
ngth
enin
g -
Faci
lity
Plan
•
Loc
al c
onsu
ltant
s
(2)
Equ
ipm
ent
- W
aste
bin
s fo
r sou
rce-
sepa
ratio
n (B
KM
) -
Was
te c
olle
ctio
n ve
hicl
e (3
.5m
3 ) (M
TM
) (3)
Impr
ovem
ent w
orks
of T
eku
T/S
【In
puts】
N
epal
(1
) Pe
rson
nel
•
Cou
nter
part
s an
d ot
her r
elev
ant
staf
f -
SWM
RM
C
- K
MC
-
LSM
C
- B
KM
-
MT
M
- K
RM
(2
) Si
te a
rran
gem
ent i
n Te
ku T
/S a
nd
O&
M o
f Tek
u T
/S
【P
reco
ndit
ions】
•
Polit
ical
and
sec
urity
co
nditi
ons
are
not w
orse
n.
• St
akeh
olde
rs d
o no
t opp
ose
the
Pilo
t Pro
ject
A 8 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
AP
PE
ND
IX 8
(2)
PR
OJE
CT
DE
SIG
N M
AT
RIX
(PD
M2)
Pr
ojec
t nam
e: P
rom
otio
n of
Was
te M
inim
izat
ion
Dur
atio
n : J
une,
200
4 to
Jun
e, 2
005
Proj
ect a
reas
: KM
C, L
SMC
, BK
M, M
TM
, KR
M
Targ
et g
roup
s : S
taff
of t
he fi
ve M
unic
ipal
ities
and
SW
MR
MC
D
ate:
Mar
ch 2
1, 2
005
Nar
rati
ve S
umm
ary
Obj
ecti
ve V
erif
iabl
e In
dica
tors
M
eans
of V
erif
icat
ion
Impo
rtan
t A
ssum
ptio
ns
【O
vera
ll G
oal】
•
SWM
ser
vice
of r
espe
ctiv
e m
unic
ipal
ities
is
impr
oved
thro
ugh
capa
city
dev
elop
men
t (so
lid
was
te m
anag
emen
t rat
io is
incr
ease
)
1. T
he c
onso
lidat
ed w
aste
man
agem
ent
ratio
of
the
five
mun
icip
aliti
es r
each
es 9
3% (
or 7
18 t
on/d
ay)
by th
e en
d of
201
5 fr
om th
e cu
rren
t lev
el o
f 76
%
(or 3
31 to
n/da
y).
1 C
onso
lidat
ed w
aste
man
agem
ent
ratio
and
qua
ntity
of t
he fi
ve
mun
icip
aliti
es
• Po
litic
al s
tabi
lity
• N
o dr
astic
cha
nge
in th
e av
aila
bilit
y of
fina
ncia
l re
sour
ces.
•
Dec
entr
aliz
atio
n of
SW
M
resp
onsi
bilit
ies
is n
ot
reve
rsed
by
HM
G/N
. 【
Pro
ject
Pur
pose】
•
Cap
abili
ties
of re
leva
nt s
taff
of t
he fi
ve
mun
icip
aliti
es a
nd S
WM
RM
C re
gard
ing
was
te
min
imiz
atio
n ar
e st
reng
then
ed.
• B
y th
e en
d of
Jun
e 20
05, m
ore
than
1,2
00
hous
ehol
ds a
re n
ewly
invo
lved
was
te
min
imiz
atio
n ac
tiviti
es
1. P
ilot P
roje
ct re
port
• E
ach
mun
icip
ality
co
ntin
ues
and
dist
ribu
te
pilo
t act
iviti
es
【
Out
puts】
1.
T
he w
aste
min
imiz
atio
n fa
cilit
y is
pla
nned
2.
L
ocal
leve
l was
te m
inim
izat
ion
activ
ities
are
st
reng
then
ed
1.
By
the
end
of P
ilot P
roje
ct, a
new
was
te
min
imiz
atio
n fa
cilit
y is
pla
nned
. 2.
B
y th
e en
d of
Pilo
t Pro
ject
, loc
al le
vel w
aste
m
inim
izat
ion
activ
ities
(hom
e co
mpo
stin
g,
sepa
ratio
n co
llect
ion
of p
last
ic) a
re
impl
emen
ted
1.
Plan
ning
repo
rt fo
r was
te
min
imiz
atio
n fa
cilit
y 2.
Pi
lot P
roje
ct re
port
• W
aste
man
agem
ent
cond
ition
s (c
olle
ctio
n,
tran
spor
tatio
n an
d di
spos
al) i
n th
e K
atm
andu
Va
lley
do n
ot b
ecom
e w
orse
than
act
ual
cond
ition
s.
A 8 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
• Tr
aine
d st
aff c
ontin
ue
wor
king
in m
unic
ipal
ities
an
d SW
MR
MC
【A
ctiv
itie
s】
1.
Trai
ning
for W
aste
Min
imiz
atio
n Fa
cilit
y 1-
1 Ve
rifi
catio
n of
exi
stin
g te
chno
logy
for w
aste
m
inim
izat
ion
1-2
Dat
a co
llect
ion
at B
KM
was
te p
roce
ssin
g fa
cilit
y 1-
3 M
arke
ting
surv
ey o
f com
post
pro
duct
1-
4 D
evel
opm
ent o
f bas
ic p
lan
of a
larg
e sc
ale
was
te p
roce
ssin
g fa
cilit
y 1-
5 Pr
e-fe
asib
ility
exa
min
atio
n on
a la
rge
scal
e w
aste
pro
cess
ing
faci
lity
1-6
Stud
y to
ur in
Indi
a 2.
Pr
actic
e of
Loc
al L
evel
Was
te M
inim
izat
ion
Act
iviti
es
2-1
Prac
tice
of c
omm
unity
-bas
ed w
aste
m
inim
izat
ion
activ
ities
in a
mod
el a
rea
(in
KM
C)
2-2
Prac
tice
of m
ediu
m-s
cale
ver
mi c
ompo
stin
g (i
n K
MC
) 2-
3 Pr
actic
e of
pro
mot
ion
of h
ome
com
post
ing
(in
LSM
C)
2-4
Prac
tice
of p
last
ic s
epar
atio
n an
d ho
me
com
post
ing
(in
KR
M)
【In
puts】
Ja
pan
(1)
Pers
onne
l •
Mem
bers
of t
he J
ICA
Stu
dy T
eam
-
Rec
yclin
g sy
stem
-
Publ
ic in
volv
emen
t/Soc
ial c
onsi
dera
tion
• L
ocal
con
sulta
nts
• L
ocal
NG
Os,
reso
urce
per
sons
and
ass
ista
nts
(2
) St
udy
tour
(3
) R
ecyc
ling
cent
er, v
erm
in-c
ompo
stin
g sh
ed,
hom
e co
mpo
st b
ins,
sui
ro a
nd c
otto
n ba
g,
man
uals
, pla
stic
sto
re h
ouse
and
sta
tione
ries
for
trai
ning
【In
puts】
N
epal
(1
) Pe
rson
nel
• C
ount
erpa
rts
and
othe
r rel
evan
t st
aff
- SW
MR
MC
-
KM
C
- L
SMC
-
BK
M
- M
TM
-
KR
M
• E
xist
ing
com
post
ing
faci
lity
op
erat
ors
in B
hakt
apur
(2)
Faci
litie
s N
eces
sary
land
, bui
ldin
gs a
nd
equi
pmen
t
【P
reco
ndit
ions】
•
The
pol
icy
of th
e N
epal
ese
Gov
ernm
ent r
emai
ns s
ame
rega
rdin
g th
e so
lid w
aste
m
anag
emen
t •
Stak
ehol
ders
do
not
oppo
se th
e Pi
lot P
roje
ct.
A 8 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
AP
PE
ND
IX 8
(3)
PR
OJE
CT
DE
SIG
N M
AT
RIX
(PD
M2)
Pr
ojec
t nam
e: Im
prov
emen
t of F
inal
Dis
posa
l Pla
nnin
g an
d O
pera
tion
Dur
atio
n : J
une,
200
4 to
Jun
e, 2
005
Proj
ect a
reas
: KM
C, L
SMC
, BK
M, M
TM
, KR
M
Targ
et g
roup
s : S
taff
of t
he fi
ve M
unic
ipal
ities
and
SW
MR
MC
D
ate:
Mar
ch 2
1, 2
005
Nar
rati
ve S
um
mar
y O
bjec
tive
ly V
erif
iabl
e In
dica
tors
M
ean
s of
Ver
ific
atio
n
Impo
rtan
t A
ssu
mpt
ion
s 【
Ove
rall
Goa
l】
• SW
M s
ervi
ce o
f res
pect
ive
mun
icip
aliti
es is
im
prov
ed th
roug
h ca
paci
ty d
evel
opm
ent (
solid
w
aste
man
agem
ent r
atio
is in
crea
se)
1. T
he
con
soli
date
d so
lid
was
te d
ispo
sal
rati
o to
sa
nit
ary
lan
dfil
l si
te(s
) of
th
e fi
ve
mu
nic
ipal
itie
s re
ach
es 1
00%
of
the
coll
eted
w
aste
by
the
end
of 2
015
from
th
e cu
rren
t le
vel o
f 0%
.
1. C
onso
lida
ted
was
te
man
agem
ent
rati
o an
d qu
anti
ty o
f th
e fi
ve
mu
nic
ipal
itie
s
• •P
oliti
cal s
tabi
lity
No
dras
tic c
hang
e in
the
avai
labi
lity
of fi
nanc
ial
reso
urce
s.
Dec
entr
aliz
atio
n of
SW
M
resp
onsi
bilit
ies
is n
ot
reve
rsed
by
HM
G/N
.
【P
roje
ct P
urp
ose】
• C
apab
ilit
ies
of r
elev
ant
staf
f of
th
e fi
ve
mu
nic
ipal
itie
s an
d S
WM
RM
C r
egar
din
g fi
nal
dis
posa
l pla
nn
ing
and
oper
atio
n a
re
stre
ngt
hen
ed.
• B
y th
e en
d of
Jun
e 20
05, s
anita
ry la
ndfi
lling
ac
tiviti
es (s
oil c
over
ing,
leac
hate
con
trol
, en
viro
nmen
tal m
onito
ring
) are
impl
emen
ted
at
Sisd
ol V
alle
y I
1. P
ilot
Pro
ject
rep
ot
• B
udge
t allo
catio
n is
en
sure
d to
dev
elop
sa
nita
ry la
ndfi
ll si
tes
【O
utp
uts】
1.
B
asic
kn
owle
dge
for
plan
nin
g of
fin
al
disp
osal
is o
btai
ned
.
2.
Bas
ic k
now
ledg
e an
d ex
peri
ence
s ar
e ob
tain
ed o
n p
lan
nin
g, d
esig
nin
g,
con
stru
ctio
n a
nd
O&
M o
f se
mi-
aero
bic
san
itar
y la
ndf
illi
ng
man
ner
s.
1-1.
By
the
end
of P
ilot
Pro
ject
, th
e ca
ndi
date
s fo
r L
/T-L
FS
are
sel
ecte
d 1-
2. B
y th
e en
d of
Pil
ot P
roje
ct,
envi
ron
men
tal a
nd
soci
al c
onsi
dera
tion
fo
r la
ndf
ill s
ite
is c
ompi
led
2-2.
By
the
end
of P
ilot
Pro
ject
, san
itar
y la
ndf
ill s
ite
wit
h s
emi a
erob
ic s
yste
m is
de
velo
ped
at S
isdo
l Val
ley
I
1.
Pil
ot P
roje
ct r
epor
t
2.
Pil
ot P
roje
ct r
epot
(in
clu
din
g as
bu
ilt
docu
men
t of
Sis
dol)
• St
aff i
s as
sign
ed to
Sis
dol
S/T-
LF
Valle
y I b
y K
MC
an
d L
SMC
•
KM
C a
nd L
SMC
toge
ther
w
ith S
WM
RM
C tr
ansp
ort
the
colle
cted
sol
id w
aste
to
Sis
dol S
/T-L
F
A 8 - 6 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
• Tr
aine
d st
aff c
ontin
ue
wor
king
in m
unic
ipal
ities
an
d SW
MR
MC
【A
ctiv
itie
s】
1.
Trai
nin
g fo
r F
inal
Dis
posa
l Pla
nn
ing
1-1.
Tra
inin
g fo
r si
te s
elec
tion
1-
2. T
rain
ing
for
envi
ron
men
tal/s
ocia
l co
nsi
dera
tion
on
lan
dfil
l sit
e 2.
Tr
ain
ing/
Pra
ctic
e fo
r S
emi-
aero
bic
San
itar
y L
andf
ill (
Sis
dol S
/T-L
FS
) 2-
1. T
rain
ing
for
plan
nin
g (1
) S
ite
visi
t to
Pok
har
a (2
) S
ite
visi
t to
Mal
aysi
a 2-
2. T
rain
ing
for
desi
gn
2-3.
Tra
inin
g fo
r co
nst
ruct
ion
su
perv
isio
n
(1)
Join
t si
te v
isit
to
Sis
dol
2-4
Pra
ctic
e of
O&
M in
clu
din
g en
viro
nm
enta
l mon
itor
ing
(1)
OJT
on
O&
M
(2)
En
viro
nm
enta
l mon
itor
ing
and
mon
itor
ing
com
mit
tee
【In
puts】
Ja
pan
(1
) P
erso
nn
el
• M
embe
rs o
f the
JIC
A S
tudy
Tea
m
- F
acil
ity
plan
-
En
viro
nm
ent
- P
ubl
ic I
nvo
lvem
ent/
Soc
ial
Con
side
rati
on
- O
rgan
izat
ion
al a
nd
Inst
itu
tion
al
Str
engt
hen
ing
- H
um
an R
esou
rce
Dev
elop
men
t
• L
ocal
con
sulta
nts,
loca
l con
trac
tor,
loca
l re
sour
ce p
erso
ns (t
rain
ing,
faci
litie
s de
sign
, co
nstr
uctio
n, e
nvir
onm
enta
l mon
itori
ng)
(2)
Stu
dy t
our
(3)
Impr
ovem
ent
was
te o
f S
isdo
l S/T
-LF
S
【In
puts】
N
epal
(1
) P
erso
nn
el
• C
ount
erpa
rts
and
othe
r rel
evan
t st
aff
- S
WM
RM
C
- K
MC
-
LS
MC
-
BK
M
- M
TM
-
KR
M
(2)
Cos
t -
Sis
dol S
/T-L
F p
repa
rati
on
exce
pt s
emi-
aero
bic
man
ner
- A
cces
s ro
ad im
prov
emen
t an
d m
ain
ten
ance
(3
) E
quip
men
t fo
r S
isdo
l S/T
-LF
op
erat
ion
an
d fo
r tr
ansp
orta
tion
【P
reco
ndi
tion
s】
• Po
litic
al a
nd s
ecur
ity
cond
ition
s ar
e no
t wor
sen.
•
Stak
ehol
ders
do
not
oppo
se th
e Pi
lot P
roje
ct
A 8 - 7 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
AP
PE
ND
IX 8
(4)
PR
OJE
CT
DE
SIG
N M
AT
RIX
(PD
M2)
Pr
ojec
t nam
e: P
rom
otio
n of
Pub
lic A
war
enes
s an
d B
ehav
ior C
hang
e C
omm
unic
atio
n/E
duca
tion
Dur
atio
n : J
uly,
200
4 to
Jun
e, 2
005
Proj
ect a
reas
: KM
C, L
SMC
, BK
T, K
RM
, MT
M
Targ
et g
roup
s : S
taff
of t
he fi
ve M
unic
ipal
ities
and
SW
MR
MC
D
ate:
Mar
ch 2
1, 2
005
Nar
rati
ve S
umm
ary
Obj
ecti
ve V
erif
iabl
e In
dica
tors
M
eans
of V
erif
icat
ion
Impo
rtan
t A
ssum
ptio
ns
【O
vera
ll G
oal】
•
SWM
ser
vice
of r
espe
ctiv
e m
unic
ipal
ities
is
impr
oved
thro
ugh
capa
city
dev
elop
men
t (so
lid
was
te m
anag
emen
t rat
io is
incr
ease
)
1. T
he c
onso
lidat
ed w
aste
man
agem
ent
ratio
of
the
five
mun
icip
aliti
es r
each
es 9
3% (
or 7
18 t
on/d
ay)
by th
e en
d of
201
5 fr
om th
e cu
rren
t lev
el o
f 76
%
(or 3
31 to
n/da
y).
1 C
onso
lidat
ed w
aste
man
agem
ent
ratio
and
qua
ntity
of t
he fi
ve
mun
icip
aliti
es
• Po
litic
al s
tabi
lity
• N
o dr
astic
cha
nge
in th
e av
aila
bilit
y of
fina
ncia
l re
sour
ces.
•
Dec
entr
aliz
atio
n of
SW
M
resp
onsi
bilit
ies
is n
ot
reve
rsed
by
HM
G/N
. 【
Pro
ject
Pur
pose】
•
Cap
abili
ties
of re
leva
nt s
taff
of t
he fi
ve
mun
icip
aliti
es a
nd S
WM
RM
C re
gard
ing
publ
ic
awar
enes
s an
d be
havi
or c
hang
e co
mm
unic
atio
n/ e
duca
tion
are
stre
ngth
ened
.
• T
he s
trat
egie
s re
gard
ing
awar
enes
s an
d pu
blic
ed
ucat
ion
are
form
ulat
ed a
nd in
corp
orat
ed in
to
Act
ion
Plan
on
SWM
in e
ach
mun
icip
ality
by
the
end
of J
une
2005
.
1.
Act
ion
Plan
on
SWM
in e
ach
mun
icip
ality
(phy
sica
l ve
rifi
catio
n)
2.
Res
ult o
f rap
id s
elf-
asse
ssm
ent
shee
t (to
be
dist
ribu
ted
to re
leva
nt
mun
icip
ality
off
icia
ls b
efor
e an
d af
ter t
he P
ilot P
roje
ct)
3.
R
esul
t of r
apid
com
pete
ncy
ratin
g sh
eet (
to b
e m
ade
and
mar
ked
by
the
Japa
nese
mem
bers
of S
tudy
Te
am b
efor
e an
d af
ter t
he P
ilot
Proj
ect)
• B
udge
t allo
catio
n is
en
sure
d to
impl
emen
t aw
aren
ess
and
publ
ic
educ
atio
n ba
sed
on A
ctio
n Pl
an o
n SW
M.
【O
utpu
ts】
1.
B
asic
kno
wle
dge
abou
t com
mun
ity
mob
iliza
tion
incl
udin
g pu
blic
edu
catio
n in
SW
M is
gai
ned
amon
g re
leva
nt o
ffic
ials
in
mun
icip
aliti
es.
2.
Kno
w-h
ow o
f mas
s co
mm
unic
atio
n an
d ed
ucat
ion
appr
oach
is tr
ansf
erre
d.
1-1.
80%
of t
arge
t gro
ups
part
icip
ate
in tr
aini
ng b
y th
e en
d of
Pilo
t Pro
ject
.
1-2.
The
mee
tings
on
awar
enes
s an
d pu
blic
ed
ucat
ion
are
join
tly o
rgan
ized
by
targ
et g
roup
s th
ree
times
by
the
end
of P
ilot P
roje
ct
2.
Edu
catio
nal e
vent
is im
plem
ente
d by
targ
et
grou
ps in
eac
h m
unic
ipal
ity b
y th
e en
d of
Pilo
t Pr
ojec
t.
1-1.
Pilo
t Pro
ject
doc
umen
t/rep
ort
1-
2. P
ilot P
roje
ct d
ocum
ent/r
epor
t 2.
Pi
lot P
roje
ct d
ocum
ent/r
epor
t
• T
he im
port
ance
of p
ublic
ed
ucat
ion
and
awar
enes
s on
SW
M is
reco
gniz
ed b
y hi
gh-l
evel
off
icia
ls in
m
unic
ipal
ities
.
A 8 - 8 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
3.
Kno
w-h
ow o
f int
erpe
rson
al c
omm
unic
atio
n an
d ed
ucat
ion
appr
oach
is tr
ansf
erre
d.
3.
The
leve
l of k
now
ledg
e, a
ttitu
de, a
nd p
ract
ice
rega
rdin
g SW
M is
impr
oved
am
ong
targ
eted
ch
ildre
n or
com
mun
ities
.
3.
Proj
ect d
ocum
ent/r
epor
t (T
he
resu
lts o
f bas
elin
e an
d im
pact
su
rvey
s)
• Tr
aine
d st
aff c
ontin
ue
wor
king
in
mun
icip
aliti
es a
nd
SWM
RM
C
.
【A
ctiv
itie
s】
1.
Trai
ning
for C
omm
unity
Mob
iliza
tion
Act
iviti
es
1-1.
Tra
inin
g fo
r com
mun
ity m
obili
zatio
n an
d pu
blic
edu
catio
n/aw
aren
ess
on S
WM
, and
ho
ld s
hari
ng m
eetin
gs
1-2.
Stu
dy to
ur to
Het
auda
2.
Pr
actic
e of
Mas
s C
omm
unic
atio
n an
d E
duca
tion
2-
1 Se
lect
ion
of m
asco
t of C
KV
Stu
dy a
nd
dist
ribu
te s
ticke
rs
2-2
Und
erta
king
of e
duca
tiona
l eve
nts
&ex
hibi
tion
2-
3 B
road
cast
ing
of ra
dio
com
mer
cial
2-
4 W
all p
aint
ing
2-
5 Im
plem
enta
tion
of c
lean
up
in th
e co
mm
unity
3.
Pr
actic
e of
Inte
rper
sona
l Com
mun
icat
ion
and
Edu
catio
n
3-1
To c
ondu
ct b
asel
ine
surv
ey re
gard
ing
know
ledg
e, a
ttitu
de a
nd p
ract
ice
on S
WM
3-
2 To
pro
vide
cou
nsel
or tr
aini
ng c
amp
for y
outh
an
d te
ache
rs w
ho s
uppo
rt c
hild
ren'
s ac
tiviti
es
3-3
To c
ondu
ct c
amp
and
esta
blis
h "N
atur
e C
lub"
an
d su
ppor
t sm
all s
cale
SW
M a
ctiv
ities
3-
4 To
con
duct
wor
ksho
p on
reso
urce
mat
eria
l de
velo
pmen
t, pr
intin
g an
d pa
per m
akin
g
3-
5 To
hol
d sh
arin
g an
d ex
chan
ging
mee
tings
3-
6 To
con
duct
impa
ct s
urve
y
【In
puts】
Ja
pan
(1)
Pers
onne
l •
Mem
bers
of t
he J
ICA
Stu
dy T
eam
-
Publ
ic In
volv
emen
t/ So
cial
Con
side
ratio
n -
Publ
ic R
elat
ions
-
Org
aniz
atio
nal a
nd In
stitu
tiona
l St
reng
then
ing/
Hum
an R
esou
rces
D
evel
opm
ent
• L
ocal
con
sulta
nts,
NG
Os
(2)
Ope
ratio
nal c
ost
- Pr
ofes
sion
als
of a
rt, b
road
cast
-
Stud
y to
ur to
Het
auda
Nep
al
(1)
Pers
onne
l •
Cou
nter
part
s an
d ot
her r
elev
ant
staf
f -
SWM
RM
C
- K
MC
-
LSM
C
- B
KM
-
MT
M
- K
RM
(2
) Fa
cilit
ies
Lan
d, b
uild
ings
and
mat
eria
ls
【P
reco
ndit
ions】
•
Polit
ical
and
sec
urity
co
nditi
ons
are
not w
orse
n.
A 8 - 9 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
AP
PE
ND
IX 8
(5)
PR
OJE
CT
DE
SIG
N M
AT
RIX
(PD
M2)
Pr
ojec
t nam
e: D
evel
opm
ent o
f Ope
ratio
n an
d M
anag
emen
t Cap
aciti
es
Dur
atio
n : J
uly,
200
4 to
Jun
e, 2
005
Proj
ect a
reas
: KM
C, L
SMC
, BK
T, K
RM
, MT
M
Targ
et g
roup
s : S
taff
of t
he fi
ve M
unic
ipal
ities
and
SW
MR
MC
D
ate:
Mar
ch 2
1, 2
005
Nar
rati
ve S
umm
ary
Obj
ecti
ve V
erif
iabl
e In
dica
tors
M
eans
of V
erif
icat
ion
Impo
rtan
t A
ssum
ptio
ns
【O
vera
ll G
oal】
•
SWM
ser
vice
of r
espe
ctiv
e m
unic
ipal
ities
is
impr
oved
thro
ugh
capa
city
dev
elop
men
t (so
lid
was
te m
anag
emen
t rat
io is
incr
ease
)
1. T
he c
onso
lidat
ed w
aste
man
agem
ent
ratio
of
the
five
mun
icip
aliti
es r
each
es 9
3% (
or 7
18 t
on/d
ay)
by th
e en
d of
201
5 fr
om th
e cu
rren
t lev
el o
f 76
%
(or 3
31 to
n/da
y).
1 C
onso
lidat
ed w
aste
man
agem
ent
ratio
and
qua
ntity
of t
he fi
ve
mun
icip
aliti
es
• Po
litic
al s
tabi
lity
• N
o dr
astic
cha
nge
in th
e av
aila
bilit
y of
fina
ncia
l re
sour
ces.
•
Dec
entr
aliz
atio
n of
SW
M
resp
onsi
bilit
ies
is n
ot
reve
rsed
by
HM
G.
【P
roje
ct P
urpo
se】
•
Cap
abili
ties
of re
leva
nt s
taff
of t
he fi
ve
mun
icip
aliti
es a
nd S
WM
RM
C re
gard
ing
tech
nica
l and
ope
ratio
nal m
anag
emen
t on
solid
w
aste
are
str
engt
hene
d.
• B
y th
e en
d of
Jun
e 20
05, a
nnua
l wor
k pl
an o
f fi
ve m
unic
ipal
ities
of n
ext f
isca
l yea
r with
fini
cal
plan
are
dev
elop
ed b
ased
on
relia
ble
data
1. P
ilot P
roje
ct re
port
• C
omm
itmen
t to
of
mun
icip
aliti
es to
SW
M
capa
city
bui
ldin
g
trai
ned
staf
f sta
y w
ithin
th
e sy
stem
.
【O
utpu
ts】
1.
M
unic
ipal
ities
acq
uire
nec
essa
ry c
apac
ities
to
ope
ratio
naliz
e A
ctio
n Pl
ans
2.
Mun
icip
aliti
es a
cqui
re th
e sk
ills
and
know
ledg
e to
col
lect
and
man
age
SWM
dat
a
1.
By
the
end
of P
ilot P
roje
ct, w
orki
ng it
ems
with
re
spon
sibl
e pe
rson
s an
d bu
dget
(fin
anci
al p
lan)
ar
e de
velo
ped.
2.
B
y th
e en
d of
Pilo
t Pro
ject
, sol
id w
aste
da
taba
se o
f eac
h m
unic
ipal
ity is
dev
elop
ed.
1.
Pilo
t Pro
ject
repo
rt
2-1.
SW
M d
atab
ase
2-2.
Pilo
t Pro
ject
repo
rt
• St
aff i
s m
ade
avai
labl
e fo
r th
e tr
aini
ng.
• C
ompu
ter l
itera
cy fo
r sta
ff
resp
onsi
ble
for d
ata
man
agem
ent.
A 8 - 10 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
The Study on the Solid Waste Management Main Reportfor the Kathmandu Valley Appendix 8
• St
aff a
re w
illin
gnes
s to
at
tend
trai
ning
pro
gram
s.
• St
aff a
re w
illin
g to
app
ly
new
lear
ning
to p
ract
ice
【A
ctiv
itie
s】
1 Tr
aini
ng fo
r Act
ion
Plan
Ope
ratio
nal
Man
agem
ent
1-
1 Tr
ansf
er o
f pla
nnin
g an
d da
ta c
olle
ctio
n kn
ow h
ow fr
om th
e JI
CA
Stu
dy T
eam
1-
2 M
onth
ly m
anag
emen
t tra
inin
g se
ssio
ns
1-3
Ope
ratio
naliz
atio
n of
Act
ion
Plan
s 1-
4 M
onth
ly m
onito
ring
of t
rain
ing
resu
lts
1-5
Self
-eva
luat
ion
exer
cise
2
Prac
tice
of S
olid
Was
te D
ata
Man
agem
ent
2-1
Prac
tice
for s
olid
was
te q
ualit
y an
d qu
antit
y su
rvey
2-
2 Pr
actic
e of
sol
id w
aste
dat
a m
anag
emen
t for
SW
M
3 Tr
aini
ng fo
r SW
M P
olic
y an
d Te
chno
logy
3-
1 Pa
rtic
ipat
ion
of J
ICA
Cou
ntry
Foc
us T
rain
ing
【In
puts】
Ja
pan
(1)
Pers
onne
l •
Mem
bers
of t
he J
ICA
Stu
dy T
eam
-
Col
lect
ion
and
tran
spor
tatio
n -
Org
aniz
atio
n an
d in
stitu
tion
Stre
ngth
enin
g -
Fina
ncia
l Ana
lysi
s •
Loc
al c
onsu
ltant
s (2
) E
quip
men
t -
Sets
of c
ompu
ter a
nd p
rint
er
(3)
Cou
ntry
Foc
us T
rain
ing
Prog
ram
【In
puts】
N
epal
(1
) Pe
rson
nel
• C
ount
erpa
rts
and
othe
r rel
evan
t st
aff
- SW
MR
MC
-
KM
C
- L
SMC
-
BK
M
- M
TM
-
KR
M
(2)
Faci
lity
- Ve
nue
for t
rain
ing
【P
reco
ndit
ions】
•
Mun
icip
aliti
es a
re
inte
rest
ed in
impr
ovin
g th
eir S
WM
ser
vice
s.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 9
A 9 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
APPENDIX 9 WARD WISE POPULATION/ POPULATION PROJECTION OF EACH MUNICIPALITY
Table A.9-1 Actual and Projected Population of Each Municipality
1971 1981 1991 2001 2004 2005 2006 2007NepalYear 2028 2038 2048 2058 2061 2062 2063 2064
150,402 235,160 421,258 671,846 741,008 765,610 791,028 817,290
59,049 79,875 115,865 162,991 180,397 186,603 193,022 199,662
40,112 48,472 61,405 72,543 80,476 83,309 86,242 89,277
20,640 26,067 31,970 47,751 53,853 56,056 58,348 60,735
20,814 24,406 31,339 40,835 43,424 44,323 45,240 46,176
253,942 327,011 417,072 525,498 540,617 545,753 550,938 556,172
544,959 740,991 1,078,909 1,521,464 1,639,775 1,681,654 1,724,818 1,769,312
2008 2009 2010 2011 2012 2013 2014 2015NepalYear 2065 2066 2067 2068 2069 2070 2071 2072
844,424 872,459 901,424 931,352 960,969 991,527 1,023,058 1,055,591
206,530 213,635 220,984 228,586 236,244 244,158 252,337 260,790
92,420 95,673 99,041 102,527 106,054 109,702 113,476 117,380
63,219 65,804 68,496 71,297 74,213 77,248 80,407 83,696
47,132 48,108 49,104 50,120 51,157 52,216 53,297 54,400
561,456 566,790 578,523 584,019 588,925 593,872 598,861 603,891
1,815,181 1,862,469 1,917,572 1,967,901 2,017,562 2,068,723 2,121,436 2,175,748Total Valley
Projected Data
BKM
MTM
KMC
LSMC
BKM
KRM
KRM
Valley VDCs
Municipality/VDC
MTM
Valley VDCs
Total Valley
KMC
LSMC
Cenesus Data Projected DataMunicipality/
VDC
Note: 1) Each number was rounded off the number calculated by using annual growth rate of Table A.9-2, which was
estimated on the Draft Kathmandu Valley Development Plan 2020, KVTDC (2000). 2) Since the population growth rate of Thimi between 1991 and 2001 was much higher than that of the KVTDC study’s
rate (2.26%), CKV Study Team has assumed that the actual growth rate (4.09%) between 1991 and 2001 would continue up to 2015.
Table A.9-2 Actual and Projected Population Growth Rate of Each Municipality
71-81 81-91 91-01 01-11 11-21
28-38 38-48 48-58 58-68 68-78
4.57 6.00 4.78 3.32 3.18
3.07 3.79 3.47 3.44 3.35
1.91 2.39 1.68 3.52 3.44
2.37 2.06 4.09 4.09 4.09
1.60 2.53 2.68 2.07 2.07
2.56 2.46 2.34 0.95 0.84
3.12 3.83 3.50 2.61 2.54
Municipality/VDC
Total Valley
BKM
MTM
KMC
LSMC
KRM
Valley VDCs
Source: Population census data of each municipality (1991, 2001)
Draft Kathmandu Valley Development Plan 2020, KVTDC (2000)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 9
A 9 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Table A.9-3 Ward Wise Population of Each Municipality
(1) Kathmandu Metropolitan City
Actual Data
1 8,731 8,464 8,187 8,055 -0.31% -0.34% -0.36%2 9,163 13,655 18,307 20,534 4.07% 3.01% 2.99%3 14,347 20,782 27,446 30,636 3.77% 2.86% 2.85%4 15,337 29,539 44,246 51,288 6.77% 4.17% 4.07%5 8,646 15,340 22,272 25,591 5.90% 3.85% 3.77%6 17,509 39,316 61,899 72,711 8.43% 4.70% 4.54%7 19,797 39,530 59,965 69,749 7.16% 4.31% 4.19%8 7,756 9,434 11,172 12,004 1.98% 1.73% 1.76%9 16,516 29,263 42,464 48,783 5.89% 3.84% 3.76%10 39,531 25,977 - - - - -11 10,055 15,244 20,618 23,190 4.25% 3.10% 3.08%12 9,940 10,313 10,699 10,884 0.37% 0.37% 0.39%13 14,746 29,721 45,229 52,653 7.26% 4.34% 4.22%14 18,425 34,488 51,123 59,087 6.47% 4.06% 3.97%15 19,627 32,441 45,711 52,064 5.15% 3.53% 3.48%16 21,286 45,450 70,474 82,454 7.88% 4.54% 4.40%17 11,605 19,876 28,441 32,542 5.53% 3.69% 3.63%18 8,081 8,065 8,048 8,040 -0.02% -0.02% -0.02%19 7,588 7,400 7,205 7,112 -0.25% -0.27% -0.29%20 8,920 8,240 7,536 7,199 -0.79% -0.90% -0.98%21 12,383 12,369 12,355 12,348 -0.01% -0.01% -0.01%22 7,884 5,840 3,723 2,710 -2.96% -4.48% -5.45%23 8,711 8,289 7,852 7,643 -0.50% -0.55% -0.59%24 6,288 5,272 4,220 3,716 -1.75% -2.24% -2.51%25 5,744 4,310 2,825 2,114 -2.83% -4.21% -5.06%26 4,248 3,764 3,263 3,023 -1.20% -1.44% -1.58%27 8,112 7,789 7,455 7,294 -0.41% -0.44% -0.47%28 5,077 5,462 5,861 6,052 0.73% 0.72% 0.75%29 19,179 24,543 30,098 32,757 2.50% 2.09% 2.11%30 11,033 9,896 8,719 8,155 -1.12% -1.33% -1.46%31 12,455 14,502 16,622 17,637 1.53% 1.39% 1.43%32 14,613 24,355 34,444 39,274 5.24% 3.57% 3.51%33 17,925 21,597 25,400 27,220 2.41% 2.03% 2.05%34 46,136 - - - - -35 35,184 - - - - -
Total 421,258 671,846 931,352 1,055,591 4.69% 3.32% 3.18%
2015 1991-2001 2001-2011 2011-2015Ward
Population Population Growth RateCensus Data Projected Data Projected Data
1991 2001 2011
Note: Because of restructuring of wards in 1991, future population of some wards cannot be projected.
Total population of all wards was projected based on the municipal level population growth rate of the Draft Kathmandu Valley Development Plan 2020, KVTDC (2000) as shown in Table A.9-2.
Source: Projected by the JICA Study Team based on Population Census data of KMC and the Draft Kathmandu Valley Development Plan 2020, KVTDC (2000)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 9
A 9 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
(2) Lalitpur Sub-Metropolitan City
Actual Data
1 9,410 7,090 - - - - -2 7,462 10,459 14,631 16,679 3.43% 3.41% 3.39%3 8,444 10,637 13,689 15,188 2.34% 2.55% 2.58%4 11,588 10,971 - - - - -5 15,118 6,573 - - - - -6 8,048 6,352 - - - - -7 5,080 6,408 8,256 9,164 2.35% 2.57% 2.59%8 3,812 7,355 12,286 14,708 6.79% 5.27% 5.07%9 5,427 8,135 11,904 13,755 4.13% 3.88% 3.82%10 2,395 5,430 - - - - -11 4,078 4,238 4,461 4,570 0.39% 0.51% 0.54%12 3,840 5,677 8,234 9,489 3.99% 3.79% 3.74%13 2,391 6,553 - - - - -14 3,076 11,530 - - - - -15 2,745 11,352 - - - - -16 2,727 5,294 8,867 10,621 6.86% 5.29% 5.10%17 2,435 6,693 - - - - -18 1,652 6,915 - - - - -19 2,728 6,048 10,669 12,938 8.29% 5.84% 5.58%20 4,013 6,519 10,007 11,720 4.97% 4.38% 4.28%21 3,974 4,249 4,632 4,820 0.67% 0.87% 0.90%22 5,422 8,513 12,815 14,928 4.61% 4.18% 4.09%
Total 115,865 162,991 228,586 260,790 3.47% 3.44% 3.35%
1991-2001 2001-2011 2011-2015
Population Growth RateCensus Data Projected Data Projected DataWard
Population
1991 2001 2011 2015
Note: Because of restructuring of wards in 1997, future population of some wards cannot be projected.
Total population of all wards was projected based on the municipal level population growth rate of the Draft Kathmandu Valley Development Plan 2020, KVTDC (2000) as shown in Table A.9-2.
Source: Projected by the JICA Study Team based on Population Census data of LSMC and the Draft Kathmandu Valley Development Plan 2020, KVTDC (2000)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 9
A 9 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
(3) Bhaktapur Municipality
Actual Data
1 4,597 5,343 7,352 8,346 1.52% 3.24% 3.24%2 2,915 3,888 6,507 7,805 2.92% 5.28% 5.10%3 2,848 3,318 4,583 5,210 1.54% 3.28% 3.28%4 5,124 6,090 8,691 9,979 1.74% 3.62% 3.59%5 3,702 4,565 6,888 8,039 2.12% 4.20% 4.12%6 2,639 3,167 4,588 5,292 1.84% 3.78% 3.74%7 4,364 4,652 5,427 5,811 0.64% 1.55% 1.60%8 3,535 3,601 3,779 3,867 0.19% 0.48% 0.51%9 2,689 2,542 2,146 1,950 -0.56% -1.68% -1.88%10 3,646 4,193 5,666 6,395 1.41% 3.06% 3.06%11 3,288 3,579 4,362 4,750 0.85% 2.00% 2.04%12 3,623 4,118 5,451 6,111 1.29% 2.84% 2.86%13 2,879 2,642 2,004 1,688 -0.86% -2.73% -3.15%14 4,148 5,070 7,552 8,782 2.03% 4.07% 4.00%15 3,636 5,202 9,418 11,506 3.65% 6.12% 5.83%16 2,924 3,582 5,353 6,231 2.05% 4.10% 4.03%17 4,848 6,991 12,760 15,618 3.73% 6.20% 5.91%
Total 61,405 72,543 102,527 117,380 1.68% 3.52% 3.44%
Population Population Growth Rate
Projected Data
2011 2015 1991-2001
Census Data Projected Data
2001
Ward
1991 2001-2011 2011-2015
Source: Projected by the JICA Study Team based on Population Census data of BKM and the Draft Kathmandu Valley
Development Plan 2020, KVTDC (2000)
(4) Madhyapur Thimi Municipality
Actual Data
1 1,934 2,545 3,457 3,936 2.78% 3.11% 3.16%2 1,732 2,147 2,766 3,092 2.17% 2.57% 2.64%3 2,486 2,820 3,318 3,581 1.27% 1.64% 1.72%4 1,341 1,816 2,525 2,898 3.08% 3.35% 3.39%5 1,600 1,792 2,078 2,229 1.14% 1.49% 1.57%6 1,296 1,412 1,585 1,676 0.86% 1.16% 1.23%7 1,963 2,732 3,879 4,484 3.36% 3.57% 3.60%8 2,052 2,374 2,854 3,107 1.47% 1.86% 1.94%9 1,817 1,543 1,134 919 -1.62% -3.03% -3.63%10 1,902 1,936 1,987 2,013 0.18% 0.26% 0.28%11 2,443 2,299 2,084 1,971 -0.61% -0.98% -1.09%12 2,027 2,218 2,503 2,653 0.90% 1.22% 1.29%13 2,597 3,168 4,020 4,469 2.01% 2.41% 2.49%14 1,723 2,215 2,949 3,336 2.54% 2.90% 2.97%15 1,600 7,531 16,380 21,041 16.75% 8.08% 7.61%16 1,855 4,788 9,164 11,469 9.95% 6.71% 6.44%17 1,602 4,415 8,612 10,822 10.67% 6.91% 6.61%
Total 31,970 47,751 71,297 83,696 4.09% 4.09% 4.09%
Ward
Population
1991 2001 2011 2015
Population Growth RateCensus Data Projected Data Projected Data
1991-2001 2001-2011 2011-2015
Source: Projected by the JICA Study Team based on Population Census data of MTM and the Draft Kathmandu Valley
Development Plan 2020, KVTDC (2000)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 9
A 9 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
(5) Kirtipur Municipality
Actual Data
1 1,826 2,824 3,799 4,249 4.46% 3.01% 2.96%2 1,430 2,328 3,206 3,610 4.99% 3.25% 3.18%3 2,919 4,149 5,352 5,905 3.58% 2.58% 2.55%4 1,619 1,828 2,032 2,127 1.22% 1.06% 1.09%5 1,811 1,992 2,169 2,251 0.96% 0.85% 0.88%6 1,330 1,348 1,366 1,374 0.13% 0.13% 0.14%7 1,686 2,051 2,408 2,572 1.98% 1.62% 1.63%8 1,833 2,024 2,211 2,297 1.00% 0.89% 0.91%9 1,726 2,019 2,305 2,438 1.58% 1.33% 1.36%10 1,013 1,091 1,167 1,202 0.74% 0.68% 0.69%11 1,767 2,172 2,568 2,751 2.09% 1.69% 1.70%12 1,670 1,895 2,115 2,216 1.27% 1.10% 1.12%13 940 1,454 1,957 2,188 4.46% 3.02% 2.96%14 1,873 2,136 2,393 2,512 1.32% 1.14% 1.16%15 2,814 3,062 3,304 3,416 0.85% 0.76% 0.78%16 1,198 1,540 1,874 2,029 2.54% 1.98% 1.99%17 1,580 3,743 5,858 6,833 9.01% 4.58% 4.39%18 1,629 2,399 3,152 3,499 3.95% 2.77% 2.73%19 674 780 884 931 1.47% 1.26% 1.27%
Total 31,338 40,835 50,120 54,400 2.68% 2.07% 2.07%
1991 2001 2001-2011 2011-2015Ward
Population Population Growth RateCensus Data Projected Data Projected Data
2011 2015 1991-2001
Source: Projected by the JICA Study Team based on Population Census data of KRM and the Draft Kathmandu Valley
Development Plan 2020, KVTDC (2000)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 11.1
A 11.1 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
APPENDIX 11.1 SOLID WASTE STREAM FLOW OF FIVE MUNICIPALITIES (CURRENT AND FUTURE)
1. Kathmandu Metropolitan City
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
Compositng
325.4
PrimaryValuables
Home
Existing Solid Waste Stream (2005)
Future Solid Waste Stream (2015)
HomeCompositng
PrimaryValuables
1.4
2.1
KMC
KMC
Consumed atout of the Valley
composting (total)0.0
0.0
GeneratedWaste Community Based
Composting
0
49.1
Material flowunder
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Material flowbeyond
Municipality'sresponsibilityDesignated Waste
Collection Points(Waste Depot.)
(Container)(Open Area)
(Others)
Material flowmay under
Municipality'sresponsibility
Cycle Hawkers Scrap Dealers
Material flowbeyond
Municipality'sresponsibility
Material flowmay under
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Cycle Hawkers
Material flowunder
Municipality'sresponsibility
Scrap DealersRecyclingIndustries
Bagmati RiverDumping Site
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
SisdolShort-term
Landfill
86%3.5279.8
RecyclingIndustries
Uncollected
45.6
45.6
276.3
321.9
TekuTransfer Station
Consumed atout of the Valley
GeneratedWaste
composting (total)50.3
60.9 95%11.8
36.5
Community BasedComposting
Waste ProcessingFacility
13.8 182.7
547.9 487.0 27.4
317.9
459.6
Uncollected
27.4
Transfer Station(Teku, Balaju)
13.8520.5
Banchare DandaLong-term Landfill
Unit: t/day
Unit: t/day
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 11.1
A 11.1 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
2. Lalitpur Sub-Metropolitan City
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
12.1
5.6
0.5
1.4
PrimaryValuables
HomeCompositng
Future Solid Waste Stream (2015)
Compositng
Existing Solid Waste Stream (2005)
PrimaryValuables
Home
Cycle Hawkers
LSMC
GeneratedWaste
31.2
135.4 117.7 13.5 Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
13.5
104.2
Uncollected
Material flowunder
Municipality'sresponsibility
Scrap DealersRecyclingIndustries
58.7
Bagmati RiverDumping Site
Consumed atout of the Valley
composting (total)
20.6
56.8
74%1.9
Uncollected
RecyclingIndustries
Consumed atout of the Valley
composting (total)
Material flowmay under
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
Material flowbeyond
Municipality'sresponsibility
SisdolShort-term
Landfill
79.3 77.4
Cycle Hawkers
LSMC
GeneratedWaste
17.7 90%121.9
20.8
20.6
Scrap Dealers
Material flowunder
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Material flowbeyond
Municipality'sresponsibility
Material flowmay under
Municipality'sresponsibility
Banchare DandaLong-term Landfill
Waste ProcessingFacility
104.16
20.8
Unit: t/day
Unit: t/day
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 11.1
A 11.1 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
3. Bhaktapur Municipality
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non ManagedMaterial flow
againstMunicipality'sresponsibility
Material flowbeyond
Municipality'sresponsibility
17.9
Material flowbeyond
Municipality'sresponsibility
Material flowmay under
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Consumed atout of the Valley
Material flowunder
Municipality'sresponsibility
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
Community BasedComposting
1.2 Material flowunder
Municipality'sresponsibility
Taikabu WasteProcessing Facility
RecyclingIndustries
Scrap Dealers
46.2 43.0 4.6
4.6
26.7
41.63.2 90% 3.01.2
15
38.4
Uncollected
TaikabuLong-term Landfill
Uncollected
6.7
Cycle Hawkers
20.0
76%0.221.6
RecyclingIndustries
Consumed atout of the Valley
Hanumante RiverDumping Site
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
Composting Facility
3.0
Material flowmay under
Municipality'sresponsibility
4.2
BKM
GeneratedWaste
composting (total)0.6
0.6
Future Solid Waste Stream (2015)
6.7
26.9
Existing Solid Waste Stream (2005)
PrimaryValuables
BKM
GeneratedWaste
composting (total)0.5
Compositng
Scrap Dealers
Home
0.2
26.7
Cycle Hawkers
PrimaryValuables
HomeCompositng
0
2.7
Unit: t/day
Unit: t/day
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 11.1
A 11.1 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
4. Madhyapur Thimi Municipality
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
0.1
17.9
Future Solid Waste Stream (2015)
Compositng
8.3
18.4
Uncollected
27.8
Existing Solid Waste Stream (2005)
PrimaryValuables
Home
PrimaryValuables
Uncollected
9.7
9.7
Scrap Dealers
26.7 8.3
0.5
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
1.1 0.719.5
1.0
Cycle Hawkers
Material flowunder
Municipality'sresponsibility
Scrap DealersRecyclingIndustries
5.5
5.4
36%0.1
Material flowbeyond
Municipality'sresponsibility
RecyclingIndustries
TekuTransfer Station
(KMC)
0.0
Material flowmay under
Municipality'sresponsibility
15.2 15.1
Cycle Hawkers
MTM
GeneratedWaste
composting (total)
Consumed atout of the Valley
0.5
TaikabuLong-term Landfill
Community BasedComposting
Chamber
Taikabu WasteProcessing Facility
0.5 0 Material flowunder
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Material flowbeyond
Municipality'sresponsibility
MTM
GeneratedWaste
HomeCompositng
0.1
0
Consumed atout of the Valley
5.4
composting (total)0.0
0.0
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
Community BasedComposting
Chamber
0
SisdolShort-term
Landfill
Material flowmay under
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Unit: t/day
Unit: t/day
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 11.1
A 11.1 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
5. Kirtipur Municipality
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
RecycledMarket Based Business Activity
Source Reduced Managed
LegendCollected
Collected
Generated Discharged Uncollected
Non Managed
0.2
Existing Solid Waste Stream (2005)
PrimaryValuables
Home
0.1 Consumed atout of the Valley
composting (total)
RecyclingIndustries
Bagmati RiverDumping Site
4.7
0
1.1 Cycle Hawkers
0.00.0 0.0
KRM
GeneratedWaste
Future Solid Waste Stream (2015)
Compositng
12.1 12.0
Material flowunder
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Material flowbeyond
Municipality'sresponsibility
Material flowmay under
Municipality'sresponsibility
KRM
GeneratedWaste
composting (total)13.2
Designated WasteCollection Points(Waste Depot.)
(Container)(Open Area)
(Others)
13.2
Uncollected
13.2
PrimaryValuables
13.2
Cycle Hawkers
Material flowunder
Municipality'sresponsibility
Scrap DealersRecyclingIndustries
Material flowbeyond
Municipality'sresponsibility
Material flowmay under
Municipality'sresponsibility
Material flowagainst
Municipality'sresponsibility
Consumed atout of the Valley
7.3
7.3
Scrap Dealers
CommunityComposting Facility
HomeCompositng
0.01.3 80%14.5
40%0.1
Uncollected
4.8
4.0
18.1 16.8 3.6
3.6
Banchare DandaLong-term Landfill
TekuTransfer Station
4.7
Unit: t/day
Unit: t/day
Term Short-term Mid-term Long-termYear 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
KMC Poplation a - 741,008 765,610 791,028 817,290 844,424 872,459 901,424 931,352 960,969 991,527 1,023,058 1,055,591 Annual Increasing Rate (Pop.) % 3.32% 3.32% 3.32% 3.32% 3.32% 3.32% 3.32% 3.18% 3.18% 3.18% 3.18% 3.18%Waste Unit Generation Rate b kg/capita-day 0.416 0.425 0.434 0.443 0.452 0.461 0.470 0.479 0.489 0.499 0.509 0.519 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%Generation Quantity c=axb ton/day 308.4 325.4 343.3 362.1 381.7 402.2 423.7 446.1 469.9 494.8 520.7 547.9 Annual Increasing Rate (Gen. Q) % 5.5% 5.5% 5.5% 5.4% 5.4% 5.3% 5.3% 5.3% 5.3% 5.2% 5.2% 0.0%Managed Waste Quantity d=cxe ton/day 250.0 279.8 298.7 318.6 339.7 362.0 385.6 410.4 437.0 465.1 494.7 520.5 Management Ratio e % 81.1% 86.0% 87.0% 88.0% 89.0% 90.0% 91.0% 92.0% 93.0% 94.0% 95.0% 95.0%Souce Reduction Quantity f=cxg ton/day 2.1 3.5 5.2 7.7 10.9 15.0 18.4 23.1 29.1 36.7 47.0 60.9 Source Reduction Ratio g % 0.7% 1.1% 1.5% 2.1% 2.9% 3.7% 4.3% 5.2% 6.2% 7.4% 9.0% 11.1%Collecion Quantity h=ix(d-f) ton/day 247.9 276.3 293.5 310.9 328.8 347.0 367.2 387.3 407.9 428.4 447.7 459.6 Collection Ratio i % 80.9% 85.8% 86.8% 87.7% 88.7% 89.6% 90.6% 91.6% 92.5% 93.5% 94.5% 94.4%
LSMC Poplation a - 180,397 186,603 193,022 199,662 206,530 213,635 220,984 228,586 236,244 244,158 252,337 260,790 Annual Increasing Rate (Pop.) % 3.44% 3.44% 3.44% 3.44% 3.44% 3.44% 3.44% 3.35% 3.35% 3.35% 3.35% 3.35%Waste Unit Generation Rate b kg/capita-day 0.416 0.425 0.434 0.443 0.452 0.461 0.470 0.479 0.489 0.499 0.509 0.519 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%Generation Quantity c=axb ton/day 75.1 79.3 83.8 88.5 93.4 98.5 103.9 109.5 115.5 121.8 128.4 135.4 Annual Increasing Rate (Gen. Q) % 5.6% 5.7% 5.6% 5.5% 5.5% 5.5% 5.4% 5.5% 5.5% 5.4% 5.5% 0.0%Managed Waste Quantity d=cxe ton/day 52.6 58.7 63.7 69.0 74.7 80.8 87.3 93.1 99.3 106.0 113.0 121.9 Management Ratio e % 70.0% 74.0% 76.0% 78.0% 80.0% 82.0% 84.0% 85.0% 86.0% 87.0% 88.0% 90.0%Souce Reduction Quantity f=cxg ton/day 1.0 1.9 2.4 3.2 4.1 5.3 6.3 7.5 9.2 11.4 14.1 17.7 Source Reduction Ratio g % 1.3% 2.4% 2.9% 3.6% 4.4% 5.4% 6.1% 6.8% 8.0% 9.4% 11.0% 13.1%Collecion Quantity h=ix(d-f) ton/day 51.6 56.8 61.3 65.8 70.6 75.5 81.0 85.6 90.1 94.6 98.9 104.2 Collection Ratio i % 69.6% 73.4% 75.3% 77.2% 79.1% 81.0% 83.0% 83.9% 84.8% 85.7% 86.5% 88.5%
BKM Poplation a - 80,476 83,309 86,242 89,277 92,420 95,673 99,041 102,527 106,054 109,702 113,476 117,380 Annual Increasing Rate (Pop.) % 3.52% 3.52% 3.52% 3.52% 3.52% 3.52% 3.52% 3.44% 3.44% 3.44% 3.44% 3.44%Waste Unit Generation Rate b kg/capita-day 0.316 0.323 0.329 0.336 0.343 0.350 0.357 0.364 0.371 0.378 0.386 0.394 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%Generation Quantity c=axb ton/day 25.5 26.9 28.4 30 31.7 33.5 35.4 37.3 39.3 41.5 43.8 46.2 Annual Increasing Rate (Gen. Q) % 5.5% 5.6% 5.6% 5.7% 5.7% 5.7% 5.4% 5.4% 5.6% 5.5% 5.5% 0.0%Managed Waste Quantity d=cxe ton/day 19.1 20.2 21.6 23.4 25.4 27.5 29.7 31.7 33.8 36.1 38.5 41.6 Management Ratio e % 75.0% 75.0% 76.0% 78.0% 80.0% 82.0% 84.0% 85.0% 86.0% 87.0% 88.0% 90.0%Souce Reduction Quantity f=cxg ton/day 0.1 0.2 0.2 0.3 0.5 0.6 0.9 1.2 1.5 1.9 2.5 3.2 Source Reduction Ratio g % 0.4% 0.7% 0.7% 1.0% 1.6% 1.8% 2.5% 3.2% 3.8% 4.6% 5.7% 6.9%Collecion Quantity h=ix(d-f) ton/day 19.0 20.0 21.4 23.1 24.9 26.9 28.8 30.5 32.3 34.2 36.0 38.4 Collection Ratio i % 74.8% 74.8% 75.8% 77.8% 79.7% 81.7% 83.6% 84.5% 85.4% 86.4% 87.3% 89.3%
MTM Poplation a - 53,853 56,056 58,348 60,735 63,219 65,804 68,496 71,297 74,213 77,248 80,407 83,696 Annual Increasing Rate (Pop.) % 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09% 4.09%Waste Unit Generation Rate b kg/capita-day 0.266 0.272 0.277 0.283 0.289 0.295 0.301 0.307 0.313 0.319 0.325 0.332 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%Generation Quantity c=axb ton/day 14.3 15.2 16.2 17.2 18.3 19.4 20.6 21.9 23.2 24.6 26.1 27.8 Annual Increasing Rate (Gen. Q) % 6.3% 6.6% 6.2% 6.4% 6.0% 6.2% 6.3% 5.9% 6.0% 6.1% 6.5% 0.0%Managed Waste Quantity d=cxe ton/day 5.0 5.5 6.2 6.7 7.3 8.3 9.5 11.0 12.8 14.8 17.0 19.5 Management Ratio e % 35.0% 36.0% 38.0% 39.0% 40.0% 43.0% 46.0% 50.0% 55.0% 60.0% 65.0% 70.0%Souce Reduction Quantity f=cxg ton/day 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.9 1.1 Source Reduction Ratio g % 0.7% 0.7% 0.6% 0.6% 1.1% 1.5% 1.9% 2.3% 2.6% 2.8% 3.4% 4.0%Collecion Quantity h=ix(d-f) ton/day 4.9 5.4 6.1 6.6 7.1 8.0 9.1 10.5 12.2 14.1 16.1 18.4 Collection Ratio i % 34.5% 35.6% 37.6% 38.6% 39.3% 42.1% 44.9% 48.8% 53.8% 58.8% 63.8% 68.8%
KRM Poplation a - 43,424 44,323 45,240 46,176 47,132 48,108 49,104 50,120 51,157 52,216 53,297 54,400 Annual Increasing Rate (Pop.) % 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07% 2.07%Waste Unit Generation Rate b kg/capita-day 0.266 0.272 0.277 0.283 0.289 0.295 0.301 0.307 0.313 0.319 0.325 0.332 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%Generation Quantity c=axb ton/day 11.6 12.1 12.5 13.1 13.6 14.2 14.8 15.4 16 16.7 17.3 18.1 Annual Increasing Rate (Gen. Q) % 4.3% 3.3% 4.8% 3.8% 4.4% 4.2% 4.1% 3.9% 4.4% 3.6% 4.6% 0.0%Managed Waste Quantity d=cxe ton/day 4.1 4.8 5.4 6.0 6.8 8.0 10.8 10.8 11.6 12.5 13.4 14.5 Management Ratio e % 35.0% 40.0% 43.0% 46.0% 50.0% 56.5% 73.0% 70.0% 72.5% 75.0% 77.5% 80.0%Souce Reduction Quantity f=cxg ton/day 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.5 0.6 0.8 1.0 1.3 Source Reduction Ratio g % 0.9% 0.8% 0.8% 0.8% 2.2% 2.1% 2.7% 3.2% 3.8% 4.8% 5.8% 7.2%Collecion Quantity h=ix(d-f) ton/day 4.0 4.7 5.3 5.9 6.5 7.7 10.4 10.3 11.0 11.7 12.4 13.2 Collection Ratio i % 34.4% 39.5% 42.5% 45.6% 48.9% 55.6% 72.3% 69.0% 71.4% 73.7% 76.1% 78.5%
Total Poplation a - 1,099,158 1,135,901 1,173,880 1,213,140 1,253,725 1,295,679 1,339,049 1,383,882 1,428,637 1,474,851 1,522,575 1,571,857Five Annual Increasing Rate (Pop.) % 3.34% 3.34% 3.34% 3.35% 3.35% 3.35% 3.35% 3.23% 3.23% 3.24% 3.24%
Municipalities Waste Unit Generation Rate b kg/capita-day 0.396 0.404 0.412 0.421 0.43 0.438 0.447 0.455 0.465 0.474 0.484 0.493 Annual Increasing Rate (UGR.) % 2.0% 2.0% 2.2% 2.1% 1.9% 2.1% 1.8% 2.2% 1.9% 2.1% 1.9%Generation Quantity c=axb ton/day 434.9 458.9 484.2 510.9 538.7 567.8 598.4 630.2 663.9 699.4 736.3 775.4 Annual Increasing Rate (Gen. Q) % 5.5% 5.5% 5.5% 5.4% 5.4% 5.4% 5.3% 5.3% 5.3% 5.3% 5.3%Managed Waste Quantity d=cxe ton/day 330.7 369.0 395.6 423.7 453.9 486.6 522.9 557.0 594.5 634.5 676.6 718.0 Management Ratio e % 76.0% 80.4% 81.7% 82.9% 84.3% 85.7% 87.4% 88.4% 89.5% 90.7% 91.9% 92.6%Souce Reduction Quantity f=cxg ton/day 3.4 5.8 8.0 11.4 16.0 21.5 26.4 32.8 41.0 51.5 65.5 84.2 Source Reduction Ratio g % 0.8% 1.3% 1.7% 2.2% 3.0% 3.8% 4.4% 5.2% 6.2% 7.4% 8.9% 10.9%Collecion Quantity h=ix(d-f) ton/day 327.33 363.2 387.5 412.4 437.9 465.1 496.5 524.1 553.5 583.0 611.1 633.7 Collection Ratio i % 75.9% 80.2% 81.4% 82.6% 83.8% 85.1% 86.8% 87.7% 88.9% 90.0% 91.1% 91.7%
source: JICA Study Team
Table A 11.2-1 Projected Solid Waste Generation and Target Waste Management Ratio
MunicpalityPresent
A 11.2 - 1
APPENDIX 11.3
Annual Work Plan of Fiscal Year of 2005/06 (2062/63)
Proposed by Task Force
(Five Municipalities and SWMRMC)
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
A-1-S1
1 Preparation of agreement and TOR for PPP SWMS/Rajesh Manander
A-1 S2
1 Agreement with private sector SWMS/Rajesh Manander
A-1-S3
1 Preparation of an equipment replacement plan MS/Purusotam Shakya
2 Procurement of Compactor Truck or Tipper with cover Environment Dept./MS 1,400,000
3 Replacement of tractors purchasing 4 vehicles Environment Dept./MS 5,500,000
A-1-S6
1 Preparation of an inventory of sweeping areas SWMS/Rajesh Manander
2 Time and Motion survey of core areas SWMS/Rajesh Manander 11,000
3 Record data of sweeping areas inventory into the GISsystem SWMS/Rajesh Manander 50,000
4 Record data of Time and Motion survey of core areas SWMS/Rajesh Manander
A-1-S7
1 Plan and implement direct collection system in 2 Wardsas pilot basis SWMS/Rajesh Manander 20,000
2 Preparation of new collection plan (core areas) SWMS/Rajesh Manander
A-2-S1
1 Preparation of an effective operation plan of Tekutransfer station SWMS/Rajesh Manander
2 Construction and laying RCC of 1,000 sq meter SWMS/Rajesh Manander 700,000
3 Infrastructure for night time operation (lighting system) SWMS/Rajesh Manander 200,000
4 Drainage management SWMS/Rajesh Manander 500,000
5 Upgrading servicing situation (vehicle washing) SWMS/Rajesh Manander 400,000
Establishment of rules for private sector collection and its monitoring system
Promotion of private sector participation in door to door collection for 25% ofHHs
Preparation of equipment replacement plan and pilot test for a few types collectionvehicles and commencement of replacement of tractors (for 25% collection)
Improvement of collection and transportation system taking intoconsideration waste transportation to Sisdol landfill site
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
Table A 11.3-1 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (KMC)
Introduction of GIS System for waste collection plan
2005 2006JulyJuly August May
Chaitra
September
Establishment of effective operation system of Teku transfer station
A 11.3 - 1
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
6 Weight bridge operation SWMS/Rajesh Manander 50,000
A-2-S2
1 Preparation of a plan together with design of Balajutransfer station SWMS/Rajesh Manander
2 Implementation of public consultation SWMS/Rajesh Manander
3 Implementation of IEE study SWMS/Rajesh Manander
A-3-S1
1 Renovation of mechanical workshop MS/Purusotam Shakya 1,000,000
2 Procurement of official facilities (computer and steelracks) MS/Purusotam Shakya 400,000
3 Store database software package and managementtraining MS/Purusotam Shakya 400,000
4 Mechanics training MS/Purusotam Shakya 100,000
B-1-S1
1 Final site selection SWMS/Rajesh Manandhar
2 Site surveys SWMS/Rajesh Manandhar
3 Concept design SWMS/Rajesh Manandhar
4 Feasibility study including market study SWMS/Rajesh Manandhar
5 EIA SWMS/Rajesh Manandhar
B-2-S1
1 Implementation of reviewing activities CMU/Shriju
B-2-S2
1 Compost bin set distribution CMU 700,000
2 Vermi-composting kits development and provision ofsubsidy CMU 40,000
3 Recycling sets for Nature Clubs CMU 200,000
Plan (design), construction and operation of Balaju transfer station (includingnecessary revision of primary collection route)
Production of home compost bins and home vermi-compost kits and theirdistribution
Renovation of existing mechanical workshop including replacement of oldequipment and establishment of efficient parts stock system
Cooperation with SWMRMC to proceed development of a central level WPF(50-100 t/d) at appropriate place
Review of the existing home and community composting and recyclingactivities
A 11.3 - 2
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
B-2-S3
1 CRC-supporting activities CMU 250,000
2 CRC-establishment in 5 Wards CMU 250,000
B-3-S1
1 Operation of medium-scale vermi-composting CMU
B-3-S2
1 Implementation of marketing study CMU
2 Preparation and Implementation of sales campaignincluding review and evaluation CMU
C-1-S1
1Procurement of heavy equipment and vehicles (1 wheelloader, 1 supervision vehicle, 1 mobile maintenancevehicle w/ tools)
MS/Purusotam Shakya 13,500,000
2 Monitoring daily LF management SWMS/Rajesh Manandhar
3 Extension of gas venting pipes SWMS/Rajesh Manandhar 100,000
4 Intermediate leachate collection SWMS/Rajesh Manandhar 600,000
5 Maintenance of leachate collection and treatmentfacilities SWMS/Rajesh Manandhar 300,000
6 Building maintenance SWMS/Rajesh Manandhar 300,000
7 Operation of pump SWMS/Rajesh Manandhar 600,000
8 Vehicle and equipment hiring including rental trucks for3 months (mid-July~end-Sept) SWMS/Rajesh Manandhar 1,200,000
9 Arrangement of fuel for equipment within the site SWMS/Rajesh Manandhar 1,200,000
C-2-S1
1 Site selection survey and public consultation SWMS/Rajesh Manandhar
Conducting of survey for possible long-term landfill sites
Operation of Community Recycling Center (CRC) in Ward 21 and itsextension to other Wards (with support from NEREPA)
Operation of Sisdol sanitary landfill site
Operation and expansion of medium-scale vermi-composting
Implementation of sales campaign together with marketing study
A 11.3 - 3
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
C-2-S2
1 Site surveys SWMS/Rajesh Manandhar
2 Concept design SWMS/Rajesh Manandhar
3 Feasibility study including market study SWMS/Rajesh Manandhar
4 EIA SWMS/Rajesh Manandhar
C-3-S1
1 Planning for rehabilitation works for Balkhu SWMS/Kiran 300,000
2 Selection of contractor for rehabilitation andlandscaping SWMS/Kiran
3 Rehabilitation works and landscaping (500~1,000m peryear) SWMS/Kiran 1,500,000
D-1-S1
1 Establishment of 50 Nature Clubs CMU/Shriju 25,000
D-1-S2 Development of training packages on 5,000
1 Solid Waste Management, Greenery Promotion.Cultural Heritage Conservation, Communication, CMU/Shriju
2 Nature Club management CMU/Shriju
D-1-S3
1 Workshop for Guide Teachers CMU/Umesh 50,000
2 Workshop for Principals CMU/Umesh 50,000
3 Workshop for Nature clubs CMU/Umesh 200,000
4 Handover Nature clubs CMU/Umesh 50,000
5 Eco-Yatra for observation visits CMU/Shriju 120,000
D-1-S4
1 Regular interaction between Nature Clubs and localcommunities CMU/Shriju
Establishment of 50 more Nature Clubs
Regular interaction between Nature Clubs and local communities to reach outto society as a whole
Training for Nature Clubs members on the above five areas
Cooperation with SWMRMC to proceed establishment of a long-term landfillsite
Rehabilitation and landscaping works of the Bagmati (Balkhu) dumping site
A 11.3 - 4
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
D-2-S1 100,000
1 Development of a database CMU/Shriju
D-2-S2
1 Review and evaluation of the existing WECs CMU/Shriju
2 Form active WECs in 5 Wards CMU/Shriju 25,000
D-2-S3
1 Training for WECs CMU/Sanu 50,000
2 Coordination and networking of WECs CMU/Sanu 50,000
3 Conduct community cleanup CMU/Sanu 50,000
D-2-S4
1 Training for NGOs/CBOs CMU/Sanu 50,000
D-2-S5
1 Provision of annual award CMU/Sanu
D-3-S1
1 Mobilization of CVs CMU/Shriju 50,000
D-3-S2
1 Capability training camp CMU/Shriju 160,000
2 City Volunteers training CMU/Shriju 100,000
D-4-S1
1 Promotional materials CMU/Shriju 200,000
D-4-S3
1 Self-explanatory displays in KMCs prime location CMU/Shriju 50,000
Implementation of closed camps for capability building and raising teamspirit of each batch
Review and evaluation of the existing Ward Environmental Committee(WEC) and formation of active WECs in 10 Wards
Provision of training on SWM and community mobilization for WECs
Production of CMU’s promotional materials (flyers, brochures, posters,stickers, etc.)
Provision of annual award to best WEC
Setting up of self-explanatory displays on SWM at CMU and other keylocations for wider publicity
Mobilization of City Volunteers (CVs) to support BABA program
Provision of technical and financial assistance to best community initiatives ofWECs
Development of a database of community groups, NGOs/CBOs and privatesector, and selection of the best ones for long-term work
A 11.3 - 5
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
D-4-S4
1 Radio Jingles CMU/Shriju 75,000
2 Media Promotion CMU/Shriju 50,000
D-4-S5
1 Web page design CMU/Shriju
2 Web page maintenance CMU/Shriju
D-4-S6
1 Community Exhibition on Environment and Earth day CMU/Shriju 300,000
D-5-S1 60,000
1 Recruiting of a BABA coordinator CMU/Shriju
D-5-S2
1 Recruiting of assistant level staff for administration CMU/Shriju 60,000
E-1-S1
1 Obtain approval from the Municipal Board/ Council onthe new organization structure
EnvironmentDept./Mr.Indraman
2 Conducting of sharing session to disseminateinformation about the new organization structure
EnvironmentDept./Mr.Indraman 5,000
E-2-S1
1 Preparation of plan of operation of monitoring andevaluation SWMS/Rajesh Manandhar
2 Conducting of monitoring and review of the AnnualWork Plan
EnvironmentDept./Mr.Indraman
3 Formulation of Annual Work Plan of FY2063/64 EnvironmentDept./Mr.Indraman
E-2-S2
1 Conducting of expenditure monitoring of the AnnualWork Plan
EnvironmentDept./Mr.Indraman
2 Formulation of program-based budget of FY2063/64 EnvironmentDept./Mr.Indraman
Regular featuring and reporting on SWM on TV program “HamroKathmandu”
Establishment of a monitoring and evaluation system in alignment with theAction Plan
Mainstreaming of program-based budgeting system and expendituremonitoring for a more efficient use of resources
Design and maintenance of the web page on SWM
Implementation of the reorganization plan of the Environment Department
Recruiting of a BABA coordinator
Recruiting of assistant level staff for administration
Implementation of community exhibition and event regularly
A 11.3 - 6
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
E-2-S3
1 Implementation of regular coordination meetings EnvironmentDept./Mr.Indraman
E-2-S4
1 Waste record database SWMS/Robert
2 Budget database SWMS/Robert 10,000
3 Store database SWMS/Robert 10,000
E-3-S1
1 Review of existing tasks and responsibilities of eachunit SWMS/Rajesh Manandhar
2 Series of meetings among related units SWMS/Rajesh Manandhar
3 Preparation of TORs for each unit SWMS/Rajesh Manandhar
E-3-S2
1 Development of reassignment plan SWMS/Rajesh Manandhar
2 Reassignment of necessary staff SWMS/Rajesh Manandhar
E-4-S1
1 Development of a staffing plan EnvironmentDept./Mr.Indraman
E-4-S2
1 Assignment of a learning manager SWMS/Rajesh Manandhar
2 Development of database SWMS/Rajesh Manandhar
3 Collection of necessary data from each staff SWMS/Rajesh Manandhar
E-4-S3
1 Development of plan of knowledge-sharing mechanismand peer-training sessions SWMS/Rajesh Manandhar
2 Implementation of knowledge-sharing meeting and peer-training session SWMS/Rajesh Manandhar
Preparation of TORs for each unit delineating tasks and responsibilities to beundertaken during Action Plan implementation
Development of a staffing plan based on HRD program and its application
Assignment of a Learning Manager for HRD and maintain an inventory ofstaff skills and knowledge, training history
Strengthening of knowledge-sharing mechanism and peer-training sessionsfor full utilization of existing human resources
Reassignment of necessary staff (Taking into consideration future resourcedemands such as for facilities development)
Improvement of information flow and management by encouraging regularcoordination meetings and sharing of experiences
Introduction of systematic collection and analysis of SW data by database
A 11.3 - 7
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Department, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Kartik
JuneMarch AprilDecember January February
Baisak Jestha
2062Magh FalgunAswin
October November
Mangsir Poush
2005 2006JulyJuly August May
Chaitra
September
F-1-S1
1 Obtain of official approval from the municipal board onthe Medical Waste Management Guidelines SWMS/Rajesh Manandhar
2 Planning of medical waste management system SWMS/Rajesh Manandhar
F-1-S2
1 Public consultation SWMS/Rajesh Manandhar
2 Conducting a test run SWMS/Rajesh Manandhar
F-1-S3
1 Procurement of an auto clave SWMS/Rajesh Manandhar 3,000,000
F-1-S4
1 Training for KMC staff operators SWMS/Rajesh Manandhar 60,000
2 Training for health care staff by national dental hospital(USAID funds) SWMS/Rajesh Manandhar
F-3-S1
1 Establishment of a day care center SWMS/Rajesh Manandhar
2 Provision of health care services to sweeper populationand their children (supported by World Vision ) SWMS/Rajesh Manandhar
Legend: Continuous activity SWMS: Solid Waste Management Section CMU: Community Mobilization Unit: Intermittent activity MS: Mechanical Section: Spot activity
Operation of a medical waste treatment facility at Teku
Review of working conditions of the sweeper population and provision ofmeasures to improve their performance.
Training for staff of KMC, private sector, and medical institutions
Dissemination of Medical Waste Management Guidelines
Procurement of additional equipment (auto clave)
A 11.3 - 8
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
A-1-S1
1 Study of private sector involvement in SWM andpaying system ES/Pradeep Amatya
A-1-S2
1Preparation of individual agreement for PPP with theexisting private sector who are presently involved thewaste collection services.
TDD/Prabin Shrestha 20,000
2 Review meeting with private operators TDD/Prabin Shrestha
3 Preparation of PPP operation guideline in SWM TDD/Prabin Shrestha 30,000
4 Signing on the agreement in 4 wards TDD/Prabin Shrestha
A-1-S3
1 Rikshaw collection system - 6 rikshaws ES/Pradeep Amatya 90,000
2 Distribution of buckets ES/Pradeep Amatya 10,000
3 Increase handcarts ES/Pradeep Amatya 40,000
A-1-S4
1 Develop networking system with private partners TDD/Prabin Shrestha 10,000
2 Set up the target area and its introduction schedule(Preparation of planning report) ES/Pradeep Amatya
A-2-S1
1 Computer training for 5 staffs ES/Pradeep Amatya 50,000
2 Detail Time and Motion survey of all existing routes ES/Pradeep Amatya 12,500
3 Preparation of survey report ES/Pradeep Amatya 7,500
Table A.11.3-2 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (LSMC)
Implementation of Time and Motion study
2062
June JulyJanuary February March April
Review of existing policy of LSMC and establishment of strong bylaws (andrules) interacting with all stakeholders and its publication
May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Preparation of standard TOR and agreement for PPP concept
Introduction of a new pilot project for waste collection from shops byprivate sector
Newly introduction of door to door collection for 25% houses at the outsidethe city core area by private sector
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
A 11.3 - 9
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2062
June JulyJanuary February March April May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
4 Improve collection route and street cleaning activitiesbased on the report ES/Pradeep Amatya
A-2-S2
1 Improvement of collection routes and collectionpoints by using GIS Map and GPS ES/Pradeep Amatya
2 Development of backup system of the collection route ES/Pradeep Amatya
A-2-S3
1 Implementation of cost analysis ES/Pradeep Amatya
A-2-S4
1 Capacity analysis ES/Pradeep Amatya
2 Preparation of procurement plan ES/Pradeep Amatya
A-3-S1
1 30 days notification for the preparation of T/S PWD/Rudra Gautam 30,000
2 Public consultation meetings PWD/Rudra Gautam 2,000
3 Hire consultants for IEE PWD/Rudra Gautam 200,000
4 Hire a supervisor for topography survey PWD/Rudra Gautam 100,000
5 Prepare a concept plan PWD/Rudra Gautam
6 Detail design, estimate and drawings PWD/Rudra Gautam 100,000
7 Arrangement of budget for the construction in nextfiscal year PWD/Rudra Gautam
Arrangement for a temporary transfer station (in Afadole) andcommencement of temporary transferring
Introduction of new collection routes
Implementation of transportation and maintenance cost analysis
Implementation of vehicle capacity analysis and plan for procurement ofnew vehicles
A 11.3 - 10
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2062
June JulyJanuary February March April May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
B-1-S1
1 Concept plan preparation PWD/Rudra Gautam 30,000
2 Candidate site investigation PWD/Rudra Gautam 100,000
3 Research previous reports and data PWD/Rudra Gautam 15,000
4prepare site selection criteria, list up potential sites,field visit, preparation of report and publicdiscussion/meetings
PWD/Rudra Gautam 10,000
B-2-S1
1 Procurement of compost bins PWD/Rudra Gautam 1,200,000
2 One day training on home compost bin forcommunity and 100 municipal staff CDS/Sabina 175,000
3 Follow-up household composting program by hiringmotivators and resource persons ES/Pradeep Amatya 36,000
4 Survey report preparation ES/Pradeep Amatya 12,000
5 Procurement of vermi-composting kits CDS/Sabina 30,000
6 Two days training on vermi-composting ES/Sabina 30,000
7 Follow-up of vermi-composting ES/Pradeep Amatya
8 Survey report preparation ES/Pradeep Amatya
B-3-S1
1 Plastic separation CDS/Sabina
2 Paper recycling CDS/Sabina
3 Introduction of cotton bags CDS/Sabina 50,000
4 Support to introduce second hand shop CDS/Sabina
Cooperation with SWMRMC and KMC for development of WPF
Distribution of 1,200 home composting bins
Promotion of 3Rs practices by local people
A 11.3 - 11
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2062
June JulyJanuary February March April May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
C-1-S1
1 Dispatch staff and loader ES/Pradeep Amatya
2 Regular visit to Sisdol LF operation ES/Pradeep Amatya 30,000
C-1-S2
1 Site surveys PWD/Rudra Gautam
2 Concept design PWD/Rudra Gautam
3 Feasibility study and market study PWD/Rudra Gautam
4 EIA PWD/Rudra Gautam
C-1-S3
1 Closure works in cooperation with KMC ES/Pradeep Amatya 10,000
D-1-S1
1 Implementation of exhibition as Public Event (1 time) CDS/Sabina 100,000
2 Implementation of wall painting as Public Event ES/Prabin Shrestha 50,000
3 Clean up campaign (provision of materials) beforeEarth Day CDS/Sabina 50,000
4 Rally for celebrating Environment Day CDS/Sabina
5 Award Ceremony on Earth Day CDS/Sabina
Operation of Sisdol SF with KMC
Closure of Bagmati dumping site
Implementation of public awareness/education activities
Cooperation with SWMRMC and KMC for development of long termlandfill site
A 11.3 - 12
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2062
June JulyJanuary February March April May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
D-2-S1
1 Identification of pilot wards CDS/Sabina
2 One-day training for selected members (about 15people) of pilot wards CDS/Sabina 10,000
3 Formulation of WECC by providing seed money CDS/Sabina 5,000
D-2-S2
1 Workshop for target school teachers (5 schools*2people+10 staffs) CDS/Sabina 15,000
2 Camp for target school students and form Nature/EcoClubs (3-day) CDS/Sabina 62,000
3 Support of Nature/Eco Clubs by providing seedmoney CDS/Sabina 25,000
4 Various activities (competition, clean up, field visit,capacity building training) CDS/Sabina 20,000
D-2-S3
1 Sharing program with KMC twice a year CDS/Sabina 5,000
2 Refresher training (2 day training ) CDS/Sabina 24,000
3 Regular monthly meetings CDS/Sabina 12,000
D-2-S4
1 One month training on reuse/recycling (30 people) CDS/Sabina 40,000
E-1-S1
1 Development of HRD plan for SWM Task Force 50,000
Plan for HRD and monitoring including municipal staff/NGOs/CBOs/TLOs
Formation and mobilization of Ward Environment ConservationCommittee (WECC) on a pilot basis
Formation and mobilization of Nature/Eco Clubs among children
Mobilization of youth as City Volunteers (CVs)
Strengthening of women groups for SWM
A 11.3 - 13
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2062
June JulyJanuary February March April May
SN
2005October November DecemberJuly August September
Falgun Chaitra
2006
Kartik Mangsir Poush Magh Baisak Jestha Ashadh
Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Division, Section)
ProposedBudget(NRs) 2063
Shrawan Bhadra Aswin
E-2-S1
1 Annual workplan monitoring Task Force 12,000
2 Mid-term Review Task Force
3 Annual Workplan Evaluation Task Force
4 Annual Workplan Formulation for FY2063 Task Force
5 Annual SWM Budget Formulation for FY2063 Task Force
E-3-S1
1 Review of SWM organization (Environment Dept.)and appoint responsible persons CEO
E-5-S1
1 Waste quantity & quality survey (Wet season) ES/Pradeep Amatya 25,000
2 Waste quantity & quality survey (Dry season) ES/Pradeep Amatya 25,000
3 Input of solid waste data to database ES/Pradeep Amatya
4 Establishment of reporting system ES/Pradeep Amatya
Legend : Continuous activity PWD: Public Works Division ES: Environment Section: Intermittent activity TDD: Town Development Division CDS: Community Development Section: Spot activity
Announcement of SWM overall yearly plan of LSMC at beginning of eachfiscal year
Collection and arrangement of solid waste data in database
Review of SWM organization (Environment Dept.) and appoint responsiblepersons as focal points to coordinate all dimensions of SWM withmotivating environment
A 11.3 - 14
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
A-1-S1
1 Procurement of Tricycles - 5 nos ES/Dinesh 90,000
2 Procurement of 1.5 m3 capacity small garbage Tipper- 2 nos ES/Dinesh 2,200,000
A-2-S1
1 Planning of source separated collection system ES/Dinesh, SWS/Moti
2 Explanation to the public ES/Dinesh, SWS/Moti
3 Selection of model areas and preparation (distributebuckets) ES/Dinesh, SWS/Moti 300,000
4 Implementation of collection ES/Dinesh, SWS/Moti
5 Evaluation ES/Dinesh, SWS/Moti
A-2-S2
1 Preparation of a plan ES/Dinesh, SWS/Moti
2 Explanation to the concerned hotels, restaurants andstakeholders ES/Dinesh, SWS/Moti
3 Preparatory works for collection ES/Dinesh, SWS/Moti 50,000
4 Implementation of activities ES/Dinesh, SWS/Moti
5 Evaluation and preparation for further planning ES/Dinesh, SWS/Moti
B-1-S1
1 Study of market for mini excavator ES/Dinesh
2 Finalization of type of excavator ES/Dinesh
3 Procurement of excavator PPWS/Laxman 7,000,000
4 Operation of excavator ES/(TBN)
2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun Chaitra Baisak Jestha Ashadh
Table A.11.3-3 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (BKM)
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Section)
ProposedBudget(NRs)
2005
2062
Promotion of source separation and collection of organic kitchen waste byformulating users groups at local household level
Procurement of Garbage Tipper and Tricycles
Procurement of a 10 t/d capacity excavator or backhoe loader, and wastesorting device
Promotion of source separation and collection from hotels and restaurants
April May June
2006January February JulyMarchJuly August September October November December
A 11.3 - 15
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun Chaitra Baisak Jestha Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Section)
ProposedBudget(NRs)
2005
2062
April May June
2006January February JulyMarchJuly August September October November December
B-1-S2
1 Preparation of plan PPWS/Laxman
2 Land acquisition PPWS/Laxman
B-1-S3
1 Design and estimate for shade PPWS/Laxman
2 Construction of shade PPWS/Laxman 7,000,000
3 Operation of shade for composting and recycling ES/(TBN)
4 Establishment of non recyclable materials disposalmechanism ES/(TBN)
B-2-S1
1 Preparation for source separation ES/Dinesh 10,000
2 700 no of bags procurement and distribution ES/Dinesh 5,000
3 Organizing of core group ES/Dinesh 80,000
4 Operation of source separation ES/Dinesh 5,000
C-1-S1
1 Preliminary studies (topographical survey, soilsurvey)
ES/Dinesh,PPWS/Laxman
C-1-S2 Completion of EIA procedure
1 Completion of EIA procedure ES/Dinesh,PPWS/Laxman 185,000
C-3-S1
1 Interaction program with local people PPWS/Laxman,ES/Dinesh, SWS/Moti 10,000
2 Interaction program with media PPWS/Laxman,ES/Dinesh, SWS/Moti 3,000
3 Interaction program with DDC, MTM, VDCs,SWMRMC, MOLD
PPWS/Laxman,ES/Dinesh, SWS/Moti 8,000
Topographical survey and soil investigation
Establishment of local committee for social consensus for the developmentof the site
Promotion of waste minimization by making people well known withvarious methods of waste reduction at sources (e.g.. home compost bins andvermi-composting, gift and educational training tools for school childrenfrom waste)
Land acquisition of extension area
Infrastructure development (open trussed shade, garage, parking area,weighbridge, sorting area, screening area, etc.)
A 11.3 - 16
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun Chaitra Baisak Jestha Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Section)
ProposedBudget(NRs)
2005
2062
April May June
2006January February JulyMarchJuly August September October November December
4 Demarcation of boundary ES/Dinesh,PPWS/Laxman
5 Formation of basket fund ES/Dinesh,PPWS/Laxman 10,000,000
6 Notification ES/Dinesh,PPWS/Laxman
D-1-S1
1 Drafting and design of OHP sheets SWS/Dilip and Krishna 1,000
2 Production of OHP sheets SWS/Dilip and Krishna 5,000
3 Procurement of OHP SWS/Dilip and Krishna 20,000
D-1-S2
1 Follow-up programs for house wives in Ward no. 14,15 and 17 (4 times) SWS/Dilip and Krishna 36,000
2 School based orientation program SWS/Dilip and Krishna 5,000
D-1-S3
1 Publication of promotional materials SWS/Dilip and Krishna 36,000
2 Cleanup campaign SWS/Dilip and Krishna 20,000
3 Drawing competition SWS/Dilip and Krishna 25,000
4 Essay competition SWS/Dilip and Krishna 20,000
5 Drama SWS/Dilip and Krishna 20,000
6 Award program SWS/Dilip and Krishna 20,000
7 Rally SWS/Dilip and Krishna 20000
Dissemination of information regarding SWM inclusive collection system(leaflets, brochures, calendars, advertisements in halls before starting offilm show)
Development of training tools/materials for community participation
Implementation of mass communication and education program(distribution of stickers & posters, drama play, competition among childrengroup-drama, original stage drama during Gaijatra festival, drawing wallpaintings, cleansing at the local community)
A 11.3 - 17
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun Chaitra Baisak Jestha Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Section)
ProposedBudget(NRs)
2005
2062
April May June
2006January February JulyMarchJuly August September October November December
D-2-S1
1Promotion of waste minimization by making peoplewell known with various methods of waste reductionat sources
1a Refresher training on composting SWS/Dilip and Krishna 10,000
1b Reuse training SWS/Dilip and Krishna 10,000
2 Expansion of Nature Clubs
2a Follow-up meetings with existing Nature Clubs SWS/Dilip and Krishna 10,000
2b Follow-up activities for existing Nature Clubs SWS/Dilip and Krishna 30,000
2c Workshop for target school teachers SWS/Dilip and Krishna 6,500
2d Training for target school children and from 5 NatureClubs SWS/Dilip and Krishna 15,000
2eProvide seed money and stationary for 5 Nature Clubsto conduct activities (Rs 2,000 for seed money and Rs500 for stationary)
SWS/Dilip and Krishna 12,500
2f Field visit (2 times with vehicles: 2 groups, 3 timeswithout vehicles: 2 groups) SWS/Dilip and Krishna 50,000
E-1-S1
1 Conduct training program as TNA PPWS/Laxman 100000
Implementation of training on SWM based on the TNA
Promotion of Interpersonal Communication and Education program witharrangement of agreement with NGO such as selection of targetcommunities, orientation workshop, baseline information survey in regardto existing knowledge, attitude & practices on SWM, counselor trainingcamp for youth, teachers who support children's activities on SWM at thetargeted communities
A 11.3 - 18
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun Chaitra Baisak Jestha Ashadh
SN Shor-term Activities to be Conducted inFY2005/06 (2062/2063)
Responsible Person(Section)
ProposedBudget(NRs)
2005
2062
April May June
2006January February JulyMarchJuly August September October November December
E-1-S2
1 Establishment of Environment Section CEO
2 Transfer of staff CEO
3 Provide TOR to the staff CEO
4 Physical improvement CEO 200,000
5 Approve Task Force TOR CEO
6 Drafting SWM guideline (By laws) Environmental Sec./(TBN) 100,000
E-2-S1
1 Collection of relating data for SWM ES/(TBN)
E-2-S2
1 Arrangement of the collected data in the database ES/(TBN)
Legend: Continuous activity PPWS: Physical Planning and Works Section ES: Environment Section: Intermittent activity SWS: Social Welfare Section TBN: To be named: Spot activity
Arrangement of the collected data in the database
Finalization of organizational restructuring for SWM
Collection of relating data for SWM
A 11.3 - 19
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
A-1-S1 Procurement of collection vehicle (s) andassignment of a driver, collectors and loaders
1 Arrangement of collection vehicle PTS/Satya 10,000
2 Arrangement of collectors with collection equipment PTS/Satya
A-2-S1
1 Preparation of a plan of depo(s) for collection/transfer PTS/Satya 10,000
2 Public meeting/consultation with local people todiscuss the depo development plan PTS/Satya
3 Preparation of design drawing of depo(s) includingtopo/geological surveys PTS/Satya 250,000
4 Tender for construction PTS/Satya 10,000
5 Construction of depo(s) PTS/Satya 2,600,000
6 Preparation of operation plan of depo(s) and review PTS/Satya
7 Operation of depo(s) PTS/Satya
A-3-S1
1 Review of the established general rules of PPP CDSS/Tulsi
2 Clarification of the existing private collection inWards 15, 16, and 17 CDSS/Tulsi
3 Preparation of own guidelines of MTM for privatesector collection CDSS/Tulsi
4 Preparation of individual agreement paper for PPPwith the existing private sector CDSS/Tulsi
5 Signing on the agreements CDSS/Tulsi
6 Monitoring of private sector activity CDSS/Tulsi
Chaitra Baisak Jestha Ashadh
2062 2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun
Setting “depo (s)” at new collection areas
Preparation of guidelines for private sector collection
July
Table A.11.3-4 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (MTM)
March April May June2005 2006
July August September October November December January February
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
Proposed Budget(NRs)
A 11.3 - 20
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Chaitra Baisak Jestha Ashadh
2062 2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun
JulyMarch April May June2005 2006
July August September October November December January February
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
Proposed Budget(NRs)
B-2-S1
1 Expansion of plastic recycling (50 bags, 50 strings,etc.) CDSS/Tulsi 60,000
2 Training for community (2 groups) CDSS/Tulsi 150,000
B-3-S2
1 Conducting a study for composting chamber operation CDSS/Tulsi 130,000
2 Trial of operation of composting chamber CDSS/Tulsi 150,000
C-1-S1
1 Nominating candidates, public consultation and siteselection PTS/Satya
2 Preliminary engineering surveys, designing and legalIEE PTS/Satya 100,000
3 Land acquisition and preparation work PTS/Satya 4,000,000
C-2-S1
1 Cooperation and support to BKM/SWMRMC PTS/Satya, LS/Siva
D-1-S1
1 Broadcasting on local FM on SWM CDSS/Tulsi
2 Miking regarding SWM CDSS/Tulsi
D-1-S2
1 SWM exhibition (1time for 2 days) CDSS/Tulsi, Krishna 75,000
D-2-S1
1 Development of training tools and promotionmaterials CDSS/Krishna
D-2-S2
1 Four Eco-clubs formation and mobilization withtraining and fund CDSS/Krishna 100,000
Implementation of public events
Formation and mobilization of Eco/Nature Clubs at schools
Development of training tools and promotion materials for communityparticipation
Raising of public awareness through local radio (FM) and miking
Providing of bags and metal strings (suiros) for separation at source
Operating community composting
Identification and arrangement of a temporary landfill site
Conclusion of agreement with BKM for development and utilization of Taikabu LF
A 11.3 - 21
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
Chaitra Baisak Jestha Ashadh
2062 2063Shrawan Bhadra Aswin Kartik Mangsir Poush Magh Falgun
JulyMarch April May June2005 2006
July August September October November December January February
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
Proposed Budget(NRs)
D-2-S3
1 Household reuse training (2times, 5days) CDSS/Tulsi 50,000
2 Community group interaction and feedback collection CDSS/Tulsi 10,000
3 Community groups formation, mobilization andpartnership CDSS/Tulsi 100,000
4 Refresher training on SWM for existing groups10days one time CDSS/Tulsi 20,000
D-2-S4
1 Clean up program (4 times) CDSS/Tulsi 80,000
2 Temple and monuments cleaning by mobilizingcommunity and students (3 times) CDSS/Tulsi 90,000
3 Municipal area cleaning works CDSS/Tulsi 200,000
D-2-S5
1 Selection of 17 city volunteers (to be assigned to eachward) CDSS/Tulsi
2 Three-day camp CDSS/Tulsi 50,000
3 Regular activities including meeting CDSS/Tulsi 25,000
E-1-S1
1 Review job descriptions and implement assignments CEO 50,000
E-2-S1 Collection of relating data for SWM
1 Collection of relating data for SWM PTS/Satya
E-2-S2 Arrangement of the collected data in the database
1 Arrangement of the collected data in the database PTS/Satya
Legend: Continuous activities PTS: Planning and Technical Section CDSS: Community Development and Sanitation Section: Intermittent activities LS: Legal Section: Spot activities
Implementation of community-based clean up program
Mobilization of youth as city volunteers for SWM
Strengthening of SWM Sub-section
Formation and mobilization and skills development of community groups for SWM
A 11.3 - 22
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
A-1-S1
1 Review & examine previous agreements andestablishment of general rules/guideline
PTS/Bal, SWMU/Anuj,Gyan
2 Preparation of individual agreement for PPP PTS/Bal, SWMU/Anuj,Gyan 10,000
3 Conduct meeting with the potential private operatorsfor identifying zoning areas
PTS/Bal, SWMU/Anuj,Gyan 30,000
4 Call for the proposal including their planning andwork
PTS/Bal, SWMU/Anuj,Gyan
5 Review and analysis of proposal and locating sites forcollection
PTS/Bal, SWMU/Anuj,Gyan
6 Signing on the agreement & contracting the work forSWM services
PTS/Bal, SWMU/Anuj,Gyan
7 Monitoring of performance of private activities PTS/Bal, SWMU/Anuj,Gyan 10,000
B-1-S1
1 Discussion with NGOs for development of acomposting facility
PTS/Bal, SWMU/Anuj,Gyan
B-2-S1
1 Planning of extension SWMU/Gyan 50,000
2 Preparation plan for three trainings SWMU/Gyan 75,000
3 Development of O&M plan SWMU/Gyan
4 Distribution of 25 bins, 150 bags and 150 suiros SWMU/Gyan 89,700
5 Evaluation and improvement SWMU/Gyan 12,000
Table A.11.3-5 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (KRM)
March
Selection and arrangement of land for a composting facility
December January February July2005 2006
July August September October April May JuneNovember
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
ProposedBudget(NRs) 2062 2063
Shrawan Poush
Preparation of agreements with private sector (NGOs/CBOs) andconclusion of the contracts (up to two parties)
Promotion of home composting program (by providing bins, bags)
JesthaBhadra Aswin Kartik Mangsir AshadhChaitra BaisakMagh Falgun
A 11.3 - 23
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
MarchDecember January February July2005 2006
July August September October April May JuneNovember
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
ProposedBudget(NRs) 2062 2063
Shrawan Poush JesthaBhadra Aswin Kartik Mangsir AshadhChaitra BaisakMagh Falgun
B-3-S1
1 Agreement with "Kawadi" for plastic collection SWMU/Anuj, Gyan
2 Planning of extension SWMU/Gyan
3 Operation of plastic store house SWMU/Gyan
4 Evaluation and improvement SWMU/Gyan
C-1-S1
1 Conclusion of agreement with KMC for Teku T/S CEO
2 Classification of waste quality (Data analysis) PTS/Bal 20,000
3 Discussion with KMC on duty demarcation and costsharing PTS/Bal
4 Discussion with private sector and NGOs on themanner to transport wastes to Teku T/S PTS/Bal
5 Procurement of necessary equipment and facilities PTS/Bal 1,000,000
D-1-S1
1 Collection of school level training demand SWMU/Anuj 1,000
2 Conduct 10 training on SWM SWMU/Anuj 250,000
3 Identify and form 5 new groups SWMU/Anuj
4 Train 5 newly formed groups SWMU/Anuj 125,000
5 Exhibition SWMU/Anuj 100,000
6 Clean up campaign SWMU/Anuj 100,000
7 Formation of 10 Nature Clubs SWMU/Anuj 50,000
Continuous implementation of separated collection of plastic bags (byproviding wires (suiros), etc.)
Coordination with KMC for utilization of Teku T/S
Implementation of education program of SWM for school children andhouseholds (by promoting home composting, plastic bag separation, etc.)
A 11.3 - 24
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
MarchDecember January February July2005 2006
July August September October April May JuneNovember
SN Shor-term Activities to be Conducted inFY2005/06 (2062/63)
Responsible Person(Section)
ProposedBudget(NRs) 2062 2063
Shrawan Poush JesthaBhadra Aswin Kartik Mangsir AshadhChaitra BaisakMagh Falgun
E-1-S1
1 Final approval of TOR and implementation CEO
2 Strengthen SWM Unit (staff selection, provision ofphysical facilities) Account Sec/(TBN) 25,000
E-2-S1
1 HRD Plan (training on SWM & other skill) PTS/Bal 50,000
2 Prepare Annual Work Plan for the coming year Municipal board/TF
E-3-S1
1 Arrangement of the collected data collection fromprivate sector PTS/Bal
E-2-S2
1 Arrangement of the collected data in the database PTS/British
F-1-S1
1 Coordination with SWMRMC, neighboringmunicipalities and NGOs/CBOs CEO, Task Force
Legend: Continuous activities PTS: Planning and Technical Section: Intermittent activities SWMU: Solid Waste Management Unit: Spot activities TBN: To be named
Arrangement of the collected data in the database
Coordination with SWMRMC, neighboring municipalities and NGOs/CBOs
Collection of related data for SWM from private sector
Establishment of a section (unit) on SWM
Implementation of staff training on SWM and other related skills
A 11.3 - 25
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
S1Clarification of demarcation between SWMRMC andLocal Bodies by issuing a new policy and amendmentof the Solid Waste Act
S2 Clarification of legal status and change ofjurisdictional area by amendment of the Act
S3Establishment of a strategic plan for SWMRMC(future organizational and institutional developmentplan)
S7 Implementation of Public Relations (PRs) activities(management of web-site and issue of newsletter, etc.)
S1 Development of Sisdol Short-term LF
S1-1 Development of Sisdol LF Valley II
S1-2 Handover Valley II to operator
S1-3 Periodic environmental monitoring
S2 Development of Waste Processing Facility (KMC,LSMC, KRM)
S2-1 Land selection
S2-2 Site investigation works
S2-3 Land acquisition
S2-4 Concept design and feasibility study
S2-5 EIA process
2005 2006July August October JulyJanuary FebruarySeptember March April May June
Baisak Jestha Ashadh2062 2063
Shrawan Bhadra Aswin Kartik Mangsir
Table A.11.3-6 Annual Work Plan of Fiscal Year of 2005/06 (2062/63) Proposed by Task Force (SWMRMC)
Necessary Budget(NRs)
Shor-term Activities to be Conducted inFY2005/06 (2062/63)SN
ChaitraPoush Magh Falgun
November December
A 11.3 - 26
The Study on the Solid Waste Managementfor the Kathmandu Valley
Main ReportAppendix 11.3
III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II
2005 2006July August October JulyJanuary FebruarySeptember March April May June
Baisak Jestha Ashadh2062 2063
Shrawan Bhadra Aswin Kartik Mangsir
Necessary Budget(NRs)
Shor-term Activities to be Conducted inFY2005/06 (2062/63)SN
ChaitraPoush Magh Falgun
November December
S3 Development of Long-term LF (KMC, LSMC, KRM)
S3-1 Construction of access road
S3-2 Identification of the capacity and service areas
S3-3 Site investigation works
S3-4 Land acquisition
S3-5 Concept design
S3-6 EIA process
S4 Development of Long-term LF (BKM, MTM)
S4-1 Site investigation works (EIA, Topography survey,Soil investigation)
S5 Closure of Bagmati River dumping site
S5-1 Design of Bagmati River dumping site closure plan
S5-2 Implementation of Bagmati closure plan
Legend : Continuous activities: Intermittent activities: Spot activities
A 11.3 - 27
APPENDIX 12
EIA Related Information - Legal Procedure of EIA in Nepal - Legal Procedure of Land Acquisition and
Compensation in Nepal - Possible Environmental Impacts and
Conceivable Mitigation Measures
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Public Notice Publishedby the Proponent
Opinions and Suggestionsfrom Public
15 daysPreparation of Scoping Report and TOR
by the Proponent
Submission of Scoping Reportand TOR to MOLD
MOEST
Approval of Scoping Reportand TOR by MOEST
EIA Study to be Conductedby the Proponent
Preparation of Draft EIA Reportby the Proponent
Public Hearing by the Proponent,Recommendation Letter
from Local Bodies
Submission of Final EIA Reportto MOLD
within 21 daysMOEST
Public Notice Publishedby MOEST
Opinions and Suggestionsfrom Public
30 daysEvaluation of Final EIA Report
by MOESTwithin 30-60 days
EIA Final Approvalby MOEST
NoteMOLD: Minitry of Local DevelopmentMOEST: Ministry of Environment, Science, &Technology
EIA ApprovalStage
EIA Study
Scoping &TOR
PreparationStage
The Study on the Solid Waste Management
for the Kathmandu Valley
Japan International Cooperation Agency
Figure A.12-1
Legal Procedure of EIA in Nepal
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
CDC: Compensation Determination CommitteeMOLD: Ministry of Local DevelopmentCDO: Chief District OfficerDLRO: Department of Land and Revenue Office
Forwarding proposal of acquisition toMOLD
Initial approval from MOLD
Notice issuance of commencement ofpreliminary investigation by project
Formation of CDC
Undertaking preliminary investigation
Submission of investigation report fromproject to CDO
Acquisition notice issuance by CDO
Ban of transaction of concerned propertyby DLRO
Submission of application forcompensation from concerned
person to CDO
Submission of complaint letter fromconcerned person to CDO
Ministry of Home Affairs
Court of Low
Determination of compensation by CDC
Compensation payment
Informing MOLD of compensation
Initial Procedure
Preliminary Investigation Process
Notice of Acquisition
Compensation
The Study on the Solid Waste Management
for the Kathmandu Valley
Japan International Cooperation Agency
Figure A.12-2
Legal Procedure of Land Acquisition and
Compensation in Nepal
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Table A 12-1 Possible Environmental Impacts and Conceivable Mitigation Measures
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
PS-1 Development of Balaju T/S Air pollution B - The surrounding areas of the proposed site
have been somewhat urbanized. Air pollution would be worsened by collection and transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about air pollution, although the impact will be confined within the limited area.
- Water spraying on the assess road and site is to be introduced as required.
- Regular maintenance of the heavy equipment is necessary in construction and operation stages.
Water pollution B - Water generated from the waste would contribute on polluting the river water
- Drainage system associated with small scale treatment against water pollution is also to be considered as required.
Soil pollution C - Activities causing the soil pollution will not be planned. However, old wastes dumped illegally around the site might be remarked if excavation work would be designed.
- Check of the existing soil pollution is preferable prior to the construction work.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
B - The surrounding areas of the proposed site have been somewhat urbanized. Noise would be worsened by collection and transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about noise, although the impact will be confined within the limited area.
- An access road maintenance and speed limit would become important in operation phase.
- Regular maintenance of the heavy equipment is necessary in construction and operation stage.
Ground subsidence
C - No factors/activities causing ground
subsidence are expected.
Offensive odor A - Local concerns on odor will be raised based on the past experiences
- In order to reduce the negative impact of odor, it is proposed to examine i) the effective unloading/loading work of waste, and ii) platform cleaning and drainage management. Regular or ad hoc observation of odor condition is also suggestive in/around the site.
Geographical features
C - Change of geographical features is expected to be minimal.
Bottom sediment
C - No factors/activities causing bottom sediment are expected.
Biota and ecosystem
C - Negligible impact on ecosystem is expected since the current status is poor.
Water usage C - No factors/activities of water resource exploitation are planned.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste collection and transportation vehicles.
- Traffic safety measures are to be secured.
Global warming C - The factors causing global warming are expected to be minimal.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Involuntary resettlement
C - There are no households within the site, and no land plots under the private ownership.
Local economy B - The waste pickers would be attracted to the site.
- Waste picking activities in the site are to be controlled properly in order to have an efficient site operation as well as to reduce the risk of accidents on the waste pickers. It is also proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
Land use and utilization of local resource
C - There are no issues to be noted on land use and resource utilization.
Social institutions
C - No impacts on infrastructure and local decision making process are expected.
Existing social infrastructures and services
C - No impacts are expected.
The poor, indigenous of ethnic people
C - There are no specific issues to be noted on the poor, indigenous and ethnic people.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - The factors introducing the misdistribution of benefit/damage are rarely expected.
Local conflict of interests
A - Local concerns will be very high toward developing the site based on the past experiences of SWM-related projects in the Valley.
- Consultation with stakeholders including the surrounding communities will be essential. Due consideration should be paid to achieve the good understandings and mutual acceptance among the stakeholders for the project in the course of consultation.
Gender C - There are no specific issues to be noted on gender.
Children’s right C - There are no specific issues to be noted on children’s right.
Cultural heritage C - There is no cultural heritage reported so far in/around the site.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- Risk of health hazard on the waste pickers would be remarked.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection.
- It is proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
PS-2 Development of WPF Air pollution B - Air pollution would be worsened by waste
collection and transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about the air pollution, although the impact will be confined within the limited area.
- Water spraying on the access road and the site is also to be introduced as required.
- Regular maintenance of the heavy equipment is necessary in construction and operation stage.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Water pollution B - Water generated from the waste would pollute the surrounding water bodies including groundwater.
- Concrete placing on the working area will be necessary. Drainage system associated with small scale treatment against water pollution is also to be considered as required.
Soil pollution C - Activities causing the soil pollution will not be planned as far as the site is operated properly.
- Residue generated in the course of waste processing is to be treated and disposed of in the appropriate manner.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
B - Noise would be worsened by collection and transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about noise, although the impact will be confined within the limited area.
- An access road maintenance and speed limit would become important in operation phase.
- Regular maintenance of the heavy equipment is necessary in construction and operation stage.
Ground subsidence
C - No factors/activities causing ground subsidence are expected.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of BKM composting plant.
- The site is not yet determined. In the course of site selection, it is preferable to examine the distribution of and distance from the residential areas nearby.
- In order to reduce the negative impact of odor, it is proposed to examine i) the house-structural design of working yard, ii) installation of buffer zone, and iii) yard cleaning and drainage management. Regular or ad hoc observation of odor condition is also suggestive in/around the site.
Geographical features
C - Change of geographical features is expected to be minimal.
Bottom sediment
C - No factors/activities causing bottom sediment are expected.
Biota and ecosystem
U - Magnitude of impact on ecosystem is dependent on the site location.
- After the site determined, the impact is to be identified, and mitigation measures are to be examined if necessary.
Water usage C - No factors/activities of water resource exploitation are planned.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste collection and transportation vehicles.
- Traffic safety measures are to be secured.
Global warming C - The factors causing global warming are expected to be minimal, since the amount of composting will not be huge.
Involuntary resettlement
B - Magnitude of resettlement is dependent on the site location. However, the magnitude is not considered to be quite significant, since the site location will not be designed within the highly populated areas.
- Due consideration should be paid in the course of site selection in order to avoid or minimize resettlement and land acquisition as much as possible.
- When inevitable, compensation should be made in line with Nepalese legal requirements.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 6 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Local economy B - The waste pickers would be attracted to the site.
- An employment opportunity at the site is expected to be created as conceivable positive effects.
- Waste picking activities in the site are necessary to be controlled properly in order to have an efficient site operation as well as to reduce the risk of accidents on the waste pickers. It is also proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
- Strategic employment of waste pickers is preferable to be pursued as much as possible from the long term viewpoint.
Land use and utilization of local resource
B - Change of land use condition within the site will be inevitable if the selected site is being used for such activities as farming.
- There will be no plan to exploit the resources such as minerals.
- Same considerations as the case of involuntary resettlement are to be paid if necessary.
Social institutions
C - No impacts on infrastructure and local decision making process are expected.
Existing social infrastructures and services
C - No impacts are expected. - Positive effect on the local social service is
expected if the access road construction/improvement and related development are included in the planning.
The poor, indigenous of ethnic people
C - There are no specific issues to be noted on the poor, indigenous and ethnic people.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - The factors introducing the misdistribution of benefit/damage are rarely expected.
Local conflict of interests
A - Local concerns will be very high toward developing the site based on the past experiences of SWM-related projects in the Valley.
- Consultation with stakeholders including the surrounding communities will be essential. Due consideration should be paid to achieve the good understandings and mutual acceptance among the stakeholders for the project in the course of consultation.
Gender C - There are no specific issues to be noted on gender.
Children’s right C - There are no specific issues to be noted on children’s right.
Cultural heritage
U - Magnitude of impact on the cultural heritage is dependent on the site location.
- It is proposed to avoid the cultural heritage or religious areas as much as possible in the site selection process.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- Risk of health hazard on the waste pickers would be remarked.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection.
- It is proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 7 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
PS-3 Development of Banchare Danda L/T-LFS Air pollution B - Air pollution would be worsened by waste
transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about the air pollution, although the impact will be confined within the limited area.
- Landfill gas will be generated.
- Water spraying on the assess road and site is to be introduced as required.
- Regular maintenance of the heavy equipment is necessary in both construction and operation stage.
- Gas ventilation system is to be planned and equipped in the landfilling area. Regular monitoring of landfill gas is also preferable.
Water pollution A - Leachate generated from the landfilling area will potentially pollute the quality of i) groundwater around the site, and ii) river water of Kolpu Khola being used for the agriculture purpose in the downstream.
- Leachate control system is essential so as not to flow out the leachate to outside of the site. Retention and recirculation facility associated with aeration of the leachate, which is functioning at Sisdol S/T-LF, is applicable and recommendable.
- In order to reduce the percolation of the leachate to the groundwater, it is recommendable to install a liner system on the bottom of landfilling area. Geo-membrane placing is preferable when applicable, but when inapplicable clay liner is to be employed at least in the same manner as Sisdol LF.
- Peripheral drainage system is to be designed and equipped for isolation of storm water runoff from the outside of the site.
- Regular monitoring on river water, groundwater and leachate is essential.
Soil pollution B - There would be a risk to contaminate the soil in/around the site, if hazardous wastes would be mixed in the wastes to be disposed of in the site.
- Hazardous waste should be restricted to be transported to and disposed of in the site.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
B - Noise would be worsened by waste transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about noise, although the impact will be confined within the limited area.
- Speed limit is to be secured for the transportation vehicles passing through the access road.
- Regular maintenance of the heavy equipment is necessary in both construction and operation stage.
Ground subsidence
B - There is no plan of the groundwater extraction at the site, which would bring about ground subsidence.
- Decomposition of the waste disposed of in the site would bring about the settlement, although the impact will be confined to the landfill area.
- Waste compacting and cover soil are to be properly carried out in the operation stage.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of SWM-related projects in the Valley.
- In order to reduce the negative impact of odor, it is proposed to carry out cover soil regularly. Aeration of leachate retention pond is also essential.
- Regular or ad hoc observation of odor condition is suggestive in/around the site.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 8 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Geographical features
A - Alignment of river channel of Kolpu Khola will be changed along with the site development.
- River diversion works is prerequisite with considering the river morphology and topography, hydrological condition, geological condition, etc. River bank protection will be also essential to avoid the damage on the site due to bank erosion and flood.
Bottom sediment
C - No factors/activities causing bottom sediment are expected.
Biota and ecosystem
B - The ecosystem in/around the site is considered to be generally poor. However, due consideration should be paid on the small plots of unregistered community forests and aquatic biota in Kolpu Khola.
- Excessive site clearance in preparatory construction stage should be avoided by identifying the boundary of construction works.
- Considerations on aquatic biota are same as the item of water pollution.
Water usage B - No factors/activities of water resource exploitation are planned. However, water pollution due to the leachate generated from the site would affect i) the agricultural water use in the downstream of Kolpu Khola, and ii) spring water used by the local people in the surrounding.
- Same considerations as the item of water pollution should be paid.
- In case that the negative impact on the spring water resources would be observed due to the site operation, small scale water supply system for the local communities should be examined.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste transportation vehicles.
- Traffic safety measures are to be secured.
Global warming C - Contribution to the global warming is expected to be small, since i) the waste amount to be disposed of at the site will not be huge, and ii) semi-aerobic manner will be applied to reduce the total volume of green house gas generated in whole life time of the site.
Involuntary resettlement
B - Involuntary resettlement due to the site development is not expected. Although the most of the land in the site is under the governmental ownership, a few hectares of farming plats out of more than 40 ha of the site will be necessary to be acquired.
- Appropriate compensation should be made in line with Nepalese legal requirements.
Local economy B - The waste pickers would be attracted to the site.
- An employment opportunity at the site is expected to be created as conceivable positive effects.
- Waste picking activities in the site should be restricted in order to have an efficient site operation as well as to avoid the accidents on the waste pickers. In this connection, it is proposed to secure the opportunities of waste picking activities at T/Ss and the planned WPF under the proper control mentioned previously.
Land use and utilization of local resource
B - Change of land use condition within the site will be inevitable especially on the agriculture-used plots, although the magnitude will not be significant. Other plots are mostly barren land with small scale community forests.
- Construction materials will be exploited from the surrounding areas.
- Same considerations as the case of involuntary resettlement are to be paid if necessary.
- Due considerations should be paid when construction materials exploited, in order to avoid the occurrence of associated impacts such as resettlement or environmental pollution.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 9 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Social institutions
C - No impacts on infrastructure and local decision making process are expected.
Existing social infrastructures and services
C - No impacts are expected. - Positive effect on the local social service is
expected, because of the access road construction and the local development works associated with the site development according to the commitment among the developer, operators, and local communities.
The poor, indigenous of ethnic people
C - There are no specific issues to be noted on the poor, indigenous and ethnic people.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - Benefit of the local development works is expected to be evenly distributed as long as the local committee is functioning properly.
Local conflict of interests
B - Local concerns would be raised toward developing the site unless the consultation with local communities is well realized.
- Role of the local committee as well as consultation among developer, operators, and local communities are important to achieve the good understandings and mutual acceptance for the project.
Gender C - There are no specific issues to be noted on gender.
Children’s right C - There are no specific issues to be noted on children’s right.
Cultural heritage
C - There is no cultural heritage reported so far in/around the site.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection at the site.
PS-4 Development of Afadol Temporary T/S (LSMC) Air pollution B - Air pollution would be worsened by collection
and transportation vehicles, although i) the increment of the traffic volume will be insignificant, and ii) highly populated areas don’t locate in the vicinity.
- Heavy equipment operation for construction might bring about the air pollution, although i) the impact will be confined within the limited area, and ii) highly populated areas don’t locate in the vicinity..
- Water spraying on the assess road and site is to be introduced as required.
- Regular maintenance of the heavy equipment is necessary in construction stage.
Water pollution C - The site is planned to be developed within or much near the previous dumping site of the Bagmati river. Moreover, the site will be used only in temporary basis up to the WPF completion, and the waste unloaded/loaded in the site is a small amount collected in LSMC. Therefore, additional impact on water quality is expected to be insignificant.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 10 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Soil pollution C - Additional impact of soil pollution is expected to be insignificant because of the same reasons as mentioned in the item of water pollution. And the excavation work in the construction will be minimal.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
B - Noise would be worsened by collection and transportation vehicles, although i) the increment of the traffic volume will be insignificant, and ii) highly populated areas don’t locate in the vicinity.
- Heavy equipment operation for the site construction and operation might bring about noise, although i) the impact will be confined within the limited area, and ii) highly populated areas don’t locate in the vicinity..
- An access road maintenance and speed limit would become important in operation phase.
- Regular maintenance of the heavy equipment is necessary in construction stage.
Ground subsidence
C - No factors/activities causing ground
subsidence are expected.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of Bagmati river dumping.
- In order to reduce the negative impact of odor, it is proposed to examine the effective unloading/loading work of waste. Regular or ad hoc observation of odor condition is also suggestive in/around the site.
Geographical features
C - Change of geographical features is expected to be minimal.
Bottom sediment
C - No factors/activities causing bottom sediment are expected.
Biota and ecosystem
C - Negligible impact on ecosystem is expected since the current status is poor.
Water usage C - No factors/activities of water resource exploitation are planned.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste collection and transportation vehicles.
- Traffic safety measures are to be secured.
Global warming C - The factors causing global warming are expected to be minimal.
Involuntary resettlement
C - There are no households within the site, and no land plots under the private ownership.
Local economy B - The waste pickers would be attracted to the site.
- Waste picking activities in the site are necessary to be controlled properly in order to have an efficient site operation as well as to reduce the risk of accidents on the waste pickers. It is also proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
Land use and utilization of local resource
C - There are no issues to be noted on land use and resource utilization.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 11 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Social institutions
C - No impacts on infrastructure and local decision making process are expected.
Existing social infrastructures and services
C - No impacts are expected.
The poor, indigenous of ethnic people
C - There are no specific issues to be noted on the poor, indigenous and ethnic people.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - The factors introducing the misdistribution of benefit/damage are rarely expected.
Local conflict of interests
A - Local concerns will be very high toward developing the site based on the past experiences of SWM-related projects in the Valley.
- Consultation with stakeholders including the surrounding communities will be essential. Due consideration should be paid to achieve the good understandings and mutual acceptance among the stakeholders for the project in the course of consultation.
Gender C - There are no specific issues to be noted on gender.
Children’s right C - There are no specific issues to be noted on children’s right.
Cultural heritage
C - There is no cultural heritage reported so far in/around the site.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- Risk of health hazard on the waste pickers would be remarked.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection.
- It is proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
PS-5 Development of Taikabu LFS Air pollution B - Air pollution would be worsened by waste
transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about the air pollution, although the impact will be confined within the limited area.
- Landfill gas will be generated.
- -Water spraying on the assess road and site is to be introduced as required.
- Regular maintenance of the heavy equipment is necessary in both construction and operation stage.
- Gas ventilation system is to be planned and equipped in the landfilling area. Regular monitoring of landfill gas is also preferable.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 12 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Water pollution A - Leachate generated from the landfilling area will potentially pollute the quality of i) groundwater around the site used for the domestic purpose by the local communities, and ii) river water of Tabya Kushi located in 500 m of distance from the site used for agricultural purpose in the downstream..
- Leachate control system is essential in order not to flow out the leachate to outside of the site. Retention and recirculation facility associated with aeration of the leachate, which is functioning at Sisdol S/T-LF, is applicable and recommendable.
- In order to reduce the percolation of the leachate to the groundwater, it is recommendable to install a liner system on the bottom of landfill area. Geo-membrane placing is preferable when applicable, but when inapplicable clay liner is to be employed at least in the same manner as Sisdol LF.
- Peripheral drainage system is to be designed and equipped for isolation of storm water runoff from the outside of the site.
- Regular monitoring on river water, groundwater and leachate is essential.
Soil pollution B - There would be a risk to contaminate the soil in/around the site, if hazardous wastes would be mixed in the wastes to be disposed of in the site.
- Hazardous waste should be restricted to be transported to and disposed of in the site.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
B - Noise would be worsened by waste transportation vehicles, although the increment of the traffic volume will be insignificant.
- Heavy equipment operation for the site construction and operation might bring about noise, although the impact will be confined within the limited area.
- The access road maintenance to the site is to be properly carried out in collaboration with local authorities.
- Speed limit is to be secured for the transportation vehicles passing through the access road.
- Regular maintenance of the heavy equipment is necessary in both construction and operation stage.
Ground subsidence
B - There is no plan of the groundwater extraction at the site, which would bring about ground subsidence.
- Decomposition of the waste disposed of in the site would bring about the settlement, although the impact will be confined to the landfilling area.
- Waste compacting and cover soil are to be properly carried out in the operation stage.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of SWM-related projects in the Valley.
- In order to reduce the negative impact of odor, it is proposed to carry out cover soil regularly. Aeration of leachate retention pond is also essential.
- In the process of site boundary delineation and project designing, installation of a buffer zone is proposed to be examined where applicable.
- Regular or ad hoc observation of odor condition is suggestive in/around the site.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 13 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Geographical features
B - Change of the topographic condition due to the site development is expected but not quite significant, since the site is currently bowl-shaped.
- In order to reduce the change of landscape due to the topographical change, it is proposed to design and secure the buffer zone as one of the land use plan of the site development.
Bottom sediment
C - No factors/activities causing bottom sediment are expected.
Biota and ecosystem
B - The ecosystem in/around the site is considered to be generally poor. However, due consideration should be paid on the scattered bush plots in the site and aquatic biota in Tabya Kushi.
- Excessive site clearance in preparatory construction stage should be avoided by identifying the boundary of construction works.
- Considerations on aquatic biota are same as the item of water pollution.
Water usage B - No factors/activities of water resource exploitation are planned. However, water pollution due to the leachate generated from the site would affect i) the agricultural water use in the downstream of Tabya Kushi, and ii) domestic water use of groundwater around the site.
- Same considerations as the item of water pollution should be paid.
- In case that the negative impact on the spring water resources would be observed due to the site operation, small scale water supply system for the local communities should be examined.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste transportation vehicles.
- Traffic safety measures are to be secured.
Global warming
C - Contribution to the global warming is expected to be small, since i) the waste amount to be disposed of at the site will not be huge, and ii) semi-aerobic manner will be applied to reduce the total volume of green house gas generated in whole life time of the site.
Involuntary resettlement
U - The magnitude of involuntary resettlement is considered to be less than 200 population in case of confining the impact to the landfilling area of the site. However, since the boundary of the site is still unclear, the identification of impact magnitude will be necessary.
- Agricultural land use is currently predominant in the site, therefore, land acquisition will be necessary.
- Due consideration should be paid in the course of site boundary delineation in order to minimize resettlement and land acquisition as much as possible.
- When inevitable, appropriate compensation should be made in line with Nepalese legal requirements.
Local economy B - The waste pickers would be attracted to the site.
- An employment opportunity at the site is expected to be created as conceivable positive effects.
- Waste picking activities in the site should be restricted in order to have an efficient site operation as well as to avoid the accidents on the waste pickers. In this connection, it is proposed to secure the opportunities of waste picking activities at T/Ss and the planned WPF under the proper control mentioned previously.
Land use and utilization of local resource
A - Change of land use condition within the site will be inevitable, especially on the agriculture-used plots. Other plots are to be considered as barren land with scattered bushes.
- Construction materials will be exploited from the surrounding areas.
- Same considerations as the case of involuntary resettlement are to be paid if necessary.
- Due considerations should be paid when construction materials exploited, in order to avoid the occurrence of associated impacts such as resettlement or environmental pollution.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 14 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Social institutions
C - No impacts on infrastructure and local decision making process are expected.
Existing social infrastructures and services
C - No impacts are expected. - Positive effect on the local social service is
expected, because of the access road construction and the local development works associated with the site development.
The poor, indigenous of ethnic people
C - There are no specific issues to be noted on the poor, indigenous and ethnic people.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - Benefit of the local development works is expected to be evenly distributed as long as the consultation among stakeholders is secured as mentioned later.
Local conflict of interests
A - Local concerns are being raised toward developing the site
- Consultation among developer, operators, and local communities are important to achieve the good understandings and mutual acceptance for the project. Approach of the local committee organization introduced in the Sisdol case is one of the better solutions for realizing the good consultation with communities.
Gender C - There are no specific issues to be noted on gender.
Children’s right C - There are no specific issues to be noted on children’s right.
Cultural heritage
C - There is no cultural heritage reported so far in/around the site, which is to be protected.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection at the site.
PS-6 Arrangement of Temporary LFS (MTM) Air pollution C - Air pollution due to the waste collection
vehicles is not expected since i) the waste to be transported to the site will be a small amount collected only in MTM, and ii) utilization of hand cart is also popular instead of the motor manner.
- Utilization of heavy equipment in the site will not be enhanced, therefore impact on air is expected to be negligible.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 15 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Water pollution B - Leachate would potentially pollute the water quality of surrounding water bodies.
- Considering that i) the waste amount to be disposed of at the site will be small, and ii) the site will be used on the temporally basis up to the completion of Taikabu LF, installation of permanent measures to control leachate is negatively proposed. In order to reduce the environmental pollution as much as possible, it is rather proposed i) to have a more enhancement of transportation of the collected wastes to Teku T/S under the cooperation with KMC, and ii) to cooperate with BKM and central government for developing Taikabu LF as early as possible.
Soil pollution C - The risk of soil contamination is considered to be slim, as far as the hazardous waste will not be mixed to the waste to be disposed of.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
C - Noise and vibration are expected to be slim because of the same reasons as mentioned in the item of air pollution.
Ground subsidence
C - There is no plan of the groundwater extraction at the site, which would bring about ground subsidence. And settlement of decomposition of the waste disposed of in the site will be very limited.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of SWM-related projects in the Valley.
- Since the site is not yet determined, the most applicable approach for mitigation is to select the site where the distance from the residential areas can be secured.
- Regular or ad hoc observation of odor condition is suggestive in/around the site.
Geographical features
C - Change of geographical features is expected to be small, considering the project scale.
Bottom sediment
C - No factors/activities causing the bottom sediment are expected.
Biota and ecosystem
C - Impact on ecosystem is not expected to be significant, considering the project scale.
Water usage C - No factors/activities of water resource exploitation will be planned.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste transportation vehicles.
- Traffic safety measures are to be secured.
Global warming
C - Contribution to the global warming is expected to be small, since the waste amount to be disposed of at the site will not be huge.
Involuntary resettlement
B - Magnitude of resettlement is dependent on the site location. However, the magnitude is not considered to be quite significant, since i) the site location will not be designed within the highly populated areas, and ii) necessary land size for the site will be small.
- Due consideration should be paid in the course of site selection in order to avoid or minimize resettlement and land acquisition as much as possible.
- When inevitable, compensation should be made in line with Nepalese legal requirements.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 16 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Local economy B - The waste pickers would be attracted to the site.
- Waste picking activities in the site are necessary to be controlled properly in order to have an efficient site operation as well as to reduce the risk of accidents on the waste pickers. It is also proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
Land use and utilization of local resource
B - Change of land use condition within the site will be inevitable if the selected site is being used for such activities as farming.
- There will be no plan to exploit the resources such as minerals.
- Same considerations as the case of involuntary resettlement are to be paid if necessary.
Social institutions
C - Impact on infrastructure and local decision making process is not expected to be significant, considering the project scale.
Existing social infrastructures and services
C - Impact on the existing social infrastructure and services is not expected to be significant, considering the project scale.
The poor, indigenous of ethnic people
C - Impact on the poor, indigenous and ethnic people is not expected to be significant, considering the project scale.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - The factors introducing the misdistribution of benefit/damage are rarely expected.
Local conflict of interests
A - Local concerns will be very high toward developing the site based on the past experiences of SWM-related projects in the Valley.
- Since the site is not yet determined, the most applicable approach is to have a consultation with stakeholders in the site selection process in order to achieve the good understandings and mutual acceptance.
Gender C - No impact on gender is expected. Children’s right C - No impact on gender is expected. Cultural heritage
U - Magnitude of impact on the cultural heritage is dependent on the site location.
- It is proposed to avoid the cultural heritage or religious areas as much as possible in the site selection process.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- Risk of health hazard on the waste pickers would be remarked.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection.
- It is proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
PS-7 Development of Community Composting Facility (KRM) Air pollution C - Air pollution due to the waste collection
vehicles is not expected since the waste to be transported to the site will be a small amount collected only in KRM.
- Utilization of heavy equipment in the site will be small scale, therefore impact on air is expected to be negligible.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 17 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Water pollution
B - Water generated from the waste would potentially pollute the surrounding water bodies including groundwater.
- Concrete placing on the working area will be preferable. Drainage system associated with small scale treatment against water pollution is also to be considered as required.
Soil pollution C - Activities causing the soil pollution will not be planned as far as the site is operated properly.
- Residue generated in the course of waste processing is to be treated and disposed of in the appropriate manner.
Waste - - The overall goal of the activity is to improve solid waste management
Noise and vibration
C - Noise and vibration are expected to be slim because of the same reasons as mentioned in the item of air pollution.
Ground subsidence
C - No factors/activities causing ground subsidence are expected.
Offensive odor A - Local concerns on odor will be raised based on the past experiences of BKM composting plant.
- Since the site is not yet determined, the most applicable approach for mitigation is to select the site where the distance from the residential areas can be secured.
- Regular or ad hoc observation of odor condition is suggestive in/around the site.
Geographical features
C - Change of geographical features is expected to be small, considering the project scale.
Bottom sediment
C - No factors/activities causing the bottom sediment are expected.
Biota and ecosystem
C - Impact on ecosystem is not expected to be significant, considering the project scale.
Water usage C - No factors/activities of water resource exploitation will be planned.
Accidents B - Risk of traffic accidents would be increased due to new traffic generation of waste transportation vehicles.
- Traffic safety measures are to be secured.
Global warming
C - Contribution to the global warming is expected to be small, since the waste to be treated at the site will not be huge.
Involuntary resettlement
B - Magnitude of resettlement is dependent on the site location. However, the magnitude is not considered to be quite significant, since the site location will not be designed within the highly populated areas, and ii) necessary land size for the site will be small.
- Due consideration should be paid in the course of site selection in order to avoid or minimize resettlement and land acquisition as much as possible.
- When inevitable, compensation should be made in line with Nepalese legal requirements.
Local economy B - The waste pickers would be attracted to the site.
- An employment opportunity at the site is expected to be created as conceivable positive effects.
- Waste picking activities in the site are necessary to be controlled properly in order to have an efficient site operation as well as to reduce the risk of accidents on the waste pickers. It is also proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
- Strategic employment of waste pickers is preferable to be pursued as much as possible from the long term viewpoint.
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 12
A.12 - 18 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Env. Item and Evaluation
Possible Environmental Impacts and Evaluation
Conceivable Mitigation Measures
Land use and utilization of local resource
B - Change of land use condition within the site will be inevitable if the selected site is being used for such activities as farming.
- There will be no plan to exploit the resources such as minerals.
- Same considerations as the case of involuntary resettlement are to be paid if necessary.
Social institutions
C - Impact on infrastructure and local decision making process is not expected to be significant, considering the facility scale.
Existing social infrastructures and services
C - Impact on the existing social infrastructure and services is not expected to be significant, considering the facility scale.
The poor, indigenous of ethnic people
C - Impact on the poor, indigenous and ethnic people is not expected to be significant, considering the facility scale.
- Issues on the waste pickers are discussed in the item of local economy.
Misdistribution of benefit and damage
C - The factors introducing the misdistribution of benefit/damage are rarely expected.
Local conflict of interests
A - Local concerns will be very high toward developing the facility based on the past experiences of SWM-related projects in the Valley.
- Since the site is not yet determined, the most applicable approach is to have a consultation with stakeholders in the site selection process in order to achieve the good understandings and mutual acceptance.
Gender C - No impact on gender is expected. Children’s right
C - No impact on gender is expected.
Cultural heritage
U - Magnitude of impact on the cultural heritage is dependent on the site location.
- It is proposed to avoid the cultural heritage or religious areas as much as possible in the site selection process.
Infectious diseases such as HIV/AIDS
B - Risk of infectious hazard would be remarked if the medical waste would not be properly managed.
- Risk of health hazard on the waste pickers would be remarked.
- System to manage the medical waste is to be established in order to avoid the accidental diseases of infection.
- It is proposed to establish the cooperation mechanism among the site operators and concerned bodies for health promotion to the waste pickers.
Note: A: Relatively high magnitude of impact is expected. B: Impact is expected, but its magnitude will not be quite significant. C: No or negligible impact is expected. U: Magnitude of impact is unclear. Source: JICA Study Team
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 1 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
APPENDIX 15 SELECTED PHOTO
1st Steering Committee
(January 27, 2004)
2nd Steering Committee
(June 29, 2004)
3rd Steering Committee (November 23, 2004)
4th Steering Committee
(June 29, 2005)
1st Seminar
(July 2, 2004)
2nd Seminar
(July 2, 2004)
Activities of the Study (1/4)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 2 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
3rd Seminar
(November 25, 2004)
4th Seminar
(June 27-28, 2005)
4th Seminar
(June 27-28, 2005)
1st Public Hearing
(March, 2004)
2nd Public Hearing
(May, 2005)
3rd Public Hearing (July/August, 2004)
Activities of the Study (2/4)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 3 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
4th Public Hearing (February, 2005)
Training Needs Analysis
(February, 2004)
Training Needs Analysis
(February, 2004)
Interview Survey to Waste Pickers
(April, 2004)
Waste Quantity and Quality Survey
(March, 2004)
Waste Quantity and Quality Survey
(March, 2004)
Activities of the Study (3/4)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 4 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
Time and Motion Survey
(March, 2004)
Interview to Sweeper
(April, 2004)
TWG Meeting (May, 2004)
TWG Meeting (June, 2005)
Task Force Meeting
(February, 2004)
Task Force Meeting
(March, 2004)
Activities of the Study (4/4)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 5 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
A-1.1: Practice of Source-separated Collection in
BKM (June, 2005)
A-1.1: Practice of Source-separated Collection in
BKM (June, 2005)
A-1.2: Practice of Collection and Transportation in
MTM (June, 2005)
A-1.2: Practice of Collection and Transportation in
MTM (June, 2005)
A-3: Workshop for Transfer Station (1)
(July 12, 2004)
A-3:Topography Survey in Teku
(August, 2004)
Activities of Pilot Project A (1/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 6 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
A-3: Construction for Improvement of Teku T/S
(November, 2004)
A-3: Completion of Improvement of
Teku T/S (March, 2005)
A-3: Practice of Operation of
Teku T/S (April, 2005)
A-3: Opening Ceremony at
Teku T/S (June, 2005)
A-3: Operation of Teku T/S
(June, 2005)
A-3: Operation of Teku T/S
Activities of Pilot Project A (2/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 7 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
B-1: Workshop on Waste Minimization Facility
(July 14, 2004)
B-1: Market Research of Compost
(October ,2004)
B-1: Study Tour to India (November 7–11, 2004)
B-1: Data Collection at BKM Composting Facility
(February, 2005)
B-2: Training on Composting at Model Area
(February, 2005)
B-2: Home Composting Activity
(May, 2005)
Activities of Pilot Project B (1/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 8 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
B-2: Vermi-Composting at Teku T/S
(March, 2005)
B-2: Vermi-Composting at Teku T/S
(May, 2005)
B-2: Training on Composting to Farmer (May,
2005)
B-2: Two-day Training for Women at KRM
(October 9-14, 2004)
B-2: Collected Plastic by using Suiro at KRM
(March, 2005)
B-2: Plastic Collection at KRM
(June, 2005)
Activities of Pilot Project B (2/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 9 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
C-1: Study Tour to Malaysia
(September 26- October 2, 2004)
C-1: Site Visit to Pokhara
(July 24-25, 2004)
C-1: Long-term candidate Landfill site
(Banchare Danda)
C-2: Improvement of Sisdol Short-term Landifll
(Drainage Carpet Work) (December, 2004)
C-2: Improvement of Sisdol Short-term Landifll
(Clay Liner Work) (November, 2004) C-2: Workshop on Sisdol Landfill
(December, 2004)
Activities of Pilot Project C (1/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 10 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
C-2: Water Quality Survey in Sisdol
(March, 2005)
C-2: Signing Ceremony for Operation of Sisdol LF
among Stakeholders (May, 2005)
C-2: Commencement of Waste Disposal
at Sisdol Landfill (June, 2005)
C-2: Operation of Sisdol Landfill
(June, 2005)
C-2: Operation of Sisdol Landfill
(June, 2005)
C-2: Operation of Sisdol Landfill
(June, 2005)
Activities of Pilot Project C (2/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 11 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
D-1: Training on Behavior Change Communication
Skill (July 21-23, 2004)
D-1:Sharing Meeting in MTM
(August 15, 2004)
D-1:Study Tour to Hetauda
(September 9-11, 2004)
D-2: Painting Workshop for School Children
(October, 2004)
D-2: 1st Public Event
(November, 2004)
D-2: 1st Public Event
(November, 2004)
Activities of Pilot Project D (1/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 12 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
D-2: 2nd Public Event
(April, 2005)
D-2: 2nd Public Event
(April, 2005)
D-2: Clean Up Campaign
(June, 2005)
D-3: Counselor Training Camp
(September 7-9, 2004)
D-3: Camp for Nature Clubs
(September 16-18, 2004)
D-3: Workshop on Product Making from Waste for
Nature Clubs (October 1-2, 2004)
Activities of Pilot Project D (2/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 13 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
E-1: Action Plan Operational Management Training
(July , 2004)
E-1: Action Plan Operational Management Training
(August , 2004)
E-1: Training on Monitoring and Evaluation System
(August , 2004)
E-1: Training on Program Based Budgeting
(September, 2004)
E-1: Training on Human Resource Management
(December, 2004)
E-2: Training on Quantity and Quality Survey
(September, 2004)
Activities of Pilot Project E (1/2)
The Study on the Solid Waste Management Main Report for the Kathmandu Valley Appendix 15
A 15 - 14 CKV Sapha Sahar Hamro Rahar
Clean Kathmandu Valley Study
E-2: Training on Quantity and Quality Survey
(September, 2004)
E-2: Training on Solid Waste Data Management
(November 9-10, 2004)
E-2: Training on Solid Waste Data Management
(November 9-10, 2004)
E-2: Practice of Data Management System
(January, 2005)
E-3: Country Focused Training in Japan
(December, 2004)
E-3: Country Focused Training in Japan
(December, 2004)
Activities of Pilot Project E (2/2)