31
FINE-LINE C I R C U I T S L I M I T E D Apex Quality Manual Doc. No. : D-MG-01 Rev.No. :00 Rev.Date : 15/05/10 Page 1 of 31 APEX QUALITY MANUAL FINE-LINE CIRCUITS LIMITED HIGHTECHNOLOGY MULTI LAYER UNIT Issue 02 Dated 15-5-10 Office: 145, SDF-V, SEEPZ-SEZ, ANDHERI (E), MUMBAI- 400 096, INDIA Tel.: 2829 0244 / 2829 0245 Fax: 2829 2554 E-mail: [email protected] [email protected]

APEX QUALITY MANUAL rev 1 - Fine-Line Circuits …€¦ · FINE-LINE C I R C U I T S L I M I T E D Apex Quality Manual Doc. No. : D-MG-01 Rev.No. :00 Rev.Date : 15/05/10 Page 5 of

Embed Size (px)

Citation preview

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 1 of 31

APEX QUALITY MANUAL

FINE-LINE CIRCUITS LIMITED

HIGHTECHNOLOGY MULTI LAYER UNIT

Issue 02 Dated 15-5-10

Office:

145, SDF-V, SEEPZ-SEZ,

ANDHERI (E), MUMBAI- 400 096, INDIA

Tel.: 2829 0244 / 2829 0245

Fax: 2829 2554

E-mail: [email protected] [email protected]

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 2 of 31

APEX QUALITY MANUAL CONTENTS

Amendment sheet .......................................................................................................................................... 3 1 Purpose And Scope Of The Quality Management System .................................................................... 4 2 Exclusion To Quality Management System And Justification ................................................................ 5 3 Company Profile .................................................................................................................................... 5 4 Products And Services ........................................................................................................................... 6 5 Resources .............................................................................................................................................. 6 6 Organizational Structure ........................................................................................................................ 8 7 Organizational Management System Policies And Guidelines .............................................................. 8 8 Quality Management System (QMS) (Clause 4.1 of ISO 9001:2008) ................................................... 8 8.2 Document Control Procedure (as per ISO 9001: 2008 clause No. 4.2.3) ....................................... 13 8.3 Record Control Procedures (as per ISO 9001: 2008 clause No. 4.2.4) .......................................... 13 9 Management Responsibility (Clause 5 of ISO 9001:2008) .................................................................. 14 9.1 Management Commitment: (Clause 5.1 of ISO 9001:2008) ........................................................... 14 9.2 Customer Focus: (Clause 5.2 of ISO 9001:2008) .......................................................................... 14 9.3 Quality Policy: (Clause 5.3 of ISO 9001:2008) ................................................................................ 15 9.4 Planning: (Clause 5.4 of ISO 9001:2008) ........................................................................................ 15 9.5 Quality Objectives: (Clause 5.4.1 of ISO 9001:2008) ...................................................................... 15 9.6 Quality Management System Planning: (Clause 5.4.2 of ISO 9001:2008) ...................................... 15 9.7 Responsibility, Authority and Communication: (Clause 5.5 of ISO 9001:2008) .............................. 16 9.7.1 Responsibility and Authority: (Clause 5.5.1 of ISO 9001:2008) .................................................. 16 9.7.2 Management Representative: (Clause 5.5.2 of ISO 9001:2008) ................................................ 18 9.7.3 Internal Communication: (Clause 5.5.3 of ISO 9001:2008) ........................................................ 19 10 Resource Management (Clause 6 of ISO 9001:2008): ................................................................... 20 10.1 Provision of Resources: (Clause 6.1 of ISO 9001:2008) ............................................................ 20 10.2 Human Resources: (Clause6.2 of ISO 9001:2008) ..................................................................... 20 10.3 Infrastructure: (Clause 6.3 of ISO 9001:2008) ............................................................................ 20 10.4 Work Environment: (Clause 6.4 of ISO 9001:2008) .................................................................... 21 11 Product Realization (Clause 7 of ISO 9001:2008): .......................................................................... 21 11.1 Planning of Product Realization (Clause 7.1 of ISO 9001:2008) ................................................ 21 11.2 Customer-related Processes (Clause 7.2 of ISO 9001:2008) ..................................................... 22 11.3 Design and Development (Clause 7.3 of ISO 9001:2008) .......................................................... 23 11.4 Purchasing (Clause 7.4 of ISO 9001:2000) ................................................................................ 23 11.5 Verification of Purchased Products (clause 7.4.3 of ISO 9001:2008): ........................................ 24 11.6 Production and Service Provision (Clause 7.5 of ISO 9001:2008) ............................................. 24 11.7 Validation of Processes for Production and Service Provision: (Clause 7.5.2 of ISO 9001:2008 11.8 Identification and Traceability: (Clause 7.5.3 of ISO 9001:2008) ............................................... 25 11.9 Customer Property (Clause 7.5.4 of ISO 9001:2008) ................................................................. 26 11.10 Preservation of Product (Clause 7.5.5 of ISO 9001:2008) .......................................................... 26 11.11 Control of Monitoring and Measuring Devices ............................................................................ 26 12 Measurement, Analysis and Improvement:(Clause 8 of ISO9001: 2008) ....................................... 27 12.1 Customer satisfaction: (Clause 8.2.1 of ISO 9001:2008) ............................................................ 27 12.2 Internal Audit: (Clause 8.2.2 of ISO 9001:2008) ......................................................................... 27 12.3 Monitoring and Measurement of Processes: (Clause 8.2.3 of ISO 9001:2008) .......................... 28 12.4 Monitoring and Measurement of Product: (Clause 8.2.4 of ISO 9001:2008) .............................. 28 12.5 Control of Non-conforming product: (Clause 8.3 of ISO 9001:2008) .......................................... 29 12.6 Customer Complaint Handling Process ...................................................................................... 29 12.7 Analysis of Data: (Clause 8.4 of ISO 9001:2008) ....................................................................... 29 12.8 Improvement: (Clause 8.5 of ISO 9001:2008) ............................................................................ 30 12.8.1 Continual Improvement (Clause 8.5.1 of ISO 9001:2008) .......................................................... 30 12.8.2 Corrective Action: (Clause 8.5.2 of ISO 9001:2008) ................................................................... 30 12.8.3 Preventive Action: (Clause 8.5.3 of ISO 9001:2008) .................................................................. 31

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 3 of 31

Amendment sheet Sr.

No

Doc. Name Doc. No. Page no.

Reasons for revision

Rev. No.

Rev. Date

1 Apex Quality Manual

D-MG-01 All First Issue 00 01-07-04

2 Apex Quality Manual

D-MG-01 All As per the observations during the pre-assessment audit conducted by the Certification agency.

01 04-01-05

3 Apex Quality Manual

D-MG-01 All The frequency of the MRM changed to once in Four months

02 09-06-05

4 Apex Quality Manual

D-MG-01 All The frequency of the MRM changed to once in Six months

03 09-05-06

5 Apex Quality Manual

D-MG-01 ALL Organisation Chart Updated

04 13/02/08

6 Apex Quality Manual

D-MG-01 All Second Issue

ISO 9001:2000 to ISO9001:2008

00 10-04-10

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 4 of 31

1 Purpose And Scope Of The Quality Management System

1.1 This document describes the Quality Management System, conforming to ISO 9001:2008 standard, as adopted by Fine-Line Circuits Limited & High technology Multilayer Unit. This manual applies to all activities, which contribute to the quality of the products and services offered by the Fine-Line Circuits Limited & High technology Multilayer Unit.

1.2 The document covers the Quality Management System for products provided

by the Fine-Line Circuits Limited & High technology Multilayer Unit to its clients in the areas of:

! Manufacturing of Unpopulated Printed Circuit Boards

1.3 The Quality Management System defined in this manual addresses the

processes employed to satisfy customers by providing above-mentioned product.

1.4 The following are the major business processes employed in Fine-Line

Circuits Limited: • Marketing • Engineering • Purchase • Manufacturing • Quality Assurance • Export and Shipping

The support processes employed within the organization to enable the above processes to deliver to the customer his requirements are as follows:

• Maintenance • HR • Process Engineering • Production Planning and Control • Material Planning and Control

Name Signature

Prepared By:

Mr Milan Trivedi Management Representative

Approved By:

Mr. Abhay Doshi, Managing Director

Date of Approval: 15/05/10

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 5 of 31

1.5 Quality Management System related processes, as per ISO 9001:2008, are addressed in this manual and referenced documents with this manual. The main processes of QMS, including the following are addressed:

! Document control ! Record control ! Management responsibility related processes like Management

commitment, Customer focus, Quality Policy, Quality Objectives, QMS planning, Defining responsibilities and authorities, Internal communication, Management review process etc.

! Human resource, Infrastructure and work environment ! Product realization process as per clause 7 of ISO 9001:2000 ! Customer satisfaction ! Internal audit ! Monitoring and Measurement of processes ! Monitoring and Measurement of products ! Control of non-conforming products ! Corrective action and ! Preventive action

1.6 Other operational processes that do not directly affect Quality Management System are also covered under this Quality System at this juncture for standardization and to minimize risk.

1.7 This Quality Management System is applicable for Fine-Line Circuits

Limited & High technology Multilayer Unit located at Andheri (SEEPZ), Mumbai.

1.8 The intent of the documentation is to validate, standardize processes leading

to enhancing customer satisfaction and improving the effectiveness of Quality Management system.

2 Exclusion To Quality Management System And Justification Design & Development (Clause 7.3) is not applicable at this point of time. By excluding this, the organization’s ability or responsibility, to provide products, which meet customer and applicable regulatory requirements, will not be affected. The system will be established and implemented as and when requirement arises. Organization manufactures unpopulated PCBS based on the Customer’s design/drawings and doesnot carryout any design activities & hence Clause 7.3 is not applicable.

3 Company Profile

3.1 About Fine-Line Circuits Limited & High technology Multilayer Unit

Fine-Line Circuits Limited & High technology Multilayer Unit are the leading manufactures & suppliers of Printed Circuit Boards started in 1989 by Mr.

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 6 of 31

B. T. Doshi & family. Fine-Line Circuits Limited & High technology Multilayer Unit today manufacture(s) high quality Printed Circuit Boards in a medium volume facility located in India’s premier free trade zone (SEEPZ) at Mumbai.

The entire PCB production is dedicated for export to customers around the world. (USA, Germany, UK, Switzerland & Singapore). Latest state-of the art manufacturing facility helps to produce high quality products.

Fine-Line is a publicly traded corporation on the Mumbai stock exchange since 1992.

Fine-Line Circuits Limited & High technology Multilayer Unit is striving for excellence in products and consistent quality to achieve customer satisfaction by implementing ISO 9001:200 Quality Management Systems.

4 Products And Services The following are the products and services offered by Fine-Line Circuits Limited & High technology Multilayer Unit:

1. Printed Circuit Board - Multi Layer PCBs - Impedance Controlled PCBs - Backplane PCBs - Immersion Gold finish PCBs - Immersion Tin finish PCBs - Hard Gold finish PCBs

5 Resources Human Resources: Band No. of Full time Employees Senior 8.23% Middle 29.41% Junior 61.17% Total 85 Infrastructural Resources: • Production Facility:

" Production facility includes the Vacuum Press, Micro Drilling

machines, Photo Imaging machines, Plating, Wet processing, Lamination, Solder mask, Fabrication (Routing, Punching, Scoring), vacuum press, Two sided Electrical Testers etc.

• Inspection & Measurement facility:

FINE-LINE C I R C U I T S L I M I T E D

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 7 of 31

" Inspection & Measurement facility for pH measurement, AOI

System, microscope, venire caliper, micrometers etc. are available.

• Information & technology facility: " Facility for communication & back up is available. " Also facility for Gerber Data analysis is available.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 8 of 31

6 Organizational Structure The organization structure (chart) below illustrates the functional authority of the persons who manage, perform and verify activities affecting Quality:

ORGANIZATION CHART

Please refer to D-HR-06 to see the Organization Chart and for the a more detailed list please refer to Functional Responsibility matrix

7 Organizational Management System Policies And Guidelines

Important policies and guidelines relevant for the Organizational management system, which have impact on the quality of Products and Services offered, are listed in the following sections 8, 9, 10, 11 & 12.

8 Quality Management System (QMS) (Clause 4.1 of ISO 9001:2008) 8.1.1 QMS is defined and documented as a Quality Manual complying with the

requirements of ISO 9001:2008.

8.1.2 Fine-Line Circuits Limited & High technology Multilayer Unit has determined the following business processes for meeting customer and regulatory requirements. The interface and sequence of the processes are also depicted as below:

Head Human

Resources Kumkum Nongrum (Band:N)

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 9 of 31

INTERACTION OF PROCESSES:

YES

NO

YES

Marketing

Production Planning

Purchase

Production

Quality

Assurance

Stores

C U S T O M E R

RECEIPT OF ENQUIRY

CHECK FEASIBILITY

NO

YES

PLAN FOR PRODUCTION

RETURN MATERIAL TO SUPPLIERS

PROCURE RAW MATERIAL FOR IN-HOUSE PRODUCTION

PREPARE & RELEASE PO

RECEIVE RAW MATERIALS UPDATE STOCK

ISSUE MATERIAL

RAISE INDENT START PRODUCTION

COMPLETE PRODUCTION

PDI IF APPLICABLE

FINISHED GOODS

INCOMING INSPECTION

YES

NO

IN-PROCESS INSPECTION

REWORK

FINAL INSPECTION

REWORK

NO

SEND REGRET LETTER

RECEIVE WORK ORDER SEND QUOTATION

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 10 of 31

START Pre.Analysis Submit Quote Order Process

PPE

Front End Analysis

Mail for

Plotting

Receive Plots

Release Job

Specs

Phototool

Prepare all

Photo tools

Shear Laminates

Shearing

Shear Back-up

MLB IL Print

Inner Layers

Expose & Develop IL Etch AOI Post Etch Punch

Pressing

Bond Film Lay-Up Pressing

CNC

Drill

Through Hole

DSmear Black Hole

PhotoPrint

Lamination Expo & Dev

Pattern Plate

Copper Plate Tin Plate

Etching

Resist Strip Copper Etch Tin Strip Premask Ok

Rej / Rework

Inspection PISM

Print Expose & Develop

Final Cure

Marketing

HAL

ENIG

Tab Gold

Peelable Mask

SCORE ROUT BBT Imm.Tin

Final

Inspection QC

CNC

Test

Au.Fi

HAL Tin Fi

Despatch

Ship Invoice

Collection

Marketing

End

Enquiry

Customer Reply

Query

Accounts

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 11 of 31

Enabling Processes:

t

FINANCE - Costing - Pay Roll - Payments - Insurance

HRD - Training &

Development - Recruitment - Induction - Motivation - Team Work - Welfare - House Keeping MB

PLANNING - MRP - Manpower

Plan & deployment

- Scheduling - Review of

Deliveries SAB/JC

P & A - Safety - Occupational

Health - Statutary &

legal obligations

HKD

MATERIALS - Procurement - Spares Mgt - Vendor

Development

SAB

MAINTENANCE - Breakdown/PM - Power/Water Mgt. - AC Mgt. - TPM - Capex - Caliberation - Expansion Projects.

PROCESS ENGG - Monitoring of

Product Quality

- Prototypes - New Process - New Products - DOE & SPC RM

QUALITY SYSTEM - Mgt. Review - Internal Audit - TQM - Document

Control

CUSTOMER SERVICE - Customer

Complaint - Customer

Returns - All Customer

Technical interaction

MJT

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 12 of 31

8.1.3 The operation and control criteria for various sub-processes are determined and are incorporated in the relevant procedures.

8.1.4 Top management ensures that necessary resources and information to support the operation and monitoring of the determined processes are provided. This is ensured through various interactions with the various functions and through management review meetings.

8.1.5 FINE-LINE CIRCUITS LIMITED has put in mechanism to monitor, measure and analyze these processes. Proper Measurement methods are used for assessing the efficacy of the processes (Refer to Monitoring and Measurement of Processes).

8.1.6 After the analysis is done, organization identifies and implements actions necessary to achieve planned results and continual improvement of these processes (Refer to Corrective Actions and Preventive Actions Procedures).

8.1.7 Process objectives and quality objectives are defined from time to time, targets are set, performance is reviewed, improvement actions suggested as part of the quality management system (Refer to D-MG-02).

8.1.8 Preventive maintenance & Calibration, is Outsourced activities and controlled through Purchase process . (Refer to Purchasing for detailed procedure).

8.1.9 Documentation is structured in three levels. The apex level of the documentation is defined as Apex Quality Manual, which includes Scope of QMS including details of and justification for any exclusions & provides all necessary and relevant information relating to Quality Management System, established and implemented in the organization. The second level of the documentation provides detailed procedures along with SOPs (Standard Operating Procedures) and work instructions. Third level of documentation provides formats and records. The procedures are electronically linked, wherever applicable, with each other document / format for easy navigation. The documentation structure is diagrammatically represented as below:

8.1.10 The departmental manuals maintained are listed out below:

Apex Quality Manua Apex Quality Manual (D-MG-01) l (D-MG-01)

Standard Operating Procedures, Work Instructions, Procedures

Formats / Records

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 13 of 31

• Marketing

• Engineering

• Production Planning & Control

• Purchase

• Material Planning & Control

• Production

• Process Engineering

• Quality Assurance

• Maintenance

• Human Resource

• Stores

• Export and Shipping

8.1.11 All procedures and documents are issued under controlled conditions as detailed below.

8.2 Control of Documents (as per ISO 9001: 2008 clause No. 4.2.3)

Documents are issued in controlled manner as per the documented procedure (D-MG-03). This procedure defines the methodology for preparation, review, approval, identification, revision, issue and distribution. This document also defines the procedure to be adopted for controlling of “Documents of external origin”. Refer to (D-MG-03) for details.

8.3 Control Records (as per ISO 9001: 2000 clause No. 4.2.4)

A documented procedure is defined to control the records (D-MG-04). These records are established and maintained to provide evidence of conformity to requirements and of the effective operation of the quality management system. This procedure scope covers control of records in terms of identification, storage, protection, retrieval, retention time and disposition. Refer to (D-MG-04) for details.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 14 of 31

9 Management Responsibility (Clause 5 of ISO 9001:2008)

9.1 Management Commitment: (Clause 5.1 of ISO 9001:2008) Evidence of top management’s commitment to QMS is shown through establishment and implementation of QMS. This QMS also provides scope for continually improving its effectiveness through Internal audits, developing and reviewing quality objectives, conducting management reviews, providing a process for improving the products and processes through corrective and preventive action.

9.1.1 The importance of meeting customer as well as statutory and regulatory requirements is communicated to the employees of the FINE-LINE CIRCUITS LIMITED through regular interactions, daily / weekly meetings, reviewing customer complaints and customer feedbacks and during management reviews. The statutory and regulatory requirements are built-in in the SOPs appropriately.

9.1.2 The top management has established quality policy and quality objectives which are defined in this apex quality manual elsewhere (Refer to Quality Policy and Quality Objectives).

9.1.3 The top management conducts management reviews once in 6 months to review the effectiveness of the Quality Management System through progress on Quality objectives, results of customer feedbacks, internal audit results, etc. (Refer to Management Review process).

9.1.4 The top management also ensures adequate resources are provided to meet customer and statutory requirements and also to continually improve the effectiveness of its system. The responsibility for ensuring compliance to the various statutory requirements is listed in D-MG-11.

9.2 Customer Focus: (Clause 5.2 of ISO 9001:2008) Customer focus is provided through determining customer requirements and meeting them. Customer requirements are identified through meeting and interacting with customers. During these interactions, the implied needs of the customers are also captured and understood. Customer feedbacks, complaints and customer satisfaction results are discussed with employees at different forums inside the FINE-LINE CIRCUITS LIMITED to enhance customer satisfaction through customer focus. The measurement of meeting customer requirements is done through reviewing customer complaints (Refer to customer complaint & feedback process) and through regular “Customer satisfaction survey. (Refer to Customer Satisfaction Survey Process).

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 15 of 31

9.3 Quality Policy: (Clause 5.3 of ISO 9001:2008) 9.3.1 Quality Policy of the FINE-LINE CIRCUITS LIMITED is established and

implemented which is appropriate for the FINE-LINE CIRCUITS LIMITED. This policy also provides framework for defining quality objectives.

9.3.2 The continual improvement of the effectiveness of the QMS is addressed

through defining Quality objectives, monitoring the compliance of SOPs, and monitoring of process performance. The improvements are driven through Corrective action and Preventive action procedures.

9.3.3 Quality Policy is reviewed during management reviews for continuing

suitability based on achieving the quality objectives and the effectiveness of the QMS. The FINE-LINE CIRCUITS LIMITED ‘s quality policy is:

QUALITY POLICY

FINE-LINE CIRCUITS COMMITS ITSELF TO MANUFACTURE AND DELIVER

DEFECT FREE PCBs TO MANUFACTURING INDUSTRIES BY CONTINUALLY

UPGRADING THE SERVICES, PROCESS CAPABILITY, PRODUCT RANGE, AND

WITH A CONSTANT CUSTOMER FOCUS SHALL ACHIEVE CUSTOMER

SATISFACTION.

9.3.4 Quality Policy is communicated for understanding of the employees through meetings, interactions, reviews, displaying the policy at various locations, etc.

9.4 Planning: (Clause 5.4 of ISO 9001:2008) 9.4.1 The Planning comprises Quality Policy, Quality Objectives derived from the

Quality Policy and supporting Quality Management System as a means to ensure that the Quality policy and objectives are achieved.

9.5 Quality Objectives: (Clause 5.4.1 of ISO 9001:2008) 9.5.1 Quality Objectives of the FINE-LINE CIRCUITS LIMITED are established on

annual basis and are documented in the Quality Objectives Document. These Organizational quality objectives are deployed to departmental levels as departmental / functional objectives in the same document. The quality objectives are measurable and consistent with the quality policy.

9.5.2 Quality objectives along with quality policy are reviewed in Management reviews. Status reporting of objectives by functions / departments is done on a monthly / quarterly basis, as applicable.

9.6 Quality Management System Planning: (Clause 5.4.2 of ISO 9001:2008)

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 16 of 31

9.6.1 This is done through implementation of the established QMS by the top management. The basic establishment and implementation of QMS itself is the major part of QMS Planning exercise. This planning is carried out in order to meet Quality Management System related requirements, customer, statutory & regulatory requirements and to achieve quality objectives. The Management Representative in the organization identifies quality initiatives needed for improvement on a regular basis.

9.6.2 The integrity of the QMS is maintained through proper Change Control procedure (Refer to D-MG-03 Document Control Procedure for details). System related changes would be implemented after review by the business head and MR and duly approved by the top management. Product related changes will be implemented only after approval of functional / departmental head and the top management, wherever required.

9.7 Responsibility, Authority and Communication: (Clause 5.5 of ISO 9001:2008)

9.7.1 Responsibility and Authority: (Clause 5.5.1 of ISO 9001:2008) 9.7.1.1 The roles, responsibilities and authorities of management and staff of the

FINE-LINE CIRCUITS LIMITED are defined in the individual job description. Please refer to the format of the Job description for details R-HR-01. The defined job description is made available to all employees so that awareness is created amongst all employees regarding their role, responsibilities and authorities.

9.7.1.2 The overall primary and secondary responsibilities are identified in the matrix given below for the various processes employed in the FINE-LINE CIRCUITS LIMITED:

ISO Clause No.

Business Process

ISO Requirement

Man

agem

ent

Man

agem

ent

Rep

rese

ntat

ive

Mar

ketin

g

Engi

neer

ing

Purc

hase

Prod

uctio

n

Proc

ess

Engi

neer

ing

Qua

lity

Ass

uran

ce

Mai

nten

ance

Sto

res

Expo

rt &

Shi

ppin

g

Hum

an R

esou

rce

4 Quality Management System 4.1 General

Requirements P P S S S S S S S S S S

4.2 Documentation Requirements 4.2.1 General P P 4.2.2 Quality manual P P 4.2.3 Control of

Documents P P P P P P P P P P P

4.2.4 Control of Records P P P P P P P P P P P

5 Management Responsibility 5.1 Management

Commitment P

5.2 Customer Focus P 5.3 Quality Policy P P S S S S S S S S S S 5.4 Planning

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 17 of 31

ISO Clause No.

Business Process

ISO Requirement

Man

agem

ent

Man

agem

ent

Rep

rese

ntat

ive

Mar

ketin

g

Engi

neer

ing

Purc

hase

Prod

uctio

n

Proc

ess

Engi

neer

ing

Qua

lity

Ass

uran

ce

Mai

nten

ance

Sto

res

Expo

rt &

Shi

ppin

g

Hum

an R

esou

rce

5.4.1 Quality Objectives P P P P P P P P P P P P

5.4.2 Quality Management System Planning

P P

5.5 Responsibility, Authority & Communication 5.5.1 Responsibility &

Authority P P S S S S S S S P

5.5.2 Management Representative P P

5.5.3 Internal Communication P S

5.6 Management Review 5.6.1 General P P 5.6.2 Review Input P P P P P P P P P P P 5.6.3 Review Output P P P P P P P P P P P P 6 Resource Management 6.1 Provision of

Resources P

6.2 Human Resources 6.2.1 General P S S S S S S S S S P 6.2.2 Competence,

awareness and Training

P S S S S S S S S S P

6.3 Infrastructure P S S S S P S S 6.4 Work

Environment P S S S S S S P S S P

7 Product Realization 7.1 Planning of

product realization

P P P

7.2 Customer Related Process 7.2.1 Determination of

requirements related to the product

P P

7.2.2 Review of requirements related to the product

P P P

7.2.3 Customer communication P P P P S S S P S S S

7.3 Design and Development Exclusion Claimed

7.4 Purchasing 7.4.1 Purchasing

process P S P S S

7.4.2 Purchasing Information P P S P S P S

7.4.3 Verification of purchased product

P P P P

7.5 Production & Service Provision 7.5.1 Control of

production and Service Provision

P P P P P P P P P P P

7.5.2 Validation of P P P

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 18 of 31

ISO Clause No.

Business Process

ISO Requirement

Man

agem

ent

Man

agem

ent

Rep

rese

ntat

ive

Mar

ketin

g

Engi

neer

ing

Purc

hase

Prod

uctio

n

Proc

ess

Engi

neer

ing

Qua

lity

Ass

uran

ce

Mai

nten

ance

Sto

res

Expo

rt &

Shi

ppin

g

Hum

an R

esou

rce

processes for production and service provision

7.5.3 Identification & Traceability P P S P S P P

7.5.4 Customer Property P P

7.5.5 Preservation of product S P S P S P P

7.6 Control of monitoring & measuring equipment

P P P P P

8 Measurement, Analysis and Improvement 8.1 General P P P P P P P P P P P P 8.2 Monitoring and Measurement 8.2.1 Customer

Satisfaction P P P S S S S S S S S

8.2.2 Internal Audit P P S S S S S S S S S S 8.2.3 Monitoring &

Measurement of processes

P P P P P P P P P P P P

8.2.4 Monitoring & Measurement of product

P P S P S

8.3 Control of non-conforming product

P P P S P S P P

8.4 Analysis of data P P P P P P P P P P P 8.5 Improvement 8.5.1 Continual

Improvement P P P P P P P P P P P P

8.5.2 Corrective Action P P P P P P P P P P P P 8.5.3 Preventive Action P P P P P P P P P P P P

P Prime Responsibility S Support Responsibility

9.7.2 Management Representative: (Clause 5.5.2 of ISO 9001:2008) 9.7.2.1 Top management has appointed Mr.Milan Trivedi Sr.G.M (QA) as a

Management Representative (MR) to establish, implement, maintain and continually improve ISO 9001:2008 system in the Organization.

9.7.2.2 MR’s responsibilities and authorities are defined as below: The Management Representative has to fulfill the following responsibilities besides his current responsibilities.

• He has the responsibility to evolve quality system in the organization with

the support and involvement of all concerned. • He has authority to ensure that the quality systems are established,

implemented and maintained through out the organization.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 19 of 31

• Also, he has the necessary authority to organize internal audits, to analyze and report the status and effectiveness of the quality management system in the management review.

• He has the responsibility to suggest the improvements in quality management system from time to time & report the same to the top management.

• He has necessary authority to organize follow up or conduct special audits to verify the implementation of corrective action and its effectiveness.

• He has the responsibility to promote awareness of customer requirements through out the organization.

• He is also authorized to have liaison with external certification agencies on the matters relating to quality management system certification.

For the above responsibility, he will report to the MD.

9.7.3 Internal Communication: (Clause 5.5.3 of ISO 9001:2008) Internal Communication is established in the organization by the top management and MR. This communication happens during regular meetings, project reviews, performance reviews, management reviews, customer complaint / feedback reviews etc. By various interaction modes defined above communication takes place regarding the effectiveness of the QMS.

The communication is exchanged inside the organization through E-mail, Internal memo or telephone.

Visual displays are also used as a means of communicating inside the organization.

9.8 Management Review: (Clause 5.6 of ISO 9001:2008)

9.8.1 Management Reviews are done once in SIX MONTH basis to review the organization’s QMS to ensure its continuing suitability, adequacy and effectiveness. For detailed procedure refer to D-MG-05. Management review assesses the opportunities for improvement and the need for changes to the QMS, including the quality policy and quality objectives.

9.8.2 Management review has an agenda points for review as review inputs. Review inputs include the following:

• Results of audits • Customer feedback • Process performance and product conformity • Status of preventive and corrective actions • Follow-up actions from previous management reviews • Changes that could affect the QMS and • Recommendations for improvement

However, a detailed agenda points are given in the format defined (R-MG-07) 9.8.3 Review outputs include any decisions and actions related to

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 20 of 31

• Improvement of the effectiveness of QMS and its processes

• Improvement of product related to customer requirements and • Resource needs.

9.8.4 Management review records (R-MG-08) with clearly defined action point review are maintained.

10 Resource Management (Clause 6 of ISO 9001:2008):

10.1 Provision of Resources: (Clause 6.1 of ISO 9001:2008) 10.1.1 Required resources are determined whenever there is a need determined or

as determined at various interactions held with responsible personnel in the organization or as an outcome of decision of management review.

10.1.2 The determined resources are provided for implementing and maintaining QMS and to improve continually its effectiveness and to enhance customer satisfaction.

10.2 Human Resources: (Clause6.2 of ISO 9001:2008) 10.2.1 Organization has determined the necessary competence for personnel

performing work affecting conformity to product requirements.

10.2.2 Personnel with required competency are assigned the work to ensure product and service quality. Job profiling is done for each individual against the Job Description defined for the role. Refer to R-HR-02 for the format of the Employee Profile Form

10.2.3 Recruitment is done based on the job descriptions defined. For details of

recruitment process refer to D-HR-01.

10.2.4 Training need identification is done based on the job description, current job profile and other developmental needs etc.

10.2.5 Training need determined is reviewed by the top management for approval. Training plan is made based on which training is provided. For details refer to D-HR-03.

10.2.6 Training records are updated and maintained.

10.2.7 Training effectiveness is measured through feedback from superior , as required. For details refer to D-HR-05

10.3 Infrastructure: (Clause 6.3 of ISO 9001:2000) 10.3.1 Organization has determined & provided the necessary infrastructure to achieve

conformity to product requirements. Infrastructure includes process equipments, building, workspace & associated utilities, other hard wares & software and

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 21 of 31

other support services needed to achieve customer satisfaction and meet regulatory and statutory requirements.

10.3.2 Infrastructure needed to achieve service delivery quality is determined on regular basis.

10.3.3 Organization has determined responsibilities for maintenance of infrastructure in terms of maintenance of buildings and structures & maintenance of utilities and process equipments and instruments like computers & servers. Annual maintenance contracts are used to maintain such identified ones.

10.4 Work Environment: (Clause 6.4 of ISO 9001:2008) 10.4.1 Organization has determined the work environment needed to achieve

conformity to product requirements. The Work environment relates to those conditions under which work is performed including physical, environmental and other factors such as noise, temperature, humidity. The parameters of work environment needed to be specially maintained (if any) are documented, wherever needed, in standard operating procedures.

10.4.2 A list of hazardous chemicals used in the organization is maintained by Process Engineering and the same is circulated to the concerned personnel. Awareness about the handling procedure to be followed for these chemicals is given to the personnel handling them.

11 Product Realization (Clause 7 of ISO 9001:2008):

11.1 Planning of Product Realization (Clause 7.1 of ISO 9001:2008) 11.1.1 Product realization is planned and realized through various business

processes, in consistency with the defined processes in the Quality Management system documentation.

11.1.2 Quality objectives and requirements for the products are determined for the existing products provided as per quality requirements. New products whenever introduced, objectives and requirements will be determined and made as quality requirements of the products or processes. These objectives will also bear reference to the customer requirements determined. This is also linked to quality objectives defined for the organization or departmental objectives.

11.1.3 Top management has established processes and provided resources specific to the product. The top management will identify and provide necessary resources at the time of any new product introduction or change in the current products or processes.

11.1.4 Verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance are determined and incorporated in various procedures.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 22 of 31

11.1.5 Records needed to provide evidence that the realization processes and resulting product meet requirements are determined and maintained. They are referenced in the SOPs.

11.1.6 The outputs of the planned and determined activities are made into forms of procedures, formats etc. for realization and are implemented and maintained. They are referenced in the appropriate SOPs.

11.2 Customer-related Processes (Clause 7.2 of ISO 9001:2008) 11.2.1 The Marketing Executive / Marketing Head interact with the customers on a

regular basis to understand the customer requirements. 11.2.2 Customer requirements are determined through meeting and interacting with

customers. During these above interactions, the implied needs (not stated requirements) of the customers are also captured, understood and determined.

11.2.3 The Marketing Executive / Marketing Head study the requirements and understand the needs. Statutory and regulatory requirements, if applicable, are also identified during this stage. They make proposals based on the feasibility, which is discussed within the organization. This feasibility / proposal also clarifies the capability of the organization.

11.2.4 These proposals are then sent to customers for approval for cost, time frame and other technical details.

11.2.5 The capability of the organization to meet the customer’s contractual requirements will be verified for the following situation

a) For the new product / service

b) Additional features needed for the existing products / services

c) Change needed in the standardized delivery time.

11.2.6 Any unresolved or ambiguous requirements are discussed with the client or customer and are resolved.

11.2.7 Clients and customers are communicated through emails, telephone, fax, meetings and postal or appropriate mode. The customer communication includes product related information (brochures), enquiries, contracts, amendments, customer feedbacks and customer complaints.

11.2.8 Refer to Pre-order process D-MKT-01 for details of the process.

11.2.9 On receipt of approvals the work is taken up for execution with proper allotment of resources.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 23 of 31

11.2.10 Any amendment to the existing contract is reviewed and communicated both ways (with client and inside the organization).

11.2.11 Records of request, reviews, proposals and approvals and amendments are maintained.

11.2.12 For details of Post-order process refer to D-MKT-02

11.3 Design and Development (Clause 7.3 of ISO 9001:2008)

The design of the PCBs is not done by Fine Line Circuits Ltd. & High technology Multilayer Unit. The design is provided by the customer & FLCL/HTML produce in conformance to customer’s drawings/data sheets / specs. Hence Design & Development (Clause 7.3) is not applicable. .

11.4 Purchasing (Clause 7.4 of ISO 9001:2008) 11.4.1 All items which affect the conformity to product requirements are procured

through defined purchase procedures.

11.4.2 Services related to infrastructure maintenance (AMCs of computers, servers), upkeep of work environment (Air conditioners), Security, building maintenance is also purchased through common purchase procedures.

11.4.3 Vendors those who provide services / products are evaluated for supply of those services / products and approved for such supplies. The vendors’ information is obtained through Vendor Registration Process (D-PUR-02). Evaluation records are maintained. Vendor Rating is done for all the vendors who supply items identified in the critical items list.

11.4.4 Outsourced services are also covered under the purchase procedures defined. The outsourced services and their relevant procedures are as referred below.

• Any deviations from the prescribed levels of quality will be reported and necessary actions will be taken to ensure that the service / product provided to Fine-line / Hitech Multilayer conforms to our requirement.

11.4.5 Vendors are selected through collecting details about vendor & technical literatures etc. Based on technical and commercial comparisons suitable vendor is selected and approved. For detailed vendor evaluation and selection procedure refer D-PUR-01.

11.4.6 Purchase orders are placed on approved and selected vendors. Purchase order is released with information of specification of the item to be procured, quantity, expected date of delivery, and any other relevant information. Refer to Purchase Order Process (D-PUR-04) for details. In case of service contracts to be signed with a vendor the process followed is detailed in Service Contract Process (D-PUR-06).

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 24 of 31

11.4.7 Vendor re-evaluation (rating) is done once in quarter as appropriate for the defined procurements. For detailed vendor rating procedure refer D-PUR-07.

11.4.8 Whenever any customer wants to verify / inspect the products at the supplier’s premise, Fineline / Multilayer will arrange for his visit to the supplier. Inspection is arranged/coordinated by Fineline / Multilayer. The same information will also be mentioned in the purchase order released for such materials / services. Fineline / Multilayer does not absolve the responsibility of using appropriate material even in case of customer-inspected and approved products.

11.5 Verification of Purchased Products (clause 7.4.3 of ISO 9001:2008): 11.5.1 Items when they are received will be verified as per the requirements defined

in Purchase Order or Purchase Specification.

11.5.2 Inspection records are maintained appropriately for the items inspected in Goods Receipt Note (GRN) / inspection reports, as applicable. Refer procedure D-PUR-05 for details of verification of purchased products and services.

11.6 Production and Service Provision (Clause 7.5 of ISO 9001:2008) 11.6.1 Suitable infrastructure is provided for the various products offered by the

organization. 11.6.2 Adequate human resource, machinery, monitoring & measuring equipment,

test tools and support resources are determined and provided. Any inadequate resources noticed for operation and control of these processes will be escalated to the top management, as required.

11.6.3 Standard Operating Procedures / Work instructions / formats are available. This access is given to all personnel who need to refer to controlled procedures for process execution, so that quality of the process and output are maintained.

11.6.4 The process parameters and product characteristics are monitored and

measured at defined frequency to ensure that the processes are carried out under controlled conditions.

11.6.5 Products are released to any next stage only when they are cleared for acceptance from the previous stage as detailed in the SOPs.

11.6.6 Products are inspected and released only when they conform to all specified requirements. Quality Assurance Manager is responsible for release of the finished product for dispatch to the customer.

11.6.7 The authority for release of products and documents / records from various

stages are identified and documented.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 25 of 31

11.6.8 Monitoring and test tools are identified and provided for the production / operation purposes.

11.7 Validation of Processes for Production and Service Provision: (Clause 7.5.2 of ISO 9001:2008)

11.7.1 Any new processes / changes to existing processes are done by Process Engineering department. Initially the new chemical / equipment / environment which need to be changed are evaluated against the existing ones in terms of the specifications.

11.7.2 Once the specifications meet the required norms a trial run is done with the changes / new process. The quality of output of the trial is evaluated by conducting the required tests.

11.7.3 Once the trial run is successful approval is sought from the Vice Chairman. If the output meets the requirements then batch production is carried out.

11.7.4 Once the batch production is satisfactory, then the production will be started.

11.7.5 All SOPs are prepared and circulated as per the experience of the personnel and are time tested. All new process / process changes shall be approved by the Vice Chairman and maintained by Process Engineering department.

11.7.6 The details of the process is given in D-PRO-VP-01 Process Validation Procedure.

11.7.7 Once in production stage all the processes are qualified by way of following the first article inspection process. Before any process is started the FA report has to be approved and only then can the production start. In case of any deviations which are observed the same have to be approved by the approval authority.

11.7.8 The details of the process is given in the First Article Inspection Process as detailed in D-QA-05 First Article Inspection Process.

11.8 Identification and Traceability: (Clause 7.5.3 of ISO 9001:2008) 11.8.1 Each product which has to be produced in the organization is assigned a

unique file No. This number changes whenever any changes happen in the design or any other aspect of the process. This no. is used to identify the various products at any point in time. This number is indicated in the Job Traveller. The status of the product is mentioned on the job traveler, which moves along with the job.

11.8.2 The date code is put on each PCB or on each array to identify the

manufacturing date of the particular batch. This ensures that the traceability for the PCB manufactured is maintained.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 26 of 31

11.8.3 This method ensures the implementation of identification and traceability of the product throughout its life cycle.

11.9 Customer Property (Clause 7.5.4 of ISO 9001:2008)

Organization exercises utmost care with customer property while it is under the organization’s control. The organization identifies, verify, protect and safeguard customer property provided for use or incorporation into product. If any customer property is lost, damaged or otherwise found to be unsuitable for use, this is reported to customer and record is maintained.

11.9.1 Refer to Customer Property Process (D-MKT-02) for details of the process. 11.10 Preservation of Product (Clause 7.5.5 of ISO 9001:2008)

Organization preserves the conformity of product during internal processing &

delivery to the intended destination in order to maintain conformity to requirements.

This preservation includes identification, handing, packing, storage & protections.

Preservation shall also apply to the constituent parts of a product.

11.10.1 11.11 Control of Monitoring and Measuring Equipment

11.11.1 Organization has determined the monitoring and measurement to undertaken&

monitoring & measuring equipment needed to provide evidence of Conformity of product to determined requirements. Organisation has established processes to ensure that monitoring and measurement can be carried out and are carried out in a manner that is consistent with monitoring and measurement requirements. To ensure valid results, measuring equipments are

(a) Calibrated or verified or both at specified intervals or prior to use against measurement standards traceable to international or national measurement standards. When no such standards exist, the basis used for calibration or verification are recorded

(b) Adjusted or re adjusted as necessary. (c) Identification in order to determined its calibration status (d) Safeguarded from adjustments that would invalidate the measurement results. (e) Protected from damage & deterioration during handling, maintenance & storage.

In the event of measuring device found to be out of calibration, the results of previous assessment are reviewed and appropriate actions are taken on the equipment and the products that are affected.

The records of the results of calibration and verification are maintained. .

11.11.2 11.11.3 All such equipment is identified and proper calibration techniques are

employed as per the process given in D-MNT-02.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 27 of 31

12 Measurement, Analysis and Improvement :(Clause 8 of ISO9001: 2008) 12.0.1 The Organization plans and implements the monitoring, measurement,

analysis and improvement processes related to demonstrating conformity of the product requirements.

12.0.2 The monitoring, measurement, analysis and improvement processes related to conformity of the QMS (internal audit, management review, document control, record control, corrective action and preventive action and certification audit findings etc.) are planned and implemented.

12.0.3 Continual improvement on the effectiveness of QMS (number of corrective and preventive actions taken, closing of internal quality audit non-conformities, completion of action points as per management review meeting records etc.) is monitored, measured, analyzed and improved.

12.1 Customer satisfaction: (Clause 8.2.1 of ISO 9001:2008) 12.1.1 Customer satisfaction is measured and reviewed on a continuous basis.

“Customer satisfaction survey” is conducted once a year. These are regularly reviewed and action plans are prepared & implemented to improve the customer satisfaction. Records of survey, analysis and action plans are maintained. Refer to (D-MKT-04) for details of the procedure. Monitoring Customer perception can include obtaining input from sources such as customer data on delivered product quality, user opinion survey ,lost business analysis, compliments.

12.2 Internal Audit: (Clause 8.2.2 of ISO 9001:2008) 12.2.1 Management Representative is responsible for planning, Scheduling and

conducting regular internal audits.

12.2.2 Minimum two rounds of audits are conducted per year. Each round will cover all aspects of the Quality Management System. Any additional audit required will be decided by MR depending on the follow-up audit or any other criticality.

12.2.3 MR reports the findings of the audit to the top management during management review meeting. The internal audit is done to determine whether the QMS is conforming to planned arrangements, including ISO requirements and to determine whether the QMS is effectively implemented and maintained.

12.2.4 List of qualified internal auditor’s team will be made and maintained. Procedure for qualifying internal auditor is defined in procedure D-MG-02.

12.2.5 Qualified internal auditors will conduct the audit as per audit schedule. They will record the audit observations and non-conformities in defined formats. The non-conformities will be vacated by auditees and signed off by the auditors and MR.The management responsible for the area being audited shall ensure that the necessary correction and corrective actions are taken without undue delay to eliminate detected nonconformities and their causes.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 28 of 31

12.2.6 MR will decide follow-up or additional audits in consultation with the top management. Follow-up activities include the verification of the actions taken and the reporting of verification of results.

12.2.7 Internal audit findings and records are maintained. The detailed procedure for Internal audit. is given in D-MG-07

12.3 Monitoring and Measurement of Processes: (Clause 8.2.3 of ISO 9001:2008)

12.3.1 The following processes will be monitored for their performance. These are made as part of Organizational Objectives and departmental objectives. They will be monitored and reviewed during the Management Review meetings. The respective department head will make monthly MIS on their departmental process performances and get reviewed by the management.

! Marketing ! Engineering ! Purchase ! MPC ! PPC ! Production ! Quality Assurance ! Stores ! Exports ! Maintenance ! HR

12.3.2 Suitable methods for monitoring and measurement of the processes are

identified, including any statistical techniques and the extent of their use. Refer to (D-MG-08) Monitoring and Measurement of processes for details of the process.

12.4 Monitoring and Measurement of Product: (Clause 8.2.4 of ISO 9001:2008)

12.4.1 Inspection / verification requirements are defined in respective SOPs appropriately for acceptance criteria. They will be processed after such verification / inspection as defined at appropriate stages and records of such inspection and verification are maintained as evidence.

12.4.2 All testing, inspection and verification activities will be completed before the product delivery is affected.

12.4.3 Test, verification results are recorded and maintained as evidence of product acceptance.

12.4.4 Only the approved authority will release the product for delivery to the customer after verification of all relevant testing and verifications are completed as per plan and the product meets the defined requirements.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 29 of 31

12.5 Control of Non-conforming product: (Clause 8.3 of ISO 9001:2008) 12.5.1 Organization ensures that product which does not conform to product

requirements is identified & controlled to prevent its unintended use or delivery. The control related responsibilities & authorities for dealing with nonconforming product has been defined in documented procedure. Where applicable Organization deals with non-conforming product by one or more of the following ways.

(a) By taking action to eliminate the detected non-conformity. (b) By authorizing its use, release or acceptance under concession by relevant

authority& where applicable, by customer. (c) By taking action to preclude its original intended use or application. (d) By taking action appropriate to the effects, or potential effects of the non-conformity

when nonconforming product is detected after delivery or use has started. 12.5.2 Please refer to the detailed procedure for control of non-conforming process

(D-MG-13).

12.6 Customer Complaint Handling Process 12.6.1 The purpose of this documented procedure is to describe the activities to be

carried out in dealing with customer complaints. 12.6.2 This procedure is applicable for complaints received from customer. 12.6.3 Any member of the marketing department receives the Customer complaint. A

Customer Complaint register is maintained at the departmental level to keep track of the complaints and the actions taken or to be taken for resolving the same. Suitable disposition action and corrective action are to be taken to ensure that recurrence of the same does not happen. Refer to D-QA-07 for details of the procedure.

12.7 Analysis of Data: (Clause 8.4 of ISO 9001:2008) 12.7.1 The need for the application of statistical technique is identified based on the

following guidelines.

a. Data relating to response to customer.

E.g. Delivery performances

b. Data relating to performance of Supplier E.g. Supplier performance rating.

c. Data relating to non-conformities in products or services. E.g. Customer complaints, Errors and Defects analysis

12.7.2 The Organization collects and analyses appropriate data to demonstrate the suitability and effectiveness of the QMS and to evaluate where continual improvement of the QMS is made.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 30 of 31

12.7.3 The basic data could be from any of the following areas. In addition to that appropriate data can be chosen for identifying the area for improvement.

σ Customer satisfaction

σ Non-Conformity of product and process

σ Characteristics and trends of products and processes

σ Suppliers Rating

12.8 Improvement: (Clause 8.5 of ISO 9001:2008)

12.8.1 Continual Improvement (Clause 8.5.1 of ISO 9001:2008)

Organization on a regular basis continually improves the effectiveness of the Quality management System through the use of the quality policy, quality objectives, audit results, analysis of data, corrective and preventive actions and management review.

12.8.2 Corrective Action: (Clause 8.5.2 of ISO 9001:2008) 12.8.2.1 Corrective action is taken for preventing re-occurrence of non-

conformities in products / processes. It focuses on eliminating the symptoms and root causes..

A documented procedure has been established to define requirements for

(a) Reviewing nonconformities in any of the process including customer complaints

(b) Determining the causes of nonconformities and its root cause (c) Evaluating the need for action to ensure that nonconformities do not reoccur in

future (d) Determining and implementing action needed (e) Records of the results of action taken (f) Reviewing the effectiveness of corrective actions

12.8.2.2 Corrective actions are initiated from any of the following areas.

a) Vendor assessment b) Customer Complaints c) Chronic quality problems d) Product / Process NCR’ s e) Not meeting objectives

12.8.2.3 Records related to investigations and effectiveness verification is maintained. Refer to D-MG-06 for detailed procedure 12.8.3 Preventive Action: (Clause 8.5.3 of ISO 9001:2008) 12.8.3.1 Preventive action is implemented for preventing occurrence of potential non-conformities in products and processes.

FINE-LINE CIRCUITS LIMITED

Apex Quality Manual Doc. No. : D-MG-01

Rev.No. :00 Rev.Date : 15/05/10 Page 31 of 31

A documented procedure has been established to define requirements for

(g) Reviewing nonconformities in any of the process including customer complaints

(h) Determining the causes of nonconformities and its root cause (i) Evaluating the need for action to ensure that nonconformities do not reoccur in

future (j) Determining and implementing action needed (k) Records of the results of action taken (l) Reviewing the effectiveness of corrective actions taken (m)

12.8.3.2 Preventive actions are initiated from any of the following areas. a)Product / Process characteristics b)Customer satisfaction survey c) Analysis of various data

12.8.3.3 Records related to investigations and effectiveness verification is maintained. Refer to D-MG-10 for detailed procedure.

Following Processes are Out Sourced :

• Calibration

• AMC &

• Training

Only the above mentioned 3 processes are out sourced.

External Calibration (OUT SOURCED PROCESS) :

Eveluate the performance of the calibration agency by Vendor Rating Process controlling the following parameters :

1) On-Time Services

2) Traceability to their certificates to the National/International standards.

3) Accerediation of the Laboratory (if any).

For AMC control points are :

1) On time service

2) Quality of Service.

For Training :

Whenevr the external training is used, is competency is verified thru his professional Competancy Certificates.