12
Dominion Energy North Carolina 800 Gaston Road, PO Box 1398 Gastonia, NC 28053 DominionEnergyNC.com August 19, 2021 Ms. Antonia Dunston Interm Chief Clerk North Carolina Utilities Commission 4325 Mail Service Center Raleigh, North Carolina 27699-4325 Re: Docket No. G-100, Sub 92 Dear Ms. Dunston: Pursuant to the Commission’s Order dated October 31, 2012, in the above referenced docket, enclosed are pipeline construction specifications for the following projects: Ref No. Description 932 M-068 Phase 2 From Olive Chapel Rd To T-021, Cary, NC (See attached As-Built G2 and G3) 941 T11A Mannix Rd, Durham, NC (See attached As-Built G2 and G3) 944 M-411 Extension at 1 Becton Cir, Durham, NC (See attached As-Built G2 and G3) 952 T-39 Replacement at Rosecraft Ln, Candler, NC (See attached G2) If you have any questions or comments regarding this filing, please do not hesitate to call me. Thank you for your assistance in this matter. Sincerely, Electronically submitted /s/ Glory J Creel Rates & Regulatory glory.creel@dominionenergy.com

Antonia Dunston Interm Chief Clerk North Carolina

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Antonia Dunston Interm Chief Clerk North Carolina

Dominion Energy North Carolina 800 Gaston Road, PO Box 1398 Gastonia, NC 28053 DominionEnergyNC.com

August 19, 2021

Ms. Antonia DunstonInterm Chief Clerk

North Carolina Utilities Commission

4325 Mail Service Center

Raleigh, North Carolina 27699-4325

Re: Docket No. G-100, Sub 92

Dear Ms. Dunston:

Pursuant to the Commission’s Order dated October 31, 2012, in the above

referenced docket, enclosed are pipeline construction specifications for the following

projects:

Ref No. Description

932 M-068 Phase 2 From Olive Chapel Rd To T-021, Cary, NC (See attached

As-Built G2 and G3)

941 T11A Mannix Rd, Durham, NC (See attached As-Built G2 and G3)

944 M-411 Extension at 1 Becton Cir, Durham, NC (See attached As-Built G2 and

G3)

952 T-39 Replacement at Rosecraft Ln, Candler, NC (See attached G2)

If you have any questions or comments regarding this filing, please do not hesitate to

call me. Thank you for your assistance in this matter.

Sincerely,

Electronically submitted

/s/ Glory J Creel

Rates & Regulatory

[email protected]

Page 2: Antonia Dunston Interm Chief Clerk North Carolina

PIPELINE DESIGN DATA

North Carolina Utilities Commission Form G-2

Company: Public Service Company of North Carolina, Inc. PSNC Project Number: P66042

Date Prepared: 19-Aug-21 Year Installed: 2021

Location of Line: Map Reference Number: 932

Length: 30,122 feet of 12 inch steel main

Estimated Date of Starting Construction: 8-Jul-20

Estimated Date Line Will Go Into Operation: 1-May-21

Contractors

Coating: Consolidated Pipe and Supply Co. Inc.

Pipeline: B&G

Testing: Hydrostatic Testing - Pipeline Contractor

Non-destructive Weld Testing - Mistras

Pipeline Specifications

Specification of pipe: API 5L PSL Minimum specified yield (S): 60,000 psi

Grade of pipe: X60 PSL 2

Nominal outside diameter of pipe (D): 12.75 inches

Nominal wall thickness (t): 0.281 inches

Longitudinal joint: ERW Joint factor (E): 1

Gas temperature: 58 degrees F Temperature factor (T): 1

Actual class location: 3

Design class location: 3 Design factor (F): 0.5

Type coating applied: Fusion Bonded Epoxy

Type of cathodic protection: Rectifier

Minimum Valve Specifications

Manufacturer: Model: Type: Material: Size: ASA: Mfg's. Test Pressure: Design Pressure:

Cameron W/W Ball Steel Steel 12" ANSI 600 2220 psi 1480 psi

psi psi

psi psi

Manufacturer: Model: Type: Material: Size: ASA: Design Pressure:

TD Williamson T.O.R. Steel 2" N/A 3600 psi

psi

psi

Hydrostatic Field Test

Medium: Water Test Period: 8 hours Test Pressure: 2051 psi

M-068 Phase 2 from Olive Chapel Rd and to T-021, Cary, NC (As-Built)

Page 3: Antonia Dunston Interm Chief Clerk North Carolina

Pipe Design

1. Steel Pipe Design Pressure:

P = 2St * F * E * T = 1322 psi

D

Mill Test Pressure: 1520 psi

2. Design Pressure of weakest component: main, fittings, valves, or other accessories: 1322 psi

3. Test Pressure divided by the appropriate factor for the class location included: 1367 psi

4. For Furnace Butt Welded steel pipe, a pressure equal to 60 percent of the

Mill Test Pressure: N/A

5. For other than Furnace Butt Welded pipe. A pressure equal to 85 percent of

the highest test pressure to which the pipe has been subjected, either Mill or Field Test: 1743 psi

6. The highest actual operating pressure to which the line was subjected

during the five years preceding July 1, 1970: N/A

7a. The pressure determined to be the maximum safe pressure after considering the

physical history of the line: 500 psi

8. Maximum Allowable Operating Pressure considering 1 through 7: 500 psi

9. Hoop Stress (HP) = Max. Allowable Operating Pressure x O.D. = 11,343 psi

2t

10. Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 18.91%

S

Actual Operating Conditions

Maximum Actual Operating Pressure: 500 psi

Hoop Stress (HS) = Max. Actual Operating Pressure x O.D. = 11,343 psi

2t

Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 18.91%

S

Remarks:

164 33 2 AD13City Key Sheet Grid

T-line

M-068

Nearest Intersection:

(Or Other Location) Olive Chapel Rd at New Hill Olive Chapel Rd in Apex NC

M-line

Line Number:

Additional Description

Purpose of Work:

Map Location:

Revised on 8/18/2021 by Josue Alcaraz to update year installed, length, pipeline contractor, non-destructive weld testing

contractor, minimum fitting specifications and pressure test parameters per actual installation records.

This project will install 72,147 feet of M-068 distribution pipeline on multiple road

shoulders between Olive Chapel Rd in Apex to T-021 off of Kit Creek Rd. This Revised

0

Page 4: Antonia Dunston Interm Chief Clerk North Carolina
Page 5: Antonia Dunston Interm Chief Clerk North Carolina

PIPELINE DESIGN DATA

North Carolina Utilities Commission Form G-2

Company: Public Service Company of North Carolina, Inc. PSNC Project Number: 70607

Date Prepared: 19-Aug-21 Year Installed: 2021

Location of Line: Map Reference Number: 941

Length: 18 feet of 10 inch steel main

Estimated Date of Starting Construction: 15-Feb-21

Estimated Date Line Will Go Into Operation: 22-Feb-21

Contractors

Coating: Consolidated Pipe and Supply Co. Inc.

Pipeline: B&G Pipeline Co

Testing: Hydrostatic Testing - Pipeline Contractor

Non-destructive Weld Testing - QSL

Pipeline Specifications

Specification of pipe: API 5L PSL Minimum specified yield (S): 52,000 psi

Grade of pipe: X52 PSL 2

Nominal outside diameter of pipe (D): 10.75 inches

Nominal wall thickness (t): 0.25 inches

Longitudinal joint: ERW Joint factor (E): 1

Gas temperature: 58 degrees F Temperature factor (T): 1

Actual class location: 3

Design class location: 3 Design factor (F): 0.5

Type coating applied: Fusion Bonded Epoxy

Type of cathodic protection: Rectifier

Minimum Valve Specifications

Manufacturer: Model: Type: Material: Size: ASA: Mfg's. Test Pressure: Design Pressure:

psi psi

psi psi

psi psi

Manufacturer: Model: Type: Material: Size: ASA: Design Pressure:

TD Williamson Stopple TDW LOR PLUS CL 600 Steel 10" ANSI 600 1255 psi

TD Williamson T.O.R. Steel 2" N/A 3600 psi

psi

Hydrostatic Field Test

Medium: Water Test Period: 8 hours Test Pressure: 1946 psi

T11A Mannix Rd, Durham, NC (As-Built)

Page 6: Antonia Dunston Interm Chief Clerk North Carolina

Pipe Design

1. Steel Pipe Design Pressure:

P = 2St * F * E * T = 1209 psi

D

Mill Test Pressure: 2060 psi

2. Design Pressure of weakest component: main, fittings, valves, or other accessories: 1209 psi

3. Test Pressure divided by the appropriate factor for the class location included: 1297 psi

4. For Furnace Butt Welded steel pipe, a pressure equal to 60 percent of the

Mill Test Pressure: N/A

5. For other than Furnace Butt Welded pipe. A pressure equal to 85 percent of

the highest test pressure to which the pipe has been subjected, either Mill or Field Test: 1751 psi

6. The highest actual operating pressure to which the line was subjected

during the five years preceding July 1, 1970: N/A

7a. The pressure determined to be the maximum safe pressure after considering the

physical history of the line: 800 psi

8. Maximum Allowable Operating Pressure considering 1 through 7: 800 psi

9. Hoop Stress (HP) = Max. Allowable Operating Pressure x O.D. = 17,200 psi

2t

10. Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 33.08%

S

Actual Operating Conditions

Maximum Actual Operating Pressure: 800 psi

Hoop Stress (HS) = Max. Actual Operating Pressure x O.D. = 17,200 psi

2t

Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 33.08%

S

Remarks:

120 20 2 AS27City Key Sheet Grid

Line Number:

Additional Description

Purpose of Work:

Map Location:

Revised on 8/9/2021 by Josue Alcaraz to update length, non destructive weld testing contractor, fitting specifications, test

pressure parameters per actual installation records.

Section is being repaced due to internal wall loss found during an ILI run

T11A

T-line

0

Nearest Intersection:

(Or Other Location) 2874' north of Mannix Dr, parallel to Redwood Rd

M-line

Page 7: Antonia Dunston Interm Chief Clerk North Carolina
Page 8: Antonia Dunston Interm Chief Clerk North Carolina

PIPELINE DESIGN DATA

North Carolina Utilities Commission Form G-2

Company: Public Service Company of North Carolina, Inc. PSNC Project Number: 70534

Date Prepared: 19-Aug-21 Year Installed: 2021

Location of Line: Map Reference Number: 944

Length: 952 feet of 6 inch steel main

Estimated Date of Starting Construction: 10-Mar-21

Estimated Date Line Will Go Into Operation: 1-Aug-21

Contractors

Coating: Consolidated Pipe and Supply Co. Inc.

Pipeline: ITS

Testing: Hydrostatic Testing - Pipeline Contractor

Non-destructive Weld Testing -

Pipeline Specifications

Specification of pipe: API 5L PSL Minimum specified yield (S): 52,000 psi

Grade of pipe: X52 PSL 2

Nominal outside diameter of pipe (D): 6.625 inches

Nominal wall thickness (t): 0.188 inches

Longitudinal joint: ERW Joint factor (E): 1

Gas temperature: 58 degrees F Temperature factor (T): 1

Actual class location: 3

Design class location: 3 Design factor (F): 0.5

Type coating applied: Fusion Bonded Epoxy

Type of cathodic protection: Rectifier

Minimum Valve Specifications

Manufacturer: Model: Type: Material: Size: ASA: Mfg's. Test Pressure: Design Pressure:

Kerotest WXW Gate Steel 6" ANSI 150 427 psi 285 psi

psi psi

psi psi

Manufacturer: Model: Type: Material: Size: ASA: Design Pressure:

TD Williamson Stopper TDW Shortstopp Steel 4" x 6" ANSI 150 280

psi

psi

psi

Hydrostatic Field Test

Medium: Water Test Period: 8 hours Test Pressure: 1950 psi

M-411 at 1 Becton Cir. Durham NC

Page 9: Antonia Dunston Interm Chief Clerk North Carolina

Pipe Design

1. Steel Pipe Design Pressure:

P = 2St * F * E * T = 1476 psi

D

Mill Test Pressure: 2210 psi

2. Design Pressure of weakest component: main, fittings, valves, or other accessories: 280 psi

3. Test Pressure divided by the appropriate factor for the class location included: 1300 psi

4. For Furnace Butt Welded steel pipe, a pressure equal to 60 percent of the

Mill Test Pressure: N/A

5. For other than Furnace Butt Welded pipe. A pressure equal to 85 percent of

the highest test pressure to which the pipe has been subjected, either Mill or Field Test: 1879 psi

6. The highest actual operating pressure to which the line was subjected

during the five years preceding July 1, 1970: N/A

7a. The pressure determined to be the maximum safe pressure after considering the

physical history of the line: 250 psi

8. Maximum Allowable Operating Pressure considering 1 through 7: 250 psi

9. Hoop Stress (HP) = Max. Allowable Operating Pressure x O.D. = 4,404 psi

2t

10. Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 8.47%

S

Actual Operating Conditions

Maximum Actual Operating Pressure: 250 psi

Hoop Stress (HS) = Max. Actual Operating Pressure x O.D. = 4,404 psi

2t

Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 8.47%

S

Remarks:

120 9 5 A121City Key Sheet Grid

Line Number:

Additional Description

Purpose of Work:

Map Location:

Revised on 8/9/2021 by Josue Alcaraz to update length, pipeline contractor, non-destructive weld testing contractor, valve

specifications, fitting specifications and test pressure parameters per actual installation records.

To extend M-411 to serve industrial customer

0

T-line

M-144

Nearest Intersection:

(Or Other Location) Project will be on Becton Cir near International Dr in Durham NC

M-line

Page 10: Antonia Dunston Interm Chief Clerk North Carolina
Page 11: Antonia Dunston Interm Chief Clerk North Carolina

PIPELINE DESIGN DATA

North Carolina Utilities Commission Form G-2

Company: Public Service Company of North Carolina, Inc. PSNC Project Number: 69209

Date Prepared: 19-Aug-21 Year Installed: 2021

Location of Line: Map Reference Number: 952

Length: 180 feet of 12 inch steel main

Estimated Date of Starting Construction: 19-Sep-21

Estimated Date Line Will Go Into Operation: 22-Oct-21

Contractors

Coating: Consolidated Pipe and Supply Co. Inc.

Pipeline: TBD

Testing: Hydrostatic Testing - Pipeline Contractor

Non-destructive Weld Testing - TBD

Pipeline Specifications

Specification of pipe: API 5L PSL Minimum specified yield (S): 52,000 psi

Grade of pipe: X52 PSL 2

Nominal outside diameter of pipe (D): 12.75 inches

Nominal wall thickness (t): 0.281 inches

Longitudinal joint: ERW Joint factor (E): 1

Gas temperature: 58 degrees F Temperature factor (T): 1

Actual class location: 3

Design class location: 3 Design factor (F): 0.5

Type coating applied: Fusion Bonded Epoxy

Type of cathodic protection: Rectifier

Minimum Valve Specifications

Manufacturer: Model: Type: Material: Size: ASA: Mfg's. Test Pressure: Design Pressure:

psi psi

psi psi

psi psi

Manufacturer: Model: Type: Material: Size: ASA: Design Pressure:

TD Williamson Stopple TDW LOR CL 600 Steel 12" ANSI 600 1055

TD Williamson Tee TDW 3-Way Spherical LOR CL 600 Steel 12" ANSI 600 1025

psi

psi

psi

Hydrostatic Field Test

Medium: Water Test Period: 8 hours Test Pressure: 2000 psi

T-39 Replacement at Rosecraft Ln, Candler, NC

Page 12: Antonia Dunston Interm Chief Clerk North Carolina

Pipe Design

1. Steel Pipe Design Pressure:

P = 2St * F * E * T = 1146 psi

D

Mill Test Pressure: 1950 psi

2. Design Pressure of weakest component: main, fittings, valves, or other accessories: 1025 psi

3. Test Pressure divided by the appropriate factor for the class location included: 1333 psi

4. For Furnace Butt Welded steel pipe, a pressure equal to 60 percent of the

Mill Test Pressure: N/A

5. For other than Furnace Butt Welded pipe. A pressure equal to 85 percent of

the highest test pressure to which the pipe has been subjected, either Mill or Field Test: 1700 psi

6. The highest actual operating pressure to which the line was subjected

during the five years preceding July 1, 1970: N/A

7a. The pressure determined to be the maximum safe pressure after considering the

physical history of the line: 720 psi

8. Maximum Allowable Operating Pressure considering 1 through 7: 720 psi

9. Hoop Stress (HP) = Max. Allowable Operating Pressure x O.D. = 16,334 psi

2t

10. Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 31.41%

S

Actual Operating Conditions

Maximum Actual Operating Pressure: 350 psi

Hoop Stress (HS) = Max. Actual Operating Pressure x O.D. = 7,940 psi

2t

Percent Specified Minimum Yield Strength (SMYS) = HS X 100 = 15.27%

S

Remarks:

322 26 4 BH32City Key Sheet Grid

Line Number:

Additional Description

Purpose of Work:

Map Location:

0

Replace a section of T-39 that is exposed in a creek.

T-39

T-line

0

Nearest Intersection:

(Or Other Location) Rosecraft Ln and Westfield Way

M-line