nghwpahsh; mf;Nlhgh; 2020
Annual Subscription – Rs.130/- Mz;L re;jh - %.130/-
Price – Rs.10/- jdp gpujp - %.10/-
fl;llk; - 13 Volume – 13
mLf;F - 1 Issue - 1
mf;Nlhgh; 2020 October 2020
nghwpahsh; PORIYAALAR
nghwpahsh; rq;fk; kw;Wk; cjtpg; nghwpahsh; rq;fk; jkpo;ehL nghJg;gzpj;Jiw Nrg;ghf;fk;> nrd;id - 600 005
njhiyNgrp: 044-2851 5445 nghwpahsh; ,uhkypq;fk; ,y;yk; : 044 - 2854 4043 / 2951 5445
website : www. aoeaeatnpwd.org / e-mail : [email protected], [email protected]
mz;ziyg; Nghw;WNthk;!
2
nghwpahsh; mf;Nlhgh; 2020
Editorial
Promotion Panels & Court Orders
Promotion panels of Assistant Executive Engineers, Executive
Engineers in our department for this year 2020-21 are not approved
citing various Court Cases and Court Orders. Even though estimate of
vacancies of these panels are approved in right time, Court Cases /
Orders become a hurdle in the approval. The case of giving merit based
or roster based promotion divides our member Engineers and the
Government still unable to take a concrete decision in this issue.
The ultimate sufferer in this issue is our member Engineers who
are holding more additional charges and many of them who are not able
to get their promotion in due turn. Even route to temporary promotion
is blocked citing Court case (Stay Order). It is unclear whether the
Government or Court will alter their position in near future. We once
again appeal to those involved in these Court Cases to solve this issue
by accepting temporary promotion in this year.
- Editor
Jiwapy; Gjpajhf gzpakh;T ngw;w cjtpg; nghwpahsh;fs; ftdj;jpw;F
TNPSC 2020-k; Mz;L Gjpajhf gzpakh;T ngw;w cjtpg; nghwpahsh;fSld;
“GOOGLE MEET”-nrayp topahf topfhl;Ljy; $l;lk; tpiutpy; Vw;ghL nra;agl ,Ug;gjhy;> Gjpa cjtpg; nghwpahsh;fs; midtUk; jq;fSila ngah;> miyNgrp
vz;> kpd;dQ;ry; Kfthp (Mail ID) kw;Wk; gzpGhpAk; mYtyfk; Mfpatw;iw
[email protected] / [email protected] vd;w kpd;dQ;rYf;F mDg;gpitf;FkhW Nfl;Lf;nfhs;fpNwhk;.
,jw;F cjtpLkhW fpisr; rq;fg; nghWg;ghsh;fis Ntz;LfpNwhk;. Mrphpah;
3
nghwpahsh; mf;Nlhgh; 2020
ngUkjpg;gpw;FhpaPh;> Ngud;gpw;fpdpaPh;> tzf;fk;.
ekJ nghwpahsh;fspd; Cjpa tpfpjk; njhlh;ghf rk;gs FiwjPh;f;Fk;
FOtpd; ghpe;Jiufis mKy;gLj;j khz;GkpF jkpof Kjy;th; mth;fis
tpiutpy; Nehpy; re;jpj;J typAWj;jTs;Nshk; vd njhptpj;Jf;nfhs;fpNwhk;.
fhypahf cs;s cjtpr; nraw;nghwpahsh; (rptpy;) kw;Wk; nraw;nghwpahsh;
(rptpy;) gjtpfis jw;fhypf gjtp cah;T %yk; epug;gpl cs;s jilfis ePf;f
Kaw;rpfs; Nkw;nfhs;sg;gl;L tUfpd;wJ. tof;fpy; njhlh;Gila
nghwpahsh;fs; jq;fs; xj;Jiog;ig toq;fpLkhW Ntz;LfpNwhk;.
fz;fhzpg;Gg; nghwpahsh; (rptpy;) gjtp cah;T gl;baYf;F murpd;
xg;Gjiy tpiue;J ngw;wpl Kjd;ikj; jiyikg; nghwpahsh;> eP.M.m.> kw;Wk;
jiyikg; nghwpahsh; (nghJ)> nghgJ mth;fis Ntz;bAs;Nshk;.
Xa;T ngw;w mYtyh;fs; / nghwpahsh;fis gzpakh;j;jp Vw;gLj;jg;gl;Ls;s
‘jkpo;ehL ePh;ts ghJfhg;G kw;Wk; MWfs; rPuikg;Gf; fofk;” vd;w mikg;G
njhlh;ghf ekJ rq;fq;fspd; mtru khepy ikar; nraw;FO $l;lk;
10.10.2020 md;W ‘Google Meet” nrayp topahf elj;jg;gl;lJ. mf;$l;lj;jpy;
epiwNtw;wg;gl;l jPh;khdq;fs; ,t;tpjopy; gphpnjhU gf;fj;jpy;
ntspaplg;gl;Ls;sJ.
fpisr; rq;fg; nghWg;ghsh;fs; jq;fs; fpisr; rq;ff; $l;lq;fis elj;jp
,e;j Mz;bw;fhd Gjpa nghWg;ghsh;fis Njh;T nra;J jiyikr; rq;fj;jpw;F
njhptpj;jpl Ntz;LfpNwhk;.
kpf;f md;Gld;>
nghwpQh;.K.jdNrfud; nghwpQh;.fh.KUfd;
nghJr; nrayhsh;> cjtpg; nghwpahsh; rq;fk; nghJr; nrayhsh;> nghwpahsh; rq;fk;
nghJr; nrayhsh; kly;
14.10.2020
4
nghwpahsh; mf;Nlhgh; 2020
Minutes of the Urgent Central Executive Committee Meeting of AOE & AEA held on AOE & AEA office premises via “Google Meet app” 10.10.2020.
An urgent Combined Central Executive Committee Meeting of Association of
Engineers and Assistant Engineers’ Association was held on 10.10.2020 by about
10.35 AM via “Google Meet” app streaming from our Association office premises,
Chepauk, Chennai-5 to discuss the following subjects.
1) Opposing Employment of retired Engineers/Bureaucrat in the “Tamil Nadu Water Resources Conservation and Rivers Restoration Corporation”
2) VIIth Pay Commission – present Stage of PGRC. 3) Court Cases with respect to Promotion of Assistant Engineers to Assistant
Executive Engineers
4) Promotion panel of Executive Engineer, Superintending Engineer and Chief Engineer.
5) Any other Subjects. The meeting was presided by Er.K.Prabakar, President, AOE, the President
invited Er.K.Murugan, GS, AOE, to brief the members about the subject agenda.
Er.K.Murugan, GS, AOE and Er.M.Dhanasekaran, GS, AEA explained the members
about the subject agenda. The President, AOE invited CEC members to speak in
the subject agenda. The following parent body office bearers and CEC members
took part in the discussions.
Parent Body Office Bearers:
1. Er.S.Lal Bahadur, Joint Secretary, Office Admin, AOE 2. Er.M.Prabakaran, Secretary Office Admin, AEA 3. Er.M.Mathan, Treasurer, ENGIBEF, AOE & AEA 4. Er.V.Ponraj, Internal Auditor, AOE & AEA 5. Er.R.Jeyakumar, EC Member, AOE
CEC Members
1. Er.S.Anbarasan, President, AOE, Thanjavur Branch 2. Er.D.Rajan, Secretary, AEA, Pollachi Branch 3. Er.S.Palanivel, Secretary, AOE, Tirunelveli Branch 4. Er.S.Raja, Secretary, AOE, Virudhunagar Branch 5. Er.R.Kumar, Secretary, AEA, Erode Branch 6. Er.D.Chandrasekar, Secretary, AOE, Erode Branch
5
nghwpahsh; mf;Nlhgh; 2020
7. Er.S.J.Sivakumar, Secretary, AOE, Trichy Branch 8. Er.R.Varadharajan, Secretary, AEA, Trichy Branch 9. Er.N.Ananthan, Secretary, AOE, Thanjavur Branch 10. Er.R.Parameswaran, PEC Member, AEA on behalf of Madurai Branch 11. Er.P.Karthikeyan, Vice President, AEA on behalf of Karaikudi Branch 12. Er.Jister Kingsly, Secretary, AEA, Kanyakumari Branch
Er.M.Suganthi, Secretary, ENGIBEF, AOE briefed the members about the enrolment of members in the 5th Phase of ENGIBEF and the active interest shown by the branches in this regard.
She also requested all the CEC members to enroll more members in this scheme so as to increase the benefit to the family of deceased Engineers. Er.P.N.S.Mahesh Babu, Resident Engineer, PRI informed the CEC about the ongoing external plastering in one side of PRI building which was exposed due to the demolition of nearby building. He requested all the CEC members to collect the building fund for PRI, so as to improve the facilities in PRI and refund the loan obtained from ENGIBEF. After the detailed discussion the following resolutions were passed unanimously.
1. Resolved to request the Government to disband the “TN Water Resources Conservation and River Restoration Corporation” which is employed by retired bureaucrat / Engineers and which causes additional financial burden to the Government. To obtain external funding, a separate wing under a serving Chief Engineer may be created as Chief Engineer “External Aided Projects” and services of in service Engineers are utilized in this wing.
2. Resolved to meet Hon’ble Chief Minister of Tamil Nadu and request to implement 7th Pay Commission Pay Scales to our Engineers equivalent to the present Pay Scales receiving as per Court Orders.
3. Resolved to appeal to the Government to take effective steps for approval of Promotion Panel (2020-21) of Assistant Executive Engineer, Executive Engineer and Superintending Engineers in Public Works Department. Er.A.Abdul Khudus, President, AEA proposed vote of thanks on behalf of
Parent body and the meeting came to an end by 1.30 P.M.
Er.M.DHANASEKARAN Er.K.MURUGAN, General Secretary, AEA General Secretary, AOE
6
nghwpahsh; mf;Nlhgh; 2020
S.No. ENGIBEF No. Name & Address
1 V-176-CHE Er.R.Vijayan, AE, PWD, Buildings Maintenance Sec. MW, Egmore 2 V-177-ERD Er.P.Rajasekaran, AE, PWD, WRD, Fishing Harbour Project Sec. Ponneri
(O/D) 3 V-178-CHE Er.P.Rajendran, Chief Engineer, PWD, O&M, Chepauk, Chennai-5 4 V-179-CHE Er.S.Prabakaran, Chief Engineer, PWD, WRD, Ground Water,
Tharamani, Chennai-113 5 V-180-POL Er.D.Jayakumar, AE, PWD, WRD, Parambikulam Basin Div.
Vettaikaranpudur 6 V-181-MDU Er.A.Anbarasan, AE, PWD, WRD, Mining & Monitoring Sec. Melur 7 V-182-MDU Er.K.B.Kumar, AE, PWD, WRD, Quality Control Sec.-II, Madurai 8 V-183-CBE Er.A.Ramaraj, AE, PWD, Buildings (C&M) Taluk Sec. Coimbatore 9 V-184-CUD&VM Er.A.Imran Khan,AE, PWD, Buildings Const. Sec. MW, Villupuram 10 V-185-CUD&VM Er.S.Manivannan, EE, PWD,Buildings (C&M),MW Div. Kallakurichi 11 V-186-CBE Er.G.Nallathambi, AE, PWD, Technical Education Section-I,
GCT Campus, Coimbatore 12 V-187-CHE Er.P.Hepsiba, AE, PWD, WRD, PW Workshop & Stores, Chennai 13 V-188-CHE Er.B.Hema Shalini, AE, PWD, WRD, PW Workshop & Stores,
Chennai 14 V-189-CHE Er.D.Banushri, AE, PWD, WRD, PW Workshop & Stores, Chennai 15 V-190-MDU Er.M.Shamin Begam, AE, PWD, Buildings (C&M) Sec.
T.Kallupatti, Madurai 16 V-191-MDU Er.V.K.Karthikeyan, AE, PWD, WRD, Periyar Main Canal
Division, Melur, Madurai 17 V-192-CHE Er.D.John, AEE, PWD, Buildings (C&M) Circle, MW, Chennai-5 18 V-193-CHE Er.S.Senthilkumar, AE, PWD, Buildings P&D Circle, Chennai-5 19 V-194-CHE Er.K.Stalin, AE, PWD, WRD, SPMU, DRIP, Chennai-5 20 V-195-MDU Er.C.Selvam, AEE, PWD, WRD, Periyar Vaigai Sub Div.II, Madurai 21 V-196-MDU Er.M.Mayakrishnan, AE, PWD, WRD, Periyar Vaigai Basin Sec.II,
Madurai 22 V-197-MDU Er.A.Pandian, AE, PWD, WRD, Gundar Basin Division, Madurai 23 V-198-MDU Er.S.Balamurugan, DSE, PWD, Buildings (C&M) Circle, Madurai 24 V-199-MDU Er.E.Ramaprabah, AE, PWD, Buildings (C&M) Circle, Madurai 25 V-200-MDU Er.R.Mahima Mathi, AE, PWD, WRD, QC Division, Madurai 26 V-201-MDU Er.S.Rajathi, AE, PWD, WRD, Environmental Cell Division, Madurai 27 V-202-DMP Er.M.Ponnivalavan, AE, PWD, WRD, Upper Vaippar Basin Sub
Divison, Hosur
ENGIBEF PHASE-V –SCHEME
7
nghwpahsh; mf;Nlhgh; 2020
28 V-203-CHE Er.R.Pandy, EE, PWD, North Presidency Division, Chennai 28 V-204-CHE Er.S.Arulmozhi Poongothai, AE, PWD, P&D Circle, Chennai 29 V-205-CBE Er.M.Anitha, AE, PWD, Buildings Const. Sec.-I, Coimbatore 30 V-206-CBE Er.B.Sivakumar, EE, PWD, Buildings (C&M) Division, Ooty 31 V-207-CBE Er.S.Gowthaman, AE, PWD, Buildings (C&M) Raj Bhavan Section,
Ooty 32 V-208-CBE Er.V.Senthur, AEE, PWD, Technical Education Sub Div. Salem
33 V-209-CBE Er.K.Alagirisamy, AEE, PWD, Technical Education Sub Div.I, Coimbatore
34 V-210-CBE Er.G.Saravanakumar, AE, PWD, Technical Education Sub Division, Coimbatore
35 V-211-CBE Er.A.Vijayalakshmi, AE, PWD, Technical Education Sec.-III, Coimbatore
36 V-212-CBE Er.S.Ramesh, AE, PWD, Technical Education Division, Coimbatore 37 V-213-TNJ Er.P.Murugavel, EE, PWD,WRD, Vennar Basin Division, Thiruvarur 38 V-214-MDU Er.K.Poovendiran, AE, PWD, Buildings (C&M) Div. MW, Madurai 39 V-215-MDU Er.K.Jothibasu, AEE, PWD, TPA, Buildings (C&M) Circle, Madurai 40 V-216-MDU Er.P.Beulah, AEE, PWD, O/o CE, Thallakulam, Madurai 41 V-217-MDU Er.S.Ilango, EE, PWD, WRD, P&D Division, Madurai 42 V-218-MDU Er.K.Govindaraju, AE, PWD, Periyar Vaigai Sub Div.II, Madurai 43 V-219-MDU Er.A.Balamurugan, AEE, PWD, WRD, WSMB, Sub Div. Madurai 44 V-220-MDU Er.S.Karthikeyan, AE, PWD, WRD, O/o CE, WRD, MR, Madurai 45 V-221-MDU Er.N.Karthigai Balan, AEE, PWD, WRD, QC, Sub Div. Theni 46 V-222-MDU Er.S.Ganga Devi, AE, PWD,WRD, Environmental Sub Div. Madurai 47 V-223-MDU Er.S.Elakkuvabhoopathi, DCE, PWD O/o CE, Buildings,
Madurai Region, Madurai 48 V-224-MDU Er.V.Sugumaran, EE, PWD, Buildings (C&M) Division, Madurai 49 V-225-CHE Er.M.Prabakaran, AE, PWD, WRD, SM&R Division, Chennai-5 50 V-226-SLM Er.P.Mahavishnu, AEE, PWD, Buildings (Const.) Sub Div. Karur 51 V-227-CHE Er.V.Veeralakshmi, EE, PWD, WRD, SPMU, DRIP, Chennai-5 52 V-228-CBE Er.A.M.Gowrisankar, AE, PWD, WRD, Spl. Pro. Sub Div.I,
Kunnathur 53 V-229-CBE Er.N.Sakthi, AE, PWD, WRD, Spl. Pro. Sub Div., Kunnathur 54 V-230-CBE Er.P.Arumugam, AE, PWD, WRD, WSMB Sub Div. Coimbatore 55 V-231-MDU Er.S.Sudharsana Vani, AE, PWD,WRD, QC Division, Madurai 56 V-232-MDU Er.M.Karthikeyan, EE, PWD,WRD, Manjalar Basin Division,
Periyakulam 57 V-233-MDU Er.N.Jeyamathi, AEE, PWD, WRD, Periyar Vaigai Basin Division,
Madurai
8
nghwpahsh; mf;Nlhgh; 2020
58 V-234-MDU Er.A.Sekaran, AE, PWD,WRD, Manjalar Basin Div. Periyakulam 59 V-235-MDU Er.K.Piran, EE, PWD,WRD, Mining & Monitoring Division, Madurai 60 V-236-MDU Er.S.Maheswaran, AE, PWD, WRD, QC Sub Div. Ramnad 61 V-237-POL Er.S.Kumaresan,AE, PWD, WRD, Spl. Project Division, Perundurai 62 V-238-MDU Er.S.Nithya, AE, PWD, WRD, Link Canal Sub Division, Usilampatti 63 V-239-MDU Er.K.Hariharasudhan, AE, PWD, WRD, Periyar Main Canal Sec.
Chittenpatti, Madurai 64 V-240-MDU Er.S.Natarajan, AE, PWD, WRD, QC Sub Div.-I, Madurai 65 V-241-MDU Er.I.Bharathi Kannan, AE, PWD, WRD, QC Sub Div. Madurai 66 V-242-MDU Er.A.H.Radha Krishnan, AE, PWD, WRD, Periyar Vaigai Basin
Division, Madurai 67 V-243-MDU Er.M.R.Navamani, AE, PWD, WRD, Ground Water Circle, Madurai 68 V-244-CHE Er.G.D.Vijay Raghavan, AE, PWD, WRD, Cooum Sub Division,
Chepauk, Chennai-5 69 V-245-KKD Er.C.Balamurugan, AE, PWD, WRD, Manimuthar Basin Sub
Division, Karaikudi 70 V-246-KKD Er.S.Arunya, AE, PWD, WRD, Kottakaraiyar Sub Div. Ilyankudi 71 V-247-KKD Er.S.Rajalakshmi, AE, PWD, WRD, Saruguniyar Basin Sub
Division, Sivagangai 72 V-248-KKD Er.J.Muthuramalingam, AE, PWD, WRD, Saruguniyar Basin
Sub Division, Sivagangai 73 V-249-KKD Er.M.Amuthasurabi, AE, PWD, WRD, Saruguniyar Basin Sub
Division, Sivagangai 74 V-250-KKD Er.K.Sampath Kumar, AE, PWD, WRD, Saruguniyar Basin Sub
Division, Sivagangai 75 V-251-KKD Er.K.Amutha, AE, PWD, WRD, Saruguniyar Basin Sub Division,
Manamadurai 76 V-252-KKD Er.S.Prashanth, AE, PWD, WRD, P&D Division, Karaikudi 77 V-253-KKD Er.K.Prathab, AE, PWD, WRD, P&D Division, Karaikudi 78 V-254-KKD Er.M.Kannan, AE, PWD, WRD, Saruguniyar Basin Sub Division,
Sivagangai 79 V-255-KKD Er.C.Malarvizhi, AEE, PWD, WRD, Saruguniyar Basin Sub
Division, Sivagangai 80 V-256-TRY Er.S.Revathi, AE, PWD, WRD, Quality Control Division, Trichy 81 V-257-TRY Er.G.Vidhya, AE, PWD, WRD, Quality Control Sub Division, Trichy 82 V-258-TNJ Er.N.S.Ravichandran, EE, PWD, Buildings (C&M) Div. Thanjavur 83 V-259-TNJ Er.T.Bhuvaneswari, AE, PWD, Buildings (C&M) Section South,
Orathanadu 84 V-260-TNJ Er.J.Chinthanai, AE, PWD, Buildings (C&M) Section, Peraurani 85 V-261-TNJ Er.R.Singaravelan, AE, PWD, Buildings (C&M) Section (Town),
Pattukottai
9
nghwpahsh; mf;Nlhgh; 2020
86 V-262-TNJ Er.M.Ragu, AE,PWD, Buildings (C&M) Sec.(Town South), Thanjavur 87 V-263-TNJ Er.C.Dhileephan, AE, PWD, Buildings (C&M) Section (Town
North), Thanjavur 88 V-264-TNJ Er.M.Banupriya, AE, PWD, Buildings (C&M) Section (East),
Kumbakonam 89 V-265-TNJ Er.A.Vivek, AE, PWD, Buildings (C&M) Section, Papanasam 90 V-266-TNJ Er.B.Karthikeyan, AE, PWD, Buildings (C&M) Section (Rural)
Mannargudi 91 V-267-CBE Er.S.Santhosh Kumar, AE, PWD, WRD, Special Project Sub
Division-III, Avinashi 92 V-268-CBE Er.G.Jegatheesh, AE, PWD, WRD, Special Project Sub Division-I,
Kunnathur 93 V-269-TNJ Er.N.Singaram, AE, PWD, Buildings (C&M) Sec. Town, Mannargudi 94 V-270-TNJ Er.G.Saravanan, AE, PWD, WRD, Mining & Monitoring Sec. Thiruvaikavur 95 V-271-TRY Er.P.Kamalakannan, AE, PWD, WRD, P&D Sub Division, Ariyalur
We request our member engineers who have not enrolled so far in ENGIBEF Phase V Modified Scheme to enroll as full-fledged member by remitting the amount through core banking system ‘ENGIBEF, SBI, A/C No.10031641514 of PWD Complex Branch (IFSC Code SBIN0006489), Chennai” or through branch offices in Cash / Cheque / Demand Draft. We solicit your earnest co-operation to enroll in this Scheme & assist the deceased Engineers’ family.
“We expect more members to enroll in ENGIBEF PHASE V” Er.M.Mathan Er.M.Suganthi Treasurer/ENGIBEF Secretary/ENGIBEF
Sl.No Name Amount Remarks 1 Er.A.Muthaiya
SE, PWD, WRD, Palar Basin Circle, Chennai 25,000 PRI Renovation Work
2 Er.A.Kalimuthu Former Superintending Engineer, PWD 2,000 On the eve of his retirement
We thank all the Engineers for their contribution - Editor
,uq;fy;: jpUkjp.T.M.K.mk;khs;> taJ 91 (nghwp.G.FkNurd;;> Kd;dhs; rpwg;Gj; jiyikg; nghwpahsh;> nghgJ> mth;fspd; md;Gj; jhahh;) mth;fs; 21.09.2020 md;W ehfh;Nfhtpypy; fhykhdhh; vd;gij kpFe;j tUj;jj;Jld; njhptpj;Jf;nfhs;fpNwhk;. jdJ jhahiu ,oe;J tUe;Jk; nghwp.G.FkNurd; mth;fSf;Fk; mth;jk; FLk;gj;jhUf;Fk; ek;Kila Mo;e;j ,uq;fiyj; njhptpj;Jf;nfhs;fpNwhk;. nghwp.A.Kj;J> taJ 60> Kd;dhs; fz;fhzpg;Gg; nghwpahsh;> Nfhak;Gj;J}h; mth;fs; 13.10.2020 md;W Nfhak;Gj;J}hpy; fhykhdhh; vd;gij kpFe;j tUj;jj;Jld; njhptpj;Jf;nfhs;fpNwhk;. md;dhiu ,oe;J tUe;Jk; mth;jk; FLk;gj;jhUf;F ek;Kila Mo;e;j ,uq;fiyj; njhptpj;Jf;nfhs;fpNwhk;. - Mrphpah;
SPECIAL CONTRIBUTION
10
nghwpahsh; mf;Nlhgh; 2020
Dear Engineer,
It has been brought to our knowledge that, Confidential Report of
many of our member Engineers for the period ending 31.03.2020 was not
written till date due to lock down.
We request you to write the Confidential Report for all
Assistant Engineers, Assistant Executive Engineers and Executive
Engineers, send the same to the Engineer-in-Chief, WRO & Chief Engineer
(General), PWD without any further delay.
Kindly ignore this letter if Confidential Report is already written by
you for the period up to 30.03.2020.
With kind regards, Yours truly,
Er.K.Murugan,
General Secretary, AOE To,
1. All the Chief Engineers, Superintending Engineers, Executive Engineers of TNPWD
2. All Branches of AOE & AEA 3. All Parent Body office bearers of AOE & AEA
S.No. Name of the Engineer Promotion & Postings 1. Er.S.Anbazhagan Electrical Engineer, PWD, Electrical
Division, Trichy
Our Hearty Congratulations to the above Engineer for their promotions – Editor
rq;fj;jpd; Nfhhpf;iff; fbjq;fs;
Promotion and Postings of Assistant Executive Engineer (Electrical) to Electrical Engineer vide G.O.(D) No.157, Public Works (A2) Department, dated 03.10.2020
11
nghwpahsh; mf;Nlhgh; 2020
fk;
nghJg;gzpj;Jiw nghwpahsh;fs; Cjpa tpfpjk; njhlh;ghf khz;GkpF ePjpaurh;
jpU.D.KUNfrd ;> Kd;dhs; jiyik ePjpgjp> nly;yp cah;ePjpkd;wk; mth;fs; jiyikapy;
mikf;fg;gl;l Cjpa Fiw jPh;f;Fk; FO fle;j 07.09.2020 md;W jq;fs; ghpe;Jiufis
khz;GkpF Kjy;th; mth;fsplk; Nehpy; toq;fpAs;sJ.
nghJg;gzpj;Jiw nghwpahsh;fSf;F 7-tJ Cjpaf; FOtpd; Cjpa tpfpjq;fis
toq;fpLk; Nkw;fz;l Cjpaf;Fiw jPh;f;Fk; FOtpd; ghpe;Jiufis mky;gLj;jpLk; NghJ
nghwpahsh;fs; jw;NghJ ngw;WtUk; 6-tJ Cjpaf; FOtpd; fPo;f;fz;l Cjpa
tpfpjq;fSf;F ,izahf toq;fpLkhW khz;GkpF jkpof Kjy;th; mth;fis gzpTld;
NfhUfpNwhk;.
gjtp jw;NghJ ngw;WtUk; 6tJ Cjpa FOtpd; Cjpa
tpfpjq;fs;
7-tJ Cjpaf; FOtpd; ,izahd Cjpa tpfpjk;
cjtpg; nghwpahsh; &.15600 - 39100 + 5400 (GP) &.56100 - 177500 cjtpr; nraw;nghwpahsh; &.15600 - 39100 + 6600 (GP) &.59300 - 187700
nraw;nghwpahsh; &.15600 - 39100 + 7600 (GP) &.61900 - 196700
Nkw;fz;l Cjpa tpfpjj;ij gpw muR Copah;fSf;F toq;fpaJ Nghy; fle;j
01.01.2016 Kjy; fUj;jpayhfTk; 01.10.2017 Kjy; gzg;gyd;fSlDk; toq;fpLkhW
gzpTld; NfhUfpNwhk;.
kpf;f md;Gld;>
jq;fs; cz;ikAs;s>
nghwp.fh.KUfd;> nghJr; nrayhsh;> nghwpahsh; rq;fk;>
jkpo;ehL nghJg;gzpj;Jiw
khz;GkpF ePjpaurh; jpU.D.KUNfrd;> Kd;dhs; jiyik ePjpgjp> nly;yp cah;ePjpkd;wk; mth;fs; jiyikapy; mikf;fg;gl;l Cjpa Fiw jPh;f;Fk; FOtpd; ghpe;Jiufs; - nghJg;gzpj;Jiw nghwpahsh;fSf;F 7tJ Cjpaf; FOtpd; Cjpa tpfpjq;fis toq;f NfhUtJ - njhlh;ghf - khz;GkpF jkpof Kjy;th; mth;fs;> jkpo;ehL muR> jiyikr; nrayfk;> nrd;id-9 mth;fSf;F vOjpa fbj vz;.fbj vz;.002/ngh.nr.ngh.r/185-2020 Njjp : 08.10.2020
12
nghwpahsh; mf;Nlhgh; 2020
ABSTRACT
Establishment - Public Works Department - Formation of Special Project Division at Kulithalai under the control of Chief Engineer, Trichy Region, Water Resources Department by redeployment - Orders – Issued
PUBLIC WORKS (F1) DEPARTMENT G.O.(D) No.137 Dated:21.08.2020 Read:
From the Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department, Letter No.AEE / T1 / AE 3 / 22571 / 2020, dated 23.6.2020
ORDER:
In the letter read above, the Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department has stated that the scheme Inter-Linking of Cauvery - Agniyar - South Vellar - Manimuthar - Vaigai - Gundar Canal was prepared for “Peninsular River Link Surplus’ by the National Water Development Agency of the Government of India. Under this scheme, a barrage was constructed during 2014 across the river Cauvery in Mayanur village of Karur District. It is now proposed to construct a flood carrier canal taking off from the downstream of this barrage to divert the flood water of the river Cauvery to South Vellar river. 2. He has further stated that in G.O.(Ms.)No.101, Public Works Department, dated 27.04.2020, the Government have accorded sanction for acquisition of 572.56.0 hectares of patta lands and transfer of 83.80.0 hectares of Poramboke lands in Pudukkottai District for the formation of a Flood Carrier Canal from Cauvery (Kattalai) to South Vellar river to divert the flood water for the benefit of the drought prone area. 3. For carrying over the above work the Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department has proposed to form a Division at Kulithalai under the control of Superintending Engineer, Special
GOVERNMENT ORDERS
13
nghwpahsh; mf;Nlhgh; 2020
Project Circle, Trichy under the control of the Chief Engineer, Trichy Region, Water Resources Department by redeploying the Thervaikandigai Reservoir Project Division, Thiruvallur along with its Sub Division No.II, III and IV at Thiruvallur to Kulithalai. He has also proposed to attach the Sub Division No.I at Thiruvallur to Kosasthalaiyar Basin Division at Thiruvallur for carrying over the remaining works and maintaining the records and files pertaining to Thervaikandigai Reservoir Project Division, Thiruvallur. The Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department further informed that the expenditure towards shifting of offices can be met out from the available budget provision under respective office contingencies. Hence, no additional funds and no additional staff will be required. The Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department has requested the orders of the Government on the above proposals. 5. The Government after careful examination of the proposals of the Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department, decided to accept them. The Government accord sanction for the formation of Special Project Division at Kulithalai, under the Control of Chief Engineer, Water Resources Department, Trichy Region for carrying over the work of formation of a Flood Carrier Canal, from Cauvery (Kattalai) to South Vellar river, to divert the flood water for the benefit of the drought prone area, by redeploying Thervaikandigai Reservoir Project Division, Thiruvallur along with its Sub divisions No.II, III and IV at Thiruvallur from the Thervaikandigai Reservoir Project Division, Thiruvallur and attach it to Kosasthalaiyar Basin Division at Thiruvallur, for carrying over the remaining works, maintaining of the records and files pertaining to Thervaikandigai Reservoir Project as detailed in the Annexur I, II and III to this order, subject to the condition that revival / creation of any division for Thervaikandigai Reservoir Project, Thiruvallur will not be entertained. 6. This order issues with the concurrence of Finance Department - vide its U.O.No.26543/Fin(PW II)2020, dated 19.082020.
(BY ORDER OF THE GOVERNOR)
K.MANIVASAN PRINCIPAL SECRETARY TO GOVERNMENT
14
nghwpahsh; mf;Nlhgh; 2020
ANNEXURE - I G.O.(D)No.137, Public Works (F1) Department, dated 21.08.2020
Formation of Special Project Division at Kulithalai
S. No.
Division/ Sub Division
Circle/ Division Region
Division/Sub Division
Circle/ Division Region
1. Thervaikandigai
Reservoir Project
Division, Tiruvallur
Palar Basin Circle, Chennai
Chennai Region, WRD
Special Project Division at Kulithalai
Special Project Circle, Trichy
Trichy Region WRD
2. Thervaikandigai
Reservoir Project
Sub Division-II, Tiruvallur
Thervaikandigai
Reservoir Project
Division, Tiruvallur
Chennai Region, WRD
Special Project Sub Division at Kulithalai
Special Project Circle, Trichy
Trichy Region WRD
3. Thervaikandigai
Reservoir Project
Sub Division-III, Tiruvallur
Thervaikandigai
Reservoir Project
Division, Tiruvallur
Chennai Region, WRD
Special Project Sub Division at Mayanur
Special Project Circle, Trichy
Trichy Region WRD
4. Thervaikandigai
Reservoir Project
Sub Division-IV, Tiruvallur
Thervaikandigai
Reservoir Project
Division, Tiruvallur
Chennai Region, WRD
Special Project Sub Division at Viralimalai
Special Project Circle, Trichy
Trichy Region WRD
5. Thervaikandigai
Reservoir Project
Sub Division-I, Tiruvallur
Thervaikandigai
Reservoir Project
Division, Tiruvallur
Chennai Region, WRD
Thervaikandigai
Reservoir Project
Sub Division-I, Tiruvallur
Kosasthalaiyar Basin Division at Tiruvallur
Chennai Region WRD
K.MANIVASAN PRINCIPAL SECRETARY TO GOVERNMENT
15
nghwpahsh; mf;Nlhgh; 2020
ANNEXURE - II G.O.(D)No.137, Public Works (F1) Department, dated 21.08.2020
Redeployment of Thervaikandigai Reservoir Project Division, Tiruvallur, with Sub Division II, III and IV at Tiruvallur under the Palar Basin Circle, Chennai from the control of the
Chief Engineer, Chennai Region, WRD as Special Project Division, Kulithalai with Sub Divisions at Kulithalai, Mayanur and Viralimalai under
Special Project Circle, Trichy under the control of Chief Engineer, Trichy Region, WRD Name of the Region / Wing Trichy Region, WRD Name of the Circle Special Project Circle, Trichy Head of Account 2701 Medium Irrigation - 80 General - 001 Direction and Administration - State’s
Expenditure - AH Executive Establishment - Special Divisions under WRD
(DPC 2701 80 001 AH 30000)
S. No.
Name of Post
Divison Sub Division at Kulithalai
Sub Division at Mayanur
Sub Division at Viralimalai
Total
Ty Ty Ty Ty Ty
Pt
Sanc
tion
ed
Vaca
nt
Mor
e th
an 2
yea
rs
Pt
Sanc
tion
ed
Vaca
nt
Mor
e th
an 2
yea
rs
Pt
Sanc
tion
ed
Vaca
nt
Mor
e th
an 2
yea
rs
Pt
Sanc
tion
ed
Vaca
nt
Mor
e th
an 2
yea
rs
Pt
Sanc
tion
ed
Vaca
nt
Mor
e th
an 2
yea
rs
1 Executive Engineer 1 1 0 2 Asst.Exe.Engineer 1 1 1 3 0 3 AE/JE 2 4 3 3 12 0 4 Senior Draughting
Officer 1 1 0
5 Draughting Officer 1 1 0 6 Junior Draughting
Officer 4 0 4
7 Assistant Draughtsman
1 0 1
8 Divisional Accountant
1 1 0
9 Superintendent 1 1 0 10 Assistant 4 3 4 3 11 Junior Assistant 2 5 2 5 12 Typist 1 0 1 13 Steno Typist 1 0 1 14 Record Clerk 1 0 1 15 Office Assistant 11 0 11 16 Watchman 2 1 2 17 Driver 2 1 1 2 18 Store Keeper 0 0 Total 14 31 5 0 0 4 0 0 5 0 0 28 31
K.MANIVASAN PRINCIPAL SECRETARY TO GOVERNMENT
16
nghwpahsh; mf;Nlhgh; 2020
ABSTRACT
Establishment – Water Resources Department – Revival of 87 numbers of temporary posts of Assistant Engineer (Civil) left un-filled for more than two years in the Divisions Establishments of the Water Resources Department – Orders – Issued.
PUBLIC WORKS (F1) DEPARTMENT G.O.(2D) No.50 Dated:11.09.2020 Read:
1. G.O.(Ms) No.04, Public Works Department, Dated 08.01.2019 2. G.O.(Ms) No.144, Public Works Department, Dated 26.09.2019 3. G.O.(Ms) No.145, Public Works Department, Dated 30.09.2019 4. From the Engineer-in-Chief, Water Resources Department and
Chief Engineer (General), Public Works Department, Chennai, Letter No.AEE/T1/AE-2/25389(Revival)/2019, dated 21.11.2019 and 30.01.2020
5. From the Engineer-in-Chief, Water Resources Department and Chief Engineer (General), Public Works Department, Chennai, Letter No.AEE/T1/AE-2/25389(Revival)/2019, dated 22.05.2020
ORDER: In the Government Order first read above, sanction was accorded for
further continuance of 3129 numbers of various temporary posts, in the
Division Establishments of the Water Resources Department for a period of
three years from 01.01.2016 to 31.12.2018, subject to the condition that the
posts which were kept vacant for more than two years should be filled up only
after obtaining the approval for revival of the posts from the Government.
2. In the letter fourth read above, the Engineer-in-Chief, Water
Resources Department and Chief Engineer (General), Public Works
Department, Chennai has sent a proposal for filling up of 87 numbers of
temporary posts of Assistant Engineer (Civil) that were not continued in the
Division Establishments of the Water Resources Department. He has also
17
nghwpahsh; mf;Nlhgh; 2020
stated that in Government Order first read above, continuance had not been
sanctioned for 96 numbers of posts of Assistant Engineer (Civil), since the said
posts were kept vacant for more than two years.
3. In the Government Order second read above, among others, sanction
has been accorded for further continuance of 7 numbers of posts of Assistant
Engineer upto 31.12.2021. In the Government Order third read above, among
others, sanction has been accorded for 2 numbers of posts of Assistant
Engineer that were erroneously included in the list of posts vacant for more
than two years in the Government Order first read above.
4. The Engineer-in-Chief, Water Resources Department and Chief
Engineer (General), Public Works Department, Chennai has also stated that
the Tamil Nadu Public Service Commission vide its Notification No.18/2019,
dated 29.05.2019, has, among others, invited for applications for direct
recruitment of 129 numbers of posts of Assistant Engineer (Civil).
5. The Engineer-in-Chief, Water Resources Department and Chief
Engineer (General), Public Works Department, Chennai has therefore,
requested permission to fill up the 87 numbers of temporary posts of Assistant
Engineer (Civil) in various Divisions in the Water Resources Department.
6. While the above proposals is under consideration of the Government,
the Engineer-in-Chief, Water Resources Department and Chief Engineer
(General), Public Works Department, in his letter fifth read above has stated
that appointment orders have already been issued to the candidates allotted
by the TNPSC ON 04.02.2020 and joined duty in Sections where they had been
posted which includes the 87 numbers of Assistant Engineer temporary posts
in the Division Establishment of Water Resources Department. He has further
stated that the above said posts are essential as the Government have
accorded sanction for construction of 11 numbers of new Medical Colleges and
Hospitals in the various districts of the State and also in anticipation of
18
nghwpahsh; mf;Nlhgh; 2020
essential works to be carried out in the newly bifurcated districts and for
carrying out the Kudimaramath works in Water Resources Department. He has
further stated that many Assistant Engineers of Water Resources Department
are diverted for carrying over the medical works related to COVID-19. He has
therefore, requested the Government to ratify his action of having filled the 87
numbers of temporary post of Assistant Engineers in Water Resources
Department.
7. The Government after careful examination have decided to accept the
proposal of the Engineer-in-Chief, Water Resources Department and Chief
Engineer (General), Public Works Department, Chennai. Accordingly, sanction
is accorded for revival of 87 numbers of temporary posts of Assistant Engineer
(Civil) in the Division Establishments of the Water Resources Department as
detailed in the Annexure to this Order, for filling the said posts, which are
essentially required at present. The Government also ratify the action of the
the Engineer-in-Chief, Water Resources Department and Chief Engineer
(General), Public Works Department in having filled 87 numbers of temporary
posts of Assistant Engineer (Civil) in the Division Establishments of Water
Resources Department in anticipation of revival of such temporary posts
vacant for more than two years.
8. The Engineer-in-Chief, Water Resources Department and Chief
Engineer (General), Public Works Department, is hereby instructed not to take
such precipitate action without orders of the Government in future and prevent
a fait accompli.
9. This order issues with the concurrence of Finance Department vide its
U.O.No.24985/PW-II/2020, dated 09.09.2020.
(BY ORDER OF THE GOVERNOR)
K.MANIVASAN PRINCIPAL SECRETARY TO GOVERNMENT
19
nghwpahsh; mf;Nlhgh; 2020
ANNEXURE G.O. (2D) No.50, Public Works (F1) Department, dated 11.09.2020
Sl. No. Office Address Circle Region
Number of Assistant Engineer
Post
Head of Account
1 Krishna Water Supply Project
Division-I, Chennai
Palar Basin Circle
Chennai Region
4 2215 Water Supply and Sanitation – 01 Water Supply – 101 Urban Water Supply Programme – State’s Expenditure – AQ
Water Supply to Chennai City from Krishna River (IFHRMS DPC 2215 01 101 AQ 30000)
2 Upper Palar Basin Division, Vellore
Project Circle, Vellore
Chennai Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions Under WRD (IFHRMS DPC 2801 80 001 AF 30000)
3 Varattar Reservoir Project Division,
Harur
Project Circle, Vellore
Chennai Region
3 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishments – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
4 Programme Management Unit,
Trichy
Trichy Region
3 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
5 South Vellar Basin Division,
Pudukottai
Middle Cauvery Basin Circle, Trichy
Trichy Region
2 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
6 Cauvery Basin Division (East), Myladuthurai
Lower Cauvery Basin
Circle, Thanjavur
Trichy Region
4 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
7 Vennar Basin Division,
Thanjavur
Lower Cauvery Basin
Circle, Thanjavur
Trichy Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
8 Periyar Dam Special Division,
Cumbum
Periyar Vaigai Basin Circle,
Madurai
Madurai Region
7 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
9 Ex-Zamin Tank Standardisation
Division, Karaikudi
Lower Vaigai Basin Circle, Sivagangai
Madurai Region
10 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
10 Upper Vaippar Basin Division, Rajapalayam
Vaippar Basin Cirle,
Virudhunagar
Madurai Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
11 Gundar Basin Division, Madurai
Vaippar Basin Circle,
Virudhunagar
Madurai Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
12 Special Project Division,
Virudhunagar
Vaippar Basin Circle,
Virudhunagar
Madurai Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
13 Thamirabarani Basin Division,
Tirunelveli
Thamirabarani Basin Circle,
Tirunelveli
Madurai Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
14 Special Project Division,
Ambasamudram
Special Project Circle,
Palayamkottai
Madurai Region
11 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
15 Special Project
Division, Nanguneri
Special Project Circle,
Palayamkottai
Madurai Region
5 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
16 Special Project Division,
Tirunelveli
Special Project circle,
Palayamkottai
Madurai Region
8 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
17 Nambiyar Reservoir Project
Division, Valliyoor
Special Project Circle,
Palayamkottai
Madurai Region
8 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AH Executive
Establishment – Special Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
20
nghwpahsh; mf;Nlhgh; 2020
18 Parambikulam Basin Division, Parambikulam
Parambi-kulam Aliyar Basin Circle,
Pollachi
Coimba-tore
Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
19 Nanganjiar Basin Division, Palani
Special Project Circle, Palani
Coimba-tore
Region
1 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AF Executive
Establishment (Territorial) Divisions under WRD (IFHRMS DPC 2701 80 001 AH 30000)
20 Hydraulics Division, Poondi (Machinery Sub
Division, Chennai)
Institute of Hydraulics & Hydrology,
Poondi
Designs Research
and Construc-
tion Support
3 2701 – Medium Irrigation – 80 General – 004 Research – State’s Expenditure – AA Irrigation Research Experiments
(IFHRMS DPC 2701 80 004 AA 30000)
21 Executive Engineer &
General Superintendent P.W.Workshop,
Chennai
Workshop & Stores Circle,
Chennai
Operation &
Mainten-ance
Chennai
1 2059 – PUBLIC WORKS – 80 General – 105 Public Works Workshops – State’s Expenditure – AD Workshop
Establishment (IFHRMS DPC 2059 80 105 AD 30000)
22 Dam Safety Division
Dam Safety Directorate,
Chennai
Operation &
Mainten-ance
Chennai
10 2701 – Medium Irrigation – 80 General – 001 Direction and Administration – State’s Expenditure – AN State Dam Safety Directorate
(IFHRMS DPC 2701 80 001 AN 30000)
87
K.MANIVASAN Principal Secretary to Government
Dear Engineer,
We wish to inform that we are finalizing printing of Engineer’s Diary 2021 and Engineer’s Calendar 2021 and have to place order on or before 31.10.2020.
We also request the branches to send the list of Branch Office Bearers for the year 2020-2021 to the Parent body on or before 31.10.2020 so as to enable us to include the same in the Engineer’s Diary 2021.
We wish to add that if the list of Branch Office Bearers for the year 2020-2021 is not received in the stipulated time (or or before 31.10.2020). We have no other option except to print the previous year list of Branch Office bearers in the Engineer’s Diary 2021.
We also request the Branches of AOE & AEA to furnish the Membership strength & correct requirements of Engineers Diary, Engineers Calendar, Complimentary Diary for their members to the parent body on or before 31.10.2020.
With kind regards, Yours truly, Er.K.Murugan,
General Secretary, AOE All Branches of AOE & AEA
21
nghwpahsh; mf;Nlhgh; 2020
ABSTRACT Establishment – Water Resourcs Department – Buildings Organisation – Shifting of Head Quarters of the Sub-Divisions / Sections In-charge of building works – Delegation of powers to Superintending Engineers of Buildings Organisation of Public Works Department – Orders – Issued.
PUBLIC WORKS (G2) DEPARTMENT G.O.(D) No.151 Dated:21.09.2020 Read:
1. G.O.(Ms)No.969, Public Works Department, Dated 07.08.1978 2. G.O.(D) No.483, Public Works Department, Dated 23.09.2005 3. G.O.(D) No.528, Public Works Department, Dated 17.10.2008 4. G.O.(D) No.81, Public Works Department, Dated 24.02.2012
Read also: 5. From the Engineer-in-Chief, (Buildings) and Chief Engineer (Buildings),
Chennai Region, Public Works Department, Letter No.AEE/T10/42067/2011, dated 29.05.2020
ORDER:
In the Government Order first read above, orders were issued that the Superintending Engineers of Public Works Department in-charge of execution of Building works, be vested with powers to approve, wherever necessary, of the shifting of the Headquarters of Sub-Divisions and sections in charge of execution of Building works, even when extra expenditure is involved, in relaxation of the provisions of the note in paragraph 59 of the Tamil Nadu Travelling Allowance Rules. It was also ordered that the delegation of powers will be in force for a period of three years from the date of that order and the Superintending Engineers should send a report to the Chief Engineer, Buildings, whenever such changes are affected.
2. In the Government Order fourth read above, orders were issued that the delegation of powers to the Superintending Engineers of Buildings Organisation of Public Works Department for shifting head quarters of sections and Sub-Divisions wherever necessary shall be continued for a further period of three years from 07.08.2011 to 06.08.2014 (inclusive of both days) subject to the recommendations and re-organisation of Buildings Organisation of Public Works Department.
22
nghwpahsh; mf;Nlhgh; 2020
3. In his letter fifth read above, the Engineer-in-Chief (Buildings) and Chief Engineer (Buildings), Chennai Region, Public Works Department, Chennai has
stated that from the year 2014, the necessity of shifting of head quarters / sections did not arises and much at present many new schemes such as
Construction of 11 Numbers of New Government Medical Colleges, Construction of Integrated Animal Husbandry Project at Thalaivasal Cootu Road, Construction New
Collectorate Buildings, etc., have been sanctioned by Government and are under progress. Hence, shifting of Head quarters / Sections have to be done based on
the necessity, accessibility and workload, etc. The delegation of powers to Superintending Engineers of Public Works Department is issued to act swiftly to
change the Head Quarters of Sections / Sub-Divisions according to site conditions so as to avoid extra expenditure to Government.
4. The Engineer-in-Chief (Buildings) and Chief Engineer (Buildings),
Chennai Region, Public Works Department, Chennai has requested orders of the Government for delegation of powers to Superintending Engineers of Public Works Department, Building Organisation permanently for shifting the Head Quarters of
Sub-Divisions / Sections wherever necessary, with effect from the date of issue of Government Order.
5. The Government after careful examination, accept the proposal of the
Engineer-in-Chief (Buildings) and Chief Engineer (Buildings), Chennai Region, Public Works Department, and hereby direct that the powers delegated in the
Government order first read above to the Superintending Engineers of Buildings Organisation of Public Works Department for shifting head quarters of sections and
Sub Divisions wherever necessary will be in force for a period of three years from the date of issue of this Government Order, subject to the recommendations and re-organisation of Buildings Organisation of Public Works Department.
6. This order issues with the concurrence of Finance Department vide its U.O.No.25183/PW-I/2020, dated 08.09.2020.
(BY ORDER OF THE GOVERNOR)
K.MANIVASAN PRINCIPAL SECRETARY TO GOVERNMENT
23
nghwpahsh; mf;Nlhgh; 2020
ABSTRACT Fundamental Rules – Special Casual Leave – Special Casual Leave fox six days in a calendar year to the Government Servants having children with special needs – Amendment to Annexure VII – Executive Instructions regarding Casual Leave under ruling (3) under rule 85 of the Fundamental Rules – Orders – Issued.
Personnel and Administrative Reforms (FR.II) Department G.O.(Ms)No.111 Dated:01.10.2020 Read:
G.O.(Ms).No.39, Personnel and Administrative Reforms (FR-III) Department, dated 23.03.2020
ORDER: In pursuance to the orders issued in the Government order read above, the following notification will be published in the Tamil Nadu Government Gazette:-
NOTIFICATION In exercise of the powers conferred by the provisio to Article 309 read with Article 313 of the Contitution of India and of all other powers hereunto enabling, the Governor of Tamil Nadu hereby makes the following amendment to the Fundamental Rules and the Instructions thereunder.
2. Amendment hereby made shall be deemed to have come into force on the 23rd day of March 2020.
AMENDMENT In the said Fundamental Rules, in Annexure-VII, under the Executive instructions regarding Casual Leave under ruling (3) under rule 85, under the heading “II. Special Casual Leave”, after rule 14, the following rule shall be added, namely:-
“15. Special Casual Leave for six days in a calendar year shall be grated to Government Servants having children with special needs on production of a supportive document obtained either from the authority competent to issue the certificate of disability under the Rights of persons with Disabilities Act, 2016 (Central Act 49 of 2016) or from a Registered Medical Practitioner attending to the child, certifying that he/she is a special child suffering from disability that requires parental support for daily life activities.”
(BY ORDER OF THE GOVERNOR) S.SWARNA
SECRETARY TO GOVERNMENT
24
nghwpahsh; mf;Nlhgh; 2020
CPS CELL OF TREASURIES AND ACCOUNTS DEPARTMENT CIRCULAR
No.0065/CPS/2019 Dated: 09.10.2020
Sir/Madam,
Sub: CPS Cell – Proposals for final settlement under CPS to subscribers who retired / resigned, deceased or terminated from service – Clarifications issued by the Government – Regarding.
Ref: 1. G.O.Ms.No.59, Finance (PGC) Department, Dated 22.03.2016.
2. Government Lr.No.6941 / Finance (PG-I)/2019, dated:20.07.2020
3. This Office Lr.No.0065/CPS/2019, Dated 19.08.2020 In the reference 2nd cited, the Government have directed that while sending the Final Authorisation proposal for the CPS subscribers, the Drawing and Disbursing Officers (DDOs) shall submit the proposals with details in the annexures given in the references 1st and 2nd cited (Copies enclosed) along with scanned pages of the Service Register duly attested by the DDOs concerned to ensure the correctness of the particulars of the individual so as to avoid risks in handling the original Service Registers through post/courier.
Consequently, all the HoDs were addressed to issue suitable instructions to the DDOs under their control with a copy marked to the PAOs/DTOs to issue sensitise the DDOs in their Bill Audit control.
However, the DDOs are continuing with the practice of sending proposals for Final Authorisation of CPS for their employees enclosing Service Registers instead of attested copies of Service Registers.
I am therefore to request you to instruct the DDOs under your Bill Audit control to follow the above revised guidelines while sending the Final Authorisation proposal for the CPS subscribers.
You are also requested to inform the DDOs that proposals received along with the original Service Register would not be accepted by this Department and the same will be returned to the sender.
for Commissioner
25
nghwpahsh; mf;Nlhgh; 2020
GOVERNMENT OF TAMIL NADU PUBLIC WORKS DEPARTMENT
From Er.K.Ramamoorthy, B.E., M.B.A., Engineer-in-Chief, WRD., & Chief Engineer (General), PWD, Chepauk, Chennai-600005.
To The Engineer-in-Chief (Buildings) & Chief Engineer (Buildings), Chennai Region, PWD., Chennai-5 All the Regional Chief Engineers of Buildings Organisation. All the Regional Chief Engineers / Fundational Chief Engineers of Water Resources Department.
Letter No.S2(2) / 45219 / 2019, dated 07.10.2020
Sir,
Sub: Establishment – Tamil Nadu Engineering Service – Regularisation of Assistant Engineers for both Water Resources Department and Buildings Organisation – Regarding
Ref: Arising
It has been brought to notice that the services of certain Assistant
Engineers (Civil & Electrical) both in Water Resources Department and
Buildings Organisation, are pending to be regularized.
2. The Regional Chief Engineers of Buildings Organisation and the
Regional Chief Engineers / Functional Chief Engineers of Water Resources
Department are requested to send necessary regularization proposals of such
Assistant Engineers (Civil & Electrical) whose services are yet to be
regularized.
3. The Regional Chief Engineers of Buildings Organisation and the
Regional Chief Engineers / Functional Chief Engineers of Water Resources
Department are also requested to verify, whether any conditional
appointments has been made and they are also requested to identify such
conditional appointments and send regularization proposals only after the
26
nghwpahsh; mf;Nlhgh; 2020
conditions are fulfilled viz. Verification of Community Claims by DVC / SLSC
and only after No Objection Certificate is issued by Tamil Nady Public Service
Commission, Passing of Second Class Language Test in Tamil etc.
4. The proposals shall be accompanied by extracts of first page of
Service Book, Entries showing the Date of Joining and Nativity Certificate of
the Concerned Assistant Engineers (Civil & Electrical).
5. The above details shall be uploaded to the Email ID detailed below
and necessary regularization proposals may please be sent early.
Email ID: “[email protected]
Er.K.Ramamoorthy, Engineer-in-Chief, WRD &
Chief Engineer (General), PWD,
Bridegroom Bride Date & Venue Er.N.Balamurugan (a) Balavijay, B.E.,M.Tech., Assistant Engineer, Quality Control, NH Coimbatore
Er.S.Durgadevi (a) Anjali, B.E., Assistant Engineer, National Highways, Coimbatore D/o Er.A.Subramani, Assistant Engineer, PWD, WRD, Coimbatore
Reception on 29.10.2020 between 6.00 pm to 9.00 pm
at Diamond and Ruby Hall,
Jenny Residency, Avinasi Road, Coimbatore - 14
We wish them a happy & Prosperous Wedding Life -Editor
nrd;idf;F tUk; nghwpahsh; cWg;gpdh;fs; midtUk; GJg;gpf;fg;gl;l nghwpahsh; ,uhkypq;fk; ,y;yj;ij gad;gLj;jpf;nfhs;SkhW Nfl;Lf;nfhs;sg;gLfpwJ. jq;fSf;F Njitahd midj;J trjpfSk; WiFi cl;gl nra;ag;gl;Ls;sJ. - ,y;yg; nghwpahsh;> nrd;id
Wedding Greetings
27
nghwpahsh; mf;Nlhgh; 2020
cd; tho;tpy; Gfnod;Dk; tpUJ gl;bay; ngw;wjd; milahskhf - eP tpUJg;gl;bapy; gpwe;jhah? eP E}y;;fis fw;wtdpy;iy Mdhy; E}y;fis mwpe;jtd;! mjdhy;jhd; rf;uth;j;jpiaAk; ruzila itf;Fk; rf;jp cdf;fpUe;jJ! eP xU tuyhw;Wg; Gj;jfk; mjdhy;jhd; eP gbf;f tpy;iy gbf;fg;gl;lha;! gQ;iraha; guhhpaha; ,Ue;jth;fs; eQ;iraha; GQ;iraha; gRik tho;T ngw - eP nfhLj;j fy;tpjhNd ifnfhLj;jJ ghl;Lghb %bapUe;j Nfhapy;fisj; jpwe;j ehad;khh; my;y - eP ghLgl;L> %bapUe;j gs;sp thapy;fisj; jpwe;j ehafd;. ViofSf;F kjpa czT vd;w cd; Gjpa fdT gypj;jjhy;jhd; grpahwp mth;fs; gl;ljhhpahdhh;fs;> Fbirf;Fs; ,Ue;jtUk; Fbikg;gzpapy; NfhNyhr;rpdh;.
cwtpdh;fis xJf;fptpl;L xJf;fgl;ltiu cwtpdh;Nghy; Nerpj;jha;. murpaypy; cd;id xJf;fpath;fisAk; mikr;ruitapy; nrJf;fpitj;J rpwe;j jkpofk; je;jha; ! NjNuhl;lk; fhZtijtpl MWfspy; ePNuhl;lk; Kf;fpankd;gjhy; fhy;thAk; miuthAkha; cz;l kf;fs; gFjpfspy; fhy;thAk; fjtizfSk; mikj;jha;. cd;dhy; Viofnsy;yhk; khb tPl;Lf;F khwpdhh;fs;. eP kl;Lk; khb tPl;L VioahapUe;jha; NeUTf;F gpur;rid NeUfpd;w Nghnjy;yhk; eP Nkhjpdhy;jhd; KbAnkd;W Nkhjpyhy; kfd; epidj;jhh; mjdhy; jhd; cd; Kf;fhy; rl;il Kf;fhy ngUik ngw;wJ cd;id xopf;f epidj;jth;fs; vy;yhk; xypf;fr; nrhd;dhh;fs; eP jhd; kf;fs; jiytnud;W! tho;f eP vk;khd;!
nghwp.jp.j.rz;Kf tbNty;> Kd;dhs; nraw;nghwpahsh;> nghgJ> jpUr;rp
epidTfs;...
28
nghwpahsh; mf;Nlhgh; 2020
RNI No.TNBIL/2010/35983
Printed by: Mr.S.G.PARTHASARATHY, and Published by: Er.C.BALAMURUGAN, M.E., PGDFE., on behalf of Association of Engineers, PWD from Association of Engineers, PWD, PWD Campus, Chepauk, Chennai - 5, and Printed at : V.P.S. Printers, 292, Triplicane High Road, Triplicane, Chennai - 5, and Published at Association of Engineers, PWD, PWD Campus, Chepauk, Chennai-5, Editor : Er.K.MURUGAN, M.E,.
Regd.News Magazine Date of Publication : Third week of every month
jdp gpujp &.10/-
PORIYAALAR, Egmore RMS / 1 Patrika, Chennai Reg. No.T.N. / CH (C) / 307 / 18 - 20 Posted on : 22.10.2020, Licensed to Post without prepayment under WPP No.TN/PMG(CCR), WPP No.340/18-20
fKf;f mwpf;if Fwpj;J ekJ rq;fq;fspd; Ntz;LNfhis Vw;W> fl;ll (f&g)> kUj;Jtg; gzpfs; jpUr;rp tl;lj;jpw;Fl;gl;l gFjpapy; gzpGhpAk; midj;Jg; nghwpahsh;fSf;Fk; chpa fhyj;jpy; fKf;f mwpf;ifia Kjd;ikj; jiyikg; nghwpashh;> eP.M.J.> kw;Wk; jiyikg; nghwpahsh; (nghJ)> nghgJ mth;fSf;F mDg;gp itj;j nghwp.,uh.,sQ;nropad;> fz;fhzpg;Gg; nghwpahsh;> nghgJ> fl;llk; (f&g) tl;lk;> kUj;Jtg; gzpfs; kw;Wk; nraw;nghwpahsh;fs; (jpUr;rp> Nryk;> jpUth&h; kw;Wk; jpUg;G+h; fl;llk; (f&g)> Nfhl;lk;> kUj;Jtg; gzpfs;) mth;fSf;F vq;fspd; kdkhh;e;j ed;wpapidj; njhptpj;Jf;nfhs;fpNwhk;.
midj;J jiyikg; nghwpahsh;fs; / fz;fhzpg;Gg; nghwpahsh;fs; / nraw;nghwpahsh;fs; fKf;f mwpf;ifapid Kjd;ikj; jiyikg; nghwpahsh;> eP.M.J.> kw;Wk; jiyikg; nghwpahsh; (nghJ)> nghgJ mth;fSf;F tpiue;J mDg;GkhW Nfl;Lf;nfhs;fpNwhk;.
- Mrphpah;
nghwp.Kidth;.m.tPug;gd ;> Kd;dhs; rpwg;Gj; jiyikg; nghwpahsh;> nghgJ kw;Wk; Kd;dhs; jiyth;> nghwpahsh; rq;fk; mth;fs; 29.09.2020 md;W S.R.M. gy;fiyf;fofj;jpy; (Ph.D., Thesis on Application of Alternate Materials & Advanced Technologies in the Construction of Irrigation Structures – Case Studies) Kidth; gl;lk; ngw;wikf;F nghwpahsh; rq;fk; kw;Wk; cjtpg; nghwpahsh; rq;fk; tho;j;Jf;fisAk;> ghuhl;Lf;fisAk; njhptpj;Jf;nfhs;fpwJ.