Annexure: ADETAILS OF CONTRACTS PLACED BY OPEN TENDER
(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)(Status for the Month of APRIL 2013-MARCH 2014)
Works Awarded : APRIL 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/
MECH/1029/
RCF.RBL-II/Induction
Heating Machine/18
5 dtd. 30.10.12
23.11.2012 Supply of 01 No. Induction Heating Machine for mounting of fork on anti-roll bar at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/ RCF.RBL-
II/Induction Heating Machine/185 dtd.01.04.13
M/s Unitech Instruments , Unit
No.: 24, Dewan & Shah, Industrial Estate No.: 7,
Navghar, Vasai East, Thane - 401210
(01 no.)`4.45 Lacs
(01 no.)`3,90,171/-
`3,90,171/- 03-months from the date of issue of LOA
2 IRCON/ MECH/102
9/ RCF.RBL-
II/Load Lifting & Turning
Device/RET-I/119
Dtd. 30.10.12
10.01.2013 Supply of 01 No. Load Lifting & Turning Device at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-RBL-
II/Multiple station/RET-I/119
dtd 05.04.13
M/s Vikrant Special Machines
Pvt. Ltd, 90, Nayapatty Road, Kolkata – 700055
Tel.:033-2551-3070 Email:
1 set (02 nos.)`55.60 Lacs
1 set (02 nos.)`39,79,656/-
`39,79,656/- 24-weeks from the date of issue of LOA
3 IRCON/ MECH/1029/RCF.RBL-II/EOT Crane/44
dtd. 25.12.201
2
24.01.2013 Supply of (05 Nos.) 10/3 Ton Electric Overhead Travelling Cranes at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-RBL-
II/EOT Crane/44/2262 dtd 15.04.13
M/s Unique Industrial Handlers Pvt. Ltd., 206-207, Nahar & Seth Ind. Estate Chakala, Andheri (East),
Mumbai-400 099
(05 nos.)`962.00 Lacs
(05 nos.)`8,62,46,984/-
`8,62,46,984/- 180-days from the date of issue of LOA
4 IRCON/ MECH/ 1029/
RCF.RBL-II/ Multiple Station/RET/ 96 dtd.
11.01.2013
08.02.2013 Supply of 01 No. Multiple Station Machine (Combined Shearing, Punching, Cropping & Notching Machine) at Rail Coach Factory, Lalganj, Raebareli, UP
IRCON/MECH/ 1029/RCF.RBL-
II/Multiple Station/RET/96 dtd.
23.04.2013
M/s United Engineering Corpn.,
B-96, Mayapur Industrial Area,
Phase-I, New Delhi-110 064
(01 no.)`46.44 Lacs
(01 no.)`22,07,415/-
`22,07,415/- 120-days from the date of issue of LOA
Works Awarded : MAY 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/
MECH/ 1029/
RCF.RBL-II/ Hand
Tools/190 dtd.
31.01.2013
27.02.2013 Supply of Hand Tools at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-
II/Hand Tools/190/3000 dtd.
02.05.2013
M/s Machinery Marketing
Associates Pvt. Ltd, 2E/24,
Jhandewalan Extension, New Delhi – 110 055,
Fax: 011-23629909
`19.78 Lacs `17,56,630/- `17,56,630/- 30-days from the date of issue of PO
2 IRCON/MECH/1029/RCF-RBL-II/ Pipelines/ 028B dtd
30.10.2012
05.02.2013 Pipelines for Compressed Air, Argo mix, Nitrogen & Oxygen Gas Supply and Storage System in Shell & Bogie Shops
IRCON/MECH/ 1029/RCF-RBL-II/ Pipelines/028B dtd
10.05.2013
M/s Legris India Pvt. Ltd., Plot No.: 99, Pace City-1,
Sector-37, Gurgaon-122 001
Fax:0124-66173708
`1607.00 Lacs `17,21,50,978/- `17,21,50,978/-+
AMC for 5 years
`2,59,91,027/-
210-days from GAD approval
3 IRCON/MECH/1029/RCF. RBL-II/
Tapping Machine, Jig Saw
Machine & Hot Air
Welding Gun/192
dtd. 31.01.2013
25.02.2013 Supply of Tapping/Drilling Machine, Jig Saw (100 nos.) & Hot Air Gun (20 nos.) at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-
II/Tapping Machine, Jig Saw Machine &
Hot Air Welding Gun/192 dtd. 13.05.2013
M/s Machinery Marketing
Associates Pvt. Ltd, 2E/24,
Jhandewalan Extension, New Delhi – 110 055,
Fax: 011-23629909
`24.55 Lacsincluding
Tapping, Drilling Machines and `17.80 Lacs
excluding Tapping, Drilling
Machine
`15,64,900/- for Jig Saw (100 nos.) & `1,75,980/- for Hot Air Gun (20
nos.) & Tapping & Drilling not ordered
`17,40,880/- 30-days from the date of issue of PO
4 IRCON/MECH/
1029/RCF. RBL-
II/Road Mobile
Crane/RET-I/53 dtd.
22.02.2013
18.03.2013 Supply of 02 Nos. Road Mobile Crane Capacity 10 MT at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-II/Road Mobile
Crane/RET-I/53 dtd. 13.05.2013
M/s Escort Limited Construction
Equipment, 603, 6th Floor,
Vishal Bhawan, 95 Nehru Place,
New Delhi-110 019Tel.:011-26444821,Fax: 011-26444873
`18.00 Lacs (01 no.)`10,34,274/-
(02 nos.)`20,68,548/-
03-months from the date of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)5 IRCON/
MECH/1029/RCF.RBL-II/Carline
Fab & Roof Acceptanc
e Fixtures/18
8/2809 dated
25.12.2013
08.02.2013 Supply of Roof Bearer, Side Wall & Carline Fabrication and Roof Acceptance Fixtures For LHB Coach at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/RCF.RBL-II/Carline
Fab & Roof Acceptance
Fixtures/188/2809 dated 14.05.2013
M/s Steel Craft (India), Vill.: Kutbi
Nangal Road, Opp. 132 KV Power House, Batala-143 505
E-mail: [email protected]
`60.31 Lacs `75,55,311/- `75,55,311/- 180-days from the date of issue of LOA
6 IRCON/ MECH/1029/RCF.R
BL-II/ Platform Truck/61/
RET dated:
25.12.12
18.01.2013 Supply of (03 Nos.) Battery Operated Platform Truck at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-II/
Platform Truck/61/RET dtd.
15.05.2013
M/s Macro Tech. Equipment Pvt. Ltd,
64A Sadananda Road, Kolkata –
700 026, FAX:033-2463-4684, Email: [email protected]
`9.90 Lacs `4,36,023/- `13,08,069/- 04-months from the date of issue of LOA
7 IRCON/J&K-
Cell/JAT/14/7004/1
7 Dtd.09.03
.13
02.04.2013 Construction of Passenger Amenities Center and other allied works including demolition of existing structures in connection with Multi Functional Complex (MFC) at Jammu Railway Station, J&K
IRCON/J&K-Cell/JAT/14/7004/17
Dtd.15.05.13
M/s Zeal Construction Co.,
J&K Bank Building, Pantha Chowk,
srinagar, Kashmir – 191 101
Mob.:0941900388309419060731
`211.06 Lacs 7.74% above `227.39 Lacs 06-months from the date of issue of LOA
8 IRCON/J&K-
Cell/JAT/14/1014/
Q-B/Hiring-
Veh-SINA-
NR/VH-10/256
Dtd.15.04.13
'03.05.2013 Hiring of Vehicles for Officers and Staff of Northern Railway associated with the Project works in connection with construction of Q-B Section of USBRL New Rail Link Project (J&K)
IRCON/J&K-SGR/Hiring Vehicle-
Srinagar/VH-10/450/240
Dtd.20.05.13
M/s Shabir Transporters,
Sagina Shopping Complex, Gogli Bagh, Srinagar
`15.78 Lacs 33% above `20.92 Lacs 12-months from the date of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
9 IRCON/MECH/1029/RCF. RBL-II/
Portable Air
Compressor/ 118/RET
15.03.2013 Supply of 03 Nos. Portable Air Compressor at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-II/Portable Air
Compressor/118/RET dtd. 21.05.2013
M/s Emprise Marketing, B-1/31 Sector-H, Aligarh, Lucknow-226 024
Ph.:0522-3250618, Email: [email protected]
`11.89 Lacs `6,30,339/- `18,91,018/- 04-months from the date of issue of LOA
10 IRCON/MECH/1029/RCF.R
BL-II/ Mechanis
ed Refuse
Collector/ 149
dated: 25.12.12
21.01.2013 Supply of (01No.) Mechanized Refuse Collector at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/RCF.RBL-II/
Mechanised Refuse Collector/149 dtd.
24.05.2013
M/s Ensol Multiclean Equipments Pvt. Ltd, 401, Neelkanth, 1,
Bhawani Singh Road, Opp. Sahakar
Bhawan, Jaipur-1, FAX: +91-141-
2226934Email: [email protected]
`12,96,000/- `23,59,090/- `23,59,090/- 03-months from the date of issue of LOA
11 IRCON/2049/ROB-
II-BIHAR/TENDER/L
C-3SPL/I/20
13/13 Dtd.
12.04.2013
03.05.2013 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 3SPL at Km. 51/09-10 between Hajipur- Muzaffarpur section on Barauni-Gorakphur Route in Sonepur Division of East Central Railway,Bihar
IRCON/2049/ROB-II-BIHAR/LC-
3SPL/LOA/104/1239 Dtd.27.05.2013
M/s BSC-C&C JV Plot No.:70, Sector-32,
Gurgaon – 122 001,Haryana
`3044.70 Lacs 12.50% above `34,25,29,193/-
15-months including the monsoon period
from the date of issue of LOA
12 IRCON/MECH/
1029/RCF. RBL-II/ Hyd.
Platform (3 Axis)/RET/
83
18.02.2013 Supply of 01 No. Hydraulic Platform with 3 Axis movement at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-II/ Hyd. Platform (3
Axis)/RET/83/2893 dated 28.05.2013
M/s Vikrant Special Machines
Pvt. Ltd, 90, Nayapatty Road, Kolkata – 700055Tel.:033-2551-3070 Email: vikrantspecial@
rediffmail.com
`6.30 Lacs `5,90,357/- `5,90,357/- 16-weeks from the date of issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)13 IRCON/Civil/
1029/RCF-RBL/10/Tender/3/OT/28 Dtd.12.03.20
13
09.04.2013 Construction of two nos. Road Under Bridges (RUB) by Cut & Cover technique comprising box of approximate opening sixe 7.0 x 3.65 m and 20 m length along with its approaches, drainage and allied road works etc. complete for RCF, Raebareli at Lalganj
IRCON/Civil/1029/RCF-RBL/10/Tender/3/
OT/28/3383 Dtd.28.05.2013
M/s Hi-Tech Competent Builders
Pvt. Ltd, G-17, RIICO Industrial Area,
Phase-I, Bhiwadi – 301019
Distt.- Alwar (Raj.)Ph.: 01493-512248,
226343,Mob.: 09314234530
Email: [email protected]
`650.97 Lacs Schedule A DSR 12 items: 11%(+)
& Schedule B (NS Items):-
11%(+)
`722.57 Lacs 12-months from the date of issue of LOA
i.e. 28.05.2014
14 IRCON/CC/TR/RS
VY-BIHAR/13
/685 dated
20.03.2013
10.04.2013 Construction/ Upgradation of Bheldi – Amanaur – Pachraur – Taraiya – Pokharia Road of SH104 in Saran district under RSVY
IRCON/CC/TR/RSVY-BIHAR/13/685/576
dated 28.05.2013
M/s Brajendra Kumar Builders
Pvt. Ltd., Achuara, Barh, Patna (Bihar), PIN-
803213
`3803.86 Lacs 5.11% Below `3609.48 06-months from the date of issue of LOA
i.e. 28.05.2013
15 IRCON/MECH/
1029/RCF.RBL-
II/Manipulator/ 196 dtd.
07.03.2013
02.04.2013 Supply of 02 Nos. Manipulator - 10 MT at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-
II/Manipulator/196 dtd. 29.05.2013
M/s Vikrant Special Machines
Pvt. Ltd, 90, Nayapatty Road, Kolkata – 700055Tel.:033-2551-3070
Email: [email protected]
`21,20,233/- `11,30,622/- `22,61,245/- 16-weeks from the date of issue of LOA
16 IRCON/ MECH/1029/RCF.RBL
-II/80T Mechanical
Press Brake/148
dated 24.01.2013
19.02.2013 Supply of 01 No. 80 T Mechanical Press Brake at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF.RBL-II/148 Station/RET/96/ dtd.
30.05.2013
M/s Mono-Tech Engineers Pvt. Ltd, S-16, South Side GT. Road Indl.
Area, Ghaziabad – 201 009 Email:
`7.40 Lacs `14,93,545 `14,93,545/- 03-months from the date of issue of LOA
17 IRCON/MECH/1029/RCF-RBL-II/
Lifting Jack/124
dtd 11.01.2013
05.02.2013 Supply of 04 Nos. Electrically Operated Synchronized Screw Jacks at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-RBL-II/
Lifting Jack/124/2913 dtd 30.05.2013
M/s Marwaha Manufacturing Co.,
Near Association Office, Anand Parbat Industrial Area, New
Delhi – 110 005Email: [email protected]
`82.52 Lacs `29,61,163/- `1,18,44,654/- 06-months from the date of issue of LOA
Works Awarded : JUNE 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered
Cost (For Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/2034/
ROB-II-BIHAR/
TENDER/LC-45AB/I/2013/
12/ dtd.08.04.201
3
30.04.2013 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 45 AB at Km. 324/13-14 between Chapra Kacheri-Goldengunj section in Varanasi Division of North Eastern Railway,Bihar
IRCON/2049/ ROB-II-BIHAR/LC-45AB/LOA/
105/1316 Dtd. 07.06.2013
M/s Tribeni Construction Ltd.,
New Town Square,
Office No.: 4M,Chinar Park,New Town,
Rajarhat, Kolkata – 700 136
`2430.44 Lacs Schedule-A : 3.00% above
Schedule-B : 3.00% above
Total amount:
Schedule-A : `2,04,81,796/-
Schedule-B : `22,98,53,968/-
`25,03,35,764/-
15-months including the
monsoon period from the date of
issue of LOA
2 IRCON/2044/GANGA BRIDGE
PATNA/ 16/24 Dtd. 27.04.13
30.04.2013 Casting RCC road deck on erected steel truss of rail cum road bridge across river ganga at Patna, for span 1 to 19 from Dighaghat end (1no.x64m + 18nos.X123m)
LOA No.: IRCON/2044/ Ganga
Bridge/Patna/16/ 24/2213/DIGHA Dtd.
13/14.06.2013
M/s BSC-C&C (JV),
Plot No.: 70,Sector-32,Gurgaon
PIN:122001Fax: 0124-4536799
E-mail: candc@candcinfra
structure.com
`2665.00 Lacs `30,49,93,362.70 `30,49,93,362.70 16-months from the date
of issue of LOA.
3 RCON/2044/
GANGA BRIDGE PATNA/ 16/25 Dtd.
27.04.13
21.05.2013 Casting RCC road deck on erected steel truss of rail cum road bridge across river Ganga at Patna, for span 20 to 38 from Pahleja Ghat end (1no.x64m + 18nos.x123m).
LOA No.: IRCON/2044/ Ganga
Bridge/Patna/16/ 18/2214/DIGHA Dtd.
15.06.2013
M/s BSC-C&C (JV),
Plot No.: 70,Sector-32,Gurgaon
PIN:122001Fax: 0124-4536799
E-mail: candc@candcinfrastr
ucture.com
`2665.00 Lacs Schedule Quoted Rate
Amount
A 16.75%
above
`28,41,53,682.70
B 10% below
`2,08,39,680.00
Total `30,49,93,362.70
`30,49,93,362.70 16-months from the date
of issue of LOA.
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)4 IRCON/MEC
H/1029/RCF.RBL-
II/Ultrasonic Tester/128
dtd.11.01.13
04.02.2013 02 Nos. Portable Ultrasonic Testing Machine
IRCON/MECH/1029/RCF.RBL-II/
Ultrasonic Tester/128/3038
dtd.18.06.13
M/s Electronic & Engineering Co. (I) Pvt. Ltd., 8, 2nd
Floor, Jyoti Wire House Near Kolsite,
Off Veera Desai Road, Andheri (W),
Mumbai-400053 Ph. No.:022-26735050
Email- [email protected]
`12,96,000/- `2,00,563/- `4,01,126/- 02-months from the date
of issue of LOA
5 IRCON/2034/ ROB-BIHAR/ TENDER/LC-79/Mithapur/ Tender/2013/
14 Date:30.04.1
3
21.05.2013 Construction of Balance Work (Balance Portion of Railway Triangular Portion, Pun-Pun Arm & Mithapur Arm) For Road Over Bridge in Lieu of LC- 79 At Mithapur, Patna (Bihar) Including Railway Span of Mithapur Arm, Reinforced Earth Wall/ Retaining Wall
IRCON/2034/ ROB-I-BIHAR/LC-79/LOA/ 110/1408
Date:21.06.13
M/s Mehar Foundations & Civil Engineers
Pvt. Ltd.,31, Dun Shoping
Centre,Lallubhai Amichand
Compound, Tardeo Road, Mumbai – 400
007
`2502.93 Lacs 8.50% above `27,15,67,756/- 15-months including the
monsoon period from the date of
issue of LOA
6 IRCON/MECH/1029/RCF.RBL-II/Fixture for Bogie/198 dtd.:22.03.20
13
22.04.2013 Pressing Fixture for Anti Roll bar, Bogie Frame Lifting Tackle cum Bolster Fixing Fixture
IRCON/MECH/1029/RCF.RBL-II/Fixture for
Bogie/198/3071 dtd.:21.06.2013
M/s Vikrant Special Machines
Pvt. Ltd, 90, Nayapatty Road, Kolkata – 700055
Tel.:033-2551-3070 Email: vikrantspecial@r
ediffmail.com
`19,00,000/- `13,32,927/- `13,32,927/- 04-months including the
monsoon period from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/2034/ ROB-BIHAR/ TENDER/LC-
72 (3leg)/2013/1
5 Date:07.05.1
3
28.05.2013 Construction of Third leg of Road over Bridge including foundation, substructure, superstructure, slip road, Reinforced Earth wall, Retaining wall etc. in lieu of LC- 72 at Km 536 between Gulzarbagh and Patna Saheb Section in Danapur Division of E C Railway , Bihar
IRCON/2049/ ROB-II-BIHAR/LC-72
(3leg)/LOA/109/1400 Dtd.21.06.2013
M/s Naraindas Construction Pvt.
Ltd., 14/441, Vinodpur, Katihar
(Bihar)PIN-854105
`893.39 Lacs 8.96% above `9,73,43,754/- 15-months including the
monsoon period from the date of
issue of LOA
8 IRCON/2049/ ROB-II-
BIHAR/TENDER /LC-
159/I/2013/2 Date:11.01.1
3
01.02.2013 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No:159 A/SPL at Km.164/15-16 between Jivdhara-Motihari Section on Barauni-Gorakhpur Route in Samastipur Division of East Central Railway – New ROB
IRCON/2049/ROB-II-BIHAR/LC-
159A/LOA/112/1422 Date:24.06.2013
M/s TRG Industries Pvt.
Ltd.,E-461, Greater
Kailash-II, Delhi-110 048
`5112.03 Lacs Schedule-A : 8.80% above
Schedule-B : 8.80% above
Total amount:
Schedule-A : `2,37,86,997/-
Schedule-B : `53,24,01,511/-
`55,61,88,508/-
15-months including the
monsoon period from the date of
issue of LOA
9 IRCON/MECH/
1029/RCF.RBL-II/Electrical Tampering
Furnace/RET/99 Dtd
24.01.2013
20.02.2013 01 No. Electrical Pre Heat Treatment Tempering Furnace
IRCON/MECH/1029/ RCF.RBL-II/Electrical
Tempering Furnace/RET/99/2955
dtd.:25.06.2013
M/s Kashyap Brothers, Pratap Ganj, Kalpi road, Kanpur – 208012
Ph.:0512-2237897Email:kashyapbros
@gmail.com
`10,80,000/- `8,74,502/- `8,74,502/- 03-months including the
monsoon period from the date of
issue of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)10 IRCON/MEC
H/ 1029/RCF.RB
L-II/20 MT LPG Storage
Bullet & Pipeline/200
Dtd 17.04.2013
09.05.2013 (02 nos.) 20 MT Mounded Underground LPG storage bullet & pipeline
IRCON/MECH/ 1029/RCF.RBL-II/20
MT LPG Storage Bullet &
Pipeline/200/3099 Dtd 26.06.2013
M/s Pioneer Fabricators (P)
Ltd., B/2, Saraswati
Industrial Estate, Partapur,
Meerut-250103, Ph.:0121-2441853, 2441509
Email:[email protected]
`2,11,56,0000/- `1,30,43,043/- `1,30,43,043/- 02-months including
the monsoon
period from the date of
issue of LOA
11 IRCON/J&K
Cell/JAT/14/1014/DQ/Support-Services-
DQ-Section/M-19R/252
dtd.24.04.201
3
06.05.2013 Providing services for maintenance of IRCON's establishments and also providing services by way of assisting IRCON's Engineers during supervision of work and services for office up-keep and other miscellaneous work as required at various locations along the project alignment from Dharam to Banihal covering Ramban, Sangaldhan, Khari, Sumber, Kholi, Dharam, etc. in connection with Dharam Qazigund section of USBRL Project
IRCON/J&K Cell/JAT/14/1014/
DQ/Support-Services-DQ-
Section/M-19R/252
dtd.27.06.2013
M/s Star Constructions,
1st Floor, AI-Noor Complex,
Hyderpora, Bypass (West),
Kashmir, Srinagar –
190014 (J&K)Mob.:094190011
4509419006074Email: mail@
starconstructions. com
`172.23 Lacs 5.45% below `162.83 Lacs 12-months from the date
of issue of LOA
Contd.../-
Works Awarded : JULY 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Pkg. No.: SB-
01 (India),
NIT No.: 683 Dt.
15.04.13
Construction of Balance work of Station Building & other associated miscellaneous work at Jaynagar Railway Station Yard in connection with Gauge conversion & construction of new B.G. Railway Line from Jaynagar (India) to Bardibas (Nepal)
LOA No.: IRCON/2050/BGL.JB
B/Tender/Pkg-01 (India)/255 Dtd.
08.07.2013
M/s Trishul Engicon Pvt. Ltd. ,
Shyam Savitri Enclave,
Main Road,Rajiv Nagar,
Post-Kesari Nagar,Patna-24
`106.12 Lacs 15.4% above estimated cost
`1,22,46,807.00 07.07.2014
2 IRCON/MECH/1029/RCF.RBL-II/lab Equipments/105
dtd 22.03.13
16.04.2013 Supply and Erection, Installation & Commissioning of Shore A&D Testing Equipment, Multy Cell Ageing Oven, Digital Melting Point Apparatus & Deep Freezer (04 nos.) 01-no. Each at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No.: IRCON/MECH/1029/
RCF/RBL-II/Lab Equipments/
105/3230 Dtd. 10.07.2013
M/s Innovative Electronics &
Systems, Lucknow
`23.19 Lacs Cost of Deep Freezer is
`3,93,250/- + Cost of Digital Melting Point Aparatus is `10,02,250/-
`13,95,500/- 20 weeks from the date of issue of PO
3 IRCON/MECH/1029/RCF.RBL-II/Bogie Frame
Machining Centre/73/RET-II dtd 22.03.13
22.04.2013 Supply and Erection, Installation & Commissioning of Bogie Frame Machining Centre (02 nos.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No.: IRCON/MECH/1029/RCF/ RBL-II/Bogie Frame Machining Centre/73/RET-
II/3286 Dtd. 16.07.13
M/s Shin Nippon Koki Co. Ltd., Tokyo, Japan
`6325.00 Lacs Cost of Machine is JPY
245,000,000.00(EXCLUDING
Custom duty) + AMC for 5 years is JPY 10,000,000.00
JPY 490,000,000.00
240 days from the date of opening of
LC
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/MECH/1029/RCF.RBL
-I/ASRS/86/RET-1
dtd 17.04.13
24.05.2013 Supply and Erection, Installation & Commissioning of ASRS (06 nos.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No.: IRCON/MECH/1029/
RCF.RBL-I/ASRS/86/RET-
1/3300 Dtd. 17.07.2013
M/s Godrej Efacec Automation & Robotics Ltd,
Mumbai
`2678.40 Lacs `.27,00,68,311/- `27,00,68,311/- 180 to 240 days from LOA
5 IRCON/J&K-
Cell/JAT/14/Q-B
Housekeeping-SINA-
ORH/M-23/Dtd.
16.05.13
06.06.13 Providing housekeeping services for up keeping, watch & ward and maintenance of Officers Rest House (ORH) at Srinagar on Q-B New BG Rail Line Project
IRCON/J&K-Cell/JAT/14/1014/Q-
B/Housekeeping-SINA ORH/M-
23/Dtd. 18.07.2013
M/s Wani Construction,
Kursoo Padahahi Bagh, Srinagar, Kashmir, J&K
`37.96 Lacs 20.20% below `30.29 Lacs 12 Months from 20.07.2013
6 IRCON/CC/TN/GBSS-Patna/13/ 686 Dated 03/06/2013
24.06.2013 Assembly, erection/ launching of (7x123m) span from pier No.-19 to pier No.-26 and (1x64m)span between pier No.-37 to abutment A2, triangulated steel girders for new rail-cum-road bridge across river Ganga at Patna from Pahlejaghat (North island End) including transportation of fabricated components of (7x123m) span from fabrication workshop at Pahlejaghat end and (1x64m) span from fabrication workshop at Dighaghat End of river Ganga to launching site including casting of bed blocks and final coat of painting
LOA No.: IRCON/2044/Ganga Bridge/Patna/16/18/ 2975A/Digha/1633
Dtd. 18.07.2013
M/s BEBL-ROYAL (JV),
Godrerj Waterside Building, Tower No. 1, 4th Floor,
No. 401, Plot No.: 5, DP Block, Salt Lake Sector-V,
KolkataPIN-700 091
Fax No.: +91-33-40188237
Email: [email protected]
`4530.00 Lacs `43,32,18,000/- 450-days (including monsoon) from the
date of issue of Letter of Acceptance
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/MECH/1029/RCF.RBL
-II/UTM/15
9 dtd 07.03.13
01.04.2013 Supply and Erection, Installation & Commissioning of Universal testing Machine (03 nos.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No.: IRCON/MECH/ 1029/RCF.RBL-
II/UTM/15/ 3358 Dtd. 29.07.2013
M/s Innotech Engineering
Devices Pvt. Ltd., Bahadurgarh
`20.00 Lacs `11,24,040/- `11,24,040/- 03 months from the date of issue of
LOA
Works Awarded : AUGUST 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 NIT-221
21.06.2013 Disposal of 40mm size Aggregates and Boulder from Pirauna Camp at Km. 175+000 and 40mm Aggregate from Badagaon Camp at km.203+600 UP-05 Road Project
LOA No.IRCON/1020/NHAI/
UP-05/NIT/221/LOA/644
Dtd 03.08.2013
M/s Azad Earthmovers, Jhansi
35740 MT 350.00 per MT `1,31,86,950/- 18.08.2013
2 NIT-222
21.06.2013 Dismantling and/or removal of temporary structures at Badagaon, Orai & reclamation of the area of Badagaon Camp and Office by excavating unsuitable soil and filling suitable soil for cultivation purpose
LOA No.IRCON/1020/NHAI/
UP-05/NIT/222/LOA/642
Dtd 03.08.2013
M/s Mahendra Pal Singh, Orai
`20.50 Lacs `19.5 Lacs for dismantling and `10.35 Lacs for
reclamation
`29.85 Lacs 03.10.2013
3 NIT-223
21.06.2013 Dismantling and/or removal of Temporary structures at Badagaon, Orai & reclamation of the area of Badagaon Workshop and plant by excavating unsuitable soil and filling suitable soil for cultivation purpose
LOA No.IRCON/1020/NHAI/
UP-05/NIT/223/LOA/643
Dtd 03.08.2013
M/s Malkhan Singh, Orai
`13.50 Lacs `4.00 Lacs for dismantling and `8.02 Lacs for
reclamation
`12.02 Lacs 03.10.2013
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 e-Tender JH-18-XI-WB-IRCON
-05
03.07.2013 Construction & Maintenance of Road (1) Chiur To Hesla-3.971 Km (2) Cherwadag To Erahatu – 2.771 Km (3) Tungaon To Bartoli - 3.124 Km. (4) Burka To Jabra-3.957Km (5) Sotiya To Hutub-5.503Km (6) Jamhar To Kasira-5.112 Km(7) Sardula To Kasira-3.669 Km(8) Burhiroma To Jhapra - 3.393 Km. (9) Kurse To Kedli - 6.012 Km (10) Kedli To Bargani - 2.974 Km. (11) Padampur To Ronhe - 4.456 Km. (Total Length: 44.942 Km, Block: Karra, District: Khunti, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-18-XI-WB-IRCON-05/66 Date
05.08.2013
M/s Altima Infrastructure Pvt. Ltd.(AIPL), First
Floor, 351 A, Road No.5, Ashok Nagar Ranchi, Jharkhand
(Cost put to tender=1653+
190=`1843Lacs
`1843.30 Lacs `18,43,29,618.79 05.02.2015
5 IRCON/JK Cell/JAT/14
/1014/D-Q/Hiring-
Veh-Jammu/VH
-07/254 dtd.
17.06.13
05.07.2013 Hiring vehicles for IRCON Officers & Staff for J&K cell, Jammu in connection with USBRL Project work (J&K)
IRCON/JK-Cell/JAT/14/1014/DQ
/Hiring-Veh-Jammu/VH-07/3463/
dtd. 14.08.2013
M/s Fair Deal Tour & Travels, 75-A,
Last Morh, Gandhi Nagar, Jammu
J&K
20.16 Lacs 10.2% above 22.21 Lacs 12 Months from the date of issue
of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
6 e-Tender JH-18-XI-WB-IRCON
-06
03.07.2013 Construction & Maintenance of Road (1) Hakaduba To Bundu Sima via Buruhatu - 3.834 Km. (2) Landup To Bandi - 4.299 Km. (3) Landup To Buruhatu - 1.573 Km. (4) Landup To kera - 6.786 Km. (5) Jojohatu To pirihtu - 2.003 Km. (6)Suukriserang To Budhudih-3.36 Km (7) Tirla To Budhudih - 2.562 Km. (8) Rewa To Manhu - 3.052 Km. (9) Aani dih To Takra - 1.67 Km. (10) Chukru To Namkom Block Sima via Karge - 3.492 Km. (11) Potamgara To Chitramu - 2.678 Km. (12) Siladon To Dasgaua - 3.75 Km. (13) Ganeor To Remta - 1.774 Km. (14) T09 To Dokar - 3.373 Km. Km. (15) Chikor To Somatoli - 1.099 Km. Km. (16) Taro To Barbanda - 3.023 Km. Km. (17) Sarasom To Putidag - 1.046 Km. (Total Length : 49.374 Km, Block: Khunti, District: Khunti, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-18-XI-WB-IRCON-06/82 Date
17.08.2013
M/s Vijay Kumar Sahu, Parmath
Nagar, Tupudana, Ranchi 834003
(Cost put to tender
=1779+200 = `1979 Lacs)
`1979.06 Lacs `19,79,00,001.00 17.02.2015
7 e-Tender JH-18-XI-WB-IRCON-
29
06.07.2013 Construction & Maintenance of Road : 1) Dumbatoli Pitch Road to Chete via Jogitoli, 3.13Km 2) Tongritoli to Bhandratoli 3.08Km 3) Kumbatoli More to Dumertoli, 4.735Km., 4) Katcrpa More to Chhota Khunta, 2.80Km., 5) Piska Railway Station Bhagalpur to Tusmu, 2.30Km 6) Daladali Bagichatoli to Satish Chowk NH23, 2.77Km 7) Bandhya to Badka Khunta Road, 3.27Km., (Total Length: 22.085 Kms,Block: Ratu-II, District: Ranchi, Jahrkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-18-XI-WB-IRCON-29/82 Date
17.08.2013
M/s Sambhu Singh, Aryapuri,
Ratu Road, Ranchi, Jharkhand
(Cost put to tender
= 882+100 = Rs.982.00
Lacs)
Rs.982.42 Lacs `9,31,68,433.01 17.02.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 IRCON/MECH/1029/RCF.RBL-II/Heavy
Duty Turret Lathe/RET-1/3502 dtd 14.05.2013
06.06.2013 Supply and Erection, Installation & Commissioning of Heavy Duty Turret Lathe Machines – 02 no. at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. IRCON/MECH/1029/RCF. RBL-II/Heavy Duty Turret Lathe/ RET-1/3502 dated
19.08.2013
M/s Sahil Alloy & Machine Tools (P)
Limited, Batala
`170.00 Lacs `1,00,00,000/- `2,00,00,000/- 04 months from the date of issue
of LOA.
9 IRCON/ELECT/102
9/RCF-RBL/Ind. Lights/49
31.05.2013 Supply of 200W, 230V AC, 50Hz, highway induction light fittings for new Rail Coach Factory, Rae Bareli (U.P.)
LOA No. IRCON/ELECT/1029
/RCF-RBL/ Ind. Lights/49 dtd 27.08.2013
M/s Crompton Greaves Ltd., 3rd Floor, Express Building, 9-10, Bahadur Shah Zafar Marg, Near
ITO Crossing, New Delhi-110002
`388.00 Lacs Supply only at unit rate of
`10092.90 each
`1,89,14,094.60 3 months
10 e-Tender JH-15-XI-WB-IRCON-
39
22.07.2013 Construction of Bridge over Goitha River on T03 to Kadwa road,Block: Dhurki, District: Garhwa, Jharkhand
LOA No.: IRCON/2054/PMGSY-JKR/JH-15-XI-WB-IRCON-39/126 Date
29.08.2013
M/s Aman Raj Construction ,
Garhwa, Jharkhand
`219.00 Lacs `215.70 Lacs `2,01,95,538.12 28.02.2015
11 IRCON/3014/RRVUNL.RS/TENDER/SS
/02 Dt. 04.06.201
3
25.06.2013 Design, Supply, Installation, Testing, Commissioning and Handing Over of 2 x 750 KVA 11/0.433 KV Sub-station for KaTPS Railway Siding at Jhalawar
LOA No. IRCON/3014/RRVUNL.RS/SS/System Electric/02/1241
dated 31.08.2013
M/s System Electric Works, 244, Shopping
Centre, Kota – 7 Tel:0744-2363804
Email: systemselectricals@g
mail.com
`161.29 Lacs `128.79 Lacs Three Month from date of Issue of LOA
i.e. 30.11.2013
12 IRCON/3014/RRVUNL.RS/Tender/High
Rise Mast/03 Dated
28.06.2013
19.07.2013 Design, Supply, Installation, Testing, Commissioning and Handing Over of High Rise Mast for KaTPS Railway Siding at Jhalawar
LOA No. IRCON/3014/RRVUNL.RS/SS/High Rise Mast/REW/03/1238 dated 31.08.2013
M/s REW Constructions Pvt. Ltd, D-5, Industrial
Area Site-A, Mathura (U.P) -
281004
`162.66 Lacs `147.14 Lacs Four Month from date of issue of
LOA i.e. 31.12.2013
Works Awarded : SEPTEMBER 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/1029/RCF.RBL-
II/Universal Milling
Machine/205 dated
14.05.2013
03.06.2013 Supply and Erection, Installation & Commissioning of Universal Milling Machine (01 no.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. IRCON/MECH/1029/
RCF. RBL-II/Universal Milling Machine/ 205/3562 dated 02.09.2013
M/s Geeta Machine Tools Pvt.
Ltd., Jamnagar
`30.78 Lacs `25,46,962/- `25,46,962/- 90 days from LOA
2 IRCON/MECH/1029/RCF.RBL-
II/Lab Equipment
s/111 dated
07.03.2013
05.04.2013 Supply and Erection, Installation & Commissioning of (01 No.) Accelerated Weathering Tester, Toxcity Tester & (01 No.) Motorized Digital Rockwell Hardness Tester at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. CON/MECH/1029/R
CF .RBL-II/Lab Equipments/111/
3889 dated 04.09.2013
M/s A.S.I Sales Pvt. Ltd., New
Delhi
`18.36 Lacs (01 NO.) Accelerated Weathering
Tester `6,06,900/-
+(01 No.)
Motorised Digital Rockwell
Hardness Tester `1,98,900/-
`8,05,800/- 2 months from LOA/PO for Accelerated
Weathering Tester and 3 months from LOA for Motorized Digital Rockwell Hardness Tester
3 IRCON/MECH/1029/RCF.RBL-II/Shell
Assembly line/117/RE
T dated 31.01.2013
09.03.2013 Supply and Erection, Installation & Commissioning of Integrated Shell Assemblies and Assembly Lines -01 no.at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. IRCON/MECH/1029/
RCF. RBL-II/Shell Assembly
line/117/RET/ 3624 dated 16.09.2013
M/s SIS Corporation, Korea
`20000.00 Lacs Cost of Full System: USD
26,999,240.00 + INR
2,39,36,491.25/-
USD 26,999,240.00 + `2,39,36.491.25
365 days from LC
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)4 IRCON/3
015/TN/ROB-
RAJ/SGNR-
119/RT-2/13/44
03.5.2013 Construction of four lane Road over Bridge (ROB) with approaches as per specifications & Quality Control Standards etc. complete including detailed design & drawings in Lieu of LC-119 at Sri Ganganagar in Rajasthan State.
IRCON/3015/ROB-RAJ/GDLC/LC-
119/98/3757 dated 17.09.2013
M/s Gannon Dunkerley & Co.
Ltd.B-228, Okhla
Industrial Area,Phase-I, New Delhi-110 020
`2719.88 Lacs `2719.88 Lacs `3,362.41 Lacs 20 months (including
monsoon) from the date of LOA
5 No. IRCON/ ELECT/1029/R
CF-RBL/
SOLAR PLANT/
44B
29.11.2012 Design, Supply, Installation, testing & commissioning of Grid connected Solar power plant of 2MW capacity with all the electrical and associated equipments including civil works at New Rail Coach Factory, Rae Bareli (U.P.)
No. IRCON/ ELECT/1029/RCF-
RBL/ SOLAR PLANT/ 44B dated
20.09.2013
M/s Tata Power Solar Systems
Ltd., 78, Electronics City, Phase I, Hosur
Road, Bangalore - 560 100
`22.40 Cr SITC Contract `15.60Cr. 8 months
6 IRCON/MECH/1029/RCF.R
BL-II/WHEEL
AXLE ASSLY
LINE/RET-I Dtd.
27.03.13
23.04.2012 Supply and Erection, Installation & Commissioning of Integrated Wheel & Axle Machining and Assembly Line with Synchronized and Automated Material Handling System for Wheel Shop at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. IRCON/MECH/1029/ RCF.RBL-II/WHEEL
AXLE ASSLY LINE/95/RET-I/3673
dtd 25.09.2013
M/s Danobat Group, Spain
`15657.00 Lacs Cost of Imported supply portion of machines with concomitant
accessories Euro 15,664,299/-
+ Cost of Indigenous supply Rs.68,503,496/- +
Cost of Spares Euro 235,285
Euro 15,899,584 + `68,503,496/-
300 days from approval of GADs
7 NIT-225
28.06.2013 Disposal of laboratory equipments, survey instruments and Hydraulic jacks from IRCON's laboratory/store situated at Badagaon Camp at km 203+600 UP-05 Road Project
LOA No.IRCON/1020/NH
AI/UP-05/NIT/225/LOA/721
Dtd 25.09.2013
M/s Shyam Babu, Kanpur
`4.21 Lacs Quoted only for Laboratory equipment
163800 (L.S)
`1,63,800.00 25.10.2013
Works Awarded : OCTOBER 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/J
&K-Cell/JAT/14/1014/DQ/Supply-Crash Barriers/
M-28/265, dtd.
06.08.13
23.08.13 Supply of component materials for Metal Crash Barriers for
Access Roads of Zone-I in connection with the
construction of the D-Q Section of J&K Rail Link
Project (M-28)
IRCON/J&KI/14/1014/DQ/Supply-Crash Barriers/M-28/5262,
dtd.03.10.2013
M/s Khanday Construction Co.,
South City, Nowgam, by-
pass, Srinagar, Kashmir-190015
J&K
46.49 Lacs 21% below 36.72 Lacs 45 days from the date of LOA
2 e-Tender JH-07-XI-WB-IRCON-
37
22.07.2013 Construction of Bridge over Kasheya Nallah on Karmat to Jatarbhajarni road, Block: Majhigawn, District: Garhwa, Jharkhand
LOA No.: IRCON/2054/LOA/P
KG-37/243 dated 04.10.2013
M/s Nawal Kishor Roy, 208 T,
Dhanauti, Chhoti Marai, Hajipur, Vaishali, Bihar
`128.56 Lacs `126.45 Lacs `1,20,97,864.00 04.04.2015
3 e-Tender JH-17-XI-WB-IRCON-
60
05.08.2013 Construction of Bridge over Khutisruti River on Sulumdag to Ursela road, Package: JH18JB006A, Block: Bishrampur, District: Palamau, Jharkhand
LOA No.: IRCON/2054/LOA/P
KG-60/244 dated 04.10.2013
M/s Baba Vishwanath
Construction, Sudna Dalton Ganj-822101
Palamau
`178.98 Lacs `177.17 Lacs `1,59,45,306.00 04.04.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 e-Tender JH-05-XI-WB-IRCON-
63
16.08.2013 Construction & Maintenance of Road : (1) REO Road To Kanaidih- 3.288 Km (2) REO Road To Kairasol - 2.091 Km (3) REO Road To Chirudih - 1.33 Km. (4) REO Road To Kumirkatta-2.57 Km (5) REO road To Taldih - 2.516 Km. (6) REO Road To Musabil - 2.483 Km. REO Road To Jangla - 3.845 Km. (Total Length: 18.123 Kms, Block: Kathikund-I, Dist- Dumka, Jharkhand).
LOA No.: IRCON/2054/LOA/P
KG-63/233 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=864.94+102.65= `967.59 Lacs
`967.04 Lacs `9,64,91,389.00 04.10.2014
5 e-Tender JH-05-XI-WB-IRCON-
64
16.08.2013 Construction & Maintenance of Road : (1) REO Road To Ledapathar-3.144 Km (2) Nayadih To Makrachattar- 2.75 Km (3)REO Road To Phitkoria- 3.214 Km (4) REO Road To Kulkat - 4.527 Km. (Total Length: 13.635 Kms, Block: Kathikund-II, Dist- Dumka, Jharkhand).
LOA No.: IRCON/2054/LOA/P
KG-64/237 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=675.14+85.3= `760.44 Lacs
`759.24 Lacs `7,57,57,041.00 04.10.2014
6 e-Tender JH-05-XI-WB-IRCON-
65
16.08.2013 Construction & Maintenance of Road : (1) Asanpahari R To Gamrah-2.929Km (2) REO Road to ERO - 4.781 Km. (3) Nargang REO Road to Balidih - 7.842 Km (Total Length: 15.552 Kms, Block: Kathikund III, Dist- Dumka, Jharkhand).
LOA No.: IRCON/2054/LOA/P
KG-65/242 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=698.99+76.38= `775.37 Lacs
`774.90 Lacs `7,73,35,854.00 04.10.2014
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)7 e-
Tender JH-05-XI-WB-IRCON-
66
16.08.2013 Construction & Maintenance of Road (1) Par Paisa more To Pakuriya via Par Paisa - 0.952 Km. (2) Jiwanpur To Bhorebadi - 1.313 Km (3) Jitara to Patusala - 1.129 Km. (4) Pakuriya To Kalakata - 4.357 Km. (5) REO Road 8th KM
To Belbuni- 3.005 Km (6) Bisundiha To Bagedar - 2.219 Km. (7) Chapuria To Sulanga - 1.164 Km. (8) REO Road Dhangara More To Dhangara - 2.912 Km. (9) Palopisa To Bhuskipahari - 3.946 Km. (Total Length: 20.997 Kms, Block: Raneshwar-I, Dist- Dumka, Jharkhand).
LOA No.: IRCON/2054/LOA/P
KG-66/240 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=995.62+139.48= `1135.10 Lacs
`1134.15 Lacs `11,32,19,287.00
04.10.2014
8 e-Tender JH-05-XI-WB-IRCON-
67
16.08.2013 Construction & Maintenance of Road : (1) Karikader To Kathalia - 2.475 Km. (2) Mohanpur To Leya - 2.658 Km. (3) PWD Road Sangrampur More To Sangrampur - 3.353 Km. (4) Patjora Road To Navgram-1.743 Km (5) Jaitara To Menhdipur - 1.6 Km. (6) Dumra Road To Harjora- 2.395 Km (7) Chotta Harkhi To Bara Harkhi - 2.345 Km (8) Manikdih To Murguni - 1.78 Km. (9) Tarni To Sunderdiha - 8.072 Km. (10) REO Road 9th KM To Bhitra - 3.361 Km. (Total Length: 29.782 Kms, Block: Raneshwar-II, Dist- Dumka, Jharkhand).
LOA No.: IRCON/2054/LOA/P
KG-67/239 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=1334.24+194.08= `1528.32 Lacs
`1527.38 Lacs `15,24,49,213.00
04.10.2014
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)9 e-
Tender JH-05-XI-WB-IRCON-
68
16.08.2013 Construction & Maintenance of Road : (1) Hathwari To Shankarpur- 3.195 Km (2) REO Road To Patranga- 3.265 Km (3) Sharpur To Porabansari - 2.15 Km. (4) Chukapari To Goradangal-1.631 Km (5) PWD Road To Makarapahari - 2.465 Km. (Total Length - 12.706 Km. Block: Shikaripara-I, Dist: Dumka).
LOA No.: IRCON/2054/LOA/P
KG-68/238 dated 04.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=604.9+78.43= `683.33 Lacs
`682.43 Lacs `6,81,27,302.00 04.10.2014
10 e-Tender JH-05-XI-WB-IRCON-
69
16.08.2013 Construction & Maintenance of Road : (1)Matyajori More To Matyajori-2.861 Km (2) Banspahari To Katpahari-3.659 Km (3)Sidhachatar More To Dhobaghat-
9.567Km (4) REO Road Birajpur To Barmasi-11.323 Km (Total Length - 27.41Km., Block: Shikaripara-II, Dist: Dumka.)
LOA No.: IRCON/2054/LOA/P
KG-69/234 dated 04.10.2013
M/s Adarsh Construction, Lal Kothi, Main Road,
Mairwa, Siwan, Bihar
=1326.16+180.21= `1506.37 Lacs
`1505.95 Lacs `14,93,82,930.00
04.10.2014
11 IRCON/ MECH/
1029/RCF.RBL-II/
Lathe Machines/62/RET-
II dtd 14.05.201
3
14.06.2013 Supply and Erection, Installation & Commissioning of 03 Nos. Lathe Machines (i.e. 01 no. for Tool Room & 02 Nos. for Mill-Wright Shop) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No. RCON/MECH/1029/RCF. RBL-II/ Lathe Machines/62/RET-II
dtd.07.10.2013
M/s ABL Machine Tools, Nagpur
3 nos. `18.71 Lacs `40,34,300/- 90 days from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)12 IRCON/
CC/TN/JBRLP-
2050/13/685 Dt. - 20.05.20
13
12.06.2013 Construction of Civil work including Embankment, Blanketing, major & minor Bridges and other ancillary works from International Boundary (near AKAUNNHA Village) OSRAHI Section Km 2+975 to Km 27+775 (near Kapileshwar Mahuwa Village) of Nepal side alignment portion in connection with Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL)
LOA No. IRCON/2050/BJL.JBB/Embkt/Km 2+97 to km 27+77/14/1547
dt: 08.10.2013
M/s Nayak Infrastructure Pvt.
Ltd ,2nd Floor,
Kamakhaya Commercial,C.K. Road,Pan Bazar,Guwahati –
781001Ph.: 0361 –
2733782FAX: 0361 –
2733784
`5787.00 Lacs Above 5% over estimated cost
`60,76,32,746.70
18 months excluding monsoon period from 1st July to 30th Sept. from
the date of issue of LOA i.e.
07.07.2015
13 IRCON/MECH/1029/RCF.R
BL-II/Overhead Tool rails/222
dtd 29.06.13
08.08.2013 Supply and Erection, Installation & Commissioning of Overhead Friction free Monorail System with Pneumatic Balancers, provision for Pneumatic & Electrical Tools and Work Lighting for seat and berth assembly station at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/RCF.RBL-
II/Overhead Tool rails/22/3740 dtd
08.10.13
M/s Diya Technologies,
Lucknow
`87.66 Lacs `81,15,058/- `81,15,058/- 90 days from LOA
14 IRCON/ J&K-Cell/ JAT/14/1014/D-Q/
Hiring Veh -CAO-
NR/271
04.10.2013 Quotation for: Hiring of vehicles for Officers and Staff working in the office of the CAO, Northern Railway, USBRL Project, Jammu (J&K)
IRCON/J&K-Cell/JAT/14/1014/D-Q/Hiring Veh-CAO-NR/271/3805, dtd.09.10.2013
M/s Dreamland Travels, Shop No.9, Bus Stand, Jammu-180001
`4.30 Lacs 17.4% above `5.05 Lacs 3 months from the date of
deployment.
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)15 IRCON/
MECH/1029/RCF.RBL
-II/Invert
ed Metallur
gical Microscope/RET-I/112
dtd 07.03.1
3
04.04.2013 Supply and Erection, Installation & Commissioning of Inverted Metallurgical Microscope with Image Analyser (01 no.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/RCF.RBL-II/Inverted
Metallurgical Microscope/RET-
I/112/3778 dtd 17.10.13
M/s Banbros Engineering Pvt. Ltd, New Delhi
1 no. `30.00 Lacs `16,89,795/- 3 months from LOA
16 e-Tender JH-21-XI-WB-IRCON-
71
16.08.2013 Construction & Maintenance of Road : (1) Ambatoli Dhorhi Road to Chapabari – 5.100 Km (2)REO Main Road to Pakritoli Nawatoli Road - 1.424 Km (3) REO Main Road Kutmakachhar to Murambatoli via Jhimari - 4.600 Km (4) Gariajor Barkibiura Road To Urumkela - 6.005 Km (Total Length: 17.13 Kms, Block: Kurdeg, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-21-XI-WB-IRCON-71/280 Date 21.10.2013
M/s SK Construction, Devi
Mandap Road, Ratu Road, Ranchi
(Jharkhand)
=658.42+59.83=`718.25 Lacs
`718.24 Lacs `7,07,24,933.17 21.04.2015
17 e-Tender JH-05-XI-WB-IRCON-
01A
16.09.2013 Construction & Maintenance of Road : (1) Pipra To Amjhari - 1.89 Km. (2) Karudih To Parbatpur - 2.207 Km. (3) PWD ROAD RANGA To PAHARPUR-1.718 Km (4) Tenijor To Duaria - 2.979 Km. (Total Length: 8.800 Kms, Block: Gopikander-I, District: Dumka, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-05-XI-WB-IRCON-01A/278
Date 21.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
=539.44+57.81 = `597.25 Lacs
`598.56 Lacs `5,95,27,226.33 21.10.2014
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
18 e-Tender JH-05-XI-WB-IRCON-
01C
16.09.2013 Construction & Maintenance of Road (1) Rangamora To Kulaipura more-3.15 Km (2) Kundapahari To Mahulda bari - 6.046 Km. (Total Length: 9.20 Kms, Block: Gopikander-III, District: Dumka, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-05-XI-WB-IRCON-01C/279
Date 21.10.2013
M/s Raja Construction, Taj Colony, Panchayati
Akhara, Gaya, Bihar – 823001
`593.34 Lacs `(512.1+79.96)=`592.06 Lacs
`5,88,80,743.48 21.10.2014
19 e-tender.: IRCON/2
049/ ROB-II-
BIHAR/e-Tender/2013/23
Date:14-09-2013
07.10.2013 Supply, fabrication, assembly , erection and painting of Bowstring girder in Railway portion, steel stair case in connection to Construction of ROB at LC-35B at Danapur in state of Bihar
IRCON/2049/ ROB-II-BIHAR/LC-
35B/Steel/LOA /126/2270,
dt.21.10.2013
S.P. DEVELOPRS & DECORATORS, #3195,Paradise Enclave, Sector-
50 D, Chandigarh
`928.88 Lacs 8.25% above `1005.51 Lacs 15 Months from the date of issue
of LOA
20 IRCON/Civil/1029/RCF/RBL/10/Tender/3/OT/29 dated. 17.06.13
19,07.2013 Construction of 3 Nos. borewell and related work including materials as Rail Coach Factory , Raebareli . (UP) .
IRCON/1029/RCF-RBL/Tender/Borewell/OT/03/10/29/4053
dt. 22.10.2013
M/s Central India Tubewell
Corporation , 13 C , Sringar Nagar ,
Alambagh , Lucknow.
`154 Lakhs Schedule-A-1%(-) `15,211,163.88 6(Six) months from the date of issue of
LOA
21 e-Tender JH-17-XI-WB-IRCON-
56
05.08.2013 Construction of Bridge across Batare River on P.W.D. Road to Gahwara in 1st Km. Road, Package No. - JH 1714, Length - 52.1 m. (District - Palamau, Block - Hariharganj)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-17-XI-WB-IRCON-56/294 Date 23.10.2013
M/s Bechu Construction Pvt.
Ltd. Kund Mahalla, Ward No.9, Daltonganj,Palamau
`151.83 Lacs `151.83 Lacs `1,36,64,344.59 23.04.2015
22 e-Tender JH-17-XI-WB-IRCON-
59
05.08.2013 Construction of A) Bridge over Nimia Nallah on PWD Road (Bara) Sighna to Lalgarwa road (JH18JB002A) and B) Bridge over Douwarpar Nallah on PWD Road (Bara) Sighna to Lalgarwa road (JH18JB002B), Block: Nodiha/Chattarpur, District: Palamau, Jharkhand
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-17-XI-WB-IRCON-59/292 Date 23.10.2013
M/s Krishna Deepak
Construction Pvt. Ltd, Indrapuri
Road, Sukhdeonagar,
Ratu Road, Ranchi
`216.34 Lacs `212.84 Lacs `2,07,48,029.48 23.04.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)23 e-
Tender JH-18-XI-WB-IRCON-
80
16.08.2013 Construction & Maintenance of Road : (1) Bijupara Khelari to Khashshitoli - 1.503 Km. And (2) Choriya Road to Madhukam - 3.126 Km. ( Total Length: 4.63Kms, Block: Chanho, District: Ranchi, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-18-XI-WB-IRCON-80/291 Date 23.10.2013
M/s LavKush Kumar Singh,
Lalitgram, Ratu, Ranchi
=214.48+24.61= `239.09 Lacs
`239.07 Lacs `2,37,59,044.85 23.04.2015
24 e-Tender JH-05-XI-WB-IRCON-
01B
16.09.2013 Construction & Maintenance of Road : (1) Paharpur I To Paharpur I-1.907 Km (2) Burhichhapar To Burhichhapar - 2.165 Km. (3) Purnakhor To Purnakhora - 3.4 Km. (Total Length: 7.480 Kms, Block: Gopikander-II, District: Dumka, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-05-XI-WB-IRCON-01B/293
Date 23.10.2013
M/s Raja Construction, Taj
Colony, Panchayati
Akhara, Gaya, Bihar – 823001
`(425.01+47.1) = `472.11 Lacs
`472.12 Lacs `4,69,52,214.70 23.10.2014
25 e-Tender JH-18-XI-WB-IRCON-
13B
16.09.2013 Construction & Maintenance of Road (1) HUMTA To MOISODIH-6.40 Kms, (2) NAWADIH To KUCHIDIH- 3.20 Kms, (Total Length: 9.60 Kms, Block: Bundu-II, District: Khunti, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-18-XI-WB-IRCON-13B/289
Date 23.10.2013
M/s Sanjay Singh, Harmu Road, Gadi Khana,
Ranchi
`(377.53+41.33)= `418.86 Lacs
`418.87 Lacs `4,08,92,129.27 23.04.2015
26 e-Tender JH-05-XI-WB-IRCON-
30B
16.09.2013 Construction & Maintenance of Bridge: 1) Tarni To Sunderdiha at Km. 7+612, (L078-Raneshwar), (Total No. of Bridges: 01 nos, Block:Raneshwar, Dist: Dumka, Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-05-XI-WB-IRCON-30B/288
Date 23.10.2013
M/s Asit Kumar, New Babupara, Post+ Thana-
Dumka, Jharkhand-814101
`52.10 Lacs `51.58 Lacs `51,05,568.00 23.10.2014
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)27 e-
Tender JH-02-XI-WB-IRCON-
49A
16.09.2013 Construction of Bridge over: A) Jharna Nallah on Holamgadha Khurd to Kari road (Package: JH02JB004A, Block: Chatra Sadar), B) Karam Bahua River on Holamgadha Khurd to Kari road (Package: JH02JB004B, Block: Chatra Sadar), (No. of Bridges-02, Block: Chatra sadar District: Chatra, State: Jharkhand)
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-02-XI-WB-IRCON-49A/287
Date 23.10.2013
M/s Sahay Construction, Awall Mohalla, Court Road,
Chatra-825401
`304.97 Lacs `297.16 Lacs `2,97,01,566.00 23.04.2015
28 IRCON/3015/TN/R
OB-RAJ/SGN
R-RUB/13/4
5
03.05.2013 Design & Construction of Two Lane Rail under Bridge (RUB) by Cut & cover Technique comprising two boxes, i.e One for each lane including it’s approaches, all Design, Casting & Placing box segments under traffic block, Drainage, Allied Road works & Junction Development etc. complete, as per Specifications & Drawings, Maintaining all Quality Control Standards complete near LC-119 at Sriganganagar in Rajasthan State
IRCON/3015/TN/ROB-RAJ/SGNR-
RUB/13/45 /3849 Dated : 24.10.2013
M/s Gannon Dunkerley & Co.
Ltd.B-228, Okhla
Industrial Area,Phase-I, New Delhi-110 020
`1097.56 Lacs `1097.56 Lacs `1366.35 Lacs 14 months (including
monsoon) from the date of LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)29 IRCON/M
ECH/1029/RCF.R
BL-II/Surface Grinding/RET/89 dated
07.06.2013
17.07.2013 Supply and Erection, Installation & Commissioning of 01 No. CNC Surface Grinding Machine at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA IRCON/MECH/1029/RCF.RBL-II/Surface Grinding/RET/89/RE
T-II/3803 Dtd 24.10.2013
M/s Parishudh Machines Pvt. Ltd.,
C-26, Industrial Area, Merut Road,
Ghaziabad -201003
Ph.: 0120-2712268, Fax:
0120-2714111
`162.00 Lacs `163.56 Lacs `1,63,56,646/- 180 days from LOA
30 e-Tender JH-07-XI-WB-IRCON-
42A
16.09.2013 Construction of Bridge over Kansi Sot River on T04 to Kari road, Block: Ranka, District: Garhwa, Jharkhand
LOA No.: IRCON/2054/PMGS
Y-LOA/JH-07-XI-WB-IRCON-42A/298
Date 24.10.2013
M/s Nawal Kishor Roy, 208 T,
Dhanauti, Chhoti Marai, Hajipur, Vaishali, Bihar
`158.36 Lacs `1,55,67,066.40 `1,55,67,066.40 24.04.2015
31 e-Tender JH-17-XI-WB-IRCON
-55
05.08.2013 Construction of 1) Bridge across Kawal Nala on B.T. Road to kawal in 1st km Road, Package No. - JH 1714A, Length - 39.14 m., 2) Bridge across Hariya Nala on T04 to Dagara in 2nd Km Road, Package No. - JH 1714, Length - 58.7 m., (District - Palamau, Block - Chhattarpur)
LOA No.: IRCON/2054/PMGSY-JKR/JH-17-XI-WB-IRCON-55/306 Date
25.10.2013
M/s Tiwari & Addi
Construction, Baratola,
Daltonganj, Palamau
`264.63 Lacs `264.63 Lacs `2,48,48,502.00 25.04.2015
32 IRCON/MECH/1029/RCF.RBL-II/Heavy
Duty Sewing Machine
& Lab Equipmen
t/145 dated
07.06.13
03.07.2013 Supply and Erection, Installation & Commissioning of Heavy Duty Sewing Machine, Water Bath Equipment, Low & High Impedence Analyser, Chemical Balance & DFT meter (01 no.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/1029/RCF.RBL-II/Heavy
Duty Sewing Machine & Lab
Equipment/145/3830 dated 28.10.13
M/s Matrix Eco Solutions Pvt. Ltd.,
New Delhi
1 no. `1.00 Lac `15,900/- 3 months from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)33 NIT-
23001.10.2013 Transportation of Plant
& Equipments from IRCON's UP-05 Road Project situated at Badagaon camp at Km 203+600 to CIC Noida/ Greater Noida including loading/ unloading of plant & equipments from UP-05 Road Project
LOA No.IRCON/1020/ NHAI/UP-05/NIT/230
Dtd 30.10.2013
M/s Anil Cargo Pvt. Ltd, New Delhi
`25.94 Lacs The rate of transportation of
different equipment was
`32100/-, `102000/-, `135200,
`32800/-, `48500, `46100, `35900 & `487700/-.
`14,31,600/- 30.11.2013
Works Awarded : NOVEMBER 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/MECH/1029/RCF.RBL-II/Pin
& Portable
Welding/104 dtd
29.06.13
23.07.2013 (03 Nos.) Portable Welding Sets.
IRCON/MECH/1029/RCF.RBL-II/Pin & Portable Welding/104/3854 dtd 01.11.13
M/s. Jamson Machine Tools, 1878, HSIDC Indl.Area, Rai, Sonipat-131029, Haryana
Estimated of `12,66,564/- for
(04 Nos.) Pin Welding and (03
Nos) Portable Welding Set &
order placed for only (04 Nos.) Pin Welding Machine their estimate is
`9,10,564/-
`9,10,564/- `11,41,600/- 3 months from LOA
2 IRCON/ MECH/1029/RCF.
RBL-II/ Motorized Turn
Table/157 dtd
29.06.13
30.07.2013 11 Nos. Motorised Turn Table
IRCON/MECH/1029/RCF.RBL-
II/Motorized Turn Table/157/3850
dtd 01.11.13
M/s Vikrant Special Machines
Pvt Limited, 90, Nayapatty Road
Kolkatta-700055Ph:2251-3070, 2550-3070; Email: [email protected]
`1,06,08,243/- `9,38,768/- `1,03,26,448/- 180 days from LOA
3 IRCON/MECH/1029/RCF.RBL-II/lab
Equipments/47/R
ET dtd
27.08.13
08.08.2013 (01 No.) Computerized Automatic Optical
Brinell hardness Tester & (01 No.) Vicker Hardness Tester
IRCON/MECH/1029/RCF.RBL-II/lab
Equipments/47/RET/3846
Dtd.01.11.13
M/s Balancing Instruments & Equipments
(Miraj) Pvt.Ltd. C-45/1, MIDC Area, Miraj-
416410 Emal:san_finetest@s
ancharnet.com
Estimate of `10,80,000/- is for
(01 No.) Computerized
Automatic Optical Brinell hardness Tester & (01 No.) Vicker Hardness
Tester order placed for only one item (i.e
01 No.) Vicker Hardness Tester) their estimate is
`5,40,000/-
`2,42,352 /- `2,42,352 /- 3 – 4 months from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/MECH/1029/RCF.RBL-II/lab
Equipments/47/R
ET dtd
27.08.13
08.08.2013 (01 No.) Computerized
Automatic Optical Brinell hardness Tester & (01 No.) Vicker Hardness
Tester
IRCON/MECH/ 1029/RCF.RBL-
II/lab Equipments/47/RE
T/3846 Dtd.01.11.13
M/s Balancing Instruments & Equipments
(Miraj) Pvt.Ltd. C-45/1, MIDC Area, Miraj-
416410 Emal:san_finetest@s
ancharnet.com
Estimate of `10,80,000/- is for
(01 No.) Computerized
Automatic Optical Brinell hardness Tester & (01 No.) Vicker Hardness
Tester order placed for only one item (i.e 01
No.) Vicker Hardness Tester) their estimate is
`5,40,000/-
`2,42,352 /- `2,42,352 /- 3 – 4 months from LOA
5 e-Tender IRCON/ELECT/1029/
RCF-RBL
/BAL.EL. Works/51
dated 16.09.2013
14.10.2013 Supply, Installation, Testing & Commissioning of External Lighting & Power Supply System to Misc. Buildings at New Rail Coach Factory, Rae Bareli (U.P.)
LOA IRCON/ELECT/1029/RCF-RBL/BAL.EL.
Works/51 dtd 01.11.2013
M/s K V Prateek Enterprises, 301, Suneja Tower-I, District Centre, Janakpuri, New Delhi-110058
`815.39 Lacs SITC Contract `7.64 Crore 6 Months
6 IRCON/MECH/1029/RCF.RBL-II/lab
Equipment/162
dtd. 07.06.13
04.07.2013 Physical Analytical Balance, Low Load Portable Hardness Tester & Digital Hot Plate
IRCON/MECH/1029/RCF.RBL-II/lab Equipment/162/
3861 Dtd.05.11.13
M/s Banbros Engineering Pvt
Ltd, 49/39, Site IV Industrial Area,
Sahibabad, Ghaziabad; Email:
Estimate of Physical Analytical
Balance is `1,08,000/-, Cost
of Portable Hardness Tester is `1,08,000/- &
Digital Hot Plate is `1,00,000/-
Cost of Physical Analytical Balance is
`53,339/-, Cost of Portable
Hardness Tester is `4,55,039/- & Digital Hot Plate
is `32,739/-
`5,41,118/- 3 months from LOA
7 IRCON/MECH/ 1029/
RCF.RBL-II/ Furniture
(TTC Hostel)/237
dtd: 08.08.13
29.08.2013 Furniture for TTC Hostel
IRCON/MECH/1029/RCF.RBL-
II/Furniture (TTC Hostel)/237/3863
Dtd: 05.11.13
M/s Durian Industries Limited, 1/20, W.H.S, Kirti Nagar New Delhi-
110015; Email:delhidurian@
gmail.com
`20,80,000/- `13,49,969 `13,49,969 30 days from PO
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 IRCON/MECH/1029/RCF.RBL-II/CNC Trainer
Lathe/ 169 dtd:
07.06.13
04.07.13 01 No. CNC Training Lathe Machine
& 02 Nos. Centre Lathe
machine
IRCON/MECH/1029/RCF.RBL-II/CNC
Trainer lathe/169/3866 dated 06.11.13
& IRCON/MECH/1029/
RCF.RBL-II/CNC Trainer
lathe/169/3894 Dated 11.11.13
LOA for 02 Nos. Centre Lathe
Machines issued to M/S ABL Machine
Tools, 46,Chandrashekhar Azad Square,
C.A. Road, Nagpur-440032
&LOA for 01 No. CNC Training lathe issued
to M/s Royal Machine Tools, 13/10, Punjabi
Bagh West (Extension) New
Delhi-1100276, Tel: 011-25223472;
Email: royalmachinery @gmail.com
Estimate of `8,10,000/- (i.e
`3.66 Lacs for for 01 No. CNC
Training Lathe Machine
& `4.44 Lacs
(02 Nos. Centre Lathe machine)
Cost of 02 Nos. Center Lathe Machines is `27,29,000/-
& Cost of 01 No. CNC Training lathe is
`17,68,000/-
Cost of 02 Nos. Center Lathe Machines is `27,29,000/-
& Cost of 01 No. CNC Training
lathe is `17,68,000
02 Nos. Center Lathe Machines (06 months from the date of issue
of PO)&
CNC Training lathe (3 months
from LOA).
9 IRCON/MECH/1029/RCF.RBL-
II/Salt Spray
Chamber/171/RET-I
dtd. 14.05.13
14.06.13 02 Nos. Salt Spray Chamber
IRCON/MECH/1029/RCF.RBL-II/Salt
Spray Chamber/171/RET-I/3904 Dtd.12.11.13
M/s Innotech Engineering
Devices Pvt Ltd, RZ-D-1/6, Vashist Park, Opp. Janak Cinema, Pankha Road, New Delhi-110046, Tel: 011-25393122; Email:
`29,00,000/- `10,20,000/- `20,40,000/- 120 days from PO / LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)10 e-
tender (NIT
No.No. IRCON/ELECT/ 1029/R
CF-RBL/
SCADA/52 dtd
23.09.13
30.10.2013 Design, Supply, Installation, Testing, Commissioning & AMC of SCADA System for display and controls of power supplies and distribution networks at New Rail Coach Factory, Rae Bareli (U.P.)
LOA No. ???issued on
12.11.2013
M/s Synergy Systems & Solutions, Faridabad
`215.39 Lacs `2.21 Crores `1.98 Crore 4 months
11 e-tender No.IRCON/J&K-
Cell/JAT/14/1014/D-Q/GRP Post etc.
– halt Station/M-29/268/55
12, dtd. 29.0813
17.09.13 Construction of GRP Post, electric Gazette (x-ray) Shed, 2 Nos. Morchas,Chain Link Fencing and other allied works at Hillar Shahabad Station KM 164/708 of Qazigund-Banihal Section of J&K rail Link Project (M-29)
IRCON/J&K-Cell/JAT/14/1014/D-Q/GRP Post etc. – Halt Station/M-
29/268/5512, dtd.13.11.13
M/s Inam & Co., Kaka Road, Nai Sarak, Srinagar,
J&K-190001
`65.33 Lacs 10.5% above `72.16 Lacs 4 months from the date of issue of
LOA.
12 IRCON/MECH/1029/RCF.R
BL-II/Shaper machine
and Pedestal Grinder
Machine/236
dated 08.08.13
30.08.13 02 Nos. Shaper Machine & (01 No.)
Pedestal Grinder
IRCON/MECH/1029/RCF.RBL-
II/Shaper machine and Pedestal
Grinder Machine/3997 Dated 19.11.13
M/s Quality Machine Tools
Corporation G.T Road Batala
143505, Email:[email protected]
`14,75,000/- (i.e
`10,80,000/- for 02 Nos. Shaper
Machine & `.2,95,000/- for
Pedestal Grinder)
` 6,56,500/- for Shaper Machine & `.54,900 for
Pedestal Grinder.
`7,11,500/- 3 months from LOA
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)13 e-
Tender JH-18-XI-WB-
IRCON-07A
28.10.2013 Construction & Maintenance Works of - (1) Anidih To Udbury - 1.39Km. (2) Dekadih To Sirkapirhi Road - 5.715 Km. (3) Sahelda–Gutigara-1.933 Km (4) Ghansar-Tengaria Road- 3.87Km (5) Bande To Kurki - 1.031 Km. (6) Dudri - Tumbokel Road- 1.117 Km(7) Balo To Ghaghari Road - 3.43 Km. (8) Oskeya - Gangira Road - 3.559Km (9) Darla - Biramkel Road- 1.355 Km (10) Gamhariya To Bhonda Road - 1.958 Km. (11) Kujala To Suti Road - 3.214 Km.(Total Length : 28.58 Kms, Block; Murhu-I, District: Khunti,Jharkhand)
IRCON/2054/PMGSY/LOA/JH-18-XI-
WB-IRCON-07A/406 Dtd. 21.11.2013
M/s Arbind Kumar Singh
`1213.48 Lacs `1213.46 Lacs `1213.12 Lacs 20.05.2015
14 e-Tender JH-21-XI-WB-
IRCON-09A1
28.10.2013 Construction & Maintenance of Road (1) Pandripani Jaldega to Banmali Road - 4.00 km (2) NH Joram to Kahupani Pahantoli Road - 4.57 km (3)Pandripani Jaldega to Pandripani - 1.970 km (Total Length: 10.540 Kms, Block: Thethaitanger-IA, District: Simdega, Jharkhand)
IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-09A1/410 Dtd. 21.11.2013
M/s Krishna Construction
`440.40 Lacs `440.41 Lacs `439.41 Lacs 20.05.2015
15 e-Tender JH-18-XI-WB-
IRCON-31A
28.10.2013 Construction & Maintenance of Road – Phase XI : (1) Chiur To Hesla at km. 2+060 (L025-Karra), (2) Burka To Jabra at km. 2+760 (L035-Karra), (3) Burhiroma To Jhapra at km.2+460 (L053-Karra), (4) Taro To Barbanda at Km.1+575 (L045-Khunti), (Total No. Of Bridges: 04, Block: Karra & Khunti, District: Khunti, State: Jharkhand)
IRCON/2054/PMGSY/LOA/JH-18-XI-
WB-IRCON-31A/405 Dtd. 21.11.2013
M/s Mahamaya Enterprises
`281.13 Lacs `278.36 Lacs `278.36 Lacs 20.05.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)16 e-
Tender JH-05-XI-WB-
IRCON-30A1
28.10.2013 Construction & Maintenance of Road – Phase XI : 1) Asanpahari R To Gamrah at Km.1+402,(L022-Kathikund), 2) Narganj REO Road to Balidih at Km.7+050,(L054-Katikund), 3) Banspahari To Katpahari at Km.1+456, (L034-Shikaripara), 4) Sidhachatar To Dobhaghat at Km. 7+892, (L036-Shikaripara), (Total No. of Bridges: 04 nos, Dist: Dumka, Jharkhand)
IRCON/2054/PMGSY/LOA/JH-18-XI-
WB-IRCON-30A1/416 Dtd. 22.11.2013
M/s Mahamaya Enterprises
`203.91 Lacs `201.91 Lacs `199.89 Lacs 21.05.2015
17 IRCON/CC/TN/
CGRLP/JVCs Office/ 13/687, Dt. 03.06.201
3
05.07.2013 Internal finishing work, partitions, false ceiling, modification of toilets, plumbing, electrical and sanitary works etc. in connection with Setting up new office for JVCs at Raipur (Chhattisgarh)
IRCON/CGRLP/LOA/13/ JVC’s office/13/687
DT.26.11.2013
M/s VAS Nirman, 22 Maulshree
Vihar, V.I.P. Road, Puraina, Raipur,
CG
`35.85 Lacs `35.85 Lacs `31,87 Lacs 3 months
18 e-Tender JH-21-XI-WB-
IRCON-20A1
28.10.2013 Construction & Maintenance of Road- 1). Arani to Purnadih 0.500 Km. 2). Biru to pataratoli 2.1 Km. , 3). Harijantoli to telitoli 3.4km 4). Belgarh to bhnwarpani 3.90 Km. ,5). Kudrum to Bhandartoli 1.6 Km. 6). Khuntitoli to Ghosra 4.2 Km, (Total length 15.7 Km, Block- Simdega Sadar-I, District :Simdega)
IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-20A1/423 Dtd. 26.11.2013
Md. Yasin Construction
Pvt. Ltd
`693.69 Lacs 692.34 ` 692.34 Lacs 25.05.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
19 e-Tender JH-21-XI-WB-IRCON-75A
28.10.2013 Construction & Maintenance of Road : Jarket to Badomda 17.50 km. (Total Length:17.50Km, Block :Bano-III, District Simdega
IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-75A/424 Dtd. 26.11.2013
Md. Yasin Construction
Pvt. Ltd
`724.61 Lacs `724.62 Lacs `724.62Lacs 25.05.2015
20 e-Tender.
: IRCON/2049/
ROB-II- BIHAR/
e-Tender/2013/24 Date:31
-10-2013
19.11.2013 Supply, fabrication, assembly , erection and painting of Bowstring girder in connection to Construction of ROB at LC-47B at Begusarai in state of Bihar
IRCON/2049/ROB-II-Bihar/LC-
47B/Steel/LOA/131/2534,
Dtd.30.11.13
M/s. SSG Techno
Services Pvt. Limited, 29,
Ashutosh Pally, P.O: Garia,
Kolkata-700084
`365.69 Lacs 0.10% below `365.32 Lacs 06 Months from the date of issue of LOA
Works Awarded : DECEMBER 2013
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/J&K/JAT/14/1014/D-Q/Survey Team/S-
1/258/5657, dtd.
17.06.13
02.07.13 Hiring of Survey teams for survey works of D-Q Section in connection with construction of D-Q Section of J&K Rail
Line Project (S-1)
IRCON/J&K/JAT/14/1014/D-
Q/Survey Team/S-1/258/5657, dtd.
05.12.13
M/s Skylark Designer &
Engineers Pvt. Ltd., B-48, IInd
Floor, Sector-63, Noida-201302
(U.P)
`60.12 Lacs 23% above `73.94 Lacs 12 months from the date of issue
of LOA.
2 IRCON/Civil/e-
Tender/1029/RCF-
RBL/OT/01 Dt.
23.10.2013
22.11.13 Construction of INDOOR SPORTS COMPLEX AND AUDITORIUM BUILDING in township for Rail Coach Factory at Lalganj , Raebareli, (UP).
IRCON/Civil/e-Tender/1029/RCF-RBL/OT/01/4398
Dt. 16.12.13
M/s. Chinmay Construction , A-1 ,
Vibhuti Khand , Gomati Nagar,
Lucknow
`1670.78 Lakhs Schedule-A-1%(+) Schedule-B-At
par
Rs. 1685.52 Lakhs
18 Months from LOA
3 IRCON/J&K-Cell/JAT/14/1014/D-Q/T-49A/295, Dtd. 19.06.13
30.08.13
Construction of Tunnels T-49 (Part Tunnel),
Bridge 2, Bridge 3 and Earthworks at Sumber
yard (between Km 110.200 to Km 116.600 approx) on D-Q Section
of USBRL Project. (T-49A)
IRCON/J&K-Cell/JAT/14/1014/
D-Q/T-49A/295/3934, Dtd. 31.12.13
M/s Hindustan Construction Co.
Ltd. (HCC),Hincon house, Lal Bahadur Shastri Marg,
Vikhroli (West), Mumbai-400083,
`35685 Lacs 24.1% above `44251 Lacs 48 months from the date of issue
of LOA.
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)4 IRCON/M
ECH/ 1029/
RCF.RBL-II/Dead
weight/241 dtd
27.09.13
25.10.13
Dead Weight LOAD for EOT cranes
IRCON/MECH/1029/RCF.RBL-
II/Dead weight/241/4105
dtd 18.12.13
M/s Aggarwal Foundry&
EngineeringWorks, Plot No.12,
Sector-24,Faridabad-121005;Tel:
0129-2234232; email:[email protected]
`22.05 Lacs `22.58 Lacs `22.58 Lacs 3 months from LOA
5 IRCON/MECH/1029/RCF.RBL-II/Hand Tools & Tapping Drilling
Machine/190 dtd 29.06.1
3
24.07.13
HAND TOOLS & TAPPING / DRILLING MACHINE
IRCON/MECH/1029/RCF.RBL-
II/Hand Tools & Tapping Drilling
Machine/190/4105 dtd 20.12.13
& IRCON/MECH/102
9/RCF.RBL-II/Hand Tools & Tapping Drilling
Machine/190/4107 dtd 20.12.13
LOA for Hand Tools issued to M/S Emprise Marketing, Lucknow-
226024;email:[email protected]
m &
LOA for Tapping Drilling Machine
issued to M/s Diya
Technologies118, Cant Road
Near Odeon Cinema
Lucknow-226001,UP,India
Mob: 9935025285
Email: ak@ diyatechnologies.co.in
Estimate of `11,51,000/-
(i.e `4.76 Lacs is for Hand
Tools & Machine &
`6.75 Lacs for TAPPING / DRILLING MACHINE
Cost of Hand Tools is
`7,16,027/-& Cost of Tapping Drilling Machine
`17,68,000/-
Cost of Hand Tools is
`7,16,027/-& Cost of Tapping Drilling
Machine `17,68,000/-
30 days from PO
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)6 IRCON/M
ECH/1029/RCF-RBL-
II/Enquiry for
Furniture/ 3759
dated : 11.10.13
24.10.2013
Furniture for TTC IRCON/MECH/1029/RCF-RBL-II/r
Furniture for TTC/190A
Dtd : 23.12.2013
M/s BHARGAVA & ASSOCIATES
Authorised Wholesale
DealerGodrej & Boyce
Mfg. Co.Ltd14A/44,
PragNaraine Road,
Lucknow-226 001
Telefax: 0522-3012048; email: rbhargavas4@g
mail.com
`37,45,389/- `.37,03,835/- `37,03,835/- 6-8 weeks from PO
7 IRCON/MECH/1029/RCF.RBL
-II/Furnitur
e for ORH/242/RET dtd 09.11.13
29.11.13
Furniture for ORH IRCON/MECH/1029/RCF.RBL-
II/Furniture for ORH/242/RET/
4129 Dtd 23.12.13
M/s Durian Industries ltd, 1/20, W.H.S.,
Kirti Nagar, New Delhi-110015, Tel:011-47140200,
Email:[email protected]
`17,84,532/- `14,64,169/- `14,64,169/- 30 days from PO
8 IRCON/ J&K-Cell/ JAT/14/
1014/D-Q/ Hiring
Veh-Bnhl-NR/VH-09/269,
dtd. 28.10.13
12.11.2013
Hiring of vehicles for Officers and Staff associated with the project works in Connection with the construction of Dharam-Qazigund Section of USBRL New Rail Link Project (J&K) (VH-09)
IRCON/J&K-Cell/JAT/14/1014/D-Q/HIRING/VEH-
NBL-NR/VH-09/269/4069, dtd.27.12.13
M/s Friends Sumo Taxi
Owners Union, Chareel, The. Bnaihal, Distt. Ramban, J&K-
182146
`43 Lacs 15.33% above `49.59 Lacs 12 months from the date of issue
of LOA.
Works Awarded : JANUARY 2014
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ MECH/1029/RCF.RBL-II/RACKS/ 224 Dated 29.06.2013
31.07.2013 Racks for storage of materials
IRCON/MECH/1029/RCF.RBL-
II/RACKS/224/4264 Dated 13.01.2014
M/s Godrej & Boyce Mfg. Co.
Ltd, Godrej Bhawan, Sher
Shah Suri Marg, New Delhi-65
Ph: 011-66507070FAX: 011-66507056
`142.00Lacs `76.65 Lacs `76.65 Lacs 90 days from the date of issue of
LOA
2 IRCON/J&K-
Cell/JAT/14/1014/
DQ/T-74R-
A/300, Dtd.25.07
.13
13.09.13 Construction of tunnel T-74R balance work from Adit between KM 127/660 to KM 130/950 (Length 3290m) on DQ Section of USBRL Project (Package: T-74R-A)
IRCON/J&K-Cell/JAT/14/1014/DQ/T-74R-A/300/75,
Dtd. 20.01.14
M/s AFCONS Infrastructure
Limited, Afcons House, 16 Shah Industrial Estate,
Veera Desai Road,Azad Nagar
P.O, Post Box No.11978,
Andheri (W), Mumbai-400053
`36234.75 Lacs Overall 23.70% above
`44823.42 Lacs Within 33 Months from the date of
issue of LOA
3 IRCON/ MECH/1029/RCF.RBL-II/Locker
Cabinet/110/RET-
II/Dated 09.11.2013
03.12.2013 200 Locker Cabinets IRCON/MECH/1029/RCF.RBL-II/Locker Cabinet/110/RET-
II/4300 Dated 21.01.2014
M/s Delite Kom Ltd., Kukreja
House, IInd Floor, 46 Rani Jhansi
Road, New Delhi Ph: 011-46287777FAX: 011-23620502
Email: [email protected]
`33.42 Lacs `28.52 Lacs `28.52 Lacs (i) 100 nos within 30 days from the
issue of P.O.(ii) 100 nos. within 60 days from the date of issue of
P.O.
Works Awarded : FEBRUARY 2014
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/9038/SLR.S&T/ PSL MX/122
13-12-13 Supply of Power Supply System for Minor Gates for Sri Lanka Railways
IRCON/9038/SLR.S&T/PSL MX/122-1053 dt. 04.02.14
M/s. Statcon Power Controls
Ltd. Gautam Budh Nagar,
NOIDA
50 USD 3955.69 USD 19,997,784.50
6 months from date of issue of
LOA
2 e-Tender JH-21-XI-WB-IRCO
N-09B2
22.01.14 Construction & Maintenance Works of
(1)Pandripani Jaldega to Gandatoli - 4.748 km (2)
NH 23 Kereya to Dangtoli - 2.250 km
(3)NH 23 to Kurpani via Kundpani - 2.775 km
(4)NH 23 Kereyadangtoli Road to
Panginpahar Road - 0.825 km (5) Jogbahar
Ambapani to Changurbera - 2.100 km
(Total Length: 12.698 Kms, Block:
Thethaitanger-IB, District: Simdega,
Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-09B2/598 Date
07.02.2014
M/s Krishna Construction
540.11 Lac 540.22Lac 539.67 Lac 03.09.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)3 e-
Tender JH-21-XI-WB-IRCO
N-10A2
22.01.14 Construction & Maintenance Works of (1) Aurwrabahar Dumki Road To Ambatoli - 1.865 Km (2) Royantoli to Bhawandipa Road - 2.215 Km (3) Thethaitanger Bolba Road to Auwrabahar Chhuria Dumki Oriss - 10.435 Km (Total Length: 14.515 Km, Block: Thethaitanger-II A, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-10A2/596 Date
07.02.2014
M/s Krishna Construction
600.22 Lac 599.62 Lac 599.62 Lac 03.09.2015
4 e-Tender JH-21-XI-WB-IRCO
N-77A1
22.01.2014
Construction & Maintenance Works of
(1)Gobardhabasa at NH-23 to Manjhartoli 6.0
km, (2) Karmatoli SH to Karkotoli 3.30 km.,
(3)Pahantoli at Kolebira-1 Manoharpur to
Rabutoli 4.20 km, (Total Length 13.50 km., Block
Kolebira-1 , Dist. Simdega.)
LOA No.: IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-77A1/596 Date
07.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
665.89Lac 665.89Lac 665.83Lac 19.08.2015
5 e-Tender JH-18-XI-WB-IRCO
N-13A1
22.01.2014
Construction & Maintenance Works of (1) BAGHADIH TO CHOTODIH - 3.60 Kms, (2) BICHKATOLI TO PAWADHI-1.30 Kms, (3) DAMI TO KOLENGHATU-3.20 Kms, (4) EDAIHATU TO PANDRA VIA BANABURA-4.60 Kms, (Total Length: 12.70 Kms, Block: Bundu-I, District: Khunti, Jharkhand)
LOA No.: IRCON/2054/PMGSY/LOA/JH-18-XI-
WB-IRCON-13A1/602 Date
12.02.2014
M/s Adarsh Construction
`586.13Lac `586.13 Lac `575.50 Lac 03.09.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)6 e-
Tender JH-18-XI-WB-IRCON-28A
22.01.2014
Construction & Maintenance Works of 1) Bajpur to Chaulli via Hisir , 1.25Km., 2) Dahutoli Road to Doriyatoli ,3.03Km., 3) Sarnatoli to Siramtoli, 1.62Km, 4) REO Hochar to Patratoli, 1.755 Km., 5) Nawatoli More to Gangatoli, 1.60Km., 6) Tiputoli to Childag, 2.51Km., 7) REO Road Ekkaguri to Ekkaguri, 0.99Km., 8) Reo Road To Gariyatoli,, 1.56Km., 9) NH23 Satish Chowk to Nagri Bandhya, 4.97Km., (Total Length: 19.285 Kms, Block: Ratu-I, District: Ranchi, Jharkhand)
LOA No.: IRCON/2054/PMGSY/LOA/JH-18-XI-
WB-IRCON-28A/603 Date
12.02.2014
M/s Adarsh Construction
822.14 Lac 822.14 Lac 804.89 Lac 03.09.2015
7 e-Tender JH-21-XI-WB-IRCO
N-09C2
22.01.2014 Construction & Maintenance Works of (1) NH 23 to Ghattari Road - 3.500 km (2) Pandripani Jaldega to Pahartoli - 8.300 km (Total Length: 11.80 Kms, Block: Thethaitanger-IC, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-09C2/609 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd.
488.13 Lac 488.14 Lac 488.14 Lac 19.08.2015
8 e-Tender JH-21-XI-WB-IRCO
N-21A2
22.01.2014 Construction & Maintenance of Road- (1) Reo Road Garja to Kharwagarha 3.5km (2).Garja road to bhagalata 5.0 km (3) Nawatoli to meromloya 2.075 km . (Total Length 10.575 km, Block : Simdega Sadar-IIA District : Simdega.)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-21A2/608 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
444.76 Lac 444.83 Lac 444.83 Lac 19.08.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
9 e-Tender
JH-21-XI-WB-IRCO
N-72A1
22.01.2014 Construction & Maintenance Works of (1) Thethaitangar Bolba Road to Jillinga Karapani - 2.59 km (2) Bolba Road To Royantoli -1.815 km (3) Asanbera to Tukupani Road - 4.453 km (4) Thethaitangar Kurpani Road to Dumbertoli Asenbera Road - 3.600 km (5) Kurpani Road to Panripani Tukupani Road - 4.575 (Total Length: 17.033 Kms, Block: Thethaitanger-IIIA, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-72A1/607 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
788.44 Lac 788.44 Lac 788.44 Lac 12.08.2015
10 e-Tender
JH-21-XI-WB-IRCO
N-72A2
22.01.2014 Construction & Maintenance Works of (1) Rengari Road to Poraha Toli- 2.850 km (2) Shankh River to Kongsera Basartoli Road -4.15 km (3) Konpala Road to Lurkutoli -1.900 km (4)Konpala to Patra toli - 2.000 km(5) Lathkhamhan Rengari Road to Sarplata via Bhawarkhol - 5.100 km (Total Length: 16.00Kms, Block: Thethaitanger-IIIB, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-72A2/606 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
621.72 Lac 621.71 Lac 621.71 Lac 19.08.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
11 e-Tender JH-21-XI-WB-IRCO
N-73A1
22.01.2014 Construction & Maintenance Works of (1) Kevgutu to Kodhipat 1.53 Km, (2) Tembaro to Marani(5.80 Km) , (3) Borsotta to Borbera 5.6 Km (4) Paro Rajmal Path to Kawalbera 2.6 Km, (5) Kansoda Ella to Mahabang Path 4.7 Km (Total length 20.23 Km, Block: Bano-I, District : Simdega)
IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-73A1/604 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
978.37 Lac 977.63 Lac 977.63 Lac 19.08.2015
12 e-Tender JH-21-XI-WB-IRCO
N-74A1
22.01.2014 Construction & Maintenance Works of (1) PWD Road to Nawagaon via Chatuora Kusum 1.4 Km, (2) Bintuka to Tudeue 2.6 Km (3) Pangur To Khujurbahar via Jumarsoya 3.0 Km (4) Rubbai to Parro via Ramjal Sumirbora 4.4 Km. (5) Bano PWD road to Ganmer Path via Pabura nimtur Bintuka Pangur Tonia 7.25 Km. , (Total length 18.65 Km, Block: Bano-II, District : Simdega)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
21-XI-WB-IRCON-74A1/605 Date
13.02.2014
M/s Md. Yasin Construction Pvt.
Ltd
919.11Lac 918.82 Lac 918.82 Lac 19.08.2015
13 e-Tender JH-21-XI-WB-IRCO
N-10B2
22.01.2014 Construction & Maintenance Works of (1) NH 23 Joram to Masania via Sudapahar - 5.950 Km (2) NH 23 Jampani Tojoram Ambapani Deobahar Road - 2.775 Km (3) Thethaitangar Bolba Road to Dhorthibahar - 7.000 Km (Total Length: 15.725 Km, Block:Thethaitanger-II B, District: Simdega, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/JH-21-XI-
WB-IRCON-10B2/614 Date
14.02.2014
M/s Krishna Construction
662.08 Lac 662.09 Lac 661.79 Lac 03.09.2015
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)14 IRCON/
JK-Cell/JAT/14/1014/DQ/Superpassage 77A-1/BR-
12, Dtd:21.1
2.13
28.02.14 Construction of Super Passage at Cut & cover No.77A-1 between KM 146.191 and KM 146.2265 under Dharam-Qazigund Section of USBRL New Rail Link Project (Jammu & Kashmir) (Package: BR-12)
IRCON/J&K-DQ/1014/Superpas
sage-77A-1/BR-12/6/27,
Dtd.15.02.2014
M/s Inam & Co, Engineers &
Contractors, Kaka Road, Nai Sarak,
Srinagar, J&K-190001
`55.84 Lacs Overall 2% below
`54.73 Lacs Within Four (4) Months from the date of issue of
LOA
15 e-Tender JH-18-XI-WB-IRCON-26A
22.01.2014
Construction & Maintenance Works of (1) Padriya to Loharakochha - 3.077 Km., (2) Tangritola to Chotkalowagarha - 2.514 Km., (3) Chaingara to Mahadeotola - 2.949 Km., (4) Baraoudi to Semratola - 1.741 Km., (5) Nawatoli to Ojhasaram - 1.700 Km., (6) Patkoi to Saram - 5.174 Km. and (7) Cholebera to Aradewar - 2.740 Km. (Total Length:19.89Kms, Block: Burmu, District: Ranchi, Jharkhand)
LOA No.: IRCON/2054/PMGSY-JKR/LOA/JH-
18-XI-WB-IRCON-26A/618 Date 18.02.2014
M/s Lions Construction
1072.88 Lac 1072.87 Lac 1048.52 Lac 27.08.2015
16 e-Tender IRCON/Elect/3014/OH
E Erectio
n/01 Dtd.
22.11.2013
16.12.2013
Design, Supply, Installation,Testing, Comissioning of Railway Electrification Works Comprising of 25 KV Overhead Line Equipment (OHE) from Jhalawar City station to Kalisindh Thermal Power Plant
IRCON/ELECT/3014/OHE
ERECTION/04 Dated 28.02.2014
M/s Kailash Electricals, S-I,
Bishambhar Dham, (Opp. Suraj
Hospital), 117/N/52, Kakadeo, Kanpur (U.P.), TELE FAX
No. 0512-2502400, 2502409, email:
`878 lacs `902.12 Lacs 30.08.2014
Works Awarded : MARCH 2014
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/CC/
TN/JBNRL/
2051/14/704 Dtd.
03.01.14
Technical Bid on
27.01.2014 and
Financial Bid on
18.03.14
Construction of Station Buildings, Passenger & Goods Platform, PF Shelter/sheds, FOB, tea stall, goods circulating area/roads works, staff quarters, guest house, Pump House, over head water tank, trolley shed & miscellaneous anciliary works for Nepal Custom Yard.
IRCON/2051/JBNRL/ Stn.
Bldg/Nepal Custom Yard/19/ 1818 dt.31.03.14
M/s Bagmati Construction Company,
Subash Chowk,
ForbesganjPIN: 854 318Araria, Bihar
Ph: 06455-225451
`1981.42 Lacs
8% Above `1491.94 Lacs 15 months from the date of issue
of LOA
Works Awarded : APRIL 2014
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and address
Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./S&T/Mech. etc Works)
Value of Contract
Scheduled completion
date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ JK Cell
/JAT/1014/17/G/
Support Services/SS-3R/ 344 (A), 28.02.14
21.03.14 Providing Support Services dor IRCON's office and Guest Houses and other locations at USBRL Project office and establishments at Jammu. (Package: SS-3R)
IRCON/JK Cell/JAT/1014/17/
G/Support Services/SS-3R/344 (A),
Dated:01.04.2014
M/s Gh. Nabi Giri & Sons, Main
Bazar, Banihal, Distt. Ramban
(J&K).
`24.04 Lacs 0.02% below `29.42 Lacs 12 months from the date of issue
of LOA
2 Consultancy-02
(Nepal), NIT No.-706 Dtd.
30.01.2014
21.02.14 Consultancy Works for Architectural and structural design and Other Services Related to the Construction of Station Building, Staff Quarters, OH Water Tank and miscellaneous works in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal). PKG: Consultancy – 02 (Nepal)
21.04.2014 `10.26 Lacs
3 Consultancy-03
(Nepal), NIT No.-707 Dtd.
30.01.2014
21.02.14 Consultancy Works for Preparation of GAD, Detailed Design & Drawing including Proof Checking of foundation, sub-structure and superstructure of Major Bridges from Km 27+775 to Km 52+336 in connection with Construction of New Broad Gauge Rail Line From Jaynagar (India) to Bardibas (Nepal). PKG: Consultancy – 03 (Nepal)
24.04.2014 `6.17 Lacs