ANALISA PERHITUNGAN MRP RAW MATERIAL Exception : Coil = 13-0100-0900-0000 Sheet = 13-0100-0220-0220 65912-77570 1 Finish Good need 1 Componen, 1 Sheet 2 pcs Componen. This item use for Y9JFPB, the forecast in October :

ANALISA PERHITUNGAN MRP RAW MATERIAL

Embed Size (px)

Citation preview

Page 1: ANALISA PERHITUNGAN MRP RAW MATERIAL

ANALISA PERHITUNGAN MRP RAW MATERIAL

Exception : Coil = 13-0100-0900-0000Sheet = 13-0100-0220-0220 65912-77570

1 Finish Good need 1 Componen, 1 Sheet 2 pcs Componen.

This item use for Y9JFPB, the forecast in October :

From MRP Calculation Sheet Oct’08 the result is 72 lbr.Formula Demand = = 144 x ½ = 72 Forecast

x pcs/sheet

Page 2: ANALISA PERHITUNGAN MRP RAW MATERIAL

From MRP Calculation Coil Oct’08 the result is 27.36 KG.Formula Demand = = D

= 144 x (0.38 x ½) = 27.36

Formula Demand =

Note : ITEM n.. the mean is Part Number sheet from Mother Coil in every Finish Good.

Forecast x (sheet weight x pcs/sheet)

{[(Total Forecast M+6) x (sheet weight x pcs/sheet)] + [ITEM n..] + [ITEM n..] + …. }

Page 3: ANALISA PERHITUNGAN MRP RAW MATERIAL

Summary Total Weight_Needed = {[(144+48+144+96+96+144+144) x (0.38 x ½)] + [(144+48+144+96+96+144+144) x (5.93 x 2/2)] + [(144+48+144+96+96+144+144) x (2.91 x 1/1)]}

= { [155.04] + [4838.88] + [2374.56] } = { 7368.00 }

Page 4: ANALISA PERHITUNGAN MRP RAW MATERIAL

FLOW PROCEDURE MAINTENANCE OUTSTANDING PO

Page 5: ANALISA PERHITUNGAN MRP RAW MATERIAL

Flow Revision maintenance O/S after meeting coil