ANALISA PERHITUNGAN MRP RAW MATERIAL
Exception : Coil = 13-0100-0900-0000Sheet = 13-0100-0220-0220 65912-77570
1 Finish Good need 1 Componen, 1 Sheet 2 pcs Componen.
This item use for Y9JFPB, the forecast in October :
From MRP Calculation Sheet Oct’08 the result is 72 lbr.Formula Demand = = 144 x ½ = 72 Forecast
x pcs/sheet
From MRP Calculation Coil Oct’08 the result is 27.36 KG.Formula Demand = = D
= 144 x (0.38 x ½) = 27.36
Formula Demand =
Note : ITEM n.. the mean is Part Number sheet from Mother Coil in every Finish Good.
Forecast x (sheet weight x pcs/sheet)
{[(Total Forecast M+6) x (sheet weight x pcs/sheet)] + [ITEM n..] + [ITEM n..] + …. }
Summary Total Weight_Needed = {[(144+48+144+96+96+144+144) x (0.38 x ½)] + [(144+48+144+96+96+144+144) x (5.93 x 2/2)] + [(144+48+144+96+96+144+144) x (2.91 x 1/1)]}
= { [155.04] + [4838.88] + [2374.56] } = { 7368.00 }
FLOW PROCEDURE MAINTENANCE OUTSTANDING PO
Flow Revision maintenance O/S after meeting coil