DAYWORK/ VARIATION
1. GENERAL NOT FOR DAYWORK CALCULATIONAttachment-1
Annex 1
1. Unit Rate for Overtime Worka Labor
Overtime Work calculated based on Normal Working Day of 8 hrs Working Day (Monday to Friday) and 40Hrs per week.Overtime Working Hours
(Normal Working Day)Overtime Working Hours
(Holiday)
1st Hr After 1st Hr Basic Hr 1st Hr after Basic Hr After 1st Hr
1 Monday 8 1.5 2 2 3 42 Tuesday 8 1.5 2 2 3 43 Wednesday 8 1.5 2 2 3 44 Thursday 8 1.5 2 2 3 45 Friday 8 1.5 2 2 3 46 Saturday 2 3 47 Sunday 2 3 4
Total 40
Note: Overtime will be calculated based on indicated koeficient on the table x basic rate per hours.Table based on "Kep-102/MEN/VI/2004" -------->
b EquipmentOvertime rate for Equipment will be calculated as follows:
> Basic rate for each overtime rate = Daily Rental Rate/8> Equipment Operator Overtime to be calculated as of Labor Overtime calculation
Overtime for Equipment = Normal Rate (Hr) + Operator Overtime
where; Operator Overtime = (rate koeficient x Hour Rate) - Hour RatePlease refer to following table of "Normal Rate for Equipment & Operator" and "Operator Overtime"
1. Normal Rate for Equipment & Operator
EQUIPMENT1 Excavator 0.8M3 Hr 479,3132 Bulldozer 19t Hr 358,2883 Tronton (26t) Hr 446,4634 Vibro Roller (8t) Hr 439,657
LABOR1 Operator/ Driver Hr 19,813
2. Operator OvertimeOvertime Working Hours
(Normal Working Day)Overtime Working Hours
(Holiday)
1st Hr(1.5 -1)N.Rate
After 1st Hr(2 -1)N.Rate
Basic Hr(2 -1)N.Rate
1st Hr after Basic Hr(3 -1)N.Rate
After 1st Hr(4 -1)N.Rate
1 Monday 8 9,907 19,813 19,813 39,626 59,4392 Tuesday 8 9,907 19,813 19,813 39,626 59,4393 Wednesday 8 9,907 19,813 19,813 39,626 59,4394 Thursday 8 9,907 19,813 19,813 39,626 59,4395 Friday 8 9,907 19,813 19,813 39,626 59,4396 Saturday 19,813 39,626 59,4397 Sunday 19,813 39,626 59,439
Total 40
2. Unit Rate for New Itemsa Labour
1 Supervisor Man-Day 221,900 27,7382 Common Labour Man-Day 88,125 11,016
BasicNormalWorking
Hours
DayNo.
No. Labour Unit
No. Equipment Unit
No. Day
BasicNormalWorking
Hours
Unit Rate(IDR)
Remark
Please Refer to Unit Rate Derivation
Unit Rate(IDR/Man-Hr)
Please Refer to Unit Rate DerivationPlease Refer to Unit Rate Derivation
As of JMCMC Evaluation
Please Refer to Unit Rate Derivation
Unit Rate(IDR)
Remark
Please Refer to Unit Rate DerivationPlease Refer to Unit Rate Derivation
See Attachment-2 ( Annex 1 ): TheExtracted Document of Kep-
102/MEN/VI/2004
1 of 2
16/12/2015Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost Proposal\Backfill at
Lebak Bulus Terminal_151210 - Copy2
DAYWORK/ VARIATION
1. GENERAL NOT FOR DAYWORK CALCULATIONAttachment-1
Annex 1
b Equipment
1 Excavator 0.8M3 Hr 479,3132 Buldozer 19t Hr 358,2883 Tronton 26t Hr 446,4634 Vibro Roller 8t Hr 439,657
c Material
1 Red Soil M3 131,300
No. Equipment CapacityUnit Rate
(IDR)Unit
No. Labour UnitUnit Rate
(IDR)Remark
As of JMCM Evaluation
Please Refer to Unit Rate Derivation
Remark
Please Refer to Unit Rate DerivationPlease Refer to Unit Rate DerivationPlease Refer to Unit Rate Derivation
2 of 2
16/12/2015Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost Proposal\Backfill at
Lebak Bulus Terminal_151210 - Copy2
Attachment-1Annex 2
Valuation of Variation - Collection SheetInstruction: Letter CN1&2/OTH/2014/12-0747 dated 02 December 2014
2. UNIT RATE DERIVATION
TWJO UNIT RATE AS OF 8TH JUNE 2015 (ORIGINAL PROPOSAL - TENTATIVE)
QTYUNIT RATE
(IDR)OVERHEAD 15%
(IDR)
UNIT RATE(TOTAL)
(IDR)REMARK
a b c=15%xb d=(bxa)+(cxa)
A. EQUIPMENT1 Excavator (0.8m3)
Equipment Rental Rate Hr - -
Opertor Man-Hr -
Mob. Demob Hr -
Fuel (Diesel) Lt -
Unit Rate of Excavator (0.8m3) IDR/HR 1 479,313 Refer to Pondok Pinang & MK Land Daywork(Proposal on 22 Sept 2015)
2 Tronton (26t)
Equipment Rental Rate Hr 1 185,000 27,750 212,750 Based on 25th Days per month
Opertor/ Driver Man-Hr 1 19,813 19,813
Fuel (Diesel) Lt 31 6,900 213,900
Unit Rate of Tronton (26t) IDR/HR 1 446,463
3 Bulldozer (19t)
Equipment Rental Rate Hr
Mob. Demob Hr
Opertor Man-Hr
Fuel (Diesel) Lt
Unit Rate of Bulldozer (19t) IDR/HR 1 358,288 Applied Eq. Rate Bulldozer 21t
4 Vibro Roller (8t)
Equipment Rental Rate Hr
Mob. Demob Hr
Opertor Man-Hr
Fuel (Diesel) Lt
Unit Rate of Vibro Roller (8t) IDR/HR 1 439,657 Applied Eq. RateTire Roller 8t-20t
B. LABOUR1 Supervisor IDR/HR 1 27,738 27,738
Refer to Pondok Pinang & MK Land Daywork(JMCMC Approval)
2 Common Labour IDR/HR 1 11,016 11,016 Using Unit Rate of Contract
C. MATERIAL1 Red Soil IDR/M3 1 135,000 135,000
Refer to Pondok Pinang & MK Land Daywork(Proposal on 22 Sept 2015)
NO DESCRIPTION UNIT
1 of 116/12/2015
Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost Proposal\Backfill at Lebak Bulus Terminal_151210 - Copy2
Valuation - Daywork Record SheetsInstruction: Letter CN1&2/OTH/2014/12-0747 dated 02 December 2014
3. FUEL CONSUMPTION CALCULATION (DIESEL)TABLE-1Hourly Fuel Consumption (Qhr):
Qhr = [12% - 15%] x HP __(Lt/Hr) --->"Analisa Harga Satuan Pekerjaan (AHSP) Bidang Pekerjaan Umum
Kementrian Pekerjaan Umum" -->E.g. Excavator CAT320C
> The equipment will be operated at 85% of heavy duty & 15% of light duty of hourly operation> Equipment & Operator satisfactory (f ) = 0.83
HP= 138Qhr(max) = 0.15xHP
= 20.7 lt/HrQhr(min) = 0.125 x HP
= 16.56 lt/HrQhr(Avr) = [(85% x Qhr(max)) + (15% x Qhr(min))]
20.08 lt/HrQhr = Qhr(Avr)/f
24.2 lt/HrQhr = 25 lt/Hr (Roundup)
Tabel:
a b=0.15xHP c=0.12xHP d=0.85b + 0.15c e f=d/eg=roundup(f,0
)
1 Excavator (0.8m3) PC 210 Zaxis 147.5 22.13 17.70 21.46 0.83 18.0 182 Tronton (26t) HINO FM 285 JD 254.8 38.22 30.58 37.07 0.83 31.0 313 Bulldozer (19t) KOMATSU D 65 E 180.0 27.00 21.60 26.19 0.83 22.0 224 Vibro Roller (8t) SAKAI SV400TB-2 100.0 15.00 12.00 14.55 0.83 13.0 13
Attachment-1Annex 3
See Attachment-2 (Annex 2):The Extracted Document of AHSP
NO EQUIPMENT MODEL/ TYPE
Qhr
(lt/Hr)Qhr(max)
(lt/Hr)Qhr(min)
(lt/Hr)Remarks
Qhr(avr)
(lt/Hr)f
Qhr
(lt/Hr)HP
1 of 1
16/12/2015Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost
Proposal\Backfill at Lebak Bulus Terminal_151210 - Copy2
Valuation of Dayworks - Collection Sheet
Instruction: TBA
Work: Backfilling Works at Lebak Bulus Terminal From ToArea: Lebak Bulus Terminal 06-Apr-15 31-Jul-15
4. SUMMARY COMPARISONSUMMARY
Normal AmountIDR
OT. AmountIDR
Tot. AmountIDR
LABOUR 23,562,432 51,426,558 74,988,990
EQUIPMENT 752,103,036 790,135,957 1,542,238,993
MATERIAL 1,925,100,000 - 1,925,100,000
TOTAL 2,700,765,468 841,562,515 3,542,327,983
REMARKRESOURCESAREA
LEBAK BULUS TERMINAL
1 of 1
16/12/2015Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost Proposal\Backfill at Lebak Bulus Terminal_151210 -
Copy2
Valuation of Dayworks - Collection Sheet
Instruction: TBA
Work: Backfilling Works at Lebak Bulus Terminal From ToArea: Lebak Bulus Terminal 06-Apr-15 31-Jul-15
5. DAYWOKS SUMMARYLEBAK BULUS TERMINAL
Date Area DRN Labour Equipment Material Total
Normal AmountIDR
OT. AmountIDR
Tot. LaborAmount
IDRNormal Amount
IDROT. Amount
IDR
Tot.EquipmentAmount
IDRTot. Amount Normal Amount
IDROT. Amount
IDRTot. Amount
06-Apr-15 1 DRN 01 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 37,260,000.00 58,813,236.00 8,573,432.00 67,386,668.0007-Apr-15 1 DRN 02 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 27,945,000.00 49,498,236.00 8,573,432.00 58,071,668.0008-Apr-15 1 DRN 03 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 18,630,000.00 40,183,236.00 8,573,432.00 48,756,668.0009-Apr-15 1 DRN 04 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 24,840,000.00 46,393,236.00 8,573,432.00 54,966,668.0010-Apr-15 1 DRN 05 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 27,945,000.00 49,498,236.00 8,573,432.00 58,071,668.0011-Apr-15 1 DRN 06 - 2,092,716.00 2,092,716.00 - 30,685,165.00 30,685,165.00 34,155,000.00 34,155,000.00 32,777,881.00 66,932,881.0012-Apr-15 1 DRN 07 - 2,092,716.00 2,092,716.00 - 30,685,165.00 30,685,165.00 18,630,000.00 18,630,000.00 32,777,881.00 51,407,881.0013-Apr-15 1 DRN 08 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 21,735,000.00 43,288,236.00 8,573,432.00 51,861,668.0014-Apr-15 1 DRN 09 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 31,050,000.00 52,603,236.00 8,573,432.00 61,176,668.0015-Apr-15 1 DRN 10 620,064.00 581,310.00 1,201,374.00 20,933,172.00 10,882,663.00 31,815,835.00 40,365,000.00 61,918,236.00 11,463,973.00 73,382,209.0016-Apr-15 1 DRN 11 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 24,840,000.00 46,393,236.00 8,573,432.00 54,966,668.0017-Apr-15 1 DRN 12 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 21,735,000.00 43,288,236.00 8,573,432.00 51,861,668.0018-Apr-15 1 DRN 13 - 2,712,780.00 2,712,780.00 - 36,631,727.00 36,631,727.00 46,575,000.00 46,575,000.00 39,344,507.00 85,919,507.0019-Apr-15 1 DRN 14 - 2,092,716.00 2,092,716.00 - 30,685,165.00 30,685,165.00 24,840,000.00 24,840,000.00 32,777,881.00 57,617,881.0020-Apr-15 1 DRN 15 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 21,735,000.00 43,288,236.00 8,573,432.00 51,861,668.0021-Apr-15 1 DRN 16 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 55,890,000.00 77,443,236.00 14,354,514.00 91,797,750.0022-Apr-15 1 DRN 17 620,064.00 891,342.00 1,511,406.00 20,933,172.00 16,353,713.00 37,286,885.00 62,100,000.00 83,653,236.00 17,245,055.00 100,898,291.0023-Apr-15 1 DRN 18 620,064.00 891,342.00 1,511,406.00 20,933,172.00 16,353,713.00 37,286,885.00 68,310,000.00 89,863,236.00 17,245,055.00 107,108,291.0024-Apr-15 1 DRN 19 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 49,680,000.00 71,233,236.00 14,354,514.00 85,587,750.0025-Apr-15 1 DRN 20 - 3,022,812.00 3,022,812.00 - 39,605,008.00 39,605,008.00 62,100,000.00 62,100,000.00 42,627,820.00 104,727,820.0026-Apr-15 1 DRN 21 - 2,712,780.00 2,712,780.00 - 36,631,727.00 36,631,727.00 55,890,000.00 55,890,000.00 39,344,507.00 95,234,507.0027-Apr-15 1 DRN 22 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 46,575,000.00 68,128,236.00 14,354,514.00 82,482,750.0028-Apr-15 1 DRN 23 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 31,050,000.00 52,603,236.00 8,573,432.00 61,176,668.0029-Apr-15 1 DRN 24 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 58,995,000.00 80,548,236.00 14,354,514.00 94,902,750.0030-Apr-15 1 DRN 25 620,064.00 891,342.00 1,511,406.00 20,933,172.00 16,353,713.00 37,286,885.00 62,100,000.00 83,653,236.00 17,245,055.00 100,898,291.0001-May-15 1 DRN 26 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 55,890,000.00 77,443,236.00 14,354,514.00 91,797,750.0002-May-15 1 DRN 27 - 2,712,780.00 2,712,780.00 - 36,631,727.00 36,631,727.00 49,680,000.00 49,680,000.00 39,344,507.00 89,024,507.0003-May-15 1 DRN 28 - 2,712,780.00 2,712,780.00 - 36,631,727.00 36,631,727.00 46,575,000.00 46,575,000.00 39,344,507.00 85,919,507.0004-May-15 1 DRN 29 620,064.00 891,342.00 1,511,406.00 20,933,172.00 16,353,713.00 37,286,885.00 65,205,000.00 86,758,236.00 17,245,055.00 104,003,291.0005-May-15 1 DRN 30 620,064.00 1,201,374.00 1,821,438.00 20,933,172.00 21,824,763.00 42,757,935.00 77,625,000.00 99,178,236.00 23,026,137.00 122,204,373.0006-May-15 1 DRN 31 620,064.00 891,342.00 1,511,406.00 20,933,172.00 16,353,713.00 37,286,885.00 62,100,000.00 83,653,236.00 17,245,055.00 100,898,291.0007-May-15 1 DRN 32 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 46,575,000.00 68,128,236.00 14,354,514.00 82,482,750.0008-May-15 1 DRN 33 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 49,680,000.00 71,233,236.00 14,354,514.00 85,587,750.0009-May-15 1 DRN 34 - 1,240,128.00 1,240,128.00 - 10,693,576.00 10,693,576.00 - - 11,933,704.00 11,933,704.0001-Jul-15 1 DRN 35 620,064.00 1,201,374.00 1,821,438.00 20,933,172.00 21,824,763.00 42,757,935.00 77,625,000.00 99,178,236.00 23,026,137.00 122,204,373.0002-Jul-15 1 DRN 36 620,064.00 1,201,374.00 1,821,438.00 20,933,172.00 21,824,763.00 42,757,935.00 80,730,000.00 102,283,236.00 23,026,137.00 125,309,373.0003-Jul-15 1 DRN 37 620,064.00 1,511,406.00 2,131,470.00 20,933,172.00 27,295,813.00 48,228,985.00 86,940,000.00 108,493,236.00 28,807,219.00 137,300,455.0004-Jul-15 1 DRN 38 - 3,022,812.00 3,022,812.00 - 39,605,008.00 39,605,008.00 62,100,000.00 62,100,000.00 42,627,820.00 104,727,820.0005-Jul-15 1 DRN 39 - 3,022,812.00 3,022,812.00 - 39,605,008.00 39,605,008.00 - - 42,627,820.00 42,627,820.0006-Jul-15 1 DRN 40 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 55,890,000.00 77,443,236.00 14,354,514.00 91,797,750.0007-Jul-15 1 DRN 41 620,064.00 736,326.00 1,356,390.00 20,933,172.00 13,618,188.00 34,551,360.00 46,575,000.00 68,128,236.00 14,354,514.00 82,482,750.0008-Jul-15 1 DRN 42 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 31,050,000.00 52,603,236.00 8,573,432.00 61,176,668.0009-Jul-15 1 DRN 43 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 24,840,000.00 46,393,236.00 8,573,432.00 54,966,668.0010-Jul-15 1 DRN 44 620,064.00 426,294.00 1,046,358.00 20,933,172.00 8,147,138.00 29,080,310.00 31,050,000.00 52,603,236.00 8,573,432.00 61,176,668.0011-Jul-15 1 DRN 45 - 1,240,128.00 1,240,128.00 10,218,060.00 - 10,218,060.00 - 10,218,060.00 1,240,128.00 11,458,188.0027-Jul-15 1 DRN 46 620,064.00 - 620,064.00 10,218,060.00 - 10,218,060.00 - 10,838,124.00 - 10,838,124.0028-Jul-15 1 DRN 47 620,064.00 - 620,064.00 10,218,060.00 - 10,218,060.00 - 10,838,124.00 - 10,838,124.0029-Jul-15 1 DRN 48 620,064.00 - 620,064.00 10,218,060.00 - 10,218,060.00 - 10,838,124.00 - 10,838,124.0030-Jul-15 1 DRN 49 620,064.00 - 620,064.00 10,218,060.00 - 10,218,060.00 - 10,838,124.00 - 10,838,124.0031-Jul-15 1 DRN 50 620,064.00 - 620,064.00 10,218,060.00 - 10,218,060.00 - 10,838,124.00 - 10,838,124.00
23,562,432.00 51,426,558.00 74,988,990.00 752,103,036.00 790,135,957.00 1,542,238,993.00 1,925,100,000.00 2,700,765,468.00 841,562,515.00 3,542,327,983.00Totals IDR
1 of 1
16/12/2015Z:\03 DIV CTRL DOCS & RECORDS\08 Commercial Division\05) Variation\Daywork\CP101_no.2_Backfill at Lebak Bulus Terminal\D. Cost Proposal\Backfill at Lebak Bulus Terminal_151210 - Copy2
Attachment - 2Annex 1Page 2 of 3
Attachment - 2Annex 1Page 3 of 3
Attachment - 2Annex 2Page 1 of 2
Attachment - 2Annex 2Page 2 of 2
Attachment‐3
1. Daily Rate for Labour, Equipment & Materials
BERANDA Tentang Kami Pasang Direktori
SURABAYA, RENTAL - SEWA ALAT BERAT
Personal Kontak :Willy Rosiyandi, S.Sos, MMAlamat :Pogot Palm Regency A29,SURABAYA60129, Jawa Timur, Indonesia
Telepon :62-31-372715408175123434081233412345No Fax :62-31-3727154Pin BB :20FFE159
E-mail :[email protected]
Alamat webste :-Yahoo Messenger :[email protected]
DESKRIPSI USAHA
Perusahaan Kami berdiri pada tahun 2008 dengancore bisnis Transportasi, Kami juga melayani rental seluruh Indonesia:
.AcehSumatera UtaraSumatera BaratRiauJambiBengkuluBangka BelitungKepulauan RiauSumatera SelatanLampungBantenJakartaJawa BaratJawa TengahYogyakartaJawa TimurBaliNusa Tenggara BaratNusa Tenggara TimurKalimantan BaratKalimantan TengahKalimantan SelatanKalimantan TimurSulawesi BaratSulawesi UtaraSulawesi TengahSulawesi TenggaraGorontaloSulawesi SelatanMalukuMaluku UtaraPapua BaratPapua...
WWW.ALATBERAT.WEB.ID adalah Web Direktori yang menampilkan profil pengusaha alat berat, baik reseller maupun persewaan alat berat, baik baru maupun bekas.
1 of 6 10/30/2015 3:54 AM
Transportation Services and Heavy Duty.- Melayani Sewa Dump Truck dan Alat-alat berat dan Tongkang- Melayani Pengurukan dan Pemindahan Material- Penyedia Sirtu, Paras, Pedel, Limpstone dan Gypsum, tanah dll- Melayani Jasa Kontruksi
PENAWARAN
Klasifikasi Sistem Rental Dump Truck:DAFTAR HARGA SEWA ( NEGOTIABLE) :
Dump truck Tronton Roda 10, kapasitas 25 - 30 tonPulau Jawa
-th 1997-2000 : Rp. 25.000.000 / unit perbulan-th 2000-2002 : Rp. 26.000.000 / unit perbulan-th 2003-2004 : Rp. 27.000.000 / unit perbulan-th 2005-2006 : Rp. 28.000.000 / unit perbulan-th 2007-2008 : Rp. 31.000.000 / unit perbulan-th 2009 : Rp. 33.000.000 / unit perbulan-th 2010 : Rp. 35.000.000 / unit perbulan-th 2011 : Rp. 37.000.000 / unit perbulan
Luar Pulau Jawa-th 2007-2008 : Rp. 42.000.000 / unit perbulan-th 2009 : Rp. 43.000.000 / unit perbulan-th 2010 : Rp. 45.000.000 / unit perbulan-th 2011 : Rp. 46.000.000 / unit perbulan
Ketentuan Maintenance:-Th 1997-2000 : Kerusakan dibawah 2.000.000 Penyewa di atas itu 50: 50-Th 2000-2006 : Kerusakan dibawah 2.000.000 Penyewa di atas itu 50: 50-Th 2007-2011 : Full Maintenance Penyewa
Dump Truck 6 Roda kapasitas 7-10 m3hanya untuk Jawa- Th 2011: Rp 13.000.000 per unit/ per bulan- Maintenance : 50: 50 di atas Rp 2.000.000
Klasifikasi Sistem Rental Alat Berat: ( Jawa)Tahun 2003- Excavator : Rp. 160 Rb/ Jam- Dozzer : Rp. 160 Rb/ Jam- Brackker : Rp. 175 Rb/ jam
NEGOTIABLE
.
.
.
.
.
.
.
.
.
2 of 6 10/30/2015 3:54 AM
KETENTUAN
KETENTUAN SEWA :
Mengirimkan/ ada MOU/ LOI/ PO Minimal Kontrak 1 Tahun untuk armada dibawah 2007Pembayaran di muka 1 bulan per unit Armada ( Dump Truck) pada saat MOU/KontrakSelanjutnya pembayaran disediakan Cek/ BG/ SKBDN selama masa sewaUntuk sewa di luar jawa pembayaran sewa bulanan dibayarkan 2 bulan didepan
Sewa Dump truck HINO/ Fuso TH 2011Adapun mekanisme penyewaan armada baru sebagai berikut :
Kami menyewakan unit dump truck 100% baruBiaya sewa/ rental sebesar Rp. / Unit/ bulan ( min kontrak 3 tahun)Uang Muka 2 bulan dimuka pada saat sign kontrak MOU.Penyewa bersedia menerbitkan PO, SPK, MOU dan Jaminan Pembayaran selamakontrak dimuka ( CEK/ BG atau SKBDN) sebelum kami melakukan order unit ke dealerMenyediakan workshop/ tempat untuk armada dan Mess untuk PengemudiPembayaran dicairkan perbulan dari jaminan Pembayaran/ sesuai dengan perjanjianSemua biaya BBM, Maintenance, kerusakan, Pengemudi ditanggung pihakpenyewa (lepaskunci)Bersedia ditempatkan 1 ( satu) orang pengawas di lokasi penyewa ( biaya ditanggung olehkami)PROSES PENGIRIMAN DUMPTRUCK SESUAI DENGAN KEMAMPUAN DEALER MAX 1BLN (PROSES PEMBUATAN DUMP 2 MINGGU)Tahapan pengiriman tergantung dari ready stock dari dealer/ dibicarakan lebih lanjutBiaya mobilisasi ke tempat penyewa ditanggung penyewaPihak penyewa wajib menjaga kondisi seluruh unit dumptruk dengan baik. Termasuk interiorkemudi/ head truckApabila terdapat hal– hal yang belum tercantum ke mekanisme penyewaan akan dibicarakanlebih lanjut dengan penyewa.
KETENTUAN RITASE/ KUBIKASI/ TONASE:- Mengirimkan/ ada MOU/ LOI/ PO- Survey Lokasi- Ketentuan Perhitungan Berdasarkan Analisa- Pembayaran Negotiable
PERINGATAN :KAMI HANYA BERTANGGUNG JAWAB TERHADAP TRANSAKSI MENGGUNAKAN REKENINGPERUSAHAAN
3 of 6 10/30/2015 3:54 AM
BCA KENJERAN SURABAYA : 4693005* * * ( HUB BY PHONE)APABILA ADA TRANSAKSI MASUK KE REK SELAIN TERSEBUT DIATAS, MAKA KAMI TIDAKBERTANGGUNG JAWAB TERHADAP PROSES, TRANSAKSI DAN PENGIRIMAN ARMADA.
MANAJEMEN PT RKM
GALERI FOTO
4 of 6 10/30/2015 3:54 AM
Tweet 0Share this Article on :
Label: Jawa Timur, KONTRAKTOR, SEWA ALAT BERAT, Surabaya
Visitors
2ShareShare
5 of 6 10/30/2015 3:54 AM
143,838© Copyright Portal Alat Berat - Jual/Beli/Sewa Alat Berat 2010 -2011
6 of 6 10/30/2015 3:54 AM