Mine Backfill - Design & Operational Integration Course PATERSON & COOKE Presents: WILLET GREEN MILLER CENTRE, SUDBURY, ONTARIO, CANADA AUSTRALIA CANADA CHILE SOUTH AFRICA UK USA Content & Program The three-day technical course consists of 26 lectures, case studies and lab demonstrations followed by an optional one-day site visit to the Kidd Mine, a Glencore Operation, in Timmins, Ontario to examine its paste backfill system including surface and underground visits. This is a unique opportunity to combine technical and practical learning to achieve a rounded, comprehensive introduction to backfill. The course will be given in English. Course Introduction Backfilling - not the most glamorous step in the mining cycle, but some say the most important; one that directly influences safety, environment and profitability. The choice of backfilling method is not only site specific, but project specific. Often project constraints such as timeline, cash flows and regional skills impact the choice of backfill method, as they rightfully should. The best method allows for the highest ore recovery at the quickest cycle time for the lowest cost; all while meeting the project’s environmental, safety and economic drivers. The successful implementation of a backfill system is dependent on a sound understanding of the requirements, the material properties, process engineering, hydraulic reticulation design, geo-mechanics and placement strategies and effective operational management to integrate backfill successfully within the mining cycle. 02-05 JUNE 2015 On completion of the course, delegates will have an appreciation of the requirements for the design and operation of a safe and reliable backfill system. The course objectives are to: Introduce the fundamental concepts of geo-mechanics and material properties which underpin decision- making when developing a backfill design; Examine the various elements that go into engineering a backfill system, including plant and process design, reticulation design and barricades; Relate to operational aspects of a backfill system including quality testing and monitoring, operational management plans, risk control and implementation. Objectives The course is presented by senior staff from Paterson & Cooke, with contributions from Mine Design Engineering and other guest speakers. All key lecturers will be available throughout the week for discussion and questions. Rob Brown (Canada) Principal (Mining) Engineer, leads P&C’s global backfill group and specializes in pastefill system design and construction. Jaco Snyman (South Africa) Senior (Civil) Engineer, provides his experience on mining projects, backfill studies and detailed engineering. Maureen McGuinness (Canada) Senior (Process) Engineer, specializes in pipeline wear and adds direct operational experience from her years managing the Kidd Mine pastefill system. Stephen Wilson (UK) Senior (Mining) Engineer, adds international expertise from mining in Russia and the integration of tailings disposal and backfill technologies. Ike Isagon (Canada) Senior (Backfill) Specialist, brings nearly 30 years of international mining experience and risk assessment expertise to the course. Dr Ben Thompson (Canada) Senior (Geomechanics) Consultant with MDE, presents his experiences with in-stope backfill monitoring programs and the latest technology. Presenters Kidd Mine Paste Backfill Plant, Timmins, Ontario

PATERSON & COOKE Presents: Mine Backfill - Design ... Backfill - Design & ... Mine Backfill - Design & Operational Integration Course WILLET GREEN MILLER CENTRE, ... Plant Design Principles

Embed Size (px)

Citation preview

Page 1: PATERSON & COOKE Presents: Mine Backfill - Design ... Backfill - Design & ... Mine Backfill - Design & Operational Integration Course WILLET GREEN MILLER CENTRE, ... Plant Design Principles

Mine Backfill - Design & Operational Integration Course

P A T E R S O N & C O O K E P r e s e n t s :

W I L L E T G R E E N M I L L E R C E N T R E , S U D B U R Y , O N T A R I O , C A N A D A

A U S T R A L I A C A N A D A C H I L E S O U T H A F R I C A U K U S A

Content & Program

The three-day technical course consists of 26 lectures, case studies and lab demonstrations followed by an optional one-day site visit to the Kidd Mine, a Glencore Operation, in Timmins, Ontario to examine its paste backfill system including surface and underground visits. This is a unique opportunity to combine technical and practical learning to achieve a rounded, comprehensive introduction to backfill. The course will be given in English.

CourseIntroduction

Backfilling - not the most glamorous step in the mining cycle, but some say the most important; one that directly influences safety, environment and profitability. The choice of backfilling method is not only site specific, but project specific. Often project constraints such as timeline, cash flows and regional skills impact the choice of backfill method, as they rightfully should. The best method allows for the highest ore recovery at the quickest cycle time for the lowest cost; all while meeting the project’s environmental, safety and economic drivers.The successful implementation of a backfill system is dependent on a sound understanding of the requirements, the material properties, process engineering, hydraulic reticulation design, geo-mechanics and placement strategies and effective operational management to integrate backfill successfully withinthe mining cycle.

0 2 - 0 5J U N E 2 0 1 5

On completion of the course, delegates will have an appreciation of the requirements for the design and operation of a safe and reliable backfill system. The course objectives are to:

Introduce the fundamental concepts of geo-mechanics and material properties which underpin decision-making when developing a backfill design;Examine the various elements that go into engineering a backfill system, including plant and process design, reticulation design and barricades;Relate to operational aspects of a backfill system including quality testing and monitoring, operational management plans, risk control and implementation.

Objectives

The course is presented by senior staff from Paterson & Cooke, with contributions from Mine Design Engineering and other guest speakers. All key lecturers will be available throughout the week for discussion and questions.Rob Brown (Canada) Principal (Mining) Engineer, leads P&C’s global backfill group and specializes in pastefill system design and construction.Jaco Snyman (South Africa) Senior (Civil) Engineer, provides his experience on mining projects, backfill studies and detailed engineering.Maureen McGuinness (Canada) Senior (Process) Engineer, specializes in pipeline wear and adds direct operational experience from her years managing the Kidd Mine pastefill system.Stephen Wilson (UK) Senior (Mining) Engineer, adds international expertise from mining in Russia and the integration of tailings disposal and backfill technologies.Ike Isagon (Canada) Senior (Backfill) Specialist, brings nearly 30 years of international mining experience and risk assessment expertise to the course.Dr Ben Thompson (Canada) Senior (Geomechanics) Consultant with MDE, presents his experiences with in-stope backfill monitoring programs and the latest technology.

Presenters

Kidd Mine Paste Backfill Plant,Timmins, Ontario

Page 2: PATERSON & COOKE Presents: Mine Backfill - Design ... Backfill - Design & ... Mine Backfill - Design & Operational Integration Course WILLET GREEN MILLER CENTRE, ... Plant Design Principles

P A T E R S O N & C O O K E P r e s e n t s :

0 2 - 0 5J U N E 2 0 1 5

Mine Backfill - Design & Operational Integration CourseW I L L E T G R E E N M I L L E R C E N T R E , S U D B U R Y , O N T A R I O , C A N A D A

The agenda is presented for information purposes only and illustrates the topics that will be covered; adjustments are not expected, but may be required at the organizer’s discretion.

Note:

Fees &Registration

Space is limited for the site visit. Registration for the site visit will be on a first come, first served basis.

The sponsor reserves the right to cancel the course and return registration fees if enrollment is insufficient. Personnel substitutions may be made at any time without penalty.

Registration DateOn or before April 24th, 2015

After April 24th, 2015

Three Day Technical CourseCAD 1900

CAD 2200

One Day Site VisitCAD 1000

CAD 1300

The course will be held from Tuesday, June 2nd through Friday, June 5th, 2015. The first three days will be held in the Willet Green Miller Centre, Sudbury, Ontario with visits to P&C’s backfill laboratory. The optional fourth day covers a visit to the Kidd Mine, in Timmins, Ontario, which will require an overnight stay in Timmins. Transportation by bus and one nights’ accommodation is included in the site visit fee.

Dates& Venue

Registration Enquiries: Gesa Witte, [email protected] Enquiries: Maureen McGuinness, [email protected] & Cooke Canada Inc., 1351-C Kelly Lake Road, Unit 2, Sudbury, Ontario, Canada P3E 5P5

Contact

CourseAgenda

Session

07:45–08:00

08:00–10:00

12:30–13:30

10:00–10:30

10:30–12:30

13:30–15:00

15:00–15:30

15:30–17:00

Evening

The course is designed for all professionals involved in backfill applications, including:Mining and geotechnical engineersChemical and mineral processing engineersMechanical engineersOperational staff

Who ShouldAttend Project and/or study managers

Equipment and reagent vendorsBusiness decision makers Government legislators and policy makers

A U S T R A L I A C A N A D A C H I L E S O U T H A F R I C A U K U S A

Tuesday June 02

Tea/Coffee

Backfill Overview

Course Introduction

Backfill SelectionsConsiderations

Material Testing 2

Material Testing 1

Plant Design Principles

Plant Design PitfallCase Study

Lunch

Tea/Coffee break

Key EquipmentSelection

Tea/Coffee break

Lab Demo -Material Testing

Social Function

Case Study -Backfill Systems

Registration (07:15 - 08:00)

Friday June 05

Travel to Kidd Mine

07:00 - 09:00

Kitting up

Visit Briefings

Site Induction

09:00 - 11:00

GROUP 2:UndergroundDistribution System Tour

GROUP 1:Paste Plant Tour

11:00 - 12:00 Lunch

12:00 - 14:00

GROUP 1:UndergroundDistribution System Tour

GROUP 2:Paste Plant Tour

14:00 - 19:00

End of Site Visit

Tour Wrap-upTravel to Sudbury by Bus

(Departure 06:30)

Wednesday June 03

Tea/Coffee

ReticulationSystem Operation

ReticulationSystem Design

Breakout Session

Quality Control& ReconciliationRisk Assessment

Instrumentation

Lunch

Tea/Coffee break

Pipeline Wear -Case Study

Lab Demo -Dewatering & Rheology

Tea/Coffee break

Backfill Binders &Cement Chemistry

Evening Free

Backfill Admixtures& Chemical Additives

Thursday June 04

Tea/Coffee

BackfillGeo-mechanicsBarricade DesignBackfill Placement& Monitoring

Backfill System Management& Integration

Lunch

Case Study - Kidd MineWrap Up Discussion

Tea/Coffee break

Backfill Economics& Life Cycle Planning

Case Study -Backfill Effecton Mine Production

End of 3 Day Course