AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz. Table of Content. 1.- Cryomagnet Current Source CCS Electrical Tests CCS Thermal Tests 2.- CSP System Current Lead Detector Module 3.- Valve Electronics Status PS module CSP PWR DRV module CSP TM/TC - PowerPoint PPT Presentation

Citation preview

Page 1: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

AMS02 TIMCAB Project Status

JSC, January 2007Prepared by H. Cuesta / G. Muñoz

Page 2: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

2

January 2007 AMS02 CAB Status Report (JSC January 2007)

Table of Content

1.- Cryomagnet Current Source CCS Electrical Tests CCS Thermal Tests

2.- CSP System Current Lead Detector Module

3.- Valve Electronics Status PS module CSP PWR DRV module CSP TM/TC

4.- CAB Schedule

Page 3: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

3

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System

Activities of the CCS Current Source

CCS Current Source tested in Thermal Vacuum Chamber at CRISA facilities

CCS Set-up preparation during Weeks 48 and 49 of 2006

Electrical and Thermal Tests of CCS Current Source performed before Christmas.

Page 4: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

4

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 5: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

5

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 6: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

6

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 7: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

7

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 8: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

8

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 9: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

9

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

CCS Electrical Test Campaign (Crisa facilities)

CCS electrical design verified at different temperatures and in Vacuum.

CCS Functionality in Vacuum conditions Good Performances of Voltage, Power and Current control loops of the current source

CCS Current Source operating in Ramp-up Sequence and Steady State

Active Load used for CCS electrical Tests

CCS operating in Short-Circuit conditions simulating Persistent Switch closed

Measured values of the CCS power dissipation similar to the typical values of the calculated power budget of the CCS.

Page 10: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

10

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 11: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

11

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 12: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

12

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 13: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

13

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 14: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

14

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

CAB POWER LOSSES (W)

0

100

200

300

400

500

600

700

-10 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150TIME (min)

POW

ER D

ISSI

PATI

0N (W

)

Page 15: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

15

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

CCS Vacuum and Thermal Test Campaign (Crisa facilities)

CCS Thermal Design Validation as main objective

Hottest temperature Monitoring during Ramp-up sequence and Steady State

Additional Thermocouples included to monitor the hottest points of CCS

CCS Thermal Test Report, including description of the Thermal Model used and the correlation with CAB detailed Thermal Model, is under preparation. It will be distributed to TWG for review.

Page 16: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

16

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 17: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

17

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 18: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

18

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Vacuum and Thermal Tests)

Page 19: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

19

January 2007 AMS02 CAB Status Report (JSC January 2007)

1.- CCS System(CCS Pending Actions)

Protections at CCS board level OC Protection Circuitry of the of the SR Power Supply of the 28V Interpoint CV modules Update the UV protection values at 109V instead of 95V Current Limitation at 95A for each CCS converter board Add TVS at the input stage of the SC SW

Protection circuitry Design, Manufacturing and Tests foreseen between Jan_07 and Apr_07

Protections at the CCS output Crisa has assessed the need of adding TVS “Transient Voltage Suppressors” at CCS output To foresee Transient voltages when opening the Persistent Switch at the end of Ramp up sequence or

opening the SC SW in case of aborting the Ramp up sequence during a power loss Objective: To protect the Mosfet of the SC SW during the Ramp up sequence Electrical design is available Physical design is on going

Calibration Procedure of the CCS Current Shunt (200)

Page 20: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

20

January 2007 AMS02 CAB Status Report (JSC January 2007)

2.- CSP system(CSP_CL_DET Board & CSP_DET_CV Board)

Page 21: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

21

January 2007 AMS02 CAB Status Report (JSC January 2007)

2.- CSP system(CSP_CL_DET Board & CSP_DET_CV Board)

Detection Function of the CL Voltages and Temperatures

New threshold values for CL voltages and temperatures defined by SCL

WARNING LEVEL (the user has time to discharge the magnet manually) Current lead cold side: 15 mV (instead of 80mV) Current lead warm side: 75 mV (instead of 80mV) Current lead temperature: 155 K (instead of 250K)

ALARM LEVEL (triggers a quench autonomously) Current lead cold side: 45 mV (instead of 100mV) Current lead warm side: 110 mV (instead of 100mV)

Page 22: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

22

January 2007 AMS02 CAB Status Report (JSC January 2007)

3.- Valve Electronics Status

CCSC Power Switches module Electrical definition Pressure and Vacuum sensors Valve Configuration Valve Control and Timing Valve Power & Monitoring External I/F Block Diagrams of the valve control architecture Preliminary Schematics On going Tasks (Electrical Design Revision, WCA, PSA) in Dec06 and Jan07 PCB Physical design foreseen in Jan/Feb 2007 PCB Manufacturing in Feb/March 2007 Board Population in March 2007 CCSC Power Switches board Tests in April 2007

Page 23: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

23

January 2007 AMS02 CAB Status Report (JSC January 2007)

3.- Valve Electronics Status

CSP Power Drivers module CSP TM/TC module

Electrical definition Valve Configuration (Control, Timing, Power and Monitoring) External I/F for the valves Block Diagrams of the valve control architecture Preliminary Schematics RDS and AQS sequences updated Update of the FPGA_CSP technical Specification in Dec06/Jan07 Power control of the CD & CL TMP heaters CSP PWR DRV module Design of the FPGA_CSP foreseen for Feb/March 2007 Pending Tasks (Electrical Design Revision, WCA, PSA) in Jan 2007 PCB Physical design foreseen in Feb 2007 PCB Manufacturing in Mar 2007 Board Population in Apr 2007 CSP board Tests in May 2007

Page 24: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

24

January 2007 AMS02 CAB Status Report (JSC January 2007)

4.- CAB Schedule

The current schedule provides the following delivery dates

CAB EM pending boards To be finished May 2007

CAB EM model: 31 July 2007

CAB EM model Integration Tests at Culham, from 17th Sep 2007 (TBC)

CAB Flight model: 20th May 2008

Page 25: AMS02 TIM CAB Project Status  JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

25

January 2007 AMS02 CAB Status Report (JSC January 2007)

4.- CAB Schedule