21
The Silicon Tracker of AMS02 The AMS02 Experiment and its Goals The Silicon Tracker of AMS02 Design & Overview Production and Assembly (Silicon, Frontend, Readout) Testbeam Results & Performance Outlook & Conclusions Daniel Haas DPNC Geneva 6th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Firenze, 29 Sep - 1 Oct 2003

The Silicon Tracker of AMS02

Embed Size (px)

DESCRIPTION

The Silicon Tracker of AMS02. Daniel Haas DPNC Geneva 6th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Firenze, 29 Sep - 1 Oct 2003. The AMS02 Experiment and its Goals The Silicon Tracker of AMS02 Design & Overview - PowerPoint PPT Presentation

Citation preview

Page 1: The Silicon Tracker of AMS02

The Silicon Tracker of AMS02

● The AMS02 Experiment and its Goals● The Silicon Tracker of AMS02

Design & Overview Production and Assembly (Silicon, Frontend, Readout) Testbeam Results & Performance

● Outlook & Conclusions

Daniel HaasDPNC Geneva

6th International Conferenceon Large Scale Applications

and Radiation Hardnessof Semiconductor Detectors

Firenze, 29 Sep - 1 Oct 2003

Page 2: The Silicon Tracker of AMS02

The AMS02 Experiment

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 2

Acceptance ~ 0.45 m2srWeight ~ 6 tons

Power ~ 2 kW

Page 3: The Silicon Tracker of AMS02

AMS02 - Physics Goals

● Search for Antimatter Improve Limits of AMS01 Increased Sensitivity Energy Range of O(1-10 TV/c) Anti-Helium Cosmic Antimatter Anti-Carbon Anti-Stars

● Search for Dark Matter High statistics for e, Antiprotons and Spectra

● Cosmic Ray Studies Precision measurements of light isotopes

● Sources of High Energy Photons● AMS02 is foreseen on ISS in November 2005

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 3

Page 4: The Silicon Tracker of AMS02

Silicon Tracker – Overview...● 2264 Sensors

Doublesided Silicon ~ 6.4m2 total 1024 channels each Combined into Ladders of 7-15 sensors,

around 200k channels● 8 layers on support planes

2 external planes - 1 layer each 3 internal planes - 2 layers each

● Goals: Track charged particles Measure rigidities p/Z up to O(10 TV)

with (p)/p ~ 1.5 % Identify elements via dE/dx

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 4

Page 5: The Silicon Tracker of AMS02

Silicon Tracker – Collaboration

● University of Geneva, Switzerland● INFN - University of Perugia, Italy● RWTH-I Aachen, Germany● National Central University, Taiwan● CERN, Switzerland● University of Turku, Finland● NIKHEF, Netherlands● NLR, Netherlands

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 5

Page 6: The Silicon Tracker of AMS02

...Silicon Tracker – Ladders

Two-sided silicon is used

K-side (n) has 384 channelsS-side (p) has 640 channels

Ladder is reinforced with Airex

Channels are bonded to Frontend

Pitch S-side K-side Implantation Readout

27.5 m 104 m110 m 208 m

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 6

Page 7: The Silicon Tracker of AMS02

...Silicon Tracker – Ladders

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 7

Page 8: The Silicon Tracker of AMS02

...Silicon Tracker – Frontend

● Frontend produced by IDEas, Norway

● AC coupling with PreAmp via Capacitors

● 64 channel PreAmp/Shaper● Multiplexed analog readout

Upilex foil is used on K-sideto connect to Frontend

Daisy chained on S-side

~11.000 bonds for 12-sensor ladder

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 8

Page 9: The Silicon Tracker of AMS02

...Silicon Tracker – Assembly

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 9

Page 10: The Silicon Tracker of AMS02

...Silicon Tracker – Electronics

Tracker Data Reduction Board (TDR)● Collect analog data and digitize it● Perform online data compression

Remove Pedestals Calculate and Remove Common Noise Search Clusters

Tracker Bias Supply (TBS)Power Supply for FrontEnd (TPSFE)

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 10

Page 11: The Silicon Tracker of AMS02

Testbeam Evaluation● Testbeam at CERN SPS, Oct 2002

20 GeV/c Protons and Fragmented Ions 1 week of DAQ, ~107 events on disk Study of Resolution, dE/dx etc...

● Testbeam at CERN PS, Jun 2003 10 GeV/c Protons Study of Shaping Time, Resolution etc...

Under Preparation:● Testbeam at CERN SPS, Oct 2003

New quasi final electronics● Testbeam at GSI Darmstadt, Nov 2003

Dedicated Ion runs (12C etc...)

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 11

Page 12: The Silicon Tracker of AMS02

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 12

Testbeam Evaluation – Setup...

Page 13: The Silicon Tracker of AMS02

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 13

Testbeam Evaluation – ...Setup

6 Silicon Ladders(connected to Tracker Electronics)

Beam

line

← NIM-Crate

← DC/DC-Converter

← Tracker Electronics

← DAQ PC

(connected to Control

Room Run Control)

Page 14: The Silicon Tracker of AMS02

Testbeam Results – Shaping Time● K-Side

Best shaping time around 4-5 s

● S-Side Best shaping time

around 2.5-3.5 s

Electronics can handle different shaping times

Bill BurgerPre

limin

a

ry

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 14

Page 15: The Silicon Tracker of AMS02

Prelim

ina

ry

Testbeam Results – Signal to Noise

Bill Burger

Signal to Noise of ~8 on S-Side and ~6.5 on K-side for Protons

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 15

Page 16: The Silicon Tracker of AMS02

Testbeam Results – Resolution

Resolution around 20-30 m in x (K-side) and 8-10 m in y (S-side)(this corresponds to the expected resolution of 110 m/12 and 27.5 m/12)

Prelim

ina

ry

Bill Burger

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 16

Page 17: The Silicon Tracker of AMS02

Testbeam Results – Raw Data● Raw Data:

4He is cut away Different dynamic

behaviour of S and K Side

● Correct charge integral: for center-of-gravity for each Z for each PreAmp Calculate truncated

charge for S and K

Bill Burger

Prelim

ina

ry

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 17

Page 18: The Silicon Tracker of AMS02

K-Side

Testbeam Results – Center-of-Gravity

Apply Correction

Philipp Azzarello

Prelim

ina

ry

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 18

Page 19: The Silicon Tracker of AMS02

Testbeam Results – corrected...

Philipp Azzarello

Prelim

ina

ry

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 19

Page 20: The Silicon Tracker of AMS02

Testbeam Results – ...corrected

Philipp Azzarello

Prelim

ina

ry

Prelim

ina

ry

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 20

Page 21: The Silicon Tracker of AMS02

Conclusions● AMS02 silicon tracker is on schedule

Ladder Production nearly finished Assembly of planes has started and is going well Production of readout electronics is ongoing

● Silicon ladders show excellent performance Good Signal to Noise Resolution of ~20-30 m for x and ~8-10 m for y

confirm expected performance● dE/dx results outperform expectations

Elements up to Nickel could be identified BUT: careful study of corrections is necessary

● More studies on upcoming testbeams...

D. Haas Firenze, 29 Sep - 1 Oct 2003, page 21