16
Ameland: Frontrunner in the Energy Transition e.g. VPP Project with 45 Fuel Cells as part of an island wide Smart Grid, large H2 project Jacob Dijkstra, on behalf of the municipality of Ameland Zurich : 01-07-2019

Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Ameland: Frontrunner in the Energy Transition e.g. VPP Project with 45 Fuel Cells as part of an island wide Smart Grid,

large H2 project

Jacob Dijkstra, on behalf of the municipality of Ameland Zurich : 01-07-2019

Page 2: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

About Ameland

• One of the Dutch Wadden Sea isles

• 3,600 inhabitants

• 27 kilometres of sandy beaches

• 550,000 – 600,000 visitors per annum

• Quality of life is driver for ambitions on

sustainability

• 2,200,000 overnight stays

• Self sufficiency second nature

Page 3: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

How it started in 2007

Page 4: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Partners then and now

Then

Some early projects

• Mixing hydrogen with natural gas in existing grid

• Natural gas fueling station for public transportation

• 30 HRe furnaces installed in local homes

Now

Some later projects

• Energy neutral high school

• Solarpark Ameland (6 Mw)

• 45 Fuel cell units installed

• Innovative Led Public lighting

• 100 Hybrid heat pumps installed (and counting) on the island

( and many more)

Page 5: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

AMELAND SUSTAINABLE ENERGY

AMBITION

council, municipal executive,

management, employees

tourists, home owners, holiday home owners,

commuters

residents, companies, associations/foundations

Portfolio holders consultation

Wetterskip

ministries

Site managers

energy region

VNG

WEST FRISIAN ISLANDS

MANAGEMENT GUESTS RESIDENTS

VILLAGE INTERESTS

WADDEN CAMPUS

PROVINCE/STREEKWERK

CENTRAL GOVERNMENT

RVO

SUSTAINABLE AMELAND COVENANT

AEC

EnTranCe

Page 6: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Some projects in pictures

Page 7: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

From Fuel cells to Energy Transition

With the completion of our solar park, Ameland reached the maximum feed-in capacity of the local grid. The ability to keep the local grid stable was at its limit.

(All with just 1 project! )

Page 8: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

From Sustainable Energy to Energy Transition

because of the VPP Fuel Cells

Page 9: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

EnTranCe Movie

Page 10: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Energy consumption on the island

Islanders 3.600 Inhabitants Public buildings Local Transport

300 TJ 50% 20% 30%

Tourists 2,2 Overnight stays 1300 Trailers / chalets 1600 Recreational houses 38 Swimming pools Companies targeting tourist

200 TJ 75% 25%

Transport 620.000 Ferry passengers per Year

200 TJ 100%

Industry 3 production locations Natural gas production equals the use in the province of Friesland

450 TJ 100%

Page 11: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

44 TJ

92 TJ

142 TJ 102 TJ

EILAND (2017)

Balanceren Electriciteit

Balanceren Gas

TJ

20 TJ TJ

TJ

TJ 2 TJ

58 TJ

TJ

244 TJ

135 TJ

...TJ

LOSS 15 loss 10

TJ TJ

127 TJ

TJ 76 TJ

...TJ ...TJ...TJ...TJ

TJ TJ

...TJ

IMPORT

Brandstof211 TJ

...TJ

LOSS

LOSS

54 TJ TJ

81TJ

LOSS

46TJ

LOSS

STORAGE

STORAGE STORAGE

STORAGESTORAGE

FUEL CELL

Solar

Tidal / Wave

Wind

Transformer

PV

MAINLAND

GEO THERMAL

TJ

BOX 1 BOX 2

BOX 3BOX 1/2BOX 4

finalfinal final final final finalfinal

TJ

...TJ...TJ

LOSS

WOONKERNEN

30 TJ

final

44 TJ 37 TJ

TJ

Other

...TJ

37 TJ

MIX

TJ

CVHP HP CV

PV PVFC FC

Page 12: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Ameland EnergyNet:

Futureproof, reproducible energy network with supply and

demand in near balance by smart management and flexible

infrastructure

Page 13: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

EnergyNet Ameland

• Ambition is to be 15 years ahead in the Energy transition: Reduce the CO2 emissions with 95% by 2030

• Works hard on an affordable and reliant, CO2 neutral energy system

• Leads by example in the Netherlands and Europe

Connecting the industry with local grid

Cluster of projects:

- 3 MWp DC solar park - High pressure fermenter - 1,5 – 3 MW electrolyzer - 3 MW accupack for local balancing and

national balancing

500 kW TidalKite (Seaqurrent) for sustainable base load production of green energy.

1 MW Fuel cell connected to a local heat net on the largest recreational park

Clever Grid connection upgrades to prevent additional cables

Island wide residential energy savings campain

Page 14: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

How do we involve the residents

Households/families/companies reached with projects:

• 80 bondholders of Zonnepark Ameland BV;

• 45 methane fuel cells installed;

• 140 recommendations provided to households from the Sustainable Construction Desk;

• 95 saving/generation measures for dwellings – municipal subsidies;

• 35 saving/generation measures for dwellings – provincial subsidies;

• 120 saving measures for municipal rented accommodation;

• 133 hybrid heat pumps installed in dwellings;

• 60 participants in energy charrettes;

• 300 members and 1,000 customers of the Ameland Energy Cooperative.

Of the island's 1,600 households, we have had talks at their kitchentable with over

1000 !

Page 15: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Energy; but a lot more

Energy

Spatial Quality

Local services

New Economy

Connecting cycles

Page 16: Ameland: Frontrunner in the Energy Transition · 2019. 3. 7. · About Ameland • One of the Dutch Wadden Sea isles • 3,600 inhabitants • 27 kilometres of sandy beaches • 550,000

Questions ?

Or Remarks