Purpose of BriefingPurpose of Briefing
Provide information on Army Aviation Mission Planning System (AMPS)
Communicate need to thoroughly coordinate changes in geospatial data used by DoD aircraft flight management systems
AME/ame_pmr_amps.ppt #3
AgendaAgenda
Overview
System Description/Status
Concept of Operations
Acquisition Strategy
Software Development Schedule
Supported Platforms/Common Avionics Insertion
Conclusion
AME/ame_pmr_amps.ppt #4
Benefits / Capabilities
Description
Concept of Operations
Planning/battle synchronization tool, which automates aviation mission planning tasks Route generation Performance planning Communications Planning Terrain Analysis Data Transfer Mission Rehearsal
Provides connectivity to Army Battle Command System
Mission Planning - Disseminates mission and map data from Brigade to Battalion and Company level
Flight Planning – Weather, Performance Planning, Weight and Balance
Data Loading – Navigation, Communications, and Weapons
Aviation MissionAviation MissionPlanning SystemPlanning System
AME/ame_pmr_amps.ppt #5
AMPS Hardware (current)AMPS Hardware (current)
MILTOPE TSC-750M CPU: 1.3 GHz Pentium® M (Intel® Centrino® chipset) Hard Drive: 40 GB Display: 13.3” Sunlight
readable (1024x768) DRAM: 1 GB Video RAM: 64 MB OS: Windows 2000 Meets all AMPS ORD environmental and ruggedization requirements Fielding 3QTR CY03 through 3QTR CY04 in conjunction
with PFPS-Army 3.3 software Manufactured by MILTOPE Corp., Hope Hull, AL
AME/ame_pmr_amps.ppt #6
Puerto Rico - 3USVI - 1
D.C. - 3
16
17
84
136
27
32
4912
13
318
5
20
8
3
8
96
16 15
139
8
13 8
81520
11
68
9
5
42
30
23
12
87
10
7
4
5
3
2413
107
20
4
93
69
AMPS System DensityAMPS System Density
Total Requirement 1149
AME/ame_pmr_amps.ppt #7
AFATDS
I II
MANEUVER BRIGADE
AMPS Battlefield Information ExchangeAMPS Battlefield Information Exchange
AVTOC
ASAS
IMETS CSSCS
X
FAADC2
AMPSLNO
MCS
AMPSLNO
TacticalInternet
NGA products
NGA products
NGA products
AME/ame_pmr_amps.ppt #8
AMPS External InterfacesAMPS External Interfaces
Air ForceAir Force
NavyNavy
SOCOMSOCOM
ADOCSADOCS
CRD (XML)ATO, ACO (USMTF)SA (XML) MIDB QueriesCOP Updates
CRD (XML); S
A (XML)
MCSMCS
SA JCDB (USMTF)
IMETSIMETS
Weather (USMTF)
TAISTAISAirspace (USMTF)
MCS LightMCS Light SA (XML)
ACESACES
Com
ms D
ata
AMPS
JMPS
MOTSMOTS
ASMISASMIS
Flight Hazard Data (XML)
ASAS(MIDB)ASAS(MIDB)
Red
Pictu
re
(US
MT
F)
CAPESCAPESAMDWSAMDWS
TUAV/SUAV/OAVTUAV/SUAV/OAV
Data
Tran
sfer
Car
tridg
e;
JVM
F; T
ACFIRE; A
FAPD
ProposedProposed
ACTDACTD
CurrentCurrent
JointJoint
Join
t In
terf
aces
HF TrackerHF TrackerSA
Falconview Route File
XML; .
doc fil
e
Air
spac
e (U
SM
TF
)
AME/ame_pmr_amps.ppt #9
AMPS Program Strategy To DateAMPS Program Strategy To Date
Evolutionary Acquisition
First baseline was CECOM C2D-developed software
Initial fielding in 1994 to support OH-58D KW
PM CHS Non-Developmental Item (NDI) hardware
Legacy: AMPS 4.3, 5.1.1, 5.2.1
Fielded PFPS-A v 3.3.0 (Falconview) baseline (Sep 03)
To mitigate warfighting deficiencies identified by then-BG Cody in TF Hawk, primarily Joint operations interoperability
First platform supported was Lot 7 AH-64D LBA
Army functionality extensions to Air Force software (AMCOM SED)
Testing PFPS-A v3.3.0 Release 3 Now!
AME/ame_pmr_amps.ppt #10
AMPS Program Strategy--FutureAMPS Program Strategy--Future
Near Term: PFPS-Army 3.3.x (Falconview)
Will field PFPS-A v3.3.0 release 3 in 1QFY05
Will support all Army rotary-wing Mission Design Series by Spring 2005
Supports Army SW Block I and II
Long Term: JMPS
Multi-service collaborative development under IPT structure (vice JPO)
All services migration to common core planner
First Army supported version JMPS 1.2.4 (Sep 2005)
JMPS 1.4 will support Army SW Block III (2008)
Future Combat System support
AME/ame_pmr_amps.ppt #11
AMPS Software MigrationAMPS Software Migration
FY04 FY05 FY06 FY07
UH-60A/LCH-47DAH-64A ModLB SW V 7
KW CDS 2-4AH-64A ModLB SW V 1- 6CH-47DUH-60A/L
KW CDS 2-4AH-64A ModLB SW V 6CH-47DUH-60A/L
UH-60A/LCH-47DAH-64A ModLB SW V 6, 8KW CDS 2, 4 IIbUH-60Q, HH-60L
UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V6.1/6.01, 9KW CDS 2, 4 IIb, Blk 1LB SW V 10
UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V 6, 8KW CDS 2, 4 IIbLB SW V 6.1/6.01, 9KW CDS 4 Blk 1
FY08
AMPSAMPS
PFPS/JMPSPFPS/JMPS
AMPSPFPSAMPS
PFPS
JPS-AAMPS
PFPS
JMPS
AMPS
PFPS-A
PFPS-A
PFPS-A UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V6 thru V10KW CDS 2, 4 IIb, Blk 1CH-47DLB SW V 11 (UAV)CH-47FUH/HH-60M
AME/ame_pmr_amps.ppt #12
Map-Related Data LoadingMap-Related Data LoadingRequirementsRequirements
AH-64D, Blk 3(fielding 2008)
CH-47F(fielding 2007)
OH-58D KW, CDS4
HH/UH-60M(fielding 2008)
CH-47D (128D)
OH-58D KW, CDS 2
UH-60A/L/Q(128D)
AH-64A Mod
Digital map-equipped Entity location data only
Armed Recon Helicopter
Advanced Common Sensor
Approximately 2,900 aircraft
AH-64D, Blk 2
AH-64D, Blk 1
AME/ame_pmr_amps.ppt #13
MessageMessage
Army Aviation fleet modernization programs
Are being designed to accept NGA products to support tactical operations
On board optimized run-time environments are architecturally rigid
DoD aircraft flight management systems are minimally three years from contract award to fielding, preceded nominally by at least one year of government requirements specification
Post-initial fielding upgrades are 18-24 months in development
It is imperative that changes being evaluated to “foundation” geospatial data be thoroughly coordinated with supported Aviation platforms to:
Include fleet-wide impacts as part of decision criteria
Program required technology insertions and funding for changes deemed necessary