14
/ame_pmr_amps.ppt #1 AMPS AMPS Aviation Mission Aviation Mission Planning System Planning System Briefing to DAFIF DWG Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) [email protected] Terry Wales AMPS Program Integrator 256-876-3239 (DSN 746) terry.wales @peoavn.redstone.army.mil 5-7 Oct 2004

AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) [email protected]

Embed Size (px)

Citation preview

Page 1: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #1

AMPSAMPS

Aviation Mission Planning Aviation Mission Planning SystemSystem

Briefing to DAFIF DWGBriefing to DAFIF DWG

MAJ Shawn Powell

APM AMPS

256-876-3238 (DSN 746)

[email protected]

Terry Wales

AMPS Program Integrator

256-876-3239 (DSN 746)

[email protected]

5-7 Oct 2004

Page 2: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #2

Purpose of BriefingPurpose of Briefing

Provide information on Army Aviation Mission Planning System (AMPS)

Communicate need to thoroughly coordinate changes in geospatial data used by DoD aircraft flight management systems

Page 3: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #3

AgendaAgenda

Overview

System Description/Status

Concept of Operations

Acquisition Strategy

Software Development Schedule

Supported Platforms/Common Avionics Insertion

Conclusion

Page 4: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #4

Benefits / Capabilities

Description

Concept of Operations

Planning/battle synchronization tool, which automates aviation mission planning tasks Route generation Performance planning Communications Planning Terrain Analysis Data Transfer Mission Rehearsal

Provides connectivity to Army Battle Command System

Mission Planning - Disseminates mission and map data from Brigade to Battalion and Company level

Flight Planning – Weather, Performance Planning, Weight and Balance

Data Loading – Navigation, Communications, and Weapons

Aviation MissionAviation MissionPlanning SystemPlanning System

Page 5: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #5

AMPS Hardware (current)AMPS Hardware (current)

MILTOPE TSC-750M CPU: 1.3 GHz Pentium® M (Intel® Centrino® chipset) Hard Drive: 40 GB Display: 13.3” Sunlight

readable (1024x768) DRAM: 1 GB Video RAM: 64 MB OS: Windows 2000 Meets all AMPS ORD environmental and ruggedization requirements Fielding 3QTR CY03 through 3QTR CY04 in conjunction

with PFPS-Army 3.3 software Manufactured by MILTOPE Corp., Hope Hull, AL

Page 6: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #6

Puerto Rico - 3USVI - 1

D.C. - 3

16

17

84

136

27

32

4912

13

318

5

20

8

3

8

96

16 15

139

8

13 8

81520

11

68

9

5

42

30

23

12

87

10

7

4

5

3

2413

107

20

4

93

69

AMPS System DensityAMPS System Density

Total Requirement 1149

Page 7: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #7

AFATDS

I II

MANEUVER BRIGADE

AMPS Battlefield Information ExchangeAMPS Battlefield Information Exchange

AVTOC

ASAS

IMETS CSSCS

X

FAADC2

AMPSLNO

MCS

AMPSLNO

TacticalInternet

NGA products

NGA products

NGA products

Page 8: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #8

AMPS External InterfacesAMPS External Interfaces

Air ForceAir Force

NavyNavy

SOCOMSOCOM

ADOCSADOCS

CRD (XML)ATO, ACO (USMTF)SA (XML) MIDB QueriesCOP Updates

CRD (XML); S

A (XML)

MCSMCS

SA JCDB (USMTF)

IMETSIMETS

Weather (USMTF)

TAISTAISAirspace (USMTF)

MCS LightMCS Light SA (XML)

ACESACES

Com

ms D

ata

AMPS

JMPS

MOTSMOTS

ASMISASMIS

Flight Hazard Data (XML)

ASAS(MIDB)ASAS(MIDB)

Red

Pictu

re

(US

MT

F)

CAPESCAPESAMDWSAMDWS

TUAV/SUAV/OAVTUAV/SUAV/OAV

Data

Tran

sfer

Car

tridg

e;

JVM

F; T

ACFIRE; A

FAPD

ProposedProposed

ACTDACTD

CurrentCurrent

JointJoint

Join

t In

terf

aces

HF TrackerHF TrackerSA

Falconview Route File

XML; .

doc fil

e

Air

spac

e (U

SM

TF

)

Page 9: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #9

AMPS Program Strategy To DateAMPS Program Strategy To Date

Evolutionary Acquisition

First baseline was CECOM C2D-developed software

Initial fielding in 1994 to support OH-58D KW

PM CHS Non-Developmental Item (NDI) hardware

Legacy: AMPS 4.3, 5.1.1, 5.2.1

Fielded PFPS-A v 3.3.0 (Falconview) baseline (Sep 03)

To mitigate warfighting deficiencies identified by then-BG Cody in TF Hawk, primarily Joint operations interoperability

First platform supported was Lot 7 AH-64D LBA

Army functionality extensions to Air Force software (AMCOM SED)

Testing PFPS-A v3.3.0 Release 3 Now!

Page 10: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #10

AMPS Program Strategy--FutureAMPS Program Strategy--Future

Near Term: PFPS-Army 3.3.x (Falconview)

Will field PFPS-A v3.3.0 release 3 in 1QFY05

Will support all Army rotary-wing Mission Design Series by Spring 2005

Supports Army SW Block I and II

Long Term: JMPS

Multi-service collaborative development under IPT structure (vice JPO)

All services migration to common core planner

First Army supported version JMPS 1.2.4 (Sep 2005)

JMPS 1.4 will support Army SW Block III (2008)

Future Combat System support

Page 11: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #11

AMPS Software MigrationAMPS Software Migration

FY04 FY05 FY06 FY07

UH-60A/LCH-47DAH-64A ModLB SW V 7

KW CDS 2-4AH-64A ModLB SW V 1- 6CH-47DUH-60A/L

KW CDS 2-4AH-64A ModLB SW V 6CH-47DUH-60A/L

UH-60A/LCH-47DAH-64A ModLB SW V 6, 8KW CDS 2, 4 IIbUH-60Q, HH-60L

UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V6.1/6.01, 9KW CDS 2, 4 IIb, Blk 1LB SW V 10

UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V 6, 8KW CDS 2, 4 IIbLB SW V 6.1/6.01, 9KW CDS 4 Blk 1

FY08

AMPSAMPS

PFPS/JMPSPFPS/JMPS

AMPSPFPSAMPS

PFPS

JPS-AAMPS

PFPS

JMPS

AMPS

PFPS-A

PFPS-A

PFPS-A UH-60A/L/Q (HH-60L)CH-47DAH-64A ModLB SW V6 thru V10KW CDS 2, 4 IIb, Blk 1CH-47DLB SW V 11 (UAV)CH-47FUH/HH-60M

Page 12: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #12

Map-Related Data LoadingMap-Related Data LoadingRequirementsRequirements

AH-64D, Blk 3(fielding 2008)

CH-47F(fielding 2007)

OH-58D KW, CDS4

HH/UH-60M(fielding 2008)

CH-47D (128D)

OH-58D KW, CDS 2

UH-60A/L/Q(128D)

AH-64A Mod

Digital map-equipped Entity location data only

Armed Recon Helicopter

Advanced Common Sensor

Approximately 2,900 aircraft

AH-64D, Blk 2

AH-64D, Blk 1

Page 13: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #13

MessageMessage

Army Aviation fleet modernization programs

Are being designed to accept NGA products to support tactical operations

On board optimized run-time environments are architecturally rigid

DoD aircraft flight management systems are minimally three years from contract award to fielding, preceded nominally by at least one year of government requirements specification

Post-initial fielding upgrades are 18-24 months in development

It is imperative that changes being evaluated to “foundation” geospatial data be thoroughly coordinated with supported Aviation platforms to:

Include fleet-wide impacts as part of decision criteria

Program required technology insertions and funding for changes deemed necessary

Page 14: AME/ame_pmr_amps.ppt #1 AMPS Aviation Mission Planning System Briefing to DAFIF DWG MAJ Shawn Powell APM AMPS 256-876-3238 (DSN 746) shawn.powell@peoavn.redstone.army.mil

AME/ame_pmr_amps.ppt #14

QuestionsQuestions

MAJ Shawn Powell

APM AMPS

256-876-3238 (DSN 746)

[email protected]

Terry Wales

AMPS Program Integrator

256-876-3239 (DSN 746)

[email protected]